Summary of the invention
The purpose of the present invention is to provide the environmental protection building material production sewage that one kind can effectively solve above-mentioned technical problem
Processing equipment.
For the purpose for reaching the present invention, adopt the following technical scheme that
A kind of environmental protection building material production sewage disposal device, the environmental protection building material production include with sewage disposal device
First frame device, is located at below first filter device the first filter device being set on first frame device
Settler, the second framework device on the right side of first frame device, be contained in the second framework device
Second filter device, is set on the third frame device third frame device below first frame device
Third filter device, the holder device that is contained in the third frame device and be set on the third frame device
Electric machine, first frame device include the first framework, the drinking-water pipe on the left of first framework, be set to it is described
Water pump, the first valve on drinking-water pipe, the first crossbar on the right side of the water pump are contained in left and right two in first framework
First inclined plate of side, the sealing frame above first inclined plate and the first filter screen on the left of the sealing frame, institute
The first filter device is stated to include the first electric cylinders, the first support at left and right sides of first electric cylinders, be located at first electricity
The first catch bar below cylinder, the first push plate below first catch bar, below first push plate
One sponge block, the second filter screen below first sponge block, first at left and right sides of first sponge block
Spring, the settler include the first transverse slat, the third filter screen below first transverse slat, are located at the third mistake
Precipitating frame below strainer, the first sealing block above first transverse slat are set to first sealing block or so two
First vertical bar of side, the second spring being set on the first baffle, is received the first baffle below first vertical bar
It is dissolved in the second crossbar of the left and right sides in first framework, first idler wheel of described second crossbar one end is set to and acts against
The first bracing wire on first idler wheel, the second framework device include first pipe, are set in the first pipe
Second valve, the second support on the left of the second framework, is located at institute at the second framework below the first pipe
It states the first fixed link on the left of second support, the second fixed link on the left of first fixed link, be located at described second
Third fixed link below frame, the second pipe below the second framework and the third being set on the second pipe
Valve, second filter device include the 4th filter screen, the 4th fixed link at left and right sides of the 4th filter screen, position
Third spring above the 4th fixed link, the branching block below the 4th filter screen and be located at the branching block
5th filter screen of the left and right sides, the third frame device include third framework, the discharge below the third framework
The 4th valve that manage, is set on the discharge pipe and it is contained in the intracorporal concentration block of the third frame, the third filtering dress
Set including the second electric cylinders, the third cross bar on the right side of second electric cylinders, the third bracket on the left of second electric cylinders,
The second catch bar below second electric cylinders, is located at described the at the second push plate below second catch bar
The second sponge block below two push plates, the second transverse slat below second sponge block are located at the second sponge block right side
The third transverse slat of side, the second idler wheel above the third transverse slat and the first convex block being set on second idler wheel,
The holder device includes the second inclined plate, the second vertical bar on the left of second inclined plate, is located at below second vertical bar
The 4th cross bar, the third vertical bar above second inclined plate, the sponge column for being set to third vertical bar lower end and position
Starting stave below second inclined plate, the electric machine include motor, the output shaft being set on the motor, position
It is bent stick below the motor, the second bracing wire being set on the output shaft, the on the left of the motor the 4th perpendicular
Bar, the 6th filter screen below the third idler wheel, is set to institute at the third idler wheel for being set to the 4th vertical bar lower end
State the 4th spring on the 6th filter screen and the fixed block below the 6th filter screen.
Compared with prior art, the invention has the following beneficial effects: environmental protection building material production sewage treatments of the present invention
Equipment can thoroughly filter sewage, effectively dispose the impurity such as particle, the dust in sewage, and filter effect is good,
It can satisfy the existing needs to sewage water filtration, and can sewage adequately be precipitated, thoroughly remove in sewage
Granule foreign.
Specific embodiment
Clear and complete explanation is made with sewage disposal device to environmental protection building material production of the present invention below in conjunction with attached drawing.
As shown in Figure 1, environmental protection building material production sewage disposal device of the present invention includes the first frame device 1, is set to
The first filter device 2 on first frame device 1, is located at the settler 3 below first filter device 2
The second framework device 4 on 1 right side of the first frame device, the second filter device being contained in the second framework device 4
5, the third frame device 6 below first frame device 1, the third mistake being set on the third frame device 6
Filter device 7, the holder device 8 being contained in the third frame device 6 and the motor being set on the third frame device 6
Device 9.
As shown in Figure 1, first frame device 1 includes the first framework 11, the pumping positioned at 11 left side of the first framework
Water pipe 12, the water pump 13 being set on the drinking-water pipe 12, the first valve 14, the first crossbar positioned at 13 right side of water pump
15, the first inclined plate 16 of the left and right sides, the sealing frame above first inclined plate 16 in first framework 11 are contained in
17 and the first filter screen 18 positioned at 17 left side of the sealing frame.First framework 11 is in hollow cuboid and puts vertically
It sets, first framework 11 is equipped with the first through hole 111 positioned at its right surface, the second through-hole 112 positioned at its left surface, institute
It is rounded and communicate with the inside of first framework 11 to state first through hole 111, the second through-hole 112.The drinking-water pipe 12 it is upper
End is directed at second through-hole 112 and is fixedly connected with the left surface of first framework 11, so that the drinking-water pipe 12 is interior
Portion is communicated with the inside of first framework 11.The water pump 13 connects to power supply, and allows to operate normally, the water pump 13
It is equipped with switch, facilitates it to turn on or off, sewage can be pumped into the drinking-water pipe 12 by the water pump 13.Described
One valve 14 is used to control the flow of water in the drinking-water pipe 12.The first crossbar 15 is horizontal, the first crossbar 15
Left end be fixedly connected with the water pump 13, the right end of the first crossbar 15 is fixedly connected with first framework 11.It is described
The left and right sides that first inclined plate 16 sets there are two and is located in first framework 11, first inclined plate 16 are inclined
Shape, the upper end of first inclined plate 16 are fixedly connected with the inner surface of first framework 11, the front and back of first inclined plate 16
Surface is fixedly connected with the inner surface of first framework 11.The sealing frame 17 is in hollow cuboid, the sealing frame 17
Cross section be in concave shape, the upper surface of the sealing frame 17 is fixedly connected with the inner surface of first framework 11, described close
Envelope frame 17 can be made of rubber and other sealing materials.First filter screen 18 is in a vertical shape, first filter screen
18 upper end is fixedly connected with the inner surface of first framework 11, the lower end of first filter screen 18 and first inclined plate
16 are fixedly connected, and the front and rear surfaces of first filter screen 18 are fixedly connected with the inner surface of first framework 11, and described
One filter screen 18 can carry out preliminary filtering to sewage.
As shown in Figure 1, first filter device 2 includes the first electric cylinders 21, is located at 21 left and right sides of the first electric cylinders
First support 22, positioned at the first catch bar 23 of first electric cylinders, 21 lower section, positioned at 23 lower section of the first catch bar
First push plate 24, the first sponge block 25 positioned at first push plate, 24 lower section, the positioned at 25 lower section of the first sponge block
Two filter screens 26, the first spring 27 positioned at 25 left and right sides of the first sponge block.First electric cylinders 21 connect to power supply,
Allow to operate normally, first electric cylinders 21 are equipped with switch, facilitate it to turn on or off, first electric cylinders 21
In the top of first framework 11.There are two the first support 22 is set, the first support 22 is L-shaped, and described first
The upper end of frame 22 is fixedly connected with the side of first electric cylinders 21, the lower end of the first support 22 and first framework 11
It is fixedly connected.First catch bar 23 is in cylindrical body and vertical placement, the upper end of first catch bar 23 and described first
Electric cylinders 21 connect, and allow first electric cylinders 21 that first catch bar 23 is driven to move up and down, first catch bar
23 through first framework 11 surfaces externally and internally and be slidably connected with it, allow first catch bar 23 smoothly on
Lower movement, the lower end of first catch bar 23 are fixedly connected with first push plate 24, and first catch bar 23 runs through institute
It states the surfaces externally and internally of sealing frame 17 and is slidably connected with it.First push plate 24 is in cuboid and is horizontally arranged, described first
The lower surface of push plate 24 is fixedly connected with the upper surface of first sponge block 25.First sponge block 25 is in cuboid, institute
The first sponge block 25 is stated between first inclined plate 16, the lower end of first inclined plate 16 and first sponge block 25
Side is slidably connected, and first sponge block 25 is compressed and diastole between first inclined plate 16, when first
When sponge block 25 is compressed, the granule foreign in sewage can be sufficiently filtered out, so that it is more preferable to wastewater purifying efficiency, it is described
The front and rear surfaces of first sponge block 25 and the inner surface of first framework 11 are slidably connected.Second filter screen 26 is in rectangular
Body and horizontal positioned, the lower surface of first sponge block 25 is fixedly connected with the upper surface of second filter screen 26.It is described
Second filter screen 26 is located at the lower section of first inclined plate 16.There are two first spring 27 is set, first spring 27 is in
Vertical shape, the lower end of first spring 27 are fixedly connected with second filter screen 26, the upper end of first spring 27 with
First inclined plate 16 is fixedly connected, and then is played a supporting role to second filter screen 26.
As shown in Figure 1, the settler 3 includes the first transverse slat 31, the third mistake positioned at 31 lower section of the first transverse slat
Strainer 32, precipitating frame 33, the first sealing block above first transverse slat 31 positioned at 32 lower section of third filter screen
36, the first vertical bar 35 at left and right sides of first sealing block 36, the first gear positioned at 35 lower section of the first vertical bar are set to
Plate 34, the second spring 37 being set on the first baffle 34, be contained in the left and right sides in first framework 11 second
Cross bar 38, the first idler wheel 39 for being set to described 38 one end of second crossbar and act against the first bracing wire on first idler wheel 39
30.First transverse slat 31 is in cuboid and is horizontally arranged, and the side of first transverse slat 31 is interior with first framework 11
Surface is fixedly connected, and first transverse slat 31 is equipped with the third through-hole 311 through its upper and lower surface, the third through-hole 311
It is square.The third filter screen 32 is the cylinder of annulus in cross section, and the third filter screen 32 is placed vertically, the third
The upper surface of filter screen 32 is fixedly connected with the lower surface of first transverse slat 31, and the third filter screen 32 is located at the third
The lower section of through-hole 311, the lower surface of the third filter screen 32 is fixedly connected with the upper surface of the precipitating frame 33, so that described
The inside of third filter screen 32 is communicated with the inside of the precipitating frame 33.The precipitating frame 33 is the cylinder of annulus in cross section,
The lower surface of the precipitating frame 33 is fixedly connected with the inner surface of first framework 11, and sewage can be in the precipitating frame 33
Precipitating.First sealing block 36 is in cuboid and is horizontally arranged, and first sealing block 36 is equipped with positioned at its lower surface
First groove 362 and the fourth hole 361 on surface disposed thereon, first groove 362 in a rectangular parallelepiped shape and are located at described the
The top of three through-holes 311, the third through-hole 311 are communicated with first groove 362, the fourth hole 361 it is rounded and
It is communicated with first groove 362, the upper surface of the lower surface of first sealing block 36 and first transverse slat 31 is fixed to be connected
It connects, first sealing block 36 is located at the top of the third through-hole 311.The first baffle 34 sets there are two and is located at
The left and right sides of first transverse slat, 31 top, first transverse slat 34 is in cuboid and horizontal positioned, the first baffle 34
One end be contained in first groove 362 and be slidably connected with first sealing block 36, under the first baffle 34
Surface is connect with the upper surface slide of first transverse slat 31, and the first baffle 34 for being contained in first groove 362 mutually pushes up
It is close together, so as to seal the third through-hole 311, so that the sewage of 36 top of the first sealing block can not be logical across third
Hole 311 enters the lower section of the first transverse slat 31.First vertical bar 35 sets there are two and is located at the first baffle 34
Top, for first vertical bar 35 in cuboid and vertical placement, the lower end of first vertical bar 35 and the first baffle 34 are solid
Fixed connection.The second spring 37 sets there are two and is located at the left and right sides of the first baffle 34, the second spring
37 is horizontal, and one end of the second spring 37 is fixedly connected with the inner surface of first framework 11, the second spring
37 other end is fixedly connected with the end of the first baffle 34, and the second spring 37 is in compressive state, and then to institute
First baffle 34 is stated to play a supporting role.There are two the second crossbar 38 is set, the second crossbar 38 is in cuboid and level
Place, one end of the second crossbar 38 is fixedly connected with the inner surface of first framework 11, the second crossbar 38 it is another
One end is equipped with the second groove, and second groove is in a rectangular parallelepiped shape.There are two first idler wheel 39 is set, first idler wheel 39
In cylindrical body, first idler wheel 39 is contained in second groove and is pivotally connected with the second crossbar 38, so that institute
Stating the first idler wheel 39 can rotate in second groove.There are two first bracing wire 30 is set, first bracing wire 30
Upper end is fixedly connected with the side of second filter screen 26, and the other end of first bracing wire 30 and first vertical bar 35 are solid
Fixed connection, first bracing wire 30 pass through second groove and act against on first idler wheel 39, and then to described first
Bracing wire 30 is played a supporting role.
As shown in Figure 1, the second framework device 4 include first pipe 41, be set in the first pipe 41 the
Two valves 42, the second framework 46 positioned at 41 lower section of first pipe, the second support positioned at 46 left side of second framework
43, the first fixed link 44 positioned at 43 left side of second support, the second fixed link positioned at 44 left side of the first fixed link
45, the third fixed link 47 positioned at 43 lower section of the second support, the second pipe 48 positioned at 46 lower section of second framework and
The third valve 49 being set on the second pipe 48.The upper end of the first pipe 41 be aligned the first through hole 111 and
It is fixedly connected with the right surface of first framework 11, so that the inside of the first pipe 41 and first framework 11 is interior
Portion communicates.Second valve 42 is used to control the flow of water in the first pipe 41.The second framework 46 is in hollow
Semicylinder shape, the second framework 46 is equipped with fifth hole 461 and the 6th through-hole 462 positioned at its lower surface, and described the
Five through-holes 461 and the 6th through-hole 462 are communicated with the inside of the second framework 46, described in the lower end aligned of the first pipe 41
Fifth hole 461 and be fixedly connected with the upper surface of the second framework 46 so that the inside of the first pipe 41 with it is described
The inside of second framework 46 communicates.The second support 43 is L-shaped, the upper end of the second support 43 and first framework 11
It is fixedly connected, the lower end of the second support 43 is fixedly connected with the second framework 46.The right end of first fixed link 44
It is fixedly connected with the second support 43, the left end of first fixed link 44 is fixedly connected with second fixed link 45.Institute
The upper end for stating the second fixed link 45 is fixedly connected with first framework 11.The third fixed link 47 is oblique, and described the
The upper end of three fixed links 47 is fixedly connected with the second framework 46.The upper end of the second pipe 48 is directed at the 6th through-hole
It 462 and is fixedly connected with the lower surface of the second framework 46, so that the inside of the second pipe 48 and the second framework
46 inside communicates.The third valve 49 is used to control the flow of water in the second pipe 48.
As shown in Figure 1, second filter device 5 includes the 4th filter screen 51, is located at the 4th filter screen 51 or so
4th fixed link 52 of two sides, is located at the 4th filter screen 51 at the third spring 53 above the 4th fixed link 52
The branching block 54 of lower section and the 5th filter screen 55 at left and right sides of the branching block 54.4th filter screen 51 it is transversal
Face is in bending, and the inner surface of the front and rear surfaces and the second framework 46 of the 4th filter screen 51 is slidably connected, and described the
Four filter screens 51 are located at the lower section of the fifth hole 461.4th fixed link 52 sets there are two and is located at described the
One end of the left and right sides of four filter screens 51, the 4th fixed link 52 is fixedly connected with the side of the 4th filter screen 51.
There are two the third spring 53 is set, the upper end of the third spring 53 is fixedly connected with the inner surface of the second framework 46,
The lower end of the third spring 53 is fixedly connected with the 4th fixed link 52, and then to the 4th fixed link 52 and the 4th mistake
Strainer 51 is played a supporting role.The cross section of the branching block 54 is in isosceles trapezoid, and the lower surface of the branching block 54 is equipped with the
Three grooves 541, the lower surface of the branching block 54 are fixedly connected with the inner surface of the second framework 46, the 6th through-hole
462 communicate with the third groove 541.There are two 5th filter screen 55 is set, the 5th filter screen 55 is in bending, institute
The upper end for stating the 5th filter screen 55 is fixedly connected with the inner surface of the second framework 46, the lower end of the 5th filter screen 55 with
The side of the branching block 54 is fixedly connected, the front and rear surfaces of the 5th filter screen 55 and the inner surface of the second framework 46
It is fixedly connected, and then sewage can be filtered.
As shown in Figure 1, the third frame device 6 includes third framework 61, the row positioned at 61 lower section of third framework
Outlet pipe 62, the 4th valve 63 being set on the discharge pipe 62 and the concentration block 64 being contained in the third framework 61.Institute
Third framework 61 is stated in hollow cuboid and vertical placement, the third framework 61 is logical equipped be located at its right surface the 7th
Hole 611 and the 8th through-hole 612 positioned at its lower surface, the 7th through-hole 611 and the 8th through-hole 612 are rounded and with described
The inside of three frameworks 61 communicates, the 7th through-hole 611 described in the lower end aligned of the second pipe 48 and with the third framework 61
Right surface be fixedly connected, the lower end of the third fixed link 47 is fixedly connected with the right surface of the third framework 61.It is described
The upper end of discharge pipe 62 is directed at the 8th through-hole 612 and is fixedly connected with the lower surface of the third framework 61, so that described
The inside of discharge pipe 62 is communicated with the inside of the third framework 61.4th valve 63 is for controlling in the discharge pipe 62
The flow of water.The rectangular triangle in cross section for concentrating block 64, the lower surface for concentrating block 64 and its left surface and institute
The inner surface for stating third framework 61 is fixedly connected, and the concentration block 64 can focus on water on the right side of its, and described concentration block 64
In the left side of the 8th through-hole 612.
As shown in Figure 1, the third filter device 7 includes the second electric cylinders 71, positioned at the of second electric cylinders, 71 right side
Three cross bars 72 are pushed positioned at the third bracket 74 in 71 left side of the second electric cylinders, positioned at the second of 71 lower section of the second electric cylinders
Bar 73, the second push plate 75 positioned at 73 lower section of the second catch bar, the second sponge block positioned at 75 lower section of the second push plate
76, the second transverse slat 77 positioned at second sponge block, 76 lower section, the third transverse slat 78 positioned at 76 right side of the second sponge block,
The second idler wheel 79 above the third transverse slat 78 and the first convex block 70 being set on second idler wheel 79.Described
Two electric cylinders 71 connect to power supply, and allow to operate normally, and second electric cylinders 71 are equipped with switch, facilitate its dozen of on or off
It closes.The third cross bar 72 is in cuboid, and the left end of the third cross bar 72 is fixedly connected with second electric cylinders 71, and described the
The right end of three cross bars 72 is fixedly connected with second fixed link 45.The third bracket 74 is in concave shape, the third bracket
74 upper end is fixedly connected with second electric cylinders 71, the left surface of the lower end of the third bracket 74 and the third framework 61
It is fixedly connected.Second catch bar 73 is in a vertical shape, and the upper end of second catch bar 73 is connect with second electric cylinders 71,
Allow second electric cylinders 71 that second catch bar 73 is driven to move up and down, the lower end of second catch bar 73 and institute
The upper surface for stating the second push plate 75 is fixedly connected, second catch bar 73 through the third framework 61 surfaces externally and internally and with
It is slidably connected, and second catch bar 73 is smoothly moved up and down.Second push plate 75 is oblique, described
The left surface of second push plate 75 and the inner surface of the third framework 61 are slidably connected, the front and rear surfaces of second push plate 75 with
The inner surface of the third framework 61 is slidably connected, the upper table of the lower surface of second push plate 75 and second sponge block 76
Face is fixedly connected, and the right end of second push plate 75 and the left surface of the third transverse slat 78 are slidably connected.Second sponge
The cross section of block 76 is in a rectangular trapezoid, and the inner surface of the left surface of second sponge block 76 and the third framework 61, which slides, to be connected
It connects, the lower surface of second sponge block 76 is fixedly connected with the upper surface of second transverse slat 77, second sponge block 76
Right surface and the left surface of the third transverse slat 78 be slidably connected, the front and rear surfaces and the third of second sponge block 76
The inner surface of framework 61 is slidably connected.Second transverse slat 77 is in cuboid and horizontal positioned, the left end of second transverse slat 77
It is fixedly connected with the inner surface of the third framework 61, the front and rear surfaces of second transverse slat 77 are interior with the third framework 61
Surface is fixedly connected.The third transverse slat 78 is in cuboid and horizontal positioned, the right end of the third transverse slat 78 and the third
The inner surface of framework 61 is fixedly connected, and the inner surface of the front and rear surfaces of the third transverse slat 78 and the third framework 61 is fixed to be connected
It connects, the third transverse slat 78 is located at the lower section of the 7th through-hole 611.Second idler wheel 79 is in cylindrical body, second rolling
Wheel 79 is pivotally connected with the third framework 61, second idler wheel 79 is rotated in the third framework 61, institute
It states the second idler wheel 79 to be connected to motor, drives 79 active rotation of the second idler wheel.First convex block 70 be equipped with several and
It is evenly distributed on second idler wheel 79, first convex block 70 is fixedly connected with second idler wheel 79.
As shown in Figure 1, the holder device 8 is erected including the second inclined plate 81, positioned at the second of 81 left side of the second inclined plate
Bar 82, the third vertical bar 84 above second inclined plate 81, is set the 4th cross bar 83 below second vertical bar 82
It is placed in the sponge column 85 of 84 lower end of third vertical bar and the starting stave 86 positioned at 81 lower section of the second inclined plate.Described second
Inclined plate 81 is oblique, and the upper end of second inclined plate 81 is fixedly connected with the lower surface of second transverse slat 77, and described second
The front and rear surfaces of inclined plate 81 are fixedly connected with the inner surface of the third framework 61.Second vertical bar 82 is in a vertical shape, described
The upper end of second vertical bar 82 is fixedly connected with second transverse slat 77, the lower end of second vertical bar 82 and the third cross bar 83
It is fixedly connected.The left end of 4th cross bar 83 is fixedly connected with the third framework 61, the right end of the 4th cross bar 83 with
Second inclined plate 81 is fixedly connected, and then is played a supporting role to it.The third vertical bar 84 is in cuboid and places vertically,
The upper end of the third vertical bar 84 is fixedly connected with the lower surface of the third transverse slat 78, and the lower end of the third vertical bar 84 is equipped with
4th groove.The sponge column 85 is in cylindrical body, and the sponge column 85 is contained in the 4th groove and erects with the third
Bar 84 is pivotally connected, and the sponge column 85 is rotated in the 4th groove, and the sponge column 85 is connected to motor,
Its active rotation is driven, the sponge column 85 acts against on second inclined plate 81.The starting stave 86 is in a vertical shape, described
The upper end of starting stave 86 is fixedly connected with the lower end of second inclined plate 81, the front and rear surfaces of the starting stave 86 with it is described
The inner surface of third framework 61 is fixedly connected.
As shown in Figure 1, the electric machine 9 includes motor 91, the output shaft 92 being set on the motor 91, is located at institute
State the bent stick 93 below motor 91, the second bracing wire 94 being set on the output shaft 92, positioned at 91 left side of motor
4th vertical bar 95, the third idler wheel 96 for being set to 95 lower end of the 4th vertical bar, the below the third idler wheel 96 the 6th
Filter screen 98, the 4th spring 99 being set on the 6th filter screen 98 and the fixation positioned at 98 lower section of the 6th filter screen
Block 97.The motor 91 connects to power supply, and allows to operate normally, the motor 91 be equipped with switch, facilitate its open or
Person closes, and the left surface of the motor 91 is fixedly connected with the right surface of the third framework 61.The output shaft 92 is in cylinder
Body, one end of the output shaft 92 are connect with the motor 91, allow the motor 91 that the output shaft 92 is driven to rotate.
The bent stick 93 is in bending, and the upper end of the bent stick 93 is fixedly connected with the motor 91, under the bent stick 93
End is fixedly connected with the third framework 61.The right end of second bracing wire 94 is fixedly connected with the output shaft 92, and described
The left end of two bracing wires 94 runs through the surfaces externally and internally of the third framework 61 and is slidably connected with it, the left end of second bracing wire 94
It is fixedly connected with the upper end of the 6th filter screen 98.For 4th vertical bar 95 in cuboid and vertical placement, the described 4th is perpendicular
The upper end of bar 95 is fixedly connected with the third transverse slat 78, and the lower end of the 4th vertical bar 95 is equipped with the 5th groove.The third
Idler wheel 96 is in cylindrical body, and the third idler wheel 96 is contained in the 5th groove and is pivotally connected with the 4th vertical bar 95,
The third idler wheel 96 is rotated in the 5th groove, second bracing wire 94 passes through the 5th groove and top
It leans against on the third idler wheel 96.The fixed block 97 in cuboid and horizontal positioned, the right end of the fixed block 97 with it is described
The inner surface of third framework 61 is fixedly connected.6th filter screen 98 is in bending, the front and back table of the 6th filter screen 98
Face and the inner surface of the third framework 61 are slidably connected, and the lower end of the 6th filter screen 98 is interior with the third framework 61
Surface is fixedly connected, the upper end of the 6th filter screen 98 act against on the inner surface of the third framework 61 and with its company of sliding
It connects, the middle section of the 6th filter screen 98 acts against on the right surface of the starting stave 86, so that the described 6th
Filter screen 98 can carry out double filtration to sewage.The left end of 4th spring 99 and the fixed company of the 6th filter screen 98
It connects, the right end of the 4th spring 99 is fixedly connected with the inner surface of the third framework 61, and the 4th spring 99 is in pressure
Contracting state, the 4th spring 99 push the 6th filter screen 98 to the left.6th filter screen 98 uses elastic material
It is made, allows to bending deformation.
As shown in Figure 1, the environmental protection building material production sewage disposal device of the present invention by described in use, draw water first
The lower end of pipe 12 is placed in sewage.Then the switch for opening water pump 13, opens simultaneously the first valve 14, so that water pump 13 will be dirty
Water is pumped into the drinking-water pipe 12, is then entered in first framework 11 by the second through-hole 112.Enter described
Sewage in one framework 11 first passes around the primary filtration of first filter screen 18, and first filter screen 18 can be by sewage
The middle biggish particle filtering of volume falls.Then sewage focuses on the top between first inclined plate 16, then by the first sea
The lower section of first inclined plate 16 is entered after the filtering of continuous block 25.Then the sewage after primary filtration is in described first
The top of transverse slat 31, first baffle 34 mutually abuts against together at this time, so that the sewage on the first transverse slat 31 can not pass through third
Through-hole 311 enters the lower section of the first transverse slat 31, and passes through in the case where guaranteeing that the second filter screen 26 will not move down
The first electric cylinders 21 are opened, so that the first catch bar 23 presses down on the first push plate 24, so that the first sponge block 25 is compressed,
To filter out the first sponge block 25 by granule foreign most in sewage, so that its filter effect is more preferable, together
When sewage be on the first transverse slat 31, settlement of sewage can be made.After sewage all after the filtering of the first sponge block 25,
One electric cylinders 21 make the first catch bar 23 continue to move down, so that first push plate 24 continues to press down on the first sponge block
25, so that first sponge block 25 and the second filter screen 26 move down, first spring 27 is stretched, due to the second mistake
Strainer 26 moves down, by first bracing wire 30, so that the first baffle 34 is mobile to two sides, so that first is oblique
The sewage of 16 lower section of plate enters in first groove 362 by fourth hole 361, and between first baffle 34, so
It is entered in the precipitating frame 33 by third through-hole 311 afterwards, since the height of fourth hole 361 is higher than the upper of the first transverse slat 31
Surface, so that the impurity being settled out can not pass through fourth hole 361 and third through-hole 311 enters under first transverse slat 31
Side.Water precipitating frame 33 in precipitate, after the water surface be higher by precipitating frame 33 upper surface after, water by third filter screen 32 filtering to
Outside sprawling, and by the filtering of third filter screen 32, the granule foreign being settled out is deposited on the bottom in the precipitating frame 33.
Then the second valve 42 is opened, so that the oettIed sewage enters in the first pipe 41, then into described
In second framework 46, the filtering of the 4th filter screen 51 is first passed around, the third spring 53 is to the 4th filter screen 51
It plays a supporting role, and when water strikes on the 4th filter screen 51, the 4th filter screen 51 shakes, and makes its filtering
It is more efficient, and the generation of clogging can be prevented.Then sewage enters described after the filtering of the 5th filter screen 55
In third groove 541, then entered in the second pipe 48 by the 6th through-hole 462.Third valve is opened at this time
49, so that the sewage in the second pipe 48 enters in the third framework 61.It opens and is connect with the second idler wheel 79 at this time
Motor so that second idler wheel 79 rotates, and then drives first convex block 70 to rotate with, so as to stir sewage
It is even, prevent clogging second sponge block 76.Then second inclined plate is entered after the filtering of second sponge block 76
On 81, when in the sewage entered in the third framework 61 impurity seldom and need not continue to filtering when, can open
Second electric cylinders 71, so that second catch bar 73 moves down, so that second push plate 75 presses down on the second sea
Continuous block 76, so that second sponge block 76 is compressed, until the right end of second push plate 75 is moved to the third transverse slat
78 lower section, so that the upper surface that the sewage entered in the third framework 61 slips over second push plate 75 is directly flowed
It moves on second inclined plate 81.Then the motor connecting with sponge column 85 is opened, so that the sponge column 85 rotates, Jin Erke
To play the role of scrub to second inclined plate 81, and certain filtration can be played to sewage.Then sewage passes through
It crosses after the filtering of the upper end and its lower end of the 6th filter screen 98 and enters the lower section of the 6th filter screen 98, then into institute
It states in discharge pipe 62, opens the 4th valve 63 at this time, purified free of contamination sewage can be discharged.It is oblique when flowing to second
When sewage impurity on plate 81 seldom needs not continue to filter or need to accelerate the efficiency of filtering, the switch of motor 91 is opened,
So that the output shaft 92 rotates, so that second bracing wire 94 is tightened up, then make the 6th filter screen 98
Upper end moves up, so that 98 bending deformation of the 6th filter screen, so that the 6th filter screen 98 no longer acts against
On the starting stave 86, so that sewage is flowed through from the space between the 6th filter screen 98 and the starting stave 86, directly
It is all discharged to by purified water.So far, environmental protection building material production of the present invention has been described with sewage disposal device use process
Finish.