The content of the invention
It is an object of the invention to provide a kind of environmental protection building material production sewage that can effectively solve above-mentioned technical problem
Processing equipment.
To reach the purpose of the present invention, adopt the following technical scheme that:
A kind of environmental protection building material production sewage disposal device, the environmental protection building material production is included with sewage disposal device
First frame device, the first filter being arranged on first frame device, positioned at first filter lower section
Settler, the second framework device on the right side of first frame device, be contained in the second framework device
Second filter, the 3rd frame device below first frame device, it is arranged on the 3rd frame device
The 3rd filter, the holder device that is contained in the 3rd frame device and be arranged on the 3rd frame device
Electric machine, first frame device include the first framework, the drinking-water pipe on the left of first framework, be arranged at it is described
Water pump, the first valve on drinking-water pipe, the first cross bar on the right side of the water pump, it is contained in first framework left and right two
First swash plate of side, the sealing frame above first swash plate and the first screen pack on the left of the sealing frame, institute
The first filter is stated including the first electric cylinders, the first support positioned at the first electric cylinders left and right sides, positioned at the described first electricity
The first catch bar below cylinder, the first push pedal below first catch bar, below first push pedal
One sponge block, the second screen pack below first sponge block, positioned at the first sponge block left and right sides first
Spring, the settler is including the first transverse slat, the 3rd screen pack below first transverse slat, positioned at the 3rd mistake
Precipitation frame below filter screen, the first sealing block above first transverse slat, it is arranged at described first sealing block or so two
First montant of side, the first baffle below first montant, the second spring being arranged on the first baffle, receipts
The second cross bar of the left and right sides in first framework is dissolved in, first roller of described second cross bar one end is arranged at and is acted against
The first bracing wire on first roller, the second framework device includes the first pipeline, is arranged on first pipeline
Second valve, the second framework below first pipeline, the second support on the left of the second framework, positioned at institute
State the first fix bar on the left of second support, the second fix bar on the left of first fix bar, positioned at described second
The 3rd fix bar below frame, the second pipe below the second framework and be arranged on the second pipe the 3rd
Valve, second filter includes the 4th screen pack, the 4th fix bar, position positioned at the 4th screen pack left and right sides
The 3rd spring above the 4th fix bar, the branching block below the 4th screen pack and positioned at the branching block
5th screen pack of the left and right sides, the 3rd frame device includes the 3rd framework, the discharge below the 3rd framework
The 4th valve manage, being arranged on the discharge pipe and the concentration block being contained in the 3rd framework, the 3rd filtering dress
Put including the second electric cylinders, the 3rd cross bar on the right side of second electric cylinders, the 3rd support on the left of second electric cylinders,
The second catch bar below second electric cylinders, the second push pedal below second catch bar, positioned at described
It is the second sponge block below two push pedals, the second transverse slat below second sponge block, right positioned at second sponge block
3rd transverse slat of side, the second roller above the 3rd transverse slat and the first projection being arranged on second roller,
The holder device is including the second swash plate, the second montant on the left of second swash plate, positioned at second montant lower section
The 4th cross bar, the 3rd montant above second swash plate, the sponge column for being arranged at the 3rd montant lower end and position
Starting stave below second swash plate, the electric machine includes motor, output shaft, the position being arranged on the motor
Bent stick below the motor, the second bracing wire being arranged on the output shaft, the on the left of the motor the 4th erect
Bar, the 3rd roller for being arranged at the 4th montant lower end, the 6th screen pack below the 3rd roller, it is arranged at institute
State the 4th spring on the 6th screen pack and the fixed block below the 6th screen pack.
Compared with prior art, the present invention has the advantages that:Environmental protection building material production sewage disposal of the present invention
Equipment can thoroughly be filtered to sewage, effectively dispose the impurity such as particle, dust in sewage, good filtration effect,
Disclosure satisfy that it is existing to sewage water filtration the need for, and can cause that sewage is sufficiently precipitated, in thoroughly removing sewage
Granule foreign.
Specific embodiment
Clearly complete explanation is made to environmental protection building material production sewage disposal device of the present invention below in conjunction with accompanying drawing.
As shown in figure 1, environmental protection building material production sewage disposal device of the present invention includes the first frame device 1, is arranged at
The first filter 2 on first frame device 1, the settler 3 positioned at the lower section of first filter 2, it is located at
The second framework device 4 on the right side of first frame device 1, the second filter being contained in the second framework device 4
5th, positioned at the lower section of first frame device 1 the 3rd frame device 6, the 3rd mistake being arranged on the 3rd frame device 6
Filter device 7, the holder device 8 being contained in the 3rd frame device 6 and the motor being arranged on the 3rd frame device 6
Device 9.
As shown in figure 1, first frame device 1 includes the first framework 11, taking out positioned at the left side of first framework 11
Water pipe 12, the water pump 13 being arranged on the drinking-water pipe 12, the first valve 14, the first cross bar positioned at the right side of the water pump 13
15th, the first swash plate 16 of the left and right sides in first framework 11, the sealing frame positioned at the top of first swash plate 16 are contained in
17 and the first screen pack 18 positioned at the left side of the sealing frame 17.First framework 11 is in hollow cuboid and puts vertically
Put, first framework 11 is provided with the first through hole 111 positioned at its right surface, the second through hole 112 positioned at its left surface, institute
State first through hole 111, the second through hole 112 is rounded and is communicated with the inside of first framework 11.The drinking-water pipe 12 it is upper
End alignment second through hole 112 and be fixedly connected with the left surface of first framework 11 so that the drinking-water pipe 12 it is interior
Portion communicates with the inside of first framework 11.The water pump 13 is connected with power supply, it is normally run, the water pump 13
Switch is provided with, facilitates it to open or close, can be pumped into sewage in the drinking-water pipe 12 by the water pump 13.Described
One valve 14 is used to control the flow of water in the drinking-water pipe 12.First cross bar 15 is horizontal, first cross bar 15
Left end be fixedly connected with the water pump 13, the right-hand member of first cross bar 15 is fixedly connected with first framework 11.It is described
First swash plate 16 is provided with two and the left and right sides being located at respectively in first framework 11, and first swash plate 16 is inclined
Shape, the upper end of first swash plate 16 is fixedly connected with the inner surface of first framework 11, first swash plate 16 it is front and rear
Surface is fixedly connected with the inner surface of first framework 11.The sealing frame 17 is in hollow cuboid, the sealing frame 17
Cross section be in concave shape, the upper surface of the sealing frame 17 is fixedly connected with the inner surface of first framework 11, described close
Envelope frame 17 can be made of rubber and other encapsulants.First screen pack 18 is in vertical shape, first screen pack
18 upper end is fixedly connected with the inner surface of first framework 11, the lower end of first screen pack 18 and first swash plate
16 are fixedly connected, and the front and rear surfaces of first screen pack 18 are fixedly connected with the inner surface of first framework 11, and described
One screen pack 18 can carry out preliminary filtering to sewage.
As shown in figure 1, first filter 2 is including the first electric cylinders 21, positioned at the left and right sides of the first electric cylinders 21
First support 22, the first catch bar 23 positioned at the lower section of first electric cylinders 21, positioned at the lower section of first catch bar 23
First push pedal 24, the first sponge block 25 positioned at the lower section of first push pedal 24, positioned at the lower section of first sponge block 25 the
Two screen packs 26, the first spring 27 positioned at the left and right sides of the first sponge block 25.First electric cylinders 21 are connected with power supply,
It is normally run, first electric cylinders 21 are provided with switch, facilitate it to open or close, first electric cylinders 21
In the top of first framework 11.The first support 22 is provided with two, and the first support 22 is L-shaped, described first
The upper end of frame 22 is fixedly connected with the side of first electric cylinders 21, the lower end of the first support 22 and first framework 11
It is fixedly connected.First catch bar 23 is in cylinder and places vertically, the upper end of first catch bar 23 and described first
Electric cylinders 21 are connected so that first electric cylinders 21 can drive first catch bar 23 to move up and down, first catch bar
23 through first framework 11 surfaces externally and internallies and be slidably connected with it so that first catch bar 23 can smoothly be gone up
Lower movement, the lower end of first catch bar 23 is fixedly connected with first push pedal 24, and first catch bar 23 runs through institute
State the surfaces externally and internally of sealing frame 17 and be slidably connected with it.First push pedal 24 is in cuboid and horizontal positioned, described first
The lower surface of push pedal 24 is fixedly connected with the upper surface of first sponge block 25.First sponge block 25 is in cuboid, institute
State the first sponge block 25 to be located between first swash plate 16, the lower end of first swash plate 16 and first sponge block 25
Side is slidably connected so that first sponge block 25 can be compressed and diastole between first swash plate 16, when first
When sponge block 25 is compressed, it can fully filter out the granule foreign in sewage so that more preferable to wastewater purifying efficiency, described
The front and rear surfaces of the first sponge block 25 are slidably connected with the inner surface of first framework 11.Second screen pack 26 is in rectangular
Body and horizontal positioned, the lower surface of first sponge block 25 are fixedly connected with the upper surface of second screen pack 26.It is described
Second screen pack 26 is located at the lower section of first swash plate 16.First spring 27 is provided with two, and first spring 27 is in
Vertical shape, the lower end of first spring 27 is fixedly connected with second screen pack 26, the upper end of first spring 27 with
First swash plate 16 is fixedly connected, and then second screen pack 26 is played a supporting role.
As shown in figure 1, the settler 3 includes the first transverse slat 31, the 3rd mistake positioned at the lower section of first transverse slat 31
Filter screen 32, precipitation frame 33, the first sealing block positioned at the top of first transverse slat 31 positioned at the lower section of the 3rd screen pack 32
36th, the first montant 35 of the left and right sides of the first sealing block 36, the first gear positioned at the lower section of first montant 35 are arranged at
Plate 34, the second spring 37 being arranged on the first baffle 34, be contained in the left and right sides in first framework 11 second
Cross bar 38, the first roller 39 for being arranged at described one end of second cross bar 38 and act against the first bracing wire on first roller 39
30.First transverse slat 31 is in cuboid and horizontal positioned, the side of first transverse slat 31 and first framework 11
Surface is fixedly connected, and first transverse slat 31 is provided with the third through-hole 311 through its upper and lower surface, the third through-hole 311
It is square.3rd screen pack 32 is the cylinder of annulus in cross section, and the 3rd screen pack 32 is placed vertically, the described 3rd
The upper surface of screen pack 32 is fixedly connected with the lower surface of first transverse slat 31, and the 3rd screen pack 32 is located at the described 3rd
The lower section of through hole 311, the lower surface of the 3rd screen pack 32 is fixedly connected with the upper surface of the precipitation frame 33 so that described
The inside of the 3rd screen pack 32 communicates with the inside of the precipitation frame 33.The precipitation frame 33 is the cylinder of annulus in cross section,
The lower surface of the precipitation frame 33 is fixedly connected with the inner surface of first framework 11, and sewage can be with the precipitation frame 33
Precipitation.First sealing block 36 is in cuboid and horizontal positioned, and first sealing block 36 is provided with positioned at its lower surface
First groove 362 and the fourth hole 361 on surface disposed thereon, first groove 362 is in rectangular-shape and positioned at described the
The top of three through holes 311, the third through-hole 311 is communicated with first groove 362, the fourth hole 361 it is rounded and
Communicated with first groove 362, the lower surface of first sealing block 36 is fixed with the upper surface of first transverse slat 31 and connected
Connect, first sealing block 36 is located at the top of the third through-hole 311.The first baffle 34 is provided with two and is located at respectively
The left and right sides of the top of first transverse slat 31, first transverse slat 34 is in cuboid and horizontal positioned, the first baffle 34
One end be contained in first groove 362 and be slidably connected with first sealing block 36, under the first baffle 34
Surface is connected with the upper surface slide of first transverse slat 31, and the first baffle 34 for being contained in first groove 362 is mutually pushed up
It is close together, such that it is able to seal the third through-hole 311 so that the sewage of the top of the first sealing block 36 cannot pass through threeway
Hole 311 enters into the lower section of the first transverse slat 31.First montant 35 is provided with two and respectively positioned at the first baffle 34
Top, first montant 35 is in cuboid and places vertically, and the lower end of first montant 35 is solid with the first baffle 34
Fixed connection.The second spring 37 is provided with two and respectively positioned at the left and right sides of the first baffle 34, the second spring
37 is horizontal, and one end of the second spring 37 is fixedly connected with the inner surface of first framework 11, the second spring
37 other end is fixedly connected with the end of the first baffle 34, and the second spring 37 is in compressive state, and then to institute
First baffle 34 is stated to play a supporting role.Second cross bar 38 is provided with two, and second cross bar 38 is in cuboid and level
Place, one end of second cross bar 38 is fixedly connected with the inner surface of first framework 11, second cross bar 38 it is another
One end is provided with the second groove, and second groove is in rectangular-shape.First roller 39 is provided with two, first roller 39
In cylinder, first roller 39 is contained in second groove and pivotally connected with second cross bar 38 so that institute
Stating the first roller 39 can rotate in second groove.First bracing wire 30 is provided with two, first bracing wire 30
Upper end is fixedly connected with the side of second screen pack 26, and the other end of first bracing wire 30 is solid with first montant 35
Fixed connection, first bracing wire 30 is through second groove and acts against on first roller 39, and then to described first
Bracing wire 30 is played a supporting role.
As shown in figure 1, the second framework device 4 includes the first pipeline 41, be arranged on first pipeline 41 the
Two valves 42, the second framework 46 positioned at the lower section of first pipeline 41, the second support positioned at the left side of the second framework 46
43rd, positioned at the left side of the second support 43 the first fix bar 44, the second fix bar positioned at the left side of first fix bar 44
45th, positioned at the lower section of the second support 43 the 3rd fix bar 47, the second pipe 48 positioned at the lower section of the second framework 46 and
It is arranged at the 3rd valve 49 on the second pipe 48.The upper end of first pipeline 41 be aligned the first through hole 111 and
Right surface with first framework 11 is fixedly connected so that in the inside of first pipeline 41 and first framework 11
Portion communicates.Second valve 42 is used to control the flow of water in first pipeline 41.The second framework 46 is in hollow
Semicylinder shape, the second framework 46 is provided with fifth hole 461 and the 6th through hole 462 positioned at its lower surface, described
Five through holes 461 and the 6th through hole 462 are communicated with the inside of the second framework 46, described in the lower end aligned of first pipeline 41
Fifth hole 461 and be fixedly connected with the upper surface of the second framework 46 so that the inside of first pipeline 41 with it is described
The inside of second framework 46 communicates.The second support 43 is L-shaped, the upper end of the second support 43 and first framework 11
It is fixedly connected, the lower end of the second support 43 is fixedly connected with the second framework 46.The right-hand member of first fix bar 44
It is fixedly connected with the second support 43, the left end of first fix bar 44 is fixedly connected with second fix bar 45.Institute
The upper end for stating the second fix bar 45 is fixedly connected with first framework 11.3rd fix bar 47 is oblique, and described the
The upper end of three fix bars 47 is fixedly connected with the second framework 46.The upper end of the second pipe 48 is directed at the 6th through hole
462 and it is fixedly connected with the lower surface of the second framework 46 so that the inside of the second pipe 48 and the second framework
46 inside communicates.3rd valve 49 is used to control the flow of water in the second pipe 48.
As shown in figure 1, second filter 5 is including the 4th screen pack 51, positioned at the 4th screen pack 51 or so
4th fix bar 52 of both sides, the 3rd spring 53 positioned at the top of the 4th fix bar 52, positioned at the 4th screen pack 51
The branching block 54 of lower section and the 5th screen pack 55 positioned at the left and right sides of the branching block 54.4th screen pack 51 it is transversal
Face is in bending, and the front and rear surfaces of the 4th screen pack 51 are slidably connected with the inner surface of the second framework 46, and described the
Four screen packs 51 are located at the lower section of the fifth hole 461.4th fix bar 52 is provided with two and is located at described the respectively
The left and right sides of four screen packs 51, one end of the 4th fix bar 52 is fixedly connected with the side of the 4th screen pack 51.
3rd spring 53 is provided with two, and the upper end of the 3rd spring 53 is fixedly connected with the inner surface of the second framework 46,
The lower end of the 3rd spring 53 is fixedly connected with the 4th fix bar 52, and then to the 4th fix bar 52 and the 4th mistake
Filter screen 51 is played a supporting role.The cross section of the branching block 54 is in isosceles trapezoid, and the lower surface of the branching block 54 is provided with the
Three grooves 541, the lower surface of the branching block 54 is fixedly connected with the inner surface of the second framework 46, the 6th through hole
462 communicate with the 3rd groove 541.5th screen pack 55 is provided with two, and the 5th screen pack 55 is in bending, institute
The upper end for stating the 5th screen pack 55 is fixedly connected with the inner surface of the second framework 46, the lower end of the 5th screen pack 55 with
The side of the branching block 54 is fixedly connected, the front and rear surfaces of the 5th screen pack 55 and the inner surface of the second framework 46
It is fixedly connected, and then sewage can be filtered.
As shown in figure 1, the 3rd frame device 6 includes the 3rd framework 61, the row positioned at the lower section of the 3rd framework 61
Outlet pipe 62, the 4th valve 63 being arranged on the discharge pipe 62 and the concentration block 64 being contained in the 3rd framework 61.Institute
The 3rd framework 61 is stated in hollow cuboid and placement vertically, the 3rd framework 61 is provided with leads to positioned at the 7th of its right surface
Hole 611 and the 8th through hole 612 positioned at its lower surface, the 7th through hole 611 and the 8th through hole 612 are rounded and with described
The inside of three frameworks 61 communicates, the 7th through hole 611 described in the lower end aligned of the second pipe 48 and with the 3rd framework 61
Right surface be fixedly connected, the lower end of the 3rd fix bar 47 is fixedly connected with the right surface of the 3rd framework 61.It is described
The upper end of discharge pipe 62 is directed at the 8th through hole 612 and is fixedly connected with the lower surface of the 3rd framework 61 so that described
The inside of discharge pipe 62 communicates with the inside of the 3rd framework 61.4th valve 63 is used to control in the discharge pipe 62
The flow of water.The rectangular triangle in cross section of the concentration block 64, the lower surface of the concentration block 64 and its left surface and institute
The inner surface for stating the 3rd framework 61 is fixedly connected, and water can be focused on its right side, the concentration block 64 by the concentration block 64
In the left side of the 8th through hole 612.
As shown in figure 1, the 3rd filter 7 includes the second electric cylinders 71, positioned at the right side of second electric cylinders 71 the
Three cross bars 72, the 3rd support 74 positioned at the left side of second electric cylinders 71, the second promotion positioned at the lower section of second electric cylinders 71
Bar 73, the second push pedal 75 positioned at the lower section of second catch bar 73, the second sponge block positioned at the lower section of second push pedal 75
76th, positioned at the lower section of second sponge block 76 the second transverse slat 77, the 3rd transverse slat 78 positioned at the right side of second sponge block 76,
Positioned at second roller 79 and the first projection 70 for being arranged on second roller 79 of the top of the 3rd transverse slat 78.Described
Two electric cylinders 71 are connected with power supply, it is normally run, and second electric cylinders 71 are provided with switch, facilitate its dozen of on or off
Close.3rd cross bar 72 is in cuboid, and the left end of the 3rd cross bar 72 is fixedly connected with second electric cylinders 71, and described the
The right-hand member of three cross bars 72 is fixedly connected with second fix bar 45.3rd support 74 is in concave shape, the 3rd support
74 upper end is fixedly connected with second electric cylinders 71, the lower end of the 3rd support 74 and the left surface of the 3rd framework 61
It is fixedly connected.Second catch bar 73 is in vertical shape, and the upper end of second catch bar 73 is connected with second electric cylinders 71,
Allow that second electric cylinders 71 drive second catch bar 73 to move up and down, the lower end of second catch bar 73 and institute
The upper surface for stating the second push pedal 75 is fixedly connected, second catch bar 73 through the 3rd framework 61 surfaces externally and internally and with
It is slidably connected so that second catch bar 73 can be moved up and down smoothly.Second push pedal 75 is oblique, described
The left surface of the second push pedal 75 is slidably connected with the inner surface of the 3rd framework 61, the front and rear surfaces of second push pedal 75 with
The inner surface of the 3rd framework 61 is slidably connected, the upper table of the lower surface of second push pedal 75 and second sponge block 76
Face is fixedly connected, and the right-hand member of second push pedal 75 is slidably connected with the left surface of the 3rd transverse slat 78.Second sponge
The cross section of block 76 is in a rectangular trapezoid, and the left surface of second sponge block 76 is slided with the inner surface of the 3rd framework 61 and connected
Connect, the lower surface of second sponge block 76 is fixedly connected with the upper surface of second transverse slat 77, second sponge block 76
Right surface be slidably connected with the left surface of the 3rd transverse slat 78, the front and rear surfaces of second sponge block 76 and the described 3rd
The inner surface of framework 61 is slidably connected.Second transverse slat 77 is in cuboid and horizontal positioned, the left end of second transverse slat 77
Inner surface with the 3rd framework 61 is fixedly connected, in the front and rear surfaces of second transverse slat 77 and the 3rd framework 61
Surface is fixedly connected.3rd transverse slat 78 is in cuboid and horizontal positioned, the right-hand member and the described 3rd of the 3rd transverse slat 78
The inner surface of framework 61 is fixedly connected, and the front and rear surfaces of the 3rd transverse slat 78 are fixed with the inner surface of the 3rd framework 61 and connected
Connect, the 3rd transverse slat 78 is located at the lower section of the 7th through hole 611.Second roller 79 is in cylinder, second rolling
Wheel 79 is pivotally connected with the 3rd framework 61 so that second roller 79 can rotation, institute in the 3rd framework 61
The second roller 79 and motor connection are stated, the active rotation of the second roller 79 is driven.First projection 70 be provided with several and
It is evenly distributed on second roller 79, first projection 70 is fixedly connected with second roller 79.
As shown in figure 1, the holder device 8 includes the second swash plate 81, is erected positioned at the second of the left side of second swash plate 81
Bar 82, the 4th cross bar 83 positioned at the lower section of second montant 82, the 3rd montant 84 positioned at the top of second swash plate 81, set
It is placed in the sponge column 85 and the starting stave 86 positioned at the lower section of second swash plate 81 of the lower end of the 3rd montant 84.Described second
Swash plate 81 is oblique, and the upper end of second swash plate 81 is fixedly connected with the lower surface of second transverse slat 77, and described second
The front and rear surfaces of swash plate 81 are fixedly connected with the inner surface of the 3rd framework 61.Second montant 82 is in vertical shape, described
The upper end of the second montant 82 is fixedly connected with second transverse slat 77, the lower end of second montant 82 and the 3rd cross bar 83
It is fixedly connected.The left end of the 4th cross bar 83 is fixedly connected with the 3rd framework 61, the right-hand member of the 4th cross bar 83 with
Second swash plate 81 is fixedly connected, and then it is played a supporting role.3rd montant 84 is in cuboid and places vertically,
The upper end of the 3rd montant 84 is fixedly connected with the lower surface of the 3rd transverse slat 78, and the lower end of the 3rd montant 84 is provided with
4th groove.The sponge column 85 is in cylinder, and the sponge column 85 is contained in the 4th groove and perpendicular with the described 3rd
Bar 84 is pivotally connected so that the sponge column 85 can rotate in the 4th groove, the sponge column 85 and motor connection,
Its active rotation is driven, the sponge column 85 is acted against on second swash plate 81.The starting stave 86 is in vertical shape, described
The upper end of starting stave 86 is fixedly connected with the lower end of second swash plate 81, the front and rear surfaces of the starting stave 86 with it is described
The inner surface of the 3rd framework 61 is fixedly connected.
As shown in figure 1, the electric machine 9 is including motor 91, the output shaft 92 being arranged on the motor 91, positioned at institute
The bent stick 93 of stating the lower section of motor 91, the second bracing wire 94 being arranged on the output shaft 92, positioned at the left side of the motor 91
4th montant 95, the 3rd roller 96 for being arranged at the lower end of the 4th montant 95, the positioned at the lower section of the 3rd roller 96 the 6th
Screen pack 98, the 4th spring 99 being arranged on the 6th screen pack 98 and the fixation positioned at the lower section of the 6th screen pack 98
Block 97.The motor 91 is connected with power supply, it is normally run, and the motor 91 is provided with switch, facilitate its open or
Person closes, and the left surface of the motor 91 is fixedly connected with the right surface of the 3rd framework 61.The output shaft 92 is in cylinder
Body, one end of the output shaft 92 is connected with the motor 91 so that the motor 91 can drive the output shaft 92 to rotate.
The bent stick 93 is in bending, and the upper end of the bent stick 93 is fixedly connected with the motor 91, under the bent stick 93
End is fixedly connected with the 3rd framework 61.The right-hand member of second bracing wire 94 is fixedly connected with the output shaft 92, and described
The left end of two bracing wires 94 runs through the surfaces externally and internally of the 3rd framework 61 and is slidably connected with it, the left end of second bracing wire 94
Upper end with the 6th screen pack 98 is fixedly connected.4th montant 95 is in cuboid and places vertically, and the described 4th erects
The upper end of bar 95 is fixedly connected with the 3rd transverse slat 78, and the lower end of the 4th montant 95 is provided with the 5th groove.Described 3rd
Roller 96 is in cylinder, and the 3rd roller 96 is contained in the 5th groove and pivotally connected with the 4th montant 95,
Allow that the 3rd roller 96 rotates in the 5th groove, second bracing wire 94 passes through the 5th groove and top
Lean against on the 3rd roller 96.The fixed block 97 be in cuboid and horizontal positioned, the right-hand member of the fixed block 97 with it is described
The inner surface of the 3rd framework 61 is fixedly connected.6th screen pack 98 is in bending, the front and rear table of the 6th screen pack 98
Face is slidably connected with the inner surface of the 3rd framework 61, in the lower end of the 6th screen pack 98 and the 3rd framework 61
Surface is fixedly connected, the upper end of the 6th screen pack 98 act against on the inner surface of the 3rd framework 61 and with its company of slip
Connect, the center section of the 6th screen pack 98 is acted against on the right surface of the starting stave 86, and then cause the described 6th
Screen pack 98 can carry out double filtration to sewage.The left end of the 4th spring 99 is fixed with the 6th screen pack 98 and connected
Connect, the right-hand member of the 4th spring 99 is fixedly connected with the inner surface of the 3rd framework 61, the 4th spring 99 is in pressure
Contracting state, the 4th spring 99 promotes the 6th screen pack 98 to the left.6th screen pack 98 uses elastomeric material
It is made, makes it can be with flexural deformation.
As shown in figure 1, when the environmental protection building material production sewage disposal device of the present invention is used, being drawn water described first
The lower end of pipe 12 is placed in sewage.Then the switch of water pump 13 is opened, while opening the first valve 14 so that water pump 13 is by dirt
Water is pumped into the drinking-water pipe 12, is then entered into first framework 11 by the second through hole 112.Enter into described
Sewage in one framework 11 first passes around the preliminary filtering of first screen pack 18, and first screen pack 18 can be by sewage
The larger particle filtering of middle volume falls.Then sewage focuses on the top between first swash plate 16, then by the first sea
The lower section of first swash plate 16 is entered into after the filtering of continuous block 25.Then it is in described first by the sewage after preliminary filtering
The top of transverse slat 31, now first baffle 34 mutually lean together so that sewage on the first transverse slat 31 cannot pass through the 3rd
Through hole 311 enters into the lower section of the first transverse slat 31, and is ensureing to pass through in the case that the second screen pack 26 will not be moved down
Open the first electric cylinders 21 so that the first catch bar 23 presses down on the first push pedal 24, and then causes that the first sponge block 25 is compressed,
So that the first sponge block 25 can filter out most granule foreign in sewage so that its filter effect is more preferable, together
When sewage be in the first transverse slat 31 on, settlement of sewage can be caused.After sewage all by after the filtering of the first sponge block 25,
One electric cylinders 21 cause that the first catch bar 23 continues to move down so that first push pedal 24 continues to press down on the first sponge block
25 so that the screen pack 26 of first sponge block 25 and second is moved down, and first spring 27 is stretched, due to the second mistake
Filter screen 26 is moved down, by first bracing wire 30 so that the first baffle 34 causes that first is oblique to two side shiftings
The sewage of the lower section of plate 16 is entered into first groove 362 by fourth hole 361, and between first baffle 34, so
Entered into the precipitation frame 33 by third through-hole 311 afterwards, because the height of fourth hole 361 is upper higher than the first transverse slat 31
Surface so that the impurity being settled out cannot be entered under first transverse slat 31 through fourth hole 361 and third through-hole 311
Side.Water precipitation frame 33 in precipitation, after the water surface be higher by precipitation frame 33 upper surface after, water by the 3rd screen pack 32 filtering to
Outside is spread, and by the filtering of the 3rd screen pack 32, the granule foreign being settled out is deposited on the bottom in the precipitation frame 33.
Then the second valve 42 is opened so that the oettIed sewage is entered into first pipeline 41, then into described
In second framework 46, the filtering of the 4th screen pack 51,53 pairs, the 3rd spring the 4th screen pack 51 are first passed around
Play a supporting role, and when water is struck on the 4th screen pack 51, the 4th screen pack 51 is rocked, and filters it
It is in hgher efficiency, and the generation of clogging can be prevented.Then sewage is described by being entered into after the filtering of the 5th screen pack 55
In 3rd groove 541, then entered into the second pipe 48 by the 6th through hole 462.Now open the 3rd valve
49 so that the sewage in the second pipe 48 is entered into the 3rd framework 61.Now open and be connected with the second roller 79
Motor so that second roller 79 rotates, and then drives first projection 70 to rotate with, such that it is able to sewage is stirred
It is even, prevent clogging second sponge block 76.Then by entering into second swash plate after the filtering of second sponge block 76
On 81, when in the sewage entered into the 3rd framework 61 impurity seldom and need not continue to filtering when, can open
Second electric cylinders 71 so that second catch bar 73 is moved down, and then cause that second push pedal 75 presses down on the second sea
Continuous block 76 so that second sponge block 76 is compressed, until the right-hand member of second push pedal 75 moves to the 3rd transverse slat
78 lower section, and then cause that the upper surface that the sewage entered into the 3rd framework 61 slips over second push pedal 75 is directly flowed
Move on second swash plate 81.Then the motor being connected with sponge column 85 is opened so that the sponge column 85 rotates, Jin Erke
To play a part of scrub to second swash plate 81, and certain filtration can be played to sewage.Then sewage is passed through
The lower section of the 6th screen pack 98 is entered into after the filtering of the upper end and its lower end of crossing the 6th screen pack 98, then into institute
State in discharge pipe 62, now open the 4th valve 63, can by purification after free of contamination sewage discharge.It is oblique when flowing to second
When sewage impurity on plate 81 seldom needs not continue to filter or need the efficiency for accelerating to filter, the switch of motor 91 is opened,
So that the output shaft 92 rotates, and then causes that second bracing wire 94 is tightened up, the 6th screen pack 98 is then caused
Upper end is moved up, and then causes the 6th screen pack 98 flexural deformation so that the 6th screen pack 98 is no longer acted against
On the starting stave 86, so that sewage flows through from the space between the 6th screen pack 98 and the starting stave 86, directly
All discharged to by the water after purification.So far, environmental protection building material production of the present invention is complete using process description with sewage disposal device
Finish.