CN106703061B - Prevent terrace differential settlement structure and construction method - Google Patents

Prevent terrace differential settlement structure and construction method Download PDF

Info

Publication number
CN106703061B
CN106703061B CN201611233777.8A CN201611233777A CN106703061B CN 106703061 B CN106703061 B CN 106703061B CN 201611233777 A CN201611233777 A CN 201611233777A CN 106703061 B CN106703061 B CN 106703061B
Authority
CN
China
Prior art keywords
support portion
terrace
prefabricated components
wall
slide bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611233777.8A
Other languages
Chinese (zh)
Other versions
CN106703061A (en
Inventor
潘黎芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Sci Tech University ZSTU
Original Assignee
Zhejiang Sci Tech University ZSTU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Sci Tech University ZSTU filed Critical Zhejiang Sci Tech University ZSTU
Priority to CN201611233777.8A priority Critical patent/CN106703061B/en
Publication of CN106703061A publication Critical patent/CN106703061A/en
Application granted granted Critical
Publication of CN106703061B publication Critical patent/CN106703061B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • E02D27/14Pile framings, i.e. piles assembled to form the substructure
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a kind of prevention terrace differential settlement structure and construction methods, it is intended to solve indoor terrace sedimentation unevenness, influence the deficiency for building normal use.The invention includes engineering pile, prefabricated components, engineering pile is equipped with stake end cushion cap, prefabricated components include the support portion of L-shaped guide part and strip, gap is equipped between support portion and engineering pile, sliding sleeve is equipped in support portion, be slidably connected slide bar in sliding sleeve, the lower end of the slider is connected on an end cushion cap, scale is equipped on slide bar outer wall from top to bottom, prestressed spring is socketed on slide bar, prestressed spring is supported between end cushion cap and support portion, it is connected with bracing piece between the support portion of adjacent two prefabricated components, the lower section of prefabricated components is the real soil by compacting, thick fill is filled between the guide part of adjacent two prefabricated components, it is rigid terrace between the support portion of adjacent two prefabricated components, joint bar is connected between rigid terrace and support portion.

Description

Prevent terrace differential settlement structure and construction method
Technical field
The present invention relates to a kind of building construction technologies, more specifically, it relates to a kind of prevention terrace differential settlement knot Structure and construction method.
Background technology
Currently, usually needing large-area fill-back earth when the relatively low place of topography carries out engineering construction, pile foundation is built For, the agent structures such as column, wall lower part is often arranged pile foundation and settles smaller, but indoor terrace is generally using recent fill The rigid terrace of base, when banketing thicker, sedimentation it is larger, close to column, wall position terrace by pile foundation influenced sedimentation it is smaller, because This, indoor terrace be usually present it is apparent it is uneven sink, to influence the normal use of building.
Chinese patent publication No. CN103806435A discloses a kind of terrace settlement treatment method and floor structure, existing One group of vertical reinforcing bar is uniformly squeezed into some backfill layers, vertical reinforcing bar bottom is contacted with the bearing layer of underground,
Bar-mat reinforcement in the top and reinforced concrete floor of vertical reinforcing bar is welded into a whole, will by one group of vertical reinforcing bar The weight transmitting of terrace surface is to bearing layer, to prevent settling.Common scaffolding steel pipe can be used in the steel pipe that the present invention uses, It is of low cost, meet design requirement as supporting course support;Bar-mat reinforcement also can be connected to be formed with regular reinforcement, easily be bought;Weight It is new to fill out the easily constructions such as backfill, graded sand and stone laying, concrete cast.The present invention is suitable for terrace during use or small There is the processing after sedimentation in type Equipment Foundations, but complicated, and construction is inconvenient.
Invention content
The present invention overcomes indoor terrace sedimentation unevenness, influence the deficiency for building normal use, provide a kind of pre- defense sector Level ground differential settlement structure and construction method, it assures that the uniform settlement of indoor terrace, ensures the normal use of building, simultaneously Convenient for intuitively finding out the settling height of terrace.
In order to solve the above-mentioned technical problem, the present invention uses following technical scheme:A kind of prevention terrace differential settlement knot Structure, including engineering pile, prefabricated components, engineering pile are equipped with stake end cushion cap, and prefabricated components include L-shaped guide part and strip Support portion is equipped with gap, sliding sleeve is equipped in support portion between support portion and engineering pile, be slidably connected slide bar in sliding sleeve, under slide bar End is connected on an end cushion cap, is equipped with scale on slide bar outer wall from top to bottom, prestressed spring, prestressing force bullet are socketed on slide bar Spring is supported between end cushion cap and support portion, and bracing piece, prefabricated components are connected between the support portion of adjacent two prefabricated components Lower section be real soil by compacting, fill thick fill between the guide part of adjacent two prefabricated components, adjacent two prefabricated components It is rigid terrace between support portion, joint bar is connected between rigid terrace and support portion.
Prefabricated components make rigid terrace at a block-like entirety, do not have the constraint of power between terrace and engineering pile, local When level ground settles, terrace is influenced small by engineering pile, ensures that the uniform settlement of terrace.And the limit of slide bar and sliding sleeve Effect, it is ensured that terrace both sides synchronize vertical sedimentation, and avoiding the occurrence of side and settling more other sides and settle causes to settle inclined less Phenomenon.On the one hand L-shaped guide part plays the role of supporting terrace, prevent from that break-off occurs with terrace, it is ensured that it is heavy to synchronize On the other hand drop plays the role of guiding during terrace settles, reduce the restraining force in infall process, effectively avoid Differential settlement.Gap between support portion and engineering pile provides space to the transverse shifting of prefabricated components, prevents prefabricated structure Occur in part infall process stuck.Prestressed spring provides certain prestressing force to support portion, keeps terrace more steady reliable. Slide bar is equipped with scale, and when terrace settles, the scale on slide bar will expose, at this time can be by slide bar outer wall Scale intuitively find out the settling height of terrace.This prevention terrace differential settlement structure ensures the uniform of indoor terrace Sedimentation ensures the normal use of building, while convenient for intuitively finding out the settling height of terrace.
Preferably, the guide part and support portion of prefabricated components are individually prefabricated, bolt fastens between guide part and support portion Connection.Guide part and support portion are individually prefabricated convenient for construction, reduce cost.
Preferably, be connected with several installation sets on sliding sleeve inner wall, installation set open end adaptation is connected with ball, ball and Abutting spring is installed, ball is connected on slide bar outer wall between installation set bottom.It is slided on slide bar in terrace infall process Sliding, ball reduce the frictional force in sliding process, are convenient for the uniform settlement of terrace, while ball is in the effect for abutting spring Under it is scalable, certain space is provided to the transverse shifting of support portion, avoids going out because of the subtle transverse shifting of support portion Stuck phenomenon is now settled, so as to cause non-uniform problem is settled.
Preferably, being socketed with bellows outside prestressed spring.The setting of bellows, preventing from banketing is stuck in prestressed spring It is interior, it is ensured that the normal use of prestressed spring.
Preferably, bracing piece includes outer tube and inner sleeve, inner sleeve is actively socketed in outer tube, housing tube end Locking swivel nut is threadedly coupled on outer wall, outer tube inner wall of end is plugged with stop collar, and several valve lockings are laid on stop collar Piece, lock sheet inner wall are fitted in inner sleeve pipe outer wall, and lock sheet outer wall is obliquely installed, and locking swivel nut inner wall is equipped with and is obliquely installed Promotion face for pushing lock sheet to move radially inwardly.Bracing piece is connected together by inner sleeve and outer tube and is constituted, from And the length of bracing piece is can be adjusted according to the needs, it is convenient for the connection of bracing piece and prefabricated components.Rotation lock swivel nut, to make Promotion face abuts on lock sheet outer wall, while locking swivel nut constantly rotates, pushes face to push in lock sheet diameter tropism and moves It is dynamic, to realize that inner sleeve is connected with the locking of outer tube.
Preferably, sliding sleeve outer wall is equipped with several bulge loops.The setting of bulge loop improve sliding sleeve and support portion it is prefabricated after Bonding strength.
Preferably, the T-shaped structure of sliding sleeve inner wall, the T-shaped structure in slide bar upper end, the lower end of the slider are threaded in an end and hold On platform.
Slide bar is threaded on an end cushion cap, easy to connect, convenient for adjusting connection height.
Preferably, being equipped with geotextiles between real soil and thick fill.The setting of geotextiles improves intensity of banketing, favorably In draining, hydrofuge.
A kind of construction method for preventing terrace differential settlement structure, the first step are beaten engineering pile and are processed on engineering pile Stake end cushion cap;Second step removes original ground loosened soil, excavates substrate to stake end cushion cap height, and tamp;Third walks, and places pre- The guide part of prefabricated components and support portion are bolted together by component processed;4th step, in the sliding sleeve of prefabricated components support portion Interior connection slide bar, and prestressed spring is socketed on slide bar, the lower end of the slider is connected on an end cushion cap;5th step, opposite two Connection reinforcement bar between the guide part of prefabricated components, and it is laid with geotextiles on the real soil between guide part;6th step, adjacent Thick fill is filled between the guide part of two prefabricated components to support portion position, and rigid terrace in construction building room on it, and Joint bar is connected between rigid terrace and support portion.After being constructed by this method, terrace forms the block structure of an entirety, sinks When drop, both sides synchronize vertical sedimentation, and Equalsettlement avoids the occurrence of local sedimentation, tilts sedimentation phenomenon, it is ensured that the normal of building makes With.
Compared with prior art, the beneficial effects of the invention are as follows:Indoor terrace uniform settlement ensures that the normal of building makes With, while convenient for intuitively finding out the settling height of terrace.
Description of the drawings
Fig. 1 is the structural schematic diagram of the present invention;
Fig. 2 is the close-up schematic view of the sliding sleeve position of the present invention;
Fig. 3 is the close-up schematic view of the bracing piece of the present invention;
In figure:1, engineering pile, 2, prefabricated components, 3, stake end cushion cap, 4, guide part, 5, support portion, 6, sliding sleeve, 7, slide bar, 8, prestressed spring, 9, bracing piece, 10, real soil, 11, thick fill, 12, rigid terrace, 13, installation set, 14, ball, 15, abut Spring, 16, bellows, 17, outer tube, 18, inner sleeve, 19, locking swivel nut, 20, stop collar, 21, lock sheet, 22, push face, 23, bulge loop, 24, geotextiles.
Specific implementation mode
Below by specific embodiment, and in conjunction with attached drawing, technical scheme of the present invention is further described:
Embodiment:A kind of prevention terrace differential settlement structure(Referring to attached drawing 1 to 3), including engineering pile 1, prefabricated components 2, engineering pile is equipped with stake end cushion cap 3, and prefabricated components include the support portion 5 of L-shaped guide part 4 and strip, support portion and work Gap is equipped between journey stake, the guide part and support portion of prefabricated components are individually prefabricated, and support lower surface is equipped with strip Mounting groove, guide part upper end are plugged in mounting groove, and bolt is fastenedly connected between guide part and support portion.Support lower surface from It is obliquely installed from lower to upper to the end far from locating part with guide part link position.L-shaped guide part vertical portion is close to stake It holds cushion cap setting and is equipped with gap between the cushion cap of stake end, horizontal component is arranged far from stake end cushion cap.Sliding sleeve is equipped in support portion 6, sliding sleeve outer wall is equipped with several bulge loops 23, and be slidably connected slide bar 7 in sliding sleeve, and the lower end of the slider is connected on an end cushion cap, sliding Scale is equipped on bar outer wall from top to bottom, is socketed with prestressed spring 8 on slide bar, prestressed spring is supported on end cushion cap and a branch Between support part, bellows 16 is socketed with outside prestressed spring.Several installation sets 13, installation set open end are connected on sliding sleeve inner wall Adaptation is connected with ball 14, and installation set open end bore is less than ball diameter, and installation set internal diameter is more than ball diameter, ball and peace It is equipped between encapsulation bottom and abuts spring 15, ball is connected on slide bar outer wall.The T-shaped structure of sliding sleeve inner wall, slide bar upper end T-shaped structure, the lower end of the slider are threaded on an end cushion cap.It is connected with bracing piece between the support portion of adjacent two prefabricated components 9, bracing piece includes outer tube 17 and inner sleeve 18, and inner sleeve is actively socketed in outer tube, screw thread on housing tube end outer wall Locking swivel nut 19 is connected, outer tube inner wall of end is plugged with stop collar 20, several valve lock sheets 21 are laid on stop collar, locks Tight piece inner wall is fitted in inner sleeve pipe outer wall, and lock sheet outer wall is obliquely installed, and locking swivel nut inner wall is equipped with to be obliquely installed and be used for The promotion face 22 for pushing lock sheet to move radially inwardly.The lower section of prefabricated components is the real soil 10 by compacting, and adjacent two is pre- Thick fill 11 is filled between the guide part of component processed, is rigid terrace 12 between the support portion of adjacent two prefabricated components, rigidly Joint bar is connected between level ground and support portion.It is equipped with geotextiles 24 between real soil and thick fill.
A kind of construction method for preventing terrace differential settlement structure, the first step are beaten engineering pile and are processed on engineering pile Stake end cushion cap;Second step removes original ground loosened soil, excavates substrate to stake end cushion cap height, and tamp;Third walks, and places pre- The guide part of prefabricated components and support portion are bolted together by component processed;4th step, in the sliding sleeve of prefabricated components support portion Interior connection slide bar, and prestressed spring is socketed on slide bar, the lower end of the slider is connected on an end cushion cap;5th step, opposite two Connection reinforcement bar between the guide part of prefabricated components, and it is laid with geotextiles on the real soil between guide part;6th step, adjacent Thick fill is filled between the guide part of two prefabricated components to support portion position, and rigid terrace in construction building room on it, and Joint bar is connected between rigid terrace and support portion.
Prefabricated components make rigid terrace at a block-like entirety, do not have the constraint of power between terrace and engineering pile, local When level ground settles, terrace is influenced small by engineering pile, ensures that the uniform settlement of terrace.And the limit of slide bar and sliding sleeve Effect, it is ensured that terrace both sides synchronize vertical sedimentation, and avoiding the occurrence of side and settling more other sides and settle causes to settle inclined less Phenomenon.On the one hand L-shaped guide part plays the role of supporting terrace, prevent from that break-off occurs with terrace, it is ensured that it is heavy to synchronize On the other hand drop plays the role of guiding during terrace settles, reduce the restraining force in infall process, effectively avoid Differential settlement.Gap between support portion and engineering pile provides space to the transverse shifting of prefabricated components, prevents prefabricated structure Occur in part infall process stuck.Prestressed spring provides certain prestressing force to support portion, keeps terrace more steady reliable. Slide bar is equipped with scale, and when terrace settles, the scale on slide bar will expose, at this time can be by slide bar outer wall Scale intuitively find out the settling height of terrace.This prevention terrace differential settlement structure ensures the uniform of indoor terrace Sedimentation ensures the normal use of building, while convenient for intuitively finding out the settling height of terrace.
Above-mentioned embodiment is only a preferred solution of the present invention, not the present invention is made in any form Limitation, on the premise of not exceeding the technical scheme recorded in the claims also other variations and modifications.

Claims (9)

1. a kind of prevention terrace differential settlement structure, characterized in that including engineering pile, prefabricated components, engineering pile is equipped with stake Cushion cap is held, prefabricated components include the support portion of L-shaped guide part and strip, and gap, branch are equipped between support portion and engineering pile Sliding sleeve is equipped in support part, be slidably connected slide bar in sliding sleeve, and the lower end of the slider is connected on an end cushion cap, on slide bar outer wall from top to bottom Equipped with scale, it is socketed with prestressed spring on slide bar, prestressed spring is supported between end cushion cap and support portion, and adjacent two is pre- Bracing piece is connected between the support portion of component processed, the lower section of prefabricated components is the real soil by compacting, adjacent two prefabricated components Guide part between fill thick fill, be rigid terrace, rigid terrace and support portion between the support portion of adjacent two prefabricated components Between connect joint bar.
2. prevention terrace differential settlement structure according to claim 1, characterized in that the guide part and branch of prefabricated components Support part is individually prefabricated, and bolt is fastenedly connected between guide part and support portion.
3. prevention terrace differential settlement structure according to claim 1, characterized in that be connected on sliding sleeve inner wall several Installation set, installation set open end adaptation are connected with ball, and abutting spring is equipped between ball and installation set bottom, and ball abuts On slide bar outer wall.
4. prevention terrace differential settlement structure according to claim 1, characterized in that be socketed with wave outside prestressed spring Line pipe.
5. prevention terrace differential settlement structure according to claim 1, characterized in that bracing piece includes outer tube and interior Casing, inner sleeve are actively socketed in outer tube, and locking swivel nut, outer tube inner wall of end are threadedly coupled on housing tube end outer wall It is plugged with stop collar, several valve lock sheets are laid on stop collar, lock sheet inner wall is fitted in inner sleeve pipe outer wall, lock sheet Outer wall is obliquely installed, and locking swivel nut inner wall is equipped with the promotion face being obliquely installed for pushing lock sheet to move radially inwardly.
6. the prevention terrace differential settlement structure according to claim 1 to 5 any one, characterized in that sliding sleeve outer wall It is equipped with several bulge loops.
7. the prevention terrace differential settlement structure according to claim 1 to 5 any one, characterized in that sliding sleeve inner wall T-shaped structure, the T-shaped structure in slide bar upper end, the lower end of the slider are threaded on an end cushion cap.
8. the prevention terrace differential settlement structure according to claim 1 to 5 any one, characterized in that real soil and thickness Geotextiles are equipped between banketing.
9. a kind of construction method described in claim 1 for preventing terrace differential settlement structure, characterized in that the first step is beaten Engineering pile simultaneously processes stake end cushion cap on engineering pile;Second step removes original ground loosened soil, excavates substrate to stake end cushion cap height Degree, and tamp;Third walks, and places prefabricated components, the guide part of prefabricated components and support portion are bolted together;4th Step, connects slide bar, and prestressed spring is socketed on slide bar, the lower end of the slider is connected to stake in the sliding sleeve of prefabricated components support portion It holds on cushion cap;5th step, the connection reinforcement bar between the guide part of opposite two prefabricated components, and on the real soil between guide part It is laid with geotextiles;6th step fills thick fill to support portion position, and on it between the guide part of adjacent two prefabricated components Rigid terrace in construction building room, and connect joint bar between rigid terrace and support portion.
CN201611233777.8A 2016-12-28 2016-12-28 Prevent terrace differential settlement structure and construction method Active CN106703061B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611233777.8A CN106703061B (en) 2016-12-28 2016-12-28 Prevent terrace differential settlement structure and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611233777.8A CN106703061B (en) 2016-12-28 2016-12-28 Prevent terrace differential settlement structure and construction method

Publications (2)

Publication Number Publication Date
CN106703061A CN106703061A (en) 2017-05-24
CN106703061B true CN106703061B (en) 2018-09-07

Family

ID=58903596

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611233777.8A Active CN106703061B (en) 2016-12-28 2016-12-28 Prevent terrace differential settlement structure and construction method

Country Status (1)

Country Link
CN (1) CN106703061B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002030649A (en) * 2000-07-19 2002-01-31 Nishimatsu Constr Co Ltd Construction method for improving foundation subsoil
JP2010265606A (en) * 2009-05-12 2010-11-25 Shimizu Corp Method for constructing dirt floor
CN203174619U (en) * 2013-01-22 2013-09-04 管自立 Reverse raft concrete terrace
CN103806435A (en) * 2012-11-09 2014-05-21 贵阳铝镁设计研究院有限公司 Terrace subsidence treatment method and terrace structure
CN203924090U (en) * 2014-05-13 2014-11-05 浙江海洋学院 The pile foundation of coming to nothing in soft foundation control basis

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002030649A (en) * 2000-07-19 2002-01-31 Nishimatsu Constr Co Ltd Construction method for improving foundation subsoil
JP2010265606A (en) * 2009-05-12 2010-11-25 Shimizu Corp Method for constructing dirt floor
CN103806435A (en) * 2012-11-09 2014-05-21 贵阳铝镁设计研究院有限公司 Terrace subsidence treatment method and terrace structure
CN203174619U (en) * 2013-01-22 2013-09-04 管自立 Reverse raft concrete terrace
CN203924090U (en) * 2014-05-13 2014-11-05 浙江海洋学院 The pile foundation of coming to nothing in soft foundation control basis

Also Published As

Publication number Publication date
CN106703061A (en) 2017-05-24

Similar Documents

Publication Publication Date Title
CN106369223B (en) A kind of silt stratum pipe jacking construction method
CN103526770B (en) A kind of construction method of high antiseepage anti-floating pile raft structure
CN106402490B (en) Silt stratum push pipe jacking construction method based on steel bushing head tool pipe
CN100501124C (en) Construction method for tunnel contact passage in shield section of underground railway
CN103343544B (en) Construction method for large-scale open caisson
CN101886545B (en) Method for treating bottom heave of soft rock roadway by using micro broken stone pipe cast pile
CN102277898B (en) Drain pipe jacking construction method
CN104343455B (en) Long-distance curved jacking pipe and pipe roof construction technique
CN103147442B (en) Ultra-deep foundation pit press-grouting pile and prestressed anchor combined supporting construction method
CN101503879B (en) Pre-control method for preventing inclination of sinking well
CN106013171B (en) A kind of semi-rigid supporting construction semi-flexible and method of deep-foundation side wall
CN105155602B (en) A kind of many fulcrums foundation stabilization synthesis inclination correction method
US20160340851A1 (en) Method for installing metal piles in permafrost soil
CN110847224A (en) Filling slope gravity retaining wall reinforcing structure and construction method thereof
CN103015519A (en) Pipe-jacking construction of drain pipe
CN110984171A (en) Steel pipe pile grouting combined waist beam anchor rod supporting method
CN112160324A (en) Construction method for deep foundation pit support
CN101936032A (en) Method for mounting and constructing polyethylene double-wall corrugated water discharge pipe
CN103195060B (en) Soft soil foundation prestressing bolt anchorage structure and uses thereof
CN106812153A (en) Beam and slab type construction elevator foundation construction engineering method in a kind of backfill
CN205329709U (en) Mountain region photovoltaic support foundation structure
CN101509258B (en) Method for precontrolling subsidence slant of sinking well
CN113107501B (en) Initial tunneling construction method for tunnel portal extension steel ring
CN106703061B (en) Prevent terrace differential settlement structure and construction method
CN103276645A (en) Precast pile, beam and slab renovation technology for diseases of existing line tunnel base

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20170524

Assignee: ZHEJIANG WANSHOU ARCHITECTURAL ENGINEERING CO.,LTD.

Assignor: ZHEJIANG SCI-TECH University

Contract record no.: X2022330000307

Denomination of invention: Structure and construction method for preventing uneven settlement of floor

Granted publication date: 20180907

License type: Common License

Record date: 20220715

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20170524

Assignee: Hangzhou Renhe Sculpture Art Co.,Ltd.

Assignor: ZHEJIANG SCI-TECH University

Contract record no.: X2023980034020

Denomination of invention: Structure and Construction Method for Preventing Uneven Settlement of Floors

Granted publication date: 20180907

License type: Common License

Record date: 20230325

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20170524

Assignee: Pinghu Jinshun building materials Co.,Ltd.

Assignor: ZHEJIANG SCI-TECH University

Contract record no.: X2023980034131

Denomination of invention: Structure and Construction Method for Preventing Uneven Settlement of Floors

Granted publication date: 20180907

License type: Common License

Record date: 20230329

Application publication date: 20170524

Assignee: Hangzhou Zhuocheng construction reinforcement Engineering Co.,Ltd.

Assignor: ZHEJIANG SCI-TECH University

Contract record no.: X2023980034130

Denomination of invention: Structure and Construction Method for Preventing Uneven Settlement of Floors

Granted publication date: 20180907

License type: Common License

Record date: 20230329

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20170524

Assignee: Zhejiang Yunchuang Printing Technology Co.,Ltd.

Assignor: ZHEJIANG SCI-TECH University

Contract record no.: X2023330000929

Denomination of invention: Structure and Construction Methods for Preventing Uneven Settlement of Floors

Granted publication date: 20180907

License type: Common License

Record date: 20231220

EE01 Entry into force of recordation of patent licensing contract