CN106707769B CN201710159761.5A CN201710159761A CN106707769B CN 106707769 B CN106707769 B CN 106707769B CN 201710159761 A CN201710159761 A CN 201710159761A CN 106707769 B CN106707769 B CN 106707769B
Authority
CN
China
Prior art keywords
data
well
oil well
management module
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710159761.5A
Other languages
Chinese (zh)
Other versions
CN106707769A (en
Inventor
于海斌
曾鹏
尚文利
石硕
李世超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Institute of Automation of CAS
Original Assignee
Shenyang Institute of Automation of CAS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Institute of Automation of CAS filed Critical Shenyang Institute of Automation of CAS
Priority to CN201710159761.5A priority Critical patent/CN106707769B/en
Publication of CN106707769A publication Critical patent/CN106707769A/en
Application granted granted Critical
Publication of CN106707769B publication Critical patent/CN106707769B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B13/00Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion
    • G05B13/02Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric
    • G05B13/04Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric involving the use of models or simulators
    • G05B13/042Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric involving the use of models or simulators in which a parameter or coefficient is automatically adjusted to optimise the performance

Abstract

The present invention relates to a kind of field management systems, comprising: oil well management module and cloud management module;By the oil well management module abstracts at corresponding Web service, and the Web service of single oil well is combined, forms the Model for Interoperability of single oil well;Model for Interoperability includes data acquisition unit, for acquiring well data;It further include data transmission unit, for storing and transmitting well data cloud management module;It is also used to update local algorithms library according to Optimal Control Strategy;Further include control unit, adjusts the production strategy of oil well in real time for the local algorithms library according to update;Cloud management module includes Data Management Unit, for receiving and storing the well data of Model for Interoperability transmission;Further include policy calculation unit, the optimisation strategy of oil well is calculated for well data based on the received, and optimisation strategy is sent to Model for Interoperability.The application may be implemented control oil well production, adjust the purpose for the strategy that recovers the oil, and implement simple, efficient.

Description

A kind of field management System and method for
Technical field
The present invention relates to a kind of field management System and method fors, belong to intelligence manufacture control field.
Background technique
With the recovery process of oil well, the abrasion of machine equipment of pumping, failure, the variation of geological state, water filling in real time are to adopting What the influence of oily condition etc. factor will continue influences oil recovery process, and the oil recovery industry in China was located always in the past In rough production model.The characteristics of due to oil development mode, administrative staff can not learn subsurface equipment in real time Real-time status, thus often oil well fault for a period of time after, fault message could be managed people by the variation of Discharge rate Member's discovery, and need staff that can just learn the accurate real-time status of oil well by artificial monitoring;Or according to oil production Significant change the variation of underground situation could be speculated, to change oil recovery strategy etc..In oil mining at this stage During, the situation of information delay formula is often in the modification of the oil recovery strategy of oil well.And the offtake strategy of oil well Change generally requires the experience accumulation of administrative staff year in year out and could take at the first time suitable mode, for having sent out Raw situation is adjusted.And such operating mode just has a large amount of experience to rely on the staff of oil well, if The time of mistake changes the oil recovery strategy of oil well, it may be desirable to which the inspection of a period of time could find new strategy not Current production status can be met, it is too low that such situation frequently can lead to oil recovery efficiency, and reduces production capacity, a large amount of to waste Human and material resources.
The Model for Interoperability of oil well improves this situation well.This technology in real time will according to the characteristic of equipment The status information of equipment is timely collected by the progress of data acquisition equipment, and after differentiation storage, in real time and cloud System interacts synchronization, to reach the real-time perception of device status information.And according to the parser of cloud offer, optimization The modules such as algorithm, the corresponding algorithm of Auto-matching are calculated in conjunction with information such as the acquisition data of oil well itself, basic datas, Corresponding optimisation strategy is formed, and is timely feedbacked to well managment System, well managment System will be according to the optimization plan received Slightly, the oil recovery process of itself is adjusted, realizes that production capacity maximizes.The adjusting of oil well production strategy in this way, has reformed into oil The information exchange of well Model for Interoperability and host computer cloud platform, and reach the process of Automatic Optimal control.
This is the trend that current oil field reform updates, and the only way which must be passed for improving producing line efficiency, reducing energy consumption.
Summary of the invention
The technical problem to be solved by the present invention is to during the oil mining of traditional field of petroleum exploitation, equipment shape The problem of state information delay, oil recovery optimisation strategy postpones.Propose a kind of well managment System based on oil well Model for Interoperability Oil well rig is subjected to modelling unified management with method, in the production process of oil well, according to the real-time status of oil well with The analysis optimization algorithm in cloud interacts, and achievees the purpose that real time data inspecting and the optimal control of oil well, so that selection is most Suitable offtake strategy achievees the purpose that maximize production capacity.
In order to solve the above-mentioned technical problems, the present invention provides a kind of field management system, the system comprises: oil well pipe Manage module and cloud management module;
Wherein, by the oil well management module abstracts at corresponding Web service, and the Web service of single oil well is carried out Combination, forms the Model for Interoperability of single oil well;
The Model for Interoperability includes data acquisition unit, data transmission unit and control unit;
The data acquisition unit, for acquiring well data;
The data transmission unit, the well data that acquisition unit acquires for storing data, and well data is transmitted To cloud management module;It is also used to update local algorithms library according to the Optimal Control Strategy that cloud management module is sent;
The local algorithms library of described control unit, the update for being sent according to data transmission unit adjusts oil well in real time Production strategy;
The cloud management module includes Data Management Unit and policy calculation unit;
The Data Management Unit, the well data sent for receiving and storing the Model for Interoperability;
The policy calculation unit, for calculating the optimization plan of oil well according to the received well data of Data Management Unit Slightly, and optimisation strategy is sent to the Model for Interoperability.
Further, the Model for Interoperability further includes judging unit, is adopted for judging that the data acquisition unit is newest The variation tendency whether well data collected meets well data in preset time period in the past notifies number if do not met According to the well data of the variation tendency of well data in the transmission unit storage preset time period of not meeting not over.
Wherein, the well data includes the basic data, reservoir information, environmental information of oil well.
Wherein, the optimisation strategy includes start and stop, frequency conversion, adjustment spurt and the balancing of oil well.
Further, the cloud management module further includes log generation unit, for according to the Data Management Unit The well data of middle storage generates the oil well log checked for the staff of oilfield according to preset format.
Further, the cloud management module further includes correction unit, for what is calculated the policy calculation unit Optimisation strategy is verified, and the optimisation strategy for meeting specification of verification is stored in algorithms library.
Present invention also provides a kind of field management methods, comprising:
By the oil well management module abstracts installed on oil well at corresponding Web service, and by the Web service of single oil well into Row combination, forms the Model for Interoperability of single oil well;
Data acquisition unit inside the Model for Interoperability acquires well data;
Cloud management module obtains the well data of the data acquisition unit acquisition;
Cloud management module calculates the optimisation strategy of oil well according to the well data, and is sent to the interoperability mould Type;
The Model for Interoperability updates local algorithms library according to the optimisation strategy that cloud management module is sent, and according to update Local algorithms library adjustment oil well production strategy.
Wherein, cloud management module obtains the well data of data acquisition unit acquisition, specifically:
Cloud data management module obtains the well data of the data acquisition unit acquisition by way of monitoring.
Further, after cloud management module obtains the well data of data acquisition unit acquisition, further includes:
Oil well log is generated according to the well data of acquisition and preset journal format.
Further, after optimisation strategy of the cloud management module according to well data calculating oil well, further includes: to calculating Optimisation strategy verified, and the optimisation strategy for meeting specification of verification is stored in algorithms library.
The beneficial effects of the present invention are:
1, the application is by calculating the optimisation strategy of oil well according to the well data of acquisition, and adjusts oil according to optimisation strategy The production strategy of well realizes the purpose of control oil well production, adjustment oil recovery strategy, and well managment System homoorganicity is good, real It applies simple;
2, further, oil well log can also be generated according to the well data of acquisition and preset journal format, for Staff checks, makes staff be found not meeting the oil well strategy of present case in time according to oil well log, thus in time It safeguards oil well, not only reduces the manpower and material resources of maintenance oil well, and improve the oil recovery efficiency of producing well, improve production capacity;
3, further, the optimisation strategy of calculating is verified, judges whether to meet specification, specification optimization plan will be met It is slightly stored in algorithms library, improves the efficiency of management of well managment System.
Detailed description of the invention
Fig. 1 is a kind of field management system structure diagram provided in an embodiment of the present invention;
Fig. 2 is a kind of field management method flow schematic diagram provided in an embodiment of the present invention.
Specific embodiment
In order to keep the purpose of the present invention, technical solution and advantage etc. more explicit, concrete instance is enumerated herein And it is further illustrated with refer-ence to the attached drawings.
The data acquisition equipment collected on oil well is modeled, being associated with for data and equipment is established, and passing through network will The system optimizing control in cloud synchronizes, and is calculated, can be met by the data and system optimizing control that have acquired The optimisation strategy of the status of the oil well, to be controlled by controller oil well next step mining method.Cloud then passes through Otherness storage is carried out to the data of acquisition, and generates corresponding log, is checked for the professional person of oilfield, is summed up new Optimization algorithm improve the algorithms library in cloud.
Wherein, modeling mentioned herein refers to taking out data collector all on every mouthful of oil well with controller As changing, the corresponding mark of oil field profession is added at Web service in the acquisition data and controllable attribute abstraction that can be provided according to it Signature claims, so that all oil wells can be obtained data or be adjusted by unified mode in field management system With.By unified label come so that cloud platform system data versatility.
Cloud optimisation strategy refers to that controlling experience to existing oil well by the professional person of oilfield carries out always Knot, and it is abstracted into corresponding formula, optimisation strategy.When producing well is abnormal or needs to optimize, need by people come according to warp Change optimisation strategy is tested, the foundation of judgement is mainly calculated according to the abnormal or certain combinations of values of certain data new The exceptions of data judged.This behavior can be abstracted into using collected data as parameter, will be finally obtained The decision logic of optimisation strategy as a result.And combination calculating therein is then abstracted into corresponding calculation formula, inputs parameter For the acquisition data of different acquisition equipment.In this way, we can need to do in such a way that computer data calculates to people Optimisation strategy selection, removed empirical, formd reliable and stable processing logic.By the way that the defeated of calculation formula will be optimized Enter output and be defined as Web service, and the mode of matched data label, to carry out unitized management to oil well.
Referring to Fig. 1, the embodiment of the invention provides a kind of field management system, which includes 11 He of oil well management module Cloud management module 12;
Wherein, oil well management module 11 is abstracted into corresponding Web service, and the Web service of single oil well is subjected to group It closes, forms the Model for Interoperability 13 of single oil well;
Oil well management module 11 is abstracted into corresponding Web service, can solve different type in oil well management module 11 Unit integrate low efficiency the problem of, the interoperability between different units is improved, so that the field management system is same Structure is good, implementation is simple.
Web service in the embodiment of the present invention meets W3C standard, naturally it is also possible to according to actual needs by oil well management mould Block 11 is abstracted into the Web service for meeting other standards, and the embodiment of the present invention is not specifically limited this.
Wherein, Model for Interoperability 13 includes data acquisition unit 131, data transmission unit 132 and control unit 133;
Data acquisition unit 131, for acquiring well data;
In the embodiment of the present invention, well data includes real time data, basic data and oil-gas reservoir data of different oil wells etc..
Data transmission unit 132, the well data that acquisition unit 131 acquires for storing data, and well data is passed Transport to cloud management module 12;It is also used to update local algorithms library according to the Optimal Control Strategy that cloud management module 12 is sent;
Further, Model for Interoperability 13 further includes judging unit, is collected for judging that data acquisition unit 131 is newest Well data whether meet the variation tendency of well data in preset time period in the past, if do not met, notification data is passed Defeated unit 132, data transmission unit 132 receive judging unit transmission do not meet notice after, store this do not meet not over preset The well data of the variation tendency of well data in period, i.e. data transmission unit 132 acquire data acquisition unit 131 Well data carries out differentiation storage.
The local algorithms library of control unit 133, the update for being sent according to data transmission unit 132 adjusts oil well in real time Production strategy.
Wherein, cloud management module 12 includes Data Management Unit 121 and policy calculation unit 122;
Data Management Unit 121, for receiving and storing the well data of Model for Interoperability transmission;
Policy calculation unit 122, for calculating the optimization plan of oil well according to the received well data of Data Management Unit 121 Slightly, and optimisation strategy is sent to Model for Interoperability 13.
In practical application, policy calculation unit 122 can be by visual operation interface, according to the basic number of oil well The numerical value that can measure oil well operating status is calculated according to, well datas such as reservoir information, environmental information, to form optimization Strategy.Optimisation strategy includes start and stop, frequency conversion, adjustment spurt, balancing of oil well etc..
Wherein basic data includes the taper of rod parameter of oil well, stroke, pump diameter, pump setting depth, caliber, tubing length etc. Parameter.Environmental information includes the information such as oil-gas reservoir density, temperature, humidity.
Further, cloud management module 12 further includes correction unit, the optimization for calculating policy calculation unit 122 Strategy is verified, and judges whether the optimisation strategy meets specification, if meeting specification, which is stored in algorithms library In.
Further, cloud management module 12 further includes log generation unit, for depositing according in Data Management Unit 121 The well data of storage generates the oil well log checked for the staff of oilfield according to preset format.
Well managment System provided in an embodiment of the present invention passes through the optimization plan according to the well data of acquisition calculating oil well Slightly, and according to optimisation strategy the production strategy for adjusting oil well, the purpose realized control oil well production, adjust the strategy that recovers the oil, and Well managment System homoorganicity is good, it is simple to implement;It further, can also be according to the well data and preset log lattice of acquisition Formula generates oil well log makes staff be found not meeting present case in time according to oil well log so that staff checks Oil well strategy not only reduce the manpower and material resources of maintenance oil well, and improve the oil recovery of producing well to safeguard oil well in time Efficiency improves production capacity;Further, the optimisation strategy of calculating is verified, judges whether to meet specification, it is excellent by specification is met Change policy store in algorithms library, improves the efficiency of management of well managment System.
Referring to fig. 2, the embodiment of the invention provides a kind of field management methods, comprising:
Step S1: by the oil well management module abstracts installed on oil well at corresponding Web service, and by single oil well Web service is combined, and forms the Model for Interoperability of single oil well;
Step S2: the data acquisition unit inside Model for Interoperability acquires well data;
Specifically, well data includes real time data, basic data and oil-gas reservoir data of different oil wells etc..
Step S3: cloud management module obtains the well data of data acquisition unit acquisition;
Specifically, cloud data management module obtains the well data of data acquisition unit acquisition by way of monitoring.
Step S4: cloud management module calculates the optimisation strategy of oil well according to well data, and is sent to Model for Interoperability;
Further, cloud management module can generate oil well day according to the well data of acquisition and preset journal format Will, so that staff checks, when staff is by checking that oil well log finds the processing plan of certain mouthful of oil well or more mouthfuls of oil wells When not meeting present case slightly, the optimisation strategy of oil well is calculated using cloud management module.
It is possible to further verifying the optimisation strategy of calculating, judge whether to meet specification, if meeting specification, The optimisation strategy is stored in algorithms library.
It further, can Optimal Control Strategy to be stored in real-time update algorithms library.
Step S5: the local algorithms library of optimisation strategy update that Model for Interoperability is sent according to cloud management module, and according to The production strategy of the local algorithms library adjustment oil well of update achievees the purpose that control oil well production, adjustment oil recovery strategy.
In conclusion method of the invention, is optimized for field of petroleum exploitation, reduce the change of oil mining strategy Hysteresis quality more.Oil well management method provided in an embodiment of the present invention by oil well management module abstracts that will be installed on oil well at Corresponding Web service, and the Web service of single oil well subordinate is combined, the Model for Interoperability of single oil well is formed, then The optimisation strategy of oil well is calculated according to the well data of acquisition, and the production strategy of oil well is adjusted according to optimisation strategy, it is not only real Control oil well production is showed, has adjusted the purpose for the strategy that recovers the oil, and has implemented simple, efficient;It further, can also be according to acquisition Well data and preset journal format generate oil well log and make staff according to oil well day so that staff checks Will finds not meeting the oil well strategy of present case in time, to safeguard oil well in time, not only reduces the manpower of maintenance oil well Material resources, and the oil recovery efficiency of producing well is improved, improve production capacity;Further, the optimisation strategy of calculating is verified, is judged Whether meet specification, specification optimisation strategy will be met and be stored in algorithms library, the efficiency of management of well managment System is improved.This It is a kind of new systematic optimization solution for oil well optimal control, is suitble to promote the use of.

Claims (8)

1. a kind of field management system, which is characterized in that the system comprises: oil well management module and cloud management module;
Wherein, by the oil well management module abstracts at corresponding Web service, and the Web service of single oil well is combined, Form the Model for Interoperability of single oil well;
The Model for Interoperability includes data acquisition unit, data transmission unit and control unit;
The data acquisition unit, for acquiring well data;
The data transmission unit, the well data that acquisition unit acquires for storing data, and well data is transmitted to cloud Hold management module;It is also used to update local algorithms library according to the Optimal Control Strategy that cloud management module is sent;
The local algorithms library of described control unit, the update for being sent according to data transmission unit adjusts the production of oil well in real time Strategy;
The cloud management module includes Data Management Unit and policy calculation unit;
The Data Management Unit, the well data sent for receiving and storing the Model for Interoperability;
The policy calculation unit, for calculating the optimisation strategy of oil well according to the received well data of Data Management Unit, and Optimisation strategy is sent to the Model for Interoperability;
The cloud management module further includes correction unit, and the optimisation strategy for calculating the policy calculation unit carries out school It tests, and the optimisation strategy for meeting specification of verification is stored in algorithms library.
2. system according to claim 1, which is characterized in that the Model for Interoperability further includes judging unit, for sentencing Whether the newest collected well data of the data acquisition unit that breaks meets the variation of well data in preset time period in the past Trend, if do not met, the variation of well data becomes in the notification data transmission unit storage preset time period of not meeting not over The well data of gesture.
3. system according to claim 1, which is characterized in that the well data includes the basic data of oil well, oil gas Hide information, environmental information.
4. system according to claim 1, which is characterized in that the optimisation strategy includes the start and stop, frequency conversion, adjustment of oil well Spurt and balancing.
5. system according to claim 1, which is characterized in that the cloud management module further includes log generation unit, For generating the work for oilfield according to preset format according to the well data stored in the Data Management Unit The oil well log checked as personnel.
6. a kind of field management method characterized by comprising
By the oil well management module abstracts installed on oil well at corresponding Web service, and the Web service of single oil well is subjected to group It closes, forms the Model for Interoperability of single oil well;
Data acquisition unit inside the Model for Interoperability acquires well data;
Cloud management module obtains the well data of the data acquisition unit acquisition;
Cloud management module calculates the optimisation strategy of oil well according to the well data, and is sent to the Model for Interoperability;
The Model for Interoperability updates local algorithms library according to the optimisation strategy that cloud management module is sent, and according to the sheet of update The production strategy of ground algorithms library adjustment oil well;
Cloud management module is calculated according to well data after the optimisation strategy of oil well, further includes:
The optimisation strategy of calculating is verified, and the optimisation strategy for meeting specification of verification is stored in algorithms library.
7. according to the method described in claim 6, it is characterized in that, cloud management module obtains the data acquisition unit acquisition Well data, specifically:
Cloud data management module obtains the well data of the data acquisition unit acquisition by way of monitoring.
8. according to the method described in claim 6, it is characterized in that, cloud management module obtains the data acquisition unit acquisition Well data after, further includes:
Oil well log is generated according to the well data of acquisition and preset journal format.
CN201710159761.5A 2017-03-17 2017-03-17 A kind of field management System and method for Active CN106707769B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710159761.5A CN106707769B (en) 2017-03-17 2017-03-17 A kind of field management System and method for

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710159761.5A CN106707769B (en) 2017-03-17 2017-03-17 A kind of field management System and method for

Publications (2)

Publication Number Publication Date
CN106707769A CN106707769A (en) 2017-05-24
CN106707769B true CN106707769B (en) 2019-07-09

Family

ID=58887241

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710159761.5A Active CN106707769B (en) 2017-03-17 2017-03-17 A kind of field management System and method for

Country Status (1)

Country Link
CN (1) CN106707769B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110263494B (en) * 2019-07-16 2023-05-12 东北大学 Alumina production operation optimization system and method based on cloud edge cooperation

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4536666B2 (en) * 2006-02-13 2010-09-01 出光興産株式会社 Optimal adjustment system and optimum adjustment method for PID controller
CN202404435U (en) * 2011-12-30 2012-08-29 深圳市中翔恒威科技有限公司 Internet of things-based oil well comprehensive monitoring system
CN203039730U (en) * 2013-01-15 2013-07-03 陕西延长石油(集团)有限责任公司研究院 Wisdom oil field ground internet of things system
CN203366116U (en) * 2013-08-11 2013-12-25 西安海联石化科技有限公司 Oil field well site data acquisition system based on Internet of things
CN109901531A (en) * 2014-02-20 2019-06-18 李新华 A kind of field management system and management method
CN104898579B (en) * 2014-03-04 2018-05-18 沈阳中科奥维科技股份有限公司 Rod-pumped well data acquisition control system and its method based on wireless network
CN205721244U (en) * 2016-06-08 2016-11-23 徐全琦 Intelligent cruise positioning number adopts control Operating Guideline management system

Also Published As

Publication number Publication date
CN106707769A (en) 2017-05-24

Similar Documents

Publication Publication Date Title
AU2007207497B2 (en) Dynamic production system management
CN113657031B (en) Heat supply dispatching automation realization method, system and platform based on digital twin
CN110929918B (en) 10kV feeder fault prediction method based on CNN and LightGBM
Almeida et al. Optimization system for valve control in intelligent wells under uncertainties
CN104460635B (en) A kind of integrated information platform system based on intelligent hydroelectric power plant
CN112861423B (en) Data-driven water-flooding reservoir optimization method and system
CN106121621A (en) A kind of intelligent drilling specialist system
CN202250028U (en) Pressure-control well drilling monitoring system for oil and gas wells
CN107965301B (en) Quantitative evaluation method for water injection process of digital oil field
CN112943181A (en) Intelligent gas well valve adjusting system
CN106707769B (en) A kind of field management System and method for
CN109811832A (en) A kind of flux of separated-zone water infection control method based on Fuzzy Neural PID control
CN109507960A (en) A kind of integral intelligent manufacture system based on cloud platform
CN110017161A (en) Fully-mechanized mining working intelligence feed liquid method, storage medium, electronic equipment and system
CN105421298A (en) Sluice gate control method based on multiple-screen display
CN108092802A (en) The numerical prediction maintenance system and method for ocean nuclear power platform nuclear power unit
CN109753729A (en) The method and device of real-time optimization drillng operation parameter, electronic equipment
CN104361454B (en) A kind of Dan Zhanyu multistations collaboration optimization integral type oil-gas gathering and transportation intelligent management system
CN102231081A (en) Energy utilization state diagnosis method for process industrial equipment
RU2602774C1 (en) System for monitoring operation of submersible pump equipment
Ezzine Gas Lift optimization by Real Time Monitoring using SCADA system
US20230229907A1 (en) System and method for water injection optimization in a reservoir
Dunham Production automation in the 21st century: Opportunities for production optimization and remote unattended operations
CN110032219A (en) Dewatering project intelligent monitor system
Yogasugama et al. A Paradigm Changing on Surveillance Thru Virtual Well Test Implementation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication