CN106743459A - A kind of conveyer of multiple bay frock assembly - Google Patents

A kind of conveyer of multiple bay frock assembly Download PDF

Info

Publication number
CN106743459A
CN106743459A CN201611164363.4A CN201611164363A CN106743459A CN 106743459 A CN106743459 A CN 106743459A CN 201611164363 A CN201611164363 A CN 201611164363A CN 106743459 A CN106743459 A CN 106743459A
Authority
CN
China
Prior art keywords
conveyer belt
platform
assembly
station
pluck
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201611164363.4A
Other languages
Chinese (zh)
Inventor
周斯加
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wenzhou University
Original Assignee
Wenzhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wenzhou University filed Critical Wenzhou University
Priority to CN201611164363.4A priority Critical patent/CN106743459A/en
Publication of CN106743459A publication Critical patent/CN106743459A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G47/00Article or material-handling devices associated with conveyors; Methods employing such devices
    • B65G47/52Devices for transferring articles or materials between conveyors i.e. discharging or feeding devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G37/00Combinations of mechanical conveyors of the same kind, or of different kinds, of interest apart from their application in particular machines or use in particular manufacturing processes

Abstract

The present invention relates to multiple bay frock assembly conveyer, it include high-rise parallel conveyer belt, bottom parallel conveyer belt, parallel and high-rise parallel conveyer belt directly over bottom parallel conveyer belt, respectively with bottom parallel conveyer belt and the oscilaltion device of high-rise parallel conveyer belt procedure connection;Reasonable in design, compact conformation of the invention and easy to use.

Description

A kind of conveyer of multiple bay frock assembly
Technical field
The present invention relates to multiple bay frock assembly conveyer.
Background technology
Production line balance, is called Production line continuous productive process, refers to the subject of labour by certain process route and unified life Speed is produced, continuously by each place of working, a kind of organization of production shape of product is processed and produces according to priority Formula.It is the further development of object specialization organizational form, is a kind of labor division's relatively thin, production efficiency production group higher Knit form.Typical production line balance has following features:Fixed production one kind or a few product (part) on streamline, Its production process is continuous;Each place of working is according to the tactic of Product Process process on streamline.Each work Ground is only fixed to complete one or several procedures, and degree of specialization is higher;Streamline is produced (institute according to unified beat Meaning beat, is exactly the time interval on streamline between front and rear production two pieces like products);The production in the last place of working of streamline Ability is the single-piece work time of balance, proportional, each procedure equal to beat or the multiple of beat;Streamline is provided with specially The conveyer of door, product is moved by unidirectional transit route.
Further, since noise produced during frock can damage workers ' health, therefore bar should be created in processing Part allows for people away from process equipment, only when equipment breaks down, just needs workman's execute-in-place.And, add to ensure Working medium amount, is also necessary to carry out videograph to processing site, to be managed collectively assembling quality.
The content of the invention
For the above, the technical problems to be solved by the invention are generally speaking to provide a kind of reasonable in design, cost It is cheap, durable, safe and reliable, simple to operate, time saving and energy saving, save fund, compact conformation and easy to use multi-functional Station frock assembly conveyer;The technical problem and acquirement beneficial effect for solving in detail are in aftermentioned content and combine specific Content is specifically described in implementation method.
To solve the above problems, the technical solution used in the present invention is:
A kind of multiple bay frock assembly conveyer, including high-rise parallel conveyer belt, bottom parallel conveyer belt, parallel and position High-rise parallel conveyer belt directly over bottom parallel conveyer belt, respectively with bottom parallel conveyer belt and high-rise parallel conveyer belt work The oscilaltion device of sequence linking;Station frock assembly is given bottom parallel by high-rise parallel conveyer belt by oscilaltion device Station frock assembly is given high-rise parallel conveyer belt by conveyer belt and/or bottom parallel conveyer belt by oscilaltion device;Bottom The left side drive of layer parallel conveyer belt is connected with the main drive belt with drive motor, the right side of bottom parallel conveyer belt Mounted in first from Timing Belt one end, first is connected with deflecting machine to driving wheel tube from the Timing Belt other end, in deflecting machine and height Second from Timing Belt is set with driving wheel on the right side of layer parallel conveyer belt;Passed in bottom parallel conveyer belt and/or high-rise parallel Send to take and be provided with process equipment corresponding with station frock assembly and location equipment.
As the further improvement of above-mentioned technical proposal:Oscilaltion device is two and is located in bottom parallel respectively Conveyer belt and high-rise parallel conveyer belt or so two ends, entry/exit material conveyer belt is provided with the side of bottom parallel conveyer belt;Enter/ Station frock assembly is given bottom parallel conveyer belt by discharge belt, and the location equipment on bottom parallel conveyer belt is to station work The workpiece is processed by the process equipment on bottom parallel conveyer belt after workpiece positioning on dress assembly;Bottom parallel is passed The station frock assembly of workpiece gives the oscilaltion device of left end, the oscilaltion device support of left end after sending band to process bottom Station frock assembly is lifted to rise and give high-rise parallel conveyer belt;Location equipment on high-rise parallel conveyer belt is total to station frock The workpiece is processed by the process equipment on high-rise parallel conveyer belt after into upper workpiece positioning;High-rise parallel conveyer belt The oscilaltion device of right-hand member is given by the station frock assembly of workpiece after high level processing, the oscilaltion device of right-hand member is by station Frock assembly is transferred and sends back to bottom parallel conveyer belt, and bottom parallel conveyer belt gives the station frock assembly of the workpiece Entry/exit material conveyer belt.Oscilaltion device is located at the left end in bottom parallel conveyer belt, in the side of bottom parallel conveyer belt It is provided with entry/exit material conveyer belt;Station frock assembly is given bottom parallel conveyer belt by entry/exit material conveyer belt, and bottom parallel is passed The location equipment for taking is sent to passing through the process equipment pair on bottom parallel conveyer belt after the workpiece positioning on station frock assembly The workpiece is processed;The station frock assembly of workpiece gives oscilaltion device after bottom parallel conveyer belt processes bottom, Oscilaltion device lifts station frock assembly and rises and give high-rise parallel conveyer belt;Positioning on high-rise parallel conveyer belt sets The workpiece is processed by the process equipment on high-rise parallel conveyer belt after the standby workpiece positioning on station frock assembly; The station frock assembly of workpiece after high level processing is given the right side that is arranged on high-rise parallel conveyer belt by high-rise parallel conveyer belt Output device, is provided with the day roof beam structure parallel with high-rise parallel conveyer belt above high-rise parallel conveyer belt;The output device Including the warp drive gear being arranged on day roof beam structure and the warp driving rack of warp drive gear engaged transmission, it is arranged on Warp driving rack lower end and taking-up electromagnet corresponding with station frock assembly, be arranged on warp driving rack and day roof beam structure it Between warp guideway.The process equipment includes the manipulator, drilling machine, tapping machine, machine for removing bur, the mark that are set by operation respectively Numbering machine and/or cleaning blower fan;The location equipment of bottom parallel conveyer belt is bottom positioning electromagnet frame or is vertically arranged upwards Jack;The location equipment of high-rise parallel conveyer belt is high-rise positioning electromagnet frame or the jack being vertically arranged downwards.On Lower lowering or hoisting gear include outer framework, be arranged in outer framework support stand, be vertically arranged in support stand on riser guide, It is horizontally set between support stand and outer framework and is fixedly connected frame, hoistable platform assembly and lifting pluck assembly;Lifting Platform assembly is used to lift station frock assembly;Lifting pluck assembly one end is connected with support stand, and lifting pluck assembly is another End is connected with hoistable platform assembly, and lifting pluck assembly drives hoistable platform assembly to be moved up and down on riser guide.Lifting is dragged Draging assembly includes that the pluck for being arranged on support stand bottom straight up drives oil cylinder/electric pushrod, is arranged on pluck driving oil The pluck driving wheel of cylinder/electric pushrod piston rod upper end, the pluck stator wheel being arranged at the top of support stand and pluck Cingulum;Pluck cingulum is set in N-type, and the right-hand member head of pluck cingulum is connected to support stand top, and the bottom right of pluck cingulum is curved The lower surface of bent portions envelope pluck driving wheel, the upper table of the upper left bending section envelope pluck stator wheel of pluck cingulum Face, the left end pluck band tail end of pluck cingulum is connected with hoistable platform assembly.It is respectively provided with the top and bottom of support stand There is lifting with Rubber end cushion cylinder and/or elevation travel switch.Hoistable platform assembly is flat including horizontally disposed platform Plate, at least two are set in parallel in platform riser below platform plate, are vertically arranged on the right side of platform riser Platform slide, the platform sliding block for being arranged on platform slide right flank and being moved up and down on riser guide, be arranged on platform cunning Seat top and be connected with tail end with the left end pluck of the pluck cingulum of lifting pluck assembly platform connector, to be arranged on platform flat Platform drive motor below plate, it is arranged on platform plate upper surface and passes through conveyer belt or gear train with platform drive motor The platform live axle of drive connection is parallel with platform live axle and to be correspondingly arranged at the platform of platform plate upper surface driven Wheel shaft, it is sleeved on platform live axle and platform follower shaft and for lifting the platform conveyer belt of station frock assembly, setting The platform band on platform plate and below the platform conveyer belt of top section is put to support flat guided way and be arranged on flat The platform side positioning guiding plate of the horizontal both sides of platform conveyer belt;Platform side positioning guiding plate is used for fixed to station frock assembly both sides Position.The roller or rolling for being provided with flat guided way and being in rolling contact with platform conveyer belt top section lower surface are supported in platform band Pearl.Station frock assembly includes that horizontally disposed station positioning carries tire, is vertically arranged in the station frock that station positioning is carried on tire Location hole, it is arranged on the station frock of station tool locating hole side and fixes V blocks, is arranged on the work that station frock is fixed on V blocks Position tool locating groove, it is arranged on station tool locating hole opposite side and fixes the corresponding station frock of V blocks with station frock and live It is dynamic to clamp V blocks, be arranged on station positioning load tire and drive the station frock of station frock movable clamping V blocks motion to clamp oil Cylinder, it is arranged on station positioning and carries the station tool locating sensor of tire side and be arranged on station positioning and carry tire lower end and following table The station frock guided way of the upper surface of the platform conveyer belt of face and hoistable platform assembly.
Video monitoring camera is also included, described video monitoring camera is arranged on outer framework inwall, the video The signal output part of monitoring camera is connected with video monitoring main frame.
It is using the beneficial effect produced by above-mentioned technical proposal:
The present invention is reasonable in design, with low cost, durable, safe and reliable, simple to operate, time saving and energy saving, save fund, structure It is compact and easy to use.Beneficial effects of the present invention not limited to this are described, in order to preferably readily appreciate, in specific embodiment Part has carried out more preferably detailed description.
Brief description of the drawings
Fig. 1 is the structural representation of the embodiment of the present invention 1;
Fig. 2 is the structural representation of the embodiment of the present invention 2;
Fig. 3 is the structural representation of outer framework of the present invention;
Fig. 4 is the decline station structure schematic diagram of oscilaltion device of the present invention;
Fig. 5 is the rising station structure schematic diagram of oscilaltion device of the present invention;
Fig. 6 is the main structure diagram of oscilaltion device of the present invention;
Fig. 7 is the left view structural representation of oscilaltion device of the present invention;
Fig. 8 is the stereopsis structural representation of oscilaltion device of the present invention;
Fig. 9 is that the blast of oscilaltion device of the present invention regards structural representation;
Figure 10 is the overlooking the structure diagram of hoistable platform assembly of the present invention;
Figure 11 is the main structure diagram of hoistable platform assembly of the present invention;
Figure 12 is the stereopsis structural representation of hoistable platform assembly of the present invention;
Figure 13 is the present invention looks up structural representation of hoistable platform assembly of the present invention;
Figure 14 is the schematic layout diagram of video monitoring camera of the present invention;
Wherein:1st, outer framework;2nd, oscilaltion device;3rd, day roof beam structure;4th, warp drive gear;5th, warp driving rack;6th, pass through Line guideway;7th, electromagnet is taken out;8th, high-rise positioning electromagnet frame;9th, blower fan is cleared up;10th, high-rise parallel conveyer belt;11st, second From Timing Belt;12nd, deflecting machine;13rd, first from Timing Belt;14th, main drive belt;15th, entry/exit material conveyer belt;16th, manipulator;17、 Bottom positioning electromagnet frame;18th, drilling machine;19th, tapping machine;20th, station frock assembly;21st, it is fixedly connected frame;22nd, support vertical Frame;23rd, hoistable platform assembly;24th, pluck assembly is lifted;25th, riser guide;26th, pluck drives oil cylinder/electric pushrod;27th, drag Drag cingulum;28th, pluck driving wheel;29th, pluck stator wheel;30th, pluck band tail end;31st, lifting buffers oil with Rubber end Cylinder;32nd, elevation travel switch;33rd, platform slide;34th, platform connector;35th, platform sliding block;36th, platform riser;37、 Platform plate;38th, platform drive motor;39th, platform live axle;40th, platform conveyer belt;41st, platform follower shaft;42nd, put down Platform band supports flat guided way;43rd, platform side positioning guiding plate;44th, station tool locating hole;45th, station frock fixes V blocks;46、 Station tool locating groove;47th, station frock movable clamping V blocks;48th, station frock clamping cylinder;49th, station tool locating is passed Sensor;50th, station frock guided way;51st, bottom parallel conveyer belt.
Specific embodiment
As shown in figures 1-13, this multiple bay frock assembly conveyer, generally speaking including high-rise parallel conveyer belt 10th, bottom parallel conveyer belt 51, parallel and high-rise parallel conveyer belt 10 directly over bottom parallel conveyer belt 51, respectively with The oscilaltion device 2 of bottom parallel conveyer belt 51 and the high-rise procedure connection of parallel conveyer belt 10;High-rise parallel conveyer belt 10 leads to Cross that station frock assembly 20 is given bottom parallel conveyer belt 51 by oscilaltion device 2 and/or bottom parallel conveyer belt 51 passes through Station frock assembly 20 is given high-rise parallel conveyer belt 10 by oscilaltion device 2;The left side transmission of bottom parallel conveyer belt 51 Wheel is connected with the main drive belt 14 with drive motor, the right side driving wheel tube of bottom parallel conveyer belt 51 mounted in first from The one end of Timing Belt 13, first is connected with deflecting machine 12 from the other end of Timing Belt 13, in deflecting machine 12 and high-rise parallel transmission Second from Timing Belt 11 is set with driving wheel with 10 right sides;In bottom parallel conveyer belt 51 and/or high-rise parallel conveyer belt It is provided with 10 and the corresponding process equipment of station frock assembly 20 and location equipment.
Embodiment 1:Realize that line samsara works, take full advantage of space resources compared to traditional streamline, greatly Occupied ground area is reduced, fund has been saved, land use amount is reduced, technological process is simplified, by feed end and discharging End merges, and reduces an artificial amount, time saving and energy saving, efficient energy-saving.
Embodiment 2:Further improvement relative to embodiment 1 is, with autgmentability, is adapted to unmanned streamline, more It is advanced, can be paused without the time difference with upper and lower operation, more preferably efficiently, it is adapted to high-volume and processes.
It is vertically arranged by direction of warp and weft, further reduces floor space, realizes that automatic absorbing is transported by taking out electromagnet 7 It is defeated to be disengaged with demagnetization, it is easy to use, it is lossless.The application can flexibly coordinate respective process equipment according to actual needs, and positioning sets Standby convenient processing conveyer belt stress, reasonable in design, long service life.
Guide effect is played by riser guide 25, by supporting stand 22 and being fixedly connected the fixation of frame 21, is passed through Riser guide 25 plays guide effect, by supporting stand 22 and being fixedly connected the fixation of frame 21.The work of lifting pluck assembly 24 Work sequentially, pluck drive oil cylinder/electric pushrod 26- pluck driving wheel 28- plucks cingulum 27 commutate through pluck stator wheel 29- Pluck band tail end 30- hoistable platform assembly 23- platform connector 34- platform plates 37.Counterweight is eliminated compared to rack pinion, Simplify structure;Compared to simple hydraulic lifting, reduction is creeped, there is provided response speed and precision, accurate positioning are durable, It is flexible.
Lifting carries Rubber end cushion cylinder 31, and elevation travel switch 32 improves security, reasonable in design.
The job order of hoistable platform assembly 23:Platform drive motor 38-- conveyer belts or gear train transmission-platform driving wheel Axle 39+ platform follower shaft 41- platform conveyer belt 40- station frocks assembly 20.
Platform riser 36 is reasonable in design, stress science, improves the rigidity of cantilever design, and platform sliding block 35 is moved surely It is fixed;Platform band supports flat guided way 42 to improve the rigidity and bearing capacity of platform conveyer belt 40, and platform side positioning guiding plate 43 is determined Rationally, roller or ball reduction rub for position, receive and send out station frock assembly 20 steadily accurately.
Station positioning carries tire upper surface and can realize that face positions, and station tool locating hole 44 can realize that hole positions, station Frock is fixed V blocks 45 and realizes that horizontal plane is positioned with the cooperation of station frock movable clamping V blocks 47, and station tool locating groove 46 is prevented Workpiece is rotated in horizontal plane, and station frock clamping cylinder 48 is realized clamping, and station tool locating sensor 49 is used to induce position Put, it is ensured that transmission and accurate positioning;Station frock guided way 50 effectively carries roller or ball, so as to reduce friction.Station work Dress assembly 20 is reasonable in design, highly versatile, and autgmentability is strong, realizes six point locations, and clamped design rationally, reduces the system of special tooling Make cost.
The present embodiment is also included and also includes video monitoring camera 91, and described video monitoring camera is arranged at outer On the inwall of framework 1, for the dynamic of videograph processing site, the signal output part of the video monitoring camera is connected with video Monitoring host computer 92, the present embodiment video monitoring camera and video monitoring main frame can be directly from market using applications.
Reasonable in design, with low cost, durable, safe and reliable, simple to operate, time saving and energy saving, saving fund of the invention, Compact conformation and easy to use.
It is, in order to more clearly disclose, and just not enumerated for prior art that the present invention is fully described.
Finally it should be noted that:The above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although The present invention has been described in detail with reference to the foregoing embodiments, it will be understood by those within the art that:It still may be used Modified with to the technical scheme described in previous embodiment, or equivalent is carried out to which part technical characteristic;Make It is obvious for those skilled in the art are combined to multiple technical schemes of the invention.And these are changed or replace Change, do not make the spirit and scope of the essence disengaging embodiment of the present invention technical scheme of appropriate technical solution.

Claims (7)

1. a kind of multiple bay frock assembly conveyer, it is characterised in that:Including high-rise parallel conveyer belt (10), bottom latitude Line conveyer belt (51), parallel and high-rise parallel conveyer belt (10) directly over bottom parallel conveyer belt (51), respectively with bottom The oscilaltion device (2) of layer parallel conveyer belt (51) and high-rise parallel conveyer belt (10) procedure connection;
Station frock assembly (20) is given bottom parallel conveyer belt by high-rise parallel conveyer belt (10) by oscilaltion device (2) And/or station frock assembly (20) is given high-rise parallel by bottom parallel conveyer belt (51) by oscilaltion device (2) (51) Conveyer belt (10);
The left side drive of bottom parallel conveyer belt (51) is connected with the main drive belt (14) with drive motor, bottom latitude The right side driving wheel tube of line conveyer belt (51) is driven mounted in first from Timing Belt (13) one end, first from Timing Belt (13) other end Deflecting machine (12) is connected with, second is set with the driving wheel on the right side of deflecting machine (12) with high-rise parallel conveyer belt (10) from same Step band (11);
It is provided with bottom parallel conveyer belt (51) and/or high-rise parallel conveyer belt (10) corresponding with station frock assembly (20) Process equipment and location equipment;
Oscilaltion device (2) is for two and is located at respectively left in bottom parallel conveyer belt (51) and high-rise parallel conveyer belt (10) Right two ends, entry/exit material conveyer belt (15) is provided with the side of bottom parallel conveyer belt (51);
Station frock assembly (20) is given bottom parallel conveyer belt (51), bottom parallel conveyer belt by entry/exit material conveyer belt (15) (51) location equipment on after the workpiece positioning in station frock assembly (20) to passing through adding on bottom parallel conveyer belt (51) Construction equipment is processed to the workpiece;Station frock assembly (20) of workpiece is sent after bottom parallel conveyer belt (51) processes bottom To the oscilaltion device (2) of left end, the oscilaltion device (2) of left end lifts station frock assembly (20) and rises and give height Layer parallel conveyer belt (10);Location equipment on high-rise parallel conveyer belt (10) is to the workpiece positioning in station frock assembly (20) The workpiece is processed by the process equipment on high-rise parallel conveyer belt (10) afterwards;High-rise parallel conveyer belt (10) is by high level Station frock assembly (20) of workpiece gives the oscilaltion device (2) of right-hand member after processing, and the oscilaltion device (2) of right-hand member will Station frock assembly (20) is transferred and sends back to bottom parallel conveyer belt (51), and bottom parallel conveyer belt (51) is by the work of the workpiece Give entry/exit material conveyer belt (15) in position frock assembly (20);
Oscilaltion device (2) including outer framework (1), the support stand (22) being arranged in outer framework (1), be vertically arranged in branch Riser guide (25) in support stand (22), it is horizontally set between support stand (22) and outer framework (1) and is fixedly connected frame (21), hoistable platform assembly (23) and lifting pluck assembly (24);Hoistable platform assembly (23) is total for lifting station frock Into (20);
Lifting pluck assembly (24) one end is connected with support stand (22), and lifting pluck assembly (24) other end is total with hoistable platform Into (23) connection, lifting pluck assembly (24) drives hoistable platform assembly (23) to be moved up and down on riser guide (25);
Video monitoring camera is also included, described video monitoring camera is arranged on outer framework (1) inwall, video prison The signal output part for controlling camera is connected with video monitoring main frame.
2. multiple bay frock assembly conveyer according to claim 1, it is characterised in that:The process equipment bag Include manipulator (16), drilling machine (18), tapping machine (19), machine for removing bur, mark numbering machine and/or the cleaning wind for being set by operation respectively Machine (9);
The location equipment of bottom parallel conveyer belt (51) is bottom positioning electromagnet frame (17) or the jack being vertically arranged upwards;
The location equipment of high-rise parallel conveyer belt (10) is high-rise positioning electromagnet frame (8) or the jack being vertically arranged downwards.
3. multiple bay frock assembly conveyer according to claim 2, it is characterised in that:Lifting pluck assembly (24) drive oil cylinder/electric pushrod (26) including being arranged on the pluck of support stand (22) bottom straight up, be arranged on pluck The pluck driving wheel (28) for driving oil cylinder/electric pushrod (26) piston rod upper end, the pluck being arranged at the top of support stand (22) Stator wheel (29) and pluck cingulum (27);
Pluck cingulum (27) is set in N-type, and the right-hand member head of pluck cingulum (27) is connected to support stand (22) top, pluck tooth The lower surface of bottom right bending section envelope pluck driving wheel (28) of band (27), the upper left bending section envelope of pluck cingulum (27) The upper surface of pluck stator wheel (29), left end pluck band tail end (30) and the hoistable platform assembly (23) of pluck cingulum (27) Connection.
4. multiple bay frock assembly conveyer according to claim 2, it is characterised in that:In support stand (22) Top and bottom be respectively arranged with lifting with Rubber end cushion cylinder (31) and/or elevation travel switch (32).
5. multiple bay frock assembly conveyer according to claim 2, it is characterised in that:Hoistable platform assembly (23) platform below platform plate (37) is set in parallel in including horizontally disposed platform plate (37), at least two to stand Plate (36), the platform slide (33) being vertically arranged on the right side of platform riser (36), it is arranged on platform slide (33) right flank It is upper and moved up and down on riser guide (25) platform sliding block (35), be arranged on platform slide (33) top and with lifting pluck Platform connector (34) that the left end pluck of the pluck cingulum (27) of assembly (24) is connected with tail end (30), it is arranged on platform plate (37) platform drive motor (38) below, it is arranged on platform plate (37) upper surface and passes through with platform drive motor (38) The platform live axle (39) that conveyer belt or gear train are connected is parallel with platform live axle (39) and is correspondingly arranged at flat The platform follower shaft (41) of platform flat board (37) upper surface, it is sleeved on platform live axle (39) and platform follower shaft (41) And for lifting the platform conveyer belt (40) of station frock assembly (20), being arranged on platform plate (37) and positioned at top section Platform conveyer belt (40) below platform band support flat guided way (42) and be arranged on platform conveyer belt (40) horizontal both sides Platform side positioning guiding plate (43);Platform side positioning guiding plate (43) to station frock assembly (20) both sides for positioning.
6. multiple bay frock assembly conveyer according to claim 2, it is characterised in that:It is flat in the support of platform band The roller or ball being in rolling contact with platform conveyer belt (40) top section lower surface are provided with guided way (42).
7. the multiple bay frock assembly conveyer according to claim any one of 2-6, it is characterised in that:Station Frock assembly (20) carries tire, the station tool locating being vertically arranged on station positioning load tire including horizontally disposed station positioning Hole (44), be arranged on station tool locating hole (44) side station frock fix V blocks (45), be arranged on station frock fix V Station tool locating groove (46) on block (45), it is arranged on station tool locating hole (44) opposite side and is fixed with station frock The corresponding station frock movable clamping V blocks (47) of V blocks (45), it is arranged on station positioning and carries on tire and drive station frock activity folder Station frock clamping cylinder (48) of tight V blocks (47) motions, the station tool locating sensing for being arranged on station positioning load tire side Device (49) and it is arranged on station positioning and carries tire lower end and lower surface with the platform conveyer belt (40) of hoistable platform assembly (23) Station frock guided way (50) of upper surface.
CN201611164363.4A 2016-12-16 2016-12-16 A kind of conveyer of multiple bay frock assembly Withdrawn CN106743459A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611164363.4A CN106743459A (en) 2016-12-16 2016-12-16 A kind of conveyer of multiple bay frock assembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611164363.4A CN106743459A (en) 2016-12-16 2016-12-16 A kind of conveyer of multiple bay frock assembly

Publications (1)

Publication Number Publication Date
CN106743459A true CN106743459A (en) 2017-05-31

Family

ID=58892794

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611164363.4A Withdrawn CN106743459A (en) 2016-12-16 2016-12-16 A kind of conveyer of multiple bay frock assembly

Country Status (1)

Country Link
CN (1) CN106743459A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113401669A (en) * 2021-07-23 2021-09-17 博众精工科技股份有限公司 Charging tray transmission system

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5465827A (en) * 1994-04-26 1995-11-14 Daifuku Co., Ltd. Transport arrangement for movable members
CN102411871A (en) * 2011-12-29 2012-04-11 天津市源峰科技发展有限责任公司 Modular manufacture training unit device and modular combined manufacture training system
CN104122844A (en) * 2013-04-23 2014-10-29 纬创资通股份有限公司 Processing system and processing method
CN104891398A (en) * 2015-06-04 2015-09-09 安徽鲲鹏装备模具制造有限公司 Anti-falling lifting device
CN105501975A (en) * 2016-01-18 2016-04-20 湖州优创科技有限公司 Structural steel carrying mechanism
CN205366780U (en) * 2016-01-19 2016-07-06 杭州厚达自动化系统有限公司 Intelligence for stereoscopic warehouse jacking move and carry a device
CN205634099U (en) * 2016-04-12 2016-10-12 湖北省烟草公司黄冈市公司 Strip cigarette sorting machine divides family box autosegregation to loopback device
CN106185144A (en) * 2016-08-29 2016-12-07 成都艾维拓思科技有限公司 A kind of autonomous merchandising machine people's system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5465827A (en) * 1994-04-26 1995-11-14 Daifuku Co., Ltd. Transport arrangement for movable members
CN102411871A (en) * 2011-12-29 2012-04-11 天津市源峰科技发展有限责任公司 Modular manufacture training unit device and modular combined manufacture training system
CN104122844A (en) * 2013-04-23 2014-10-29 纬创资通股份有限公司 Processing system and processing method
CN104891398A (en) * 2015-06-04 2015-09-09 安徽鲲鹏装备模具制造有限公司 Anti-falling lifting device
CN105501975A (en) * 2016-01-18 2016-04-20 湖州优创科技有限公司 Structural steel carrying mechanism
CN205366780U (en) * 2016-01-19 2016-07-06 杭州厚达自动化系统有限公司 Intelligence for stereoscopic warehouse jacking move and carry a device
CN205634099U (en) * 2016-04-12 2016-10-12 湖北省烟草公司黄冈市公司 Strip cigarette sorting machine divides family box autosegregation to loopback device
CN106185144A (en) * 2016-08-29 2016-12-07 成都艾维拓思科技有限公司 A kind of autonomous merchandising machine people's system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113401669A (en) * 2021-07-23 2021-09-17 博众精工科技股份有限公司 Charging tray transmission system

Similar Documents

Publication Publication Date Title
CN206336754U (en) Station frock assembly conveyer with video recording apparatus
CN207313019U (en) One kind mechanical processing uses fast lifting transmission device
CN205763027U (en) A kind of novel three traction machines
CN206455407U (en) Save the station frock assembly conveyer of floor space
CN206750893U (en) Station frock assembly conveyer
CN106670661A (en) Laser cutting machine workbench interactive exchange system and control method
CN106743471A (en) Station frock assembly conveyer
CN106516685A (en) Station tool assembly conveying device with video recording device
CN106743459A (en) A kind of conveyer of multiple bay frock assembly
CN207226680U (en) A kind of automatic Nisc changing device
CN206750841U (en) Station frock assembly conveyer with safety device
CN212191733U (en) Laser cutting machine with hydraulic lifting exchange workbench
CN206263357U (en) A kind of double saw hauling machines of double end
CN106736576A (en) Save the station frock assembly conveyer of floor space
CN201201155Y (en) Floor combined horizontal lathe
CN106743323A (en) Station frock assembly conveyer with safety device
CN206466708U (en) A kind of assembly line lift and conveyer
CN206474955U (en) A kind of circulation reciprocating type automatic feed system
CN214518246U (en) Three-station exchange type circulating platform laser cutting machine
CN212371446U (en) Laser cutting machine change table
CN212711553U (en) Feeding device
CN205802178U (en) A kind of semi-automatic aerial conveying suspender
CN208856361U (en) A kind of solid solution furnace disengaging material conveying device
CN106424401A (en) Automatic U-shaped pipe conveying and shrinking mechanism
CN206666027U (en) A kind of cylinder type lifting mechanism of full-automatic net puller

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20170531

WW01 Invention patent application withdrawn after publication