CN106746534A - 3D bend glasses hot-press equipment and formed product method - Google Patents
3D bend glasses hot-press equipment and formed product method Download PDFInfo
- Publication number
- CN106746534A CN106746534A CN201710125013.5A CN201710125013A CN106746534A CN 106746534 A CN106746534 A CN 106746534A CN 201710125013 A CN201710125013 A CN 201710125013A CN 106746534 A CN106746534 A CN 106746534A
- Authority
- CN
- China
- Prior art keywords
- hot
- mould
- majesty
- heating plate
- coldplate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000011521 glass Substances 0.000 title claims abstract description 58
- 238000000034 method Methods 0.000 title claims abstract description 16
- 238000010438 heat treatment Methods 0.000 claims abstract description 65
- 238000001816 cooling Methods 0.000 claims abstract description 50
- 239000005357 flat glass Substances 0.000 claims abstract description 39
- 238000007731 hot pressing Methods 0.000 claims abstract description 17
- 238000007493 shaping process Methods 0.000 claims abstract description 9
- 239000007788 liquid Substances 0.000 claims description 47
- 239000002826 coolant Substances 0.000 claims description 14
- 238000012546 transfer Methods 0.000 claims description 6
- 238000013459 approach Methods 0.000 claims description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 3
- 238000005482 strain hardening Methods 0.000 abstract description 7
- 238000009740 moulding (composite fabrication) Methods 0.000 description 58
- 239000000463 material Substances 0.000 description 2
- 238000007789 sealing Methods 0.000 description 2
- 230000007812 deficiency Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000002688 persistence Effects 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
- 230000002123 temporal effect Effects 0.000 description 1
- 230000007704 transition Effects 0.000 description 1
Classifications
-
- C—CHEMISTRY; METALLURGY
- C03—GLASS; MINERAL OR SLAG WOOL
- C03B—MANUFACTURE, SHAPING, OR SUPPLEMENTARY PROCESSES
- C03B23/00—Re-forming shaped glass
- C03B23/02—Re-forming glass sheets
- C03B23/023—Re-forming glass sheets by bending
- C03B23/03—Re-forming glass sheets by bending by press-bending between shaping moulds
- C03B23/0307—Press-bending involving applying local or additional heating, cooling or insulating means
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Materials Engineering (AREA)
- Organic Chemistry (AREA)
- Re-Forming, After-Treatment, Cutting And Transporting Of Glass Products (AREA)
Abstract
The invention discloses a kind of 3D bend glasses hot-press equipment and formed product method, wherein, the equipment includes:Forming room, through the feed arrangement that forming room is set, the preheating device connected with forming room, hot-press arrangement and cooling duct.3D bend glasses hot-press equipment provided by the present invention, so that monolithic flat glass blank can be positioned in different moulds, sequentially pass through preheating, hot pressing and cooling shaping, compared to cold working mode, only need to select suitable mould and adjust corresponding heating, hot pressing and cooling parameter, it is not only simple to operate, and the radian fillet size that can be processed can be carried out from main regulation using mould;Solve radian fillet size that 3D bend glasses in the prior art can be processed using cold working mode also restricted problem.
Description
Technical field
The present invention relates to hot-press equipment field, more particularly to a kind of 3D bend glasses hot-press equipment and formed product side
Method.
Background technology
With the development of smart mobile phone, except Samsung, LG are proposed Curved screen smart mobile phone, as the intelligent hand that apple is released
Machine is then more used using non-plane glass of the edge with circular arc chamfering, i.e. glass zone line for plane and in edge
Curved surface carries out transition, and above-mentioned these non-plane glass belong to being related to and using model for smart mobile phone 3D bend glasses of the present invention
Farmland.
Because the difficulty of processing of 3D bend glasses is larger, process route is also complex, and existing non-plane glass is general
Cold working mode is all used, i.e., the edge of flat glass is ground and polished, to obtain required cambered surface edge;But,
The radian fillet size that cold working mode can be processed is also restrained.
Therefore, prior art has yet to be improved and developed.
The content of the invention
In view of above-mentioned the deficiencies in the prior art, it is an object of the invention to provide a kind of 3D bend glasses hot-press equipment and product
Product forming method, it is intended to solve the radian fillet size that 3D bend glasses can be processed using cold working mode in the prior art
Restricted problem.
Technical scheme is as follows:
A kind of 3D bend glasses hot-press equipment, wherein, the 3D bend glasses hot-press equipment includes:
For the monolithic flat glass blank for accommodating mould and being placed in mould, and internally complete monolithic flat glass blank point
It is the forming room of smart mobile phone 3D bend glass products that stage is hot-forming;
Through the forming room set, for being placed in mould in monolithic flat glass blank after, preheating before, mould is defeated
Deliver to the feed arrangement of forming room;
Connect with the forming room, for carrying out the multistage before monolithic flat glass blank die mould, to it, gradually heating up in advance
The preheating device of heat;
Connect with the forming room and arranged in pipeline system with the preheating device, for pre- in monolithic flat glass blank
After heat, carried out hot-press arrangement of the die mould as smart mobile phone 3D bend glass products;
Connected with the forming room, for the cooling duct as output of products after die mould and cooling approach.
In preferred scheme, described 3D bend glass hot-press equipments, wherein, the cooling duct includes:Up and down four
Block liquid cooling plate;An inlet, a liquid runner and a liquid outlet are all provided with four pieces of liquid cooling plates.
In preferred scheme, described 3D bend glass hot-press equipments, wherein, the forming room includes front and rear four pieces of companies up and down
Fishplate bar, is provided with a connecting plate inlet, a connecting plate liquid runner and a connecting plate liquid outlet in the rear connecting plate.
In preferred scheme, described 3D bend glass hot-press equipments, wherein, four pieces of liquid cooling plates and rear connecting plate are common
A feed pipe group is connected with, the feed pipe group includes:One input duct and a drain pipe road;
The input duct and drain pipe road all offer at least five supply openings, and are connected respectively by five supply openings
Supreme liquid cooling plate, lower liquid cooling plate, left liquid cooling plate, right liquid cooling plate and rear connecting plate.
In preferred scheme, described 3D bend glass hot-press equipments, wherein, the input duct and drain pipe road one end connect
It is connected to for providing coolant, by input duct the coolant being delivered into four liquid cooling plates and rear connecting plate and cold
But after liquid completes circulation, the liquid coolant sources reclaimed by drain pipe road;The liquid coolant sources are water source.
In preferred scheme, described 3D bend glass hot-press equipments, wherein, the preheating device includes:
It is multiple to be arranged in pipeline system, for by way of heat transfer to mould and the monolithic flat glass being placed in mould hair
The pre- thermal module that base is preheated.
In preferred scheme, described 3D bend glass hot-press equipments, wherein, the pre- hot-die nearest apart from the hot-press arrangement
Group includes:
Countercylinder, Your Majesty's coldplate, Your Majesty's heating plate, main lower heating plate and main lower coldplate, the countercylinder is vertically arranged, main
Upper coldplate, Your Majesty's heating plate, main lower heating plate and main lower coldplate are placed in the casing of a closing and ventilating, Your Majesty
Coldplate is connected to the lower end of countercylinder, and Your Majesty's heating plate is connected under Your Majesty's coldplate, and the bottom surface of Your Majesty's heating plate is used for
Top surface with 3D curved surface forming moulds is in contact, and the top surface of main lower heating plate is used to connect with the bottom surface of 3D curved surface forming moulds
Touch, main lower heating plate is connected on main lower coldplate.
In preferred scheme, described 3D bend glass hot-press equipments, wherein, Your Majesty's heating plate and Your Majesty's coldplate it
Between and main lower heating plate and main lower coldplate between be provided with a two-sided flase floor.
In preferred scheme, described 3D bend glass hot-press equipments, wherein, the hot-press arrangement includes:Multiple hot-dies
Group, multiple hot pressing modules all include:
Master cylinder, Your Majesty's coldplate, Your Majesty's heating plate, main lower heating plate and main lower coldplate, the master cylinder is vertically arranged, main
Upper coldplate, Your Majesty's heating plate, main lower heating plate and main lower coldplate are placed in the casing of a closing and ventilating, Your Majesty
Coldplate is connected to the lower end of master cylinder, and Your Majesty's heating plate is connected under Your Majesty's coldplate, and the bottom surface of Your Majesty's heating plate is used for
Top surface with 3D curved surface forming moulds is in contact, and the top surface of main lower heating plate is used to connect with the bottom surface of 3D curved surface forming moulds
Touch, main lower heating plate is connected on main lower coldplate;
Multiple hot pressing modules carry out heat using one of them according to the difference of converted products to monolithic flat glass blank
Pressure, remaining is used to preheat monolithic flat glass blank, and/or product after shaping is cooled down.
A kind of formed product method realized by as above any one 3D bend glasses hot-press equipment, wherein, the product
Product forming method includes that step is as follows:
Mould is delivered to forming room by feed arrangement after monolithic flat glass blank is placed in mould;
Preheating device carries out the multistage to mould and the monolithic flat glass blank being placed in mould, gradually heat up preheating;
Hot-press arrangement after the preheating of monolithic flat glass blank is completed, carried out die mould as smart mobile phone 3D bend glasses
Product;
Product after shaping is exported through cooling duct, and carries out heat transfer in output procedure and cooling duct, completes to cool down and defeated
Go out.
3D bend glasses hot-press equipment provided by the present invention, as a result of forming room, through entering that forming room is set
Material device, the preheating device connected with forming room, hot-press arrangement and cooling duct.So that monolithic flat glass blank can be positioned over
In different moulds, preheating, hot pressing and cooling shaping are sequentially passed through, compared to cold working mode, it is only necessary to select suitable mould simultaneously
The corresponding heating of adjustment, hot pressing and cooling parameter, it is not only simple to operate, and the big I profit of radian fillet that can be processed
Carried out from main regulation with mould;Solve the radian fillet that 3D bend glasses can be processed using cold working mode in the prior art
Size also restricted problem.
Brief description of the drawings
Fig. 1 is the structural representation of 3D bend glass hot-press equipment preferred embodiments in the present invention.
Fig. 2 is pre- thermal module and the hot pressing module structural representation of 3D bend glass hot-press equipment preferred embodiments in the present invention
Figure.
Fig. 3 is the feed arrangement structural representation of 3D bend glass hot-press equipment preferred embodiments in the present invention.
Fig. 4 is the enlarged drawing of part A in Fig. 3.
Fig. 5 is the partial structural diagram of the feed arrangement of 3D bend glass hot-press equipment preferred embodiments in the present invention.
Specific embodiment
The present invention provides a kind of 3D bend glasses hot-press equipment, to make the purpose of the present invention, technical scheme and effect more
It is clear, clear and definite, referring to the drawings and give an actual example that the present invention is described in more detail.It should be appreciated that tool described herein
Body embodiment is only used to explain the present invention, is not intended to limit the present invention.
As shown in figure 1,3D bend glasses hot-press equipment provided by the present invention includes:For accommodating mould and being placed in mould
In monolithic flat glass blank, and it is smart mobile phone 3D bent internally to complete monolithic flat glass blank hot-forming stage by stage
The forming room 400 of surface glass product;Set through the forming room 400, for being placed in mould in monolithic flat glass blank
Afterwards, before preheating, mould is delivered to the feed arrangement 500 of forming room 400;Connect with the forming room 400, in list
Multistage, the preheating device 200 of the preheating that gradually heats up are carried out before plate plane chunk glass die mould, to it;With the forming room
400 connect and with the preheating device 200 in pipeline system arrange, for monolithic flat glass blank preheating after, by its
Carry out hot-press arrangement 100 of the die mould as smart mobile phone 3D bend glass products;Connected with the forming room 400, for conduct
The cooling duct 300 of output of products and cooling approach after die mould.
The cooling duct 300 includes:Four pieces of liquid cooling plates up and down;A feed liquor is all provided with four pieces of liquid cooling plates
Mouth, a liquid runner and a liquid outlet.It is preferred that the upper liquid cooling plate, left liquid cooling plate and right liquid cooling plate are integrally formed.The tool of liquid runner
Shape is not limited herein, and this is prior art.
The forming room 400 includes front and rear four pieces of connecting plates up and down, and a connecting plate feed liquor is provided with the rear connecting plate
Mouth, a connecting plate liquid runner and a connecting plate liquid outlet.
Four pieces of liquid cooling plates and rear connecting plate are connected with a feed pipe group jointly, and the feed pipe group includes:One feed liquor
Pipeline and a drain pipe road;The input duct and drain pipe road all offer at least five supply openings, and by described in five
Supply opening is respectively connecting to liquid cooling plate, lower liquid cooling plate, left liquid cooling plate, right liquid cooling plate and rear connecting plate.
The input duct and drain pipe road one end are connected to for providing coolant, the coolant being passed through into feed tube
Road is delivered to four liquid cooling plates and rear connecting plate and after coolant completes circulation, the liquid coolant sources reclaimed by drain pipe road;
The liquid coolant sources are water source.
As shown in Fig. 2 the preheating device 200 includes:It is multiple to be arranged in pipeline system, for by way of heat transfer
The pre- thermal module preheated to mould and the monolithic flat glass blank being placed in mould.
In addition to the pre- thermal module nearest apart from hot-press arrangement 100, remaining pre- thermal module is set to:Countercylinder 211, pair
Heating plate 213, secondary lower heating plate 214 and secondary lower coldplate 215 on upper coldplate 212, pair, the countercylinder 211 are vertically arranged,
Heating plate 213, secondary lower heating plate 214 and secondary lower coldplate 215 are also placed in the forming room on coldplate 212, pair in pair
In 400, coldplate 212 is connected to the lower end of countercylinder 211 in pair, in pair heating plate 213 be connected in pair coldplate 212 it
Under, the bottom surface of heating plate 213 is used to be in contact with the top surface of the 3D curved surface formings mould in pair, the top of the lower heating plate 214 of pair
Face is used to be in contact with the bottom surface of the 3D curved surface formings mould, and the lower heating plate 214 of pair is connected under pair on coldplate 215.
The pre- thermal module nearest apart from the hot-press arrangement 100 includes:Countercylinder 211, Your Majesty's coldplate 112, Zhu Shangjia
Hot plate 113, main lower heating plate 114 and main lower coldplate 115, the countercylinder 211 are vertically arranged, Your Majesty's coldplate 112, Your Majesty
Heating plate 113, main lower heating plate 114 and main lower coldplate 115 are placed in the casing i.e. forming room 400 of a closing and ventilating
In, Your Majesty's coldplate 112 is connected to the lower end of countercylinder 211, and Your Majesty's heating plate 113 is connected under Your Majesty's coldplate 112, main
The bottom surface of upper heating plate 113 is used to be in contact with the top surface of the 3D curved surface formings mould, and the top surface of main lower heating plate 114 is used for
Bottom surface with the 3D curved surface formings mould is in contact, and main lower heating plate 114 is connected on main lower coldplate 115.This is pre-
Thermal module is set to be configured with hot pressing module identical part, and replaces master cylinder 111 using countercylinder 211, bent to slow down 3D
The temperature rise speed of face mould, while avoiding applying excessive pressure to 3D curved surface formings mould before formal hot pressing.
Between Your Majesty's heating plate 113 and Your Majesty's coldplate 112 and main lower heating plate 114 and main lower coldplate 115
Between be provided with a two-sided flase floor 116 and 117.
And the hot-press arrangement 100 includes:Multiple hot pressing modules, multiple hot pressing modules all include:
Master cylinder 111, Your Majesty's coldplate 112, Your Majesty's heating plate 113, main lower heating plate 114 and main lower coldplate 115, the master
Cylinder 111 is vertically arranged, and Your Majesty's coldplate 112, Your Majesty's heating plate 113, main lower heating plate 114 and main lower coldplate 115 are put
It is placed in the casing i.e. forming room 400 of a closing and ventilating, Your Majesty's coldplate 112 is connected to the lower end of master cylinder 111, Your Majesty
Heating plate 113 is connected under Your Majesty's coldplate 112, and the bottom surface of Your Majesty's heating plate 113 is used for and the 3D curved surface formings mould
Top surface be in contact, the top surface of main lower heating plate 114 is used to be in contact with the bottom surface of the 3D curved surface formings mould, main lower heating
Plate 114 is connected on main lower coldplate 115;Multiple hot pressing modules according to the difference of converted products, using one of them
Hot pressing is carried out to monolithic flat glass blank, remaining is used to preheat monolithic flat glass blank, and/or to being produced after shaping
Product are cooled down.
As shown in figure 3, the feed arrangement 500 includes:Control centre 510 and first enter through what forming room 400 was set
Material guide rail 520, as shown in Figure 5;And be arranged at described one end of first feed lead rail 520 first charging cylinder 530, such as Fig. 5
It is shown;The forming room 400 is provided with the first feeding gate(Because the first door cylinder 550 is arranged at the top of the first feed lead rail 520
Cover plate on, therefore the first door cylinder 550 and upper cover plate are concealed in Figure 5, to highlight the setting position of the first feeding gate
Put, it should be noted that, 540 is the set location of the first feeding gate, rather than the first feeding gate is in itself), the first feeding gate company
The first door cylinder 550 is connected to, as shown in Figure 4.
The control centre 510 is used for after Preset Time is reached sending signal respectively and controls the first door cylinder 550 to open
First feeding gate, and control first feeds cylinder 530 and pushes mould to forming room 400.
Preferably, the horizontally set of the forming room 400, it is used for the monolithic flat glass for accommodating mould and being placed in mould
Blank, and it is smart mobile phone 3D bend glass products internally to complete monolithic flat glass blank hot-forming stage by stage.Shaping
Room 400 itself uses as the passage that accommodating chamber and mould are moved between each module, and monolithic flat glass blank is stage by stage
Hot-forming is bend glass, is indexed by pipeline system, and extends vertically through each pre- thermal module of the setting of forming room 400
And die mould module is realized.
And the first feed lead rail 520 and the first charging cylinder 530 are set parallel to forming room 400.First charging is led
Rail 520 is a square based plate.
In monolithic flat glass blank is placed on mould, then mould is placed on or is delivered to the first feed lead rail
520, control centre 510 before Preset Time is reached, the work shape in control preheating device, hot-press arrangement and cooling device
Under state, once reaching preheating time, control centre 510 will first control the first door cylinder 550 to drive the first feeding gate to rise, so
Control first afterwards feeds cylinder 530 and promotes mould into forming room 400, in this process, in preheating device, hot-press arrangement
And the mould under cooling device will be promoted simultaneously, by the impeller being connected with the first charging cylinder 530, the impeller sets
Multiple cross bars and a montant are equipped with, montant is connected with the first charging cylinder 530, when cross bar is horizontal, can driven mold motion.
The feed arrangement 500 being applied in 3D bend glass hot-press equipments provided by the present invention, as a result of control
Center 510, forming room 400, the first feeding gate for being arranged at forming room 400, are connected and are controlled by with the first feeding gate in control
First door cylinder 550 of the heart 510, through the first feed lead rail 520 that forming room 400 is set, and is arranged at the first charging and leads
The one end of rail 520, the first charging cylinder 530 for being controlled by control centre 510.So that after mould is placed on the first feed rail,
Control centre 510 distinguishes sending signal control the first door cylinder 550 after Preset Time is reached and opens the first feeding gate, and controls
First charging cylinder 530 pushes mould to forming room 400, it is ensured that forming room 400 is sealing during hot-press equipment hot pressing die,
And when needing charging, forming room 400 is opened in time and mould is pushed in it, then ensure that in the case where machined mould gradually enters
During one technique, new mould energy feeding in time is in place.
As shown in figure 4, in ground of the invention further preferred embodiment, the forming room 400 sets the first feeding gate
One end outside is provided with one, and the charging of temporal persistence suspends chamber 560 before mould enters forming room 400;Through the charging
Pause chamber 560 be provided with one it is vertical with first feed lead rail 520 connect, for carrying mould and be its mobile guide
Second feed lead rail 570;The top of second feed lead rail 570 is provided with one, for mould to be pushed into the first charging cylinder
Second charging cylinder 580 of 530 parallel positions.
It refers to that the two is in workflow that mould is pushed to the parallel position of the first charging cylinder 530 by the second charging cylinder 580
It is mutually linked in journey, mould is positioned over the second feed lead rail 570 first, specific bit is then pushed to by the second charging cylinder 580
Put, in the position first, charging cylinder 530 can directly push to mould after the control instruction for receiving control centre 510
In forming room 400.
Can be by operating desk by parallel with forming room 400 by setting the second feed lead rail 570 and the second charging cylinder 580
Lengthwise position, be adjusted to the lateral attitude vertical with forming room 400, improve operation convenience.
In ground of the invention further preferred embodiment, the second charging cylinder 580 is connected with one, is controlled by control
The heart 510, the lift cylinder 590 for driving the second charging cylinder 580 to move up and down.
The charging pause chamber 560 is provided with one second feeding gate 610 near second charging cylinder 580 one end;Described
Two feeding gates 610 are connected with one, are controlled by control centre 510, for driving open or close second of the second feeding gate 610
Cylinder 620.The second charging output end of cylinder 580 is connected with the right angle trigonometry block 630 of a hollow;When second feeding gas
Cylinder 580 drops to extreme position, after direct corner block is fitted with feeding-passage, right angle trigonometry block 630, feeding-passage and second enters
Bin gate 610 is encircled into an annular seal space.
And described one end of second feed lead rail 570 is provided with one, for promoting mould to be moved along the second feed lead rail 570,
Until the 3rd charging cylinder 640 in its front of the second feeding gate of arrival 610.
Second feed lead rail 570 is provided with one near the 3rd charging cylinder 640 side, for sensing that mould is placed
After the second feed lead rail 570, send in place signal to control centre 510 charging sensor.
The charging pause chamber 560 sets the side of the second feeding gate 610 and is connected with a feeding-passage;The feeding-passage one
End is connected with the charging pause parallel sealing of chamber 560, the downward-sloping setting of the other end.
Present invention also offers a kind of product realized by as above any one 3D scheme mean camber glass hot-press equipment
Forming method, it includes that step is as follows:
Mould is delivered to forming room by feed arrangement after monolithic flat glass blank is placed in mould;
Preheating device carries out the multistage to mould and the monolithic flat glass blank being placed in mould, gradually heat up preheating;
Hot-press arrangement after the preheating of monolithic flat glass blank is completed, carried out die mould as smart mobile phone 3D bend glasses
Product;
Product after shaping is exported through cooling duct, and carries out heat transfer in output procedure and cooling duct, completes to cool down and defeated
Go out.
It should be appreciated that application of the invention is not limited to above-mentioned citing, and for those of ordinary skills, can
To be improved according to the above description or be converted, such as rotary speed set-up mode of described rotary speed setting module etc., institute
Having these modifications and variations should all belong to the protection domain of appended claims of the present invention.
Claims (10)
1. a kind of 3D bend glasses hot-press equipment, it is characterised in that the 3D bend glasses hot-press equipment includes:
For the monolithic flat glass blank for accommodating mould and being placed in mould, and internally complete monolithic flat glass blank point
It is the forming room of smart mobile phone 3D bend glass products that stage is hot-forming;
Through the forming room set, for being placed in mould in monolithic flat glass blank after, preheating before, mould is defeated
Deliver to the feed arrangement of forming room;
Connect with the forming room, for carrying out the multistage before monolithic flat glass blank die mould, to it, gradually heating up in advance
The preheating device of heat;
Connect with the forming room and arranged in pipeline system with the preheating device, for pre- in monolithic flat glass blank
After heat, carried out hot-press arrangement of the die mould as smart mobile phone 3D bend glass products;
Connected with the forming room, for the cooling duct as output of products after die mould and cooling approach.
2. 3D bend glasses hot-press equipment according to claim 1, it is characterised in that the cooling duct includes:Up and down
The four pieces of liquid cooling plates in left and right;An inlet, a liquid runner and a liquid outlet are all provided with four pieces of liquid cooling plates.
3. 3D bend glasses hot-press equipment according to claim 2, it is characterised in that before and after the forming room is included up and down
Four pieces of connecting plates, are provided with a connecting plate inlet, a connecting plate liquid runner and a connecting plate liquid outlet in the rear connecting plate.
4. 3D bend glasses hot-press equipment according to claim 3, it is characterised in that four pieces of liquid cooling plates and rear connection
Plate is connected with a feed pipe group jointly, and the feed pipe group includes:One input duct and a drain pipe road;
The input duct and drain pipe road all offer at least five supply openings, and are connected respectively by five supply openings
Supreme liquid cooling plate, lower liquid cooling plate, left liquid cooling plate, right liquid cooling plate and rear connecting plate.
5. 3D bend glasses hot-press equipment according to claim 4, it is characterised in that the input duct and drain pipe road
One end be connected to for provide coolant, by the coolant by input duct be delivered to four liquid cooling plates and rear connecting plate,
And after coolant completes circulation, the liquid coolant sources reclaimed by drain pipe road;The liquid coolant sources are water source.
6. 3D bend glasses hot-press equipment according to claim 5, it is characterised in that the preheating device includes:
It is multiple to be arranged in pipeline system, for by way of heat transfer to mould and the monolithic flat glass being placed in mould hair
The pre- thermal module that base is preheated.
7. 3D bend glasses hot-press equipment according to claim 6, it is characterised in that nearest apart from the hot-press arrangement
Pre- thermal module includes:
Countercylinder, Your Majesty's coldplate, Your Majesty's heating plate, main lower heating plate and main lower coldplate, the countercylinder is vertically arranged, main
Upper coldplate, Your Majesty's heating plate, main lower heating plate and main lower coldplate are placed in the casing of a closing and ventilating, Your Majesty
Coldplate is connected to the lower end of countercylinder, and Your Majesty's heating plate is connected under Your Majesty's coldplate, and the bottom surface of Your Majesty's heating plate is used for
Top surface with 3D curved surface forming moulds is in contact, and the top surface of main lower heating plate is used to connect with the bottom surface of 3D curved surface forming moulds
Touch, main lower heating plate is connected on main lower coldplate.
8. 3D bend glasses hot-press equipment according to claim 7, it is characterised in that Your Majesty's heating plate is cold with Your Majesty
But it is provided with a two-sided flase floor between plate and between main lower heating plate and main lower coldplate.
9. 3D bend glasses hot-press equipment according to claim 1, it is characterised in that the hot-press arrangement includes:It is multiple
Hot pressing module, multiple hot pressing modules all include:
Master cylinder, Your Majesty's coldplate, Your Majesty's heating plate, main lower heating plate and main lower coldplate, the master cylinder is vertically arranged, main
Upper coldplate, Your Majesty's heating plate, main lower heating plate and main lower coldplate are placed in the casing of a closing and ventilating, Your Majesty
Coldplate is connected to the lower end of master cylinder, and Your Majesty's heating plate is connected under Your Majesty's coldplate, and the bottom surface of Your Majesty's heating plate is used for
Top surface with 3D curved surface forming moulds is in contact, and the top surface of main lower heating plate is used to connect with the bottom surface of 3D curved surface forming moulds
Touch, main lower heating plate is connected on main lower coldplate;
Multiple hot pressing modules carry out heat using one of them according to the difference of converted products to monolithic flat glass blank
Pressure, remaining is used to preheat monolithic flat glass blank, and/or product after shaping is cooled down.
10. it is a kind of by such as claim 1 to 9 any one 3D bend glasses hot-press equipment realize formed product method,
Characterized in that, the formed product method includes that step is as follows:
Mould is delivered to forming room by feed arrangement after monolithic flat glass blank is placed in mould;
Preheating device carries out the multistage to mould and the monolithic flat glass blank being placed in mould, gradually heat up preheating;
Hot-press arrangement after the preheating of monolithic flat glass blank is completed, carried out die mould as smart mobile phone 3D bend glasses
Product;
Product after shaping is exported through cooling duct, and carries out heat transfer in output procedure and cooling duct, completes to cool down and defeated
Go out.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710125013.5A CN106746534A (en) | 2017-03-03 | 2017-03-03 | 3D bend glasses hot-press equipment and formed product method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710125013.5A CN106746534A (en) | 2017-03-03 | 2017-03-03 | 3D bend glasses hot-press equipment and formed product method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106746534A true CN106746534A (en) | 2017-05-31 |
Family
ID=58962342
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710125013.5A Pending CN106746534A (en) | 2017-03-03 | 2017-03-03 | 3D bend glasses hot-press equipment and formed product method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106746534A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107117801A (en) * | 2017-06-14 | 2017-09-01 | 深圳市策维科技有限公司 | Bend glass hot press and forming method |
CN107337338A (en) * | 2017-08-30 | 2017-11-10 | 东莞恩特贝斯智能技术有限公司 | A kind of selection forming method of 3D bend glasses hot-press equipment |
CN108751676A (en) * | 2018-07-26 | 2018-11-06 | 安徽蓝瑟智能科技有限公司 | A kind of 3D glass heats bender transfer hot compression make-up machine structure |
CN109694178A (en) * | 2019-02-01 | 2019-04-30 | 福建上润精密仪器有限公司 | Aspheric optical lens compression molding forming machine |
Citations (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2861654Y (en) * | 2005-12-29 | 2007-01-24 | 朱秀莲 | Zero friction flat-wedging type sluice valve |
CN201992108U (en) * | 2011-04-18 | 2011-09-28 | 东北石油大学 | Zero-friction flat wedge gate valve |
CN103899779A (en) * | 2014-03-05 | 2014-07-02 | 大丰市奥凯流体机械有限公司 | Pressure self-sealing sluice valve |
CN104445888A (en) * | 2014-12-16 | 2015-03-25 | 蓝思科技(长沙)有限公司 | Forming method for bent glass |
CN104986948A (en) * | 2015-06-26 | 2015-10-21 | 东莞市华星镀膜科技有限公司 | Machining device and machining technology for glass sheet hot bending molding |
CN105271654A (en) * | 2015-11-18 | 2016-01-27 | 广东拓捷科技股份有限公司 | Hot press molding device for bent glass |
CN105776828A (en) * | 2016-01-30 | 2016-07-20 | 深圳大宇精雕科技有限公司 | Hot bending machine |
CN105776827A (en) * | 2016-01-30 | 2016-07-20 | 深圳大宇精雕科技有限公司 | Hot bending machine and glass hot bending machining method |
CN205678153U (en) * | 2016-06-03 | 2016-11-09 | 广州市昊封流体工程技术有限公司 | Flashboard type is without the flexible stop valve of abrasion |
CN205820309U (en) * | 2016-07-27 | 2016-12-21 | 深圳市宇泰隆科技有限公司 | The conveyer device of mould during a kind of glass processing |
CN205838833U (en) * | 2016-07-27 | 2016-12-28 | 深圳市宇泰隆科技有限公司 | The device of air is completely cut off during a kind of 3D glass processing |
CN106316081A (en) * | 2016-08-31 | 2017-01-11 | 饶武良 | Hot-bending forming machine for mobile phone glass and watch surface covers |
CN106365419A (en) * | 2016-08-31 | 2017-02-01 | 弓睿莲 | 3D glass processing production line |
CN206616138U (en) * | 2017-03-03 | 2017-11-07 | 东莞恩特贝斯智能技术有限公司 | 3D bend glass hot-press equipments |
-
2017
- 2017-03-03 CN CN201710125013.5A patent/CN106746534A/en active Pending
Patent Citations (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2861654Y (en) * | 2005-12-29 | 2007-01-24 | 朱秀莲 | Zero friction flat-wedging type sluice valve |
CN201992108U (en) * | 2011-04-18 | 2011-09-28 | 东北石油大学 | Zero-friction flat wedge gate valve |
CN103899779A (en) * | 2014-03-05 | 2014-07-02 | 大丰市奥凯流体机械有限公司 | Pressure self-sealing sluice valve |
CN104445888A (en) * | 2014-12-16 | 2015-03-25 | 蓝思科技(长沙)有限公司 | Forming method for bent glass |
CN104986948A (en) * | 2015-06-26 | 2015-10-21 | 东莞市华星镀膜科技有限公司 | Machining device and machining technology for glass sheet hot bending molding |
CN105271654A (en) * | 2015-11-18 | 2016-01-27 | 广东拓捷科技股份有限公司 | Hot press molding device for bent glass |
CN105776828A (en) * | 2016-01-30 | 2016-07-20 | 深圳大宇精雕科技有限公司 | Hot bending machine |
CN105776827A (en) * | 2016-01-30 | 2016-07-20 | 深圳大宇精雕科技有限公司 | Hot bending machine and glass hot bending machining method |
CN205678153U (en) * | 2016-06-03 | 2016-11-09 | 广州市昊封流体工程技术有限公司 | Flashboard type is without the flexible stop valve of abrasion |
CN205820309U (en) * | 2016-07-27 | 2016-12-21 | 深圳市宇泰隆科技有限公司 | The conveyer device of mould during a kind of glass processing |
CN205838833U (en) * | 2016-07-27 | 2016-12-28 | 深圳市宇泰隆科技有限公司 | The device of air is completely cut off during a kind of 3D glass processing |
CN106316081A (en) * | 2016-08-31 | 2017-01-11 | 饶武良 | Hot-bending forming machine for mobile phone glass and watch surface covers |
CN106365419A (en) * | 2016-08-31 | 2017-02-01 | 弓睿莲 | 3D glass processing production line |
CN206616138U (en) * | 2017-03-03 | 2017-11-07 | 东莞恩特贝斯智能技术有限公司 | 3D bend glass hot-press equipments |
Non-Patent Citations (3)
Title |
---|
周小勇: "单工位模压机床设计及硫系玻璃模压成形试验研究" * |
周小勇: "单工位模压机床设计及硫系玻璃模压成形试验研究", 《中国优秀硕士学位论文全文数据库 工程科技Ⅰ辑》, 15 February 2017 (2017-02-15), pages 22 * |
周小勇: "单工位模压机床设计及硫系玻璃模压成形试验研究", pages 20 - 22 * |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107117801A (en) * | 2017-06-14 | 2017-09-01 | 深圳市策维科技有限公司 | Bend glass hot press and forming method |
CN107337338A (en) * | 2017-08-30 | 2017-11-10 | 东莞恩特贝斯智能技术有限公司 | A kind of selection forming method of 3D bend glasses hot-press equipment |
CN107337338B (en) * | 2017-08-30 | 2019-10-18 | 东莞恩特贝斯智能技术有限公司 | A kind of selection forming method of 3D bend glass hot-press equipment |
CN108751676A (en) * | 2018-07-26 | 2018-11-06 | 安徽蓝瑟智能科技有限公司 | A kind of 3D glass heats bender transfer hot compression make-up machine structure |
CN109694178A (en) * | 2019-02-01 | 2019-04-30 | 福建上润精密仪器有限公司 | Aspheric optical lens compression molding forming machine |
CN109694178B (en) * | 2019-02-01 | 2024-05-10 | 福州研达自动化有限公司 | Aspherical optical lens compression molding machine |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106746534A (en) | 3D bend glasses hot-press equipment and formed product method | |
CN106746531A (en) | 3D bend glass hot-press equipments | |
CN106830646A (en) | A kind of bend glass forming method of mobile terminal | |
CN106316081A (en) | Hot-bending forming machine for mobile phone glass and watch surface covers | |
CN106673411A (en) | Cooling system in 3D (three dimensional) curved glass hot pressing device and cooling method | |
CN106746533A (en) | A kind of compression system of mobile terminal bend glass shaping | |
CN106673410A (en) | Cooling device and cooling method for 3D (three-dimensional) curved glass hot-pressing equipment | |
CN106746532B (en) | A kind of 3D bend glass hot-press method | |
WO2019080947A1 (en) | Foam moulding mechanical device | |
CN206616138U (en) | 3D bend glass hot-press equipments | |
CN203484567U (en) | High-frequency spinning sealing machine of shock absorber oil storage cylinder bottom cover | |
CN108927454A (en) | The point heating mould and technique strengthened for the segmentation of hot forming boron steel material | |
CN101186106A (en) | Door board multi-point synchronous hot riveting machine | |
CN107021609A (en) | A kind of Curred glass forming machine mould cooling discharging device | |
CN206751645U (en) | A kind of feed arrangement being applied in 3D bend glass hot-press equipments | |
CN207243724U (en) | 3D bend glass hot-press equipments | |
CN109970327A (en) | Hot-bending machine and hot bending shape method | |
CN107473572B (en) | A kind of forming method of the Curred glass forming machine structure for mobile terminal | |
CN206751649U (en) | Slow down the flase floor of mould temperature rise speed in a kind of bend glass forming process | |
CN206607159U (en) | A kind of preheating device of mobile terminal bend glass shaping | |
CN207193112U (en) | A kind of hot pressing module for bend glass shaping | |
CN107417076A (en) | 3D bend glass hot-press equipments | |
CN106746535A (en) | The pressure control device and method of a kind of mobile terminal bend glass shaping | |
CN107337338B (en) | A kind of selection forming method of 3D bend glass hot-press equipment | |
CN207193111U (en) | The shaped device of 3D bend glass hot-press equipments |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170531 |
|
RJ01 | Rejection of invention patent application after publication |