CN106223159A - Subgrade drainage structures former and forming method - Google Patents

Subgrade drainage structures former and forming method Download PDF

Info

Publication number
CN106223159A
CN106223159A CN201610839266.4A CN201610839266A CN106223159A CN 106223159 A CN106223159 A CN 106223159A CN 201610839266 A CN201610839266 A CN 201610839266A CN 106223159 A CN106223159 A CN 106223159A
Authority
CN
China
Prior art keywords
gutter
concrete
former
track
filling concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610839266.4A
Other languages
Chinese (zh)
Inventor
未丙岩
张玮
宁旭阳
姜延峰
肖志广
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHINA REILWAY CONSTRUCTION BRIDGE ENGINEERING BUREAU GROUP NO6 ENGINEERING Co Ltd
Sixth Engineering Co Ltd of China Railway Construction Bridge Engineering Bureau Group Co Ltd
Original Assignee
CHINA REILWAY CONSTRUCTION BRIDGE ENGINEERING BUREAU GROUP NO6 ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHINA REILWAY CONSTRUCTION BRIDGE ENGINEERING BUREAU GROUP NO6 ENGINEERING Co Ltd filed Critical CHINA REILWAY CONSTRUCTION BRIDGE ENGINEERING BUREAU GROUP NO6 ENGINEERING Co Ltd
Priority to CN201610839266.4A priority Critical patent/CN106223159A/en
Publication of CN106223159A publication Critical patent/CN106223159A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/224Surface drainage of streets
    • E01C11/227Gutters; Channels ; Roof drainage discharge ducts set in sidewalks

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Sewage (AREA)

Abstract

A kind of subgrade drainage structures former, belong to railway, highway construction technology field, it is characterized in that: the track laying of track travel system is outside gutter on base, operation platform is respectively equipped with filling concrete groove, controls operating board, motor and attached vibrator, it it is funnel-form feeding mouth above filling concrete groove, the corresponding connection of basal plane is constructed at discharging fork respectively with gutter, and the gutter that vibrator is also disposed at is constructed on basal plane.Its forming method is: a, track travel system track laying outside gutter on base, in order to former can in-line arrangement ditch to walking;B, by filling concrete in filling concrete groove, control concrete discharging quantity and the equipment speed of travel;C, vibrator need to be equipped with, its concrete is fully vibrated;D, utilize institute graying slurry, its end face is carried out press polish, water is discharged;E, unlatching travelling control switch, it is ensured that concreting seriality and density.Provide the benefit that: on the premise of ensureing construction quality, be effectively improved efficiency of construction, it is achieved concreting is moulding integrated to be continuously finished, simple to operate, easy.

Description

Subgrade drainage structures former and forming method
Technical field
The invention belongs to railway, highway construction technology field.
Background technology
At present, in railway, Expressway Construction, it is necessary to construct gutter in road on both sides of the road, and gutter is mixed Solidifying soil pours molding and still uses the techniques such as matched moulds, concreting, form removal, labor intensive, financial resources, simultaneously need to longer construction In the cycle, especially rainy season, rainwater was more, brought adverse effect can to construction quality and construction period.
Summary of the invention
It is an object of the invention to: providing a kind of subgrade drainage structures former and forming method, it can need not close In the case of mould, form removal, just can carry out concreting, concreting can be realized moulding integrated.
The technical scheme is that
Its former structure is:
The both sides of the edge of operation platform are provided with track travel system, the track laying of track travel system base outside gutter On, operation platform is respectively equipped with filling concrete groove, controls operating board, motor and attached vibrator, underpants shape Being open funnel-form feeding mouth above filling concrete groove, basal plane pair is constructed with gutter respectively in two discharging forks below Should connect, attached vibrator is also disposed at the gutter of operation platform and constructs on basal plane.
Its forming method is:
A, being provided with track travel system in the both sides of the edge of operation platform, the track laying of track travel system is in gutter On outer base, in order to former can in-line arrangement ditch to walking;
B, by filling concrete in filling concrete groove, control concrete discharging quantity and the equipment speed of travel;
C, this former need to be equipped with 2-5 platform attached vibrator, fully vibrate its concrete, to ensure coagulation Soil vibrates quality;
D, for the complete concrete that vibrates, utilize institute graying slurry, its end face carried out press polish, it is ensured that without counter-slope, suitable Water is discharged by profit;
E, unlatching travelling control switch, it is ensured that concreting seriality and density, it is not necessary to form removal just can be successfully by it Gutter one-shot forming perfusion.
The invention has the beneficial effects as follows: simplify gutter concreting processing technology, before ensureing construction quality Putting, be effectively improved efficiency of construction, this equipment can realize that concreting is moulding integrated to be continuously finished, and operates letter Single, easy.
Accompanying drawing explanation
Fig. 1: be gutter of the present invention concreting moulding integrated device structure plane graph;
Fig. 2: be gutter of the present invention concreting moulding integrated device structure elevation;
Fig. 3: be gutter of the present invention concreting moulding integrated device structure side view.
Detailed description of the invention
Embodiment 1
Below in conjunction with the accompanying drawings the present invention is described further:
As it can be seen, 1 is filling concrete groove;2 is support shuttering;3 is to control operating board;4 is motor;5 is attachment Formula vibrator;6 is running gear;7 is operation platform.
The both sides of the edge of operation platform 7 are provided with track travel system 6, and the track laying of track travel system 6 is in gutter On outer base, making operation platform 7 above gutter, and operation platform 7 can be walked along direction, gutter, at operation platform Being respectively equipped with filling concrete groove 1 on 7, control operating board 3, motor 4 and attached vibrator 5, the concrete of underpants shape fills Note groove 1 is open funnel-form feeding mouth above, it is simple to feeding, and basal plane is constructed even respectively in two forks below with gutter Logical, make concrete enter smoothly in concreting space, gutter, attached vibrator 5 is also disposed at the draining of operation platform Ditch is constructed on basal plane.So along with the walking of operation platform 7, concrete is also fed in concreting space, gutter, executes Concrete discharging quantity to be controlled and the equipment speed of travel in work, prevented cavity appearance.
Forming operation method
1, this equipment need to be equipped with walking track in both sides, in order to equipment can be walked;
2, by concrete-spouting plant feed bin, concrete discharging quantity and the equipment speed of travel are controlled;
3, this equipment need to be equipped with 2-5 platform attached vibrator, fully vibrates its concrete, to ensure that concrete shakes Smash quality;
4, for the complete concrete that vibrates, utilize institute's graying slurry, its end face is carried out press polish, it is ensured that without counter-slope, suitable Water is discharged by profit;
5, travelling control switch is opened, it is ensured that concreting seriality and density, it is not necessary to form removal just can be successfully by it Gutter one-shot forming perfusion.
This perfusion equipment of above-mentioned steps 1 need to be equipped with walking track;Step 2 controls concrete discharging quantity and equipment row Walk speed, prevent cavity appearance;Step 3 is equipped with 2-5 platform attached vibrator, it is ensured that concrete vibrating quality;Step 4 ensures Concrete-face closure presentation quality;Step 5 ensures gutter concrete continuous form.

Claims (2)

1. a subgrade drainage structures former, is characterized in that: the both sides of the edge of operation platform are provided with track travel system, The track laying of track travel system on base, is respectively equipped with filling concrete groove on operation platform, controls behaviour outside gutter Station, motor and attached vibrator, be open funnel-form feeding mouth above the filling concrete groove of underpants shape, below The corresponding connection of basal plane is constructed at two discharging forks respectively with gutter, and attached vibrator is also disposed at the gutter of operation platform Construct on basal plane.
2. constructing a forming method with subgrade drainage structures former, its forming method is:
A, it is provided with track travel system, the track laying of track travel system base outside gutter in the both sides of the edge of operation platform On, in order to former can in-line arrangement ditch to walking;
B, by filling concrete in filling concrete groove, control concrete discharging quantity and the equipment speed of travel;
C, this former need to be equipped with 2-5 platform attached vibrator, fully vibrate its concrete, to ensure that concrete shakes Smash quality;
D, for the complete concrete that vibrates, utilize institute graying slurry, its end face carried out press polish, it is ensured that without counter-slope, smoothly general Water is discharged;
E, unlatching travelling control switch, it is ensured that concreting seriality and density, it is not necessary to form removal just can be successfully by its draining Ditch one-shot forming irrigates.
CN201610839266.4A 2016-09-22 2016-09-22 Subgrade drainage structures former and forming method Pending CN106223159A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610839266.4A CN106223159A (en) 2016-09-22 2016-09-22 Subgrade drainage structures former and forming method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610839266.4A CN106223159A (en) 2016-09-22 2016-09-22 Subgrade drainage structures former and forming method

Publications (1)

Publication Number Publication Date
CN106223159A true CN106223159A (en) 2016-12-14

Family

ID=58076136

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610839266.4A Pending CN106223159A (en) 2016-09-22 2016-09-22 Subgrade drainage structures former and forming method

Country Status (1)

Country Link
CN (1) CN106223159A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106758704A (en) * 2017-02-24 2017-05-31 中铁三局集团有限公司 A kind of gutter disposal molding construction equipment and construction method
CN107326871A (en) * 2017-08-09 2017-11-07 北京铁科特种工程技术开发公司 Sliding formwork equipment, sliding-mode method and its construction method being molded for irrigation canals and ditches
CN110952642A (en) * 2019-11-29 2020-04-03 中国电建集团华东勘测设计研究院有限公司 Construction equipment and construction method for rapid working drainage ditch
CN116254739A (en) * 2023-02-01 2023-06-13 中国一冶集团有限公司 Integral cast-in-situ tool for highway drainage ditch and construction method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2400084A1 (en) * 1977-08-11 1979-03-09 Bouchet Francis Double U=section in-situ poured concrete kerb for highway - contains service cables and is extruded by self-propelled machine with vibrator
CN87104940A (en) * 1987-07-18 1988-02-03 陕西省交口抽渭灌溉管理局 Self-progressive lining-brick laying machine for U-shaped cannels
CN2118749U (en) * 1991-12-19 1992-10-14 义乌市苏溪水利经营管理站 Hand driven type paving machine
CN201354454Y (en) * 2009-01-22 2009-12-02 史根彦 Large section track-type U-shaped channel concrete lining machine
CN201990983U (en) * 2011-03-14 2011-09-28 葛洲坝集团项目管理有限公司 Full-section lining machine for channels
CN104047291A (en) * 2014-06-20 2014-09-17 盐城鑫素元机械制造有限公司 Full-automatic water-saving anti-seepage canal cast-in-place forming machine
CN206070290U (en) * 2016-09-22 2017-04-05 中铁建大桥工程局集团第六工程有限公司 Subgrade drainage structures former

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2400084A1 (en) * 1977-08-11 1979-03-09 Bouchet Francis Double U=section in-situ poured concrete kerb for highway - contains service cables and is extruded by self-propelled machine with vibrator
CN87104940A (en) * 1987-07-18 1988-02-03 陕西省交口抽渭灌溉管理局 Self-progressive lining-brick laying machine for U-shaped cannels
CN2118749U (en) * 1991-12-19 1992-10-14 义乌市苏溪水利经营管理站 Hand driven type paving machine
CN201354454Y (en) * 2009-01-22 2009-12-02 史根彦 Large section track-type U-shaped channel concrete lining machine
CN201990983U (en) * 2011-03-14 2011-09-28 葛洲坝集团项目管理有限公司 Full-section lining machine for channels
CN104047291A (en) * 2014-06-20 2014-09-17 盐城鑫素元机械制造有限公司 Full-automatic water-saving anti-seepage canal cast-in-place forming machine
CN206070290U (en) * 2016-09-22 2017-04-05 中铁建大桥工程局集团第六工程有限公司 Subgrade drainage structures former

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106758704A (en) * 2017-02-24 2017-05-31 中铁三局集团有限公司 A kind of gutter disposal molding construction equipment and construction method
CN107326871A (en) * 2017-08-09 2017-11-07 北京铁科特种工程技术开发公司 Sliding formwork equipment, sliding-mode method and its construction method being molded for irrigation canals and ditches
CN110952642A (en) * 2019-11-29 2020-04-03 中国电建集团华东勘测设计研究院有限公司 Construction equipment and construction method for rapid working drainage ditch
CN110952642B (en) * 2019-11-29 2021-08-31 中国电建集团华东勘测设计研究院有限公司 Construction equipment for rapidly processing drainage ditch and construction method thereof
CN116254739A (en) * 2023-02-01 2023-06-13 中国一冶集团有限公司 Integral cast-in-situ tool for highway drainage ditch and construction method thereof

Similar Documents

Publication Publication Date Title
CN106223159A (en) Subgrade drainage structures former and forming method
CN206143569U (en) Formula of stirring of shaking is slipform by oneself
CN107956490A (en) A kind of intelligent tunnel lining trolley
CN1034602A (en) The mould that is used for constructing pavement boards
CN207920627U (en) A kind of intelligent tunnel lining trolley
CN206070290U (en) Subgrade drainage structures former
CN105563613B (en) Six rib block pavement of road laying methods of goaf
CN209687505U (en) Reinforced concrete frame tunnel, which pours, uses hydraulic template trolley
CN106284789B (en) Construction technology for controlling cast-in-situ floor Forming Quality
CN103422472B (en) U-shaped canal shaped device and forming method
CN209243525U (en) A kind of slip-form machine
CN109797630A (en) A kind of full-automatic numerical control slip-form machine roadbed gutter construction method
CN207495722U (en) A kind of concrete slip-form system
CN102912713B (en) Machine for casting curbs in situ and use method thereof
CN2923827Y (en) Concrete U-shape canal cast-in-situ vibration extending machine
CN105926625B (en) Gate dam overflow surface concrete exempts from backform rapid constructing method
CN203625847U (en) Automatic surface polishing self-propelled channel lining machine
CN202849910U (en) Machine tool for casting kerb in situ
CN110004956A (en) Make and use the bank protecting method of revetment brick
CN211104697U (en) Composite water permeable brick press forming device
CN207972104U (en) A kind of separately-loaded flowerpot frame molding die
CN207032164U (en) Sliding formwork equipment for irrigation canals and ditches shaping
CN106049221B (en) A kind of construction method of the non-absolute isolating device of Multifunctional City
CN206428665U (en) One kind is conveniently steered the section channel coffering machine of formula half
CN211714145U (en) Concrete construction equipment for drainage ditch

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20161214

WD01 Invention patent application deemed withdrawn after publication