CN106703010A - Jacket-material-bed-free sleeve valve pipe grouting quick construction method - Google Patents

Jacket-material-bed-free sleeve valve pipe grouting quick construction method Download PDF

Info

Publication number
CN106703010A
CN106703010A CN201510769041.1A CN201510769041A CN106703010A CN 106703010 A CN106703010 A CN 106703010A CN 201510769041 A CN201510769041 A CN 201510769041A CN 106703010 A CN106703010 A CN 106703010A
Authority
CN
China
Prior art keywords
inflation ring
grouting
mini
ring
slip casting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510769041.1A
Other languages
Chinese (zh)
Other versions
CN106703010B (en
Inventor
房营光
欧振锋
谷任国
李波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
South China University of Technology SCUT
Original Assignee
South China University of Technology SCUT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by South China University of Technology SCUT filed Critical South China University of Technology SCUT
Priority to CN201510769041.1A priority Critical patent/CN106703010B/en
Publication of CN106703010A publication Critical patent/CN106703010A/en
Application granted granted Critical
Publication of CN106703010B publication Critical patent/CN106703010B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/12Consolidating by placing solidifying or pore-filling substances in the soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/04Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/003Injection of material

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention discloses a jacket-material-bed-free sleeve valve pipe grouting quick construction method. An upper and lower inflatable ring layered sealing mode is adopted to replace a jacket material sealing mode, an upper ring and a lower ring are connected with an air guiding pipe, and the air inflation state is controlled by the ground; after a sleeve valve pipe is sleeved with the inflatable rings, the sleeve valve pipe and the inflatable rings are inserted into a grouting drilled hole together, in the air inflation state, the inner sides of the inflatable rings are closely attached to the outer surface of the sleeve valve pipe, the outer sides of the inflatable rings are closely attached to the wall of the grouting drilled hole, a sealed grouting gap is formed between the upper inflatable ring and the lower inflatable ring, and grout enters the sealed gap from the sleeve valve pipe and permeates into a stratum through the grouting hole wall between the upper inflatable ring and the lower inflatable ring to be subjected to pressure grouting; and the upper inflatable ring can be lifted upwards along a grouting floral pipe after being subjected to air leakage so that the fixed position of the upper inflatable ring can be changed and layered sealing and layered grouting can be conducted, and grouting operation conducted in the whole grouting hole is completed from bottom to top. According to the jacket-material-bed-free sleeve valve pipe grouting quick construction method, the layer thickness can be adjusted according to the practical situation, the sleeve valve pipe can be pulled out before the grout is completely condensed, and can be recycled after being cleaned; and a hole formed after the sleeve valve pipe is pulled out is filled with grout.

Description

One kind is without sheath body bed of material sleeve valve barrel grouting rapid constructing method
Technical field
The invention belongs to Geotechnical Engineering slurry injection technique field, it is related to a kind of soft soil foundation grouting strengthening method, more particularly to one kind is without sheath body bed of material sleeve valve barrel grouting rapid constructing method.
Background technology
The technological process of conventional sleeve valve barrel grouting is:Drilling → insertion mini-valve tube → perfusion sleeve shell material → sleeve shell material solidifies 3 ~ 5 days → grouting.The technology is by mini-valve tube by being inserted to bottom hole under drilling, sleeve shell material is filled the gap between mini-valve tube and slip casting hole wall from bottom to top in the form of irrigating, after sleeve shell material solidification reaches some strength in 3 ~ 5 days, grouting tube is inserted in mini-valve tube carries out segmenting slip casting, slurries is spread to Rock And Soil in the presence of grouting pressure.Due to the method can carry out depthkeeping, it is quantitative, determine section and repeat slip casting, concentrated the advantage of compaction grouting, infiltration slip casting and fracture grouting, the at present extensive use in the consolidation process engineering such as soft soil foundation, tunnel, subway, roadbed and dyke seepage control.But weak point is there is also in actual applications:1. slip casting will can just be carried out after sleeve shell material solidification reaches some strength, considerably increase construction period;2. the cementing mini-valve tube of the sleeve shell material of some strength, mini-valve tube is often difficult to extract, and causes mini-valve tube to reuse, and consumes a large amount of steel pipes;3. the thickness of delamination pour slurry is fixed, it is impossible to the actual conditions adjustment slip casting thickness according to stratum;4. sleeve valve barrel grouting, its slurries diffusion control is difficult, and typically resulting in can not form continuous injecting cement paste, influences grouting quality.
The content of the invention
The purpose of the present invention is directed to existing conventional slurry injection technique of sleeve valve tube deficiency in actual applications, play the sealing function that layered seal replaces the sheath body bed of material using inflation is bicyclic, the sheath body bed of material of mini-valve tube appearance is wrapped in so as to cancel, there is provided one kind is without sheath body bed of material sleeve valve barrel grouting rapid constructing method.
Technical scheme is specific as follows:
One kind is without sheath body bed of material sleeve valve barrel grouting rapid constructing method, including step:
1)Mud off vertical drilling is carried out in foundation soil using geological drilling rig, injected hole is obtained;
2)Upper inflation ring and lower inflation ring are from top to bottom enclosed within mini-valve tube outer surface, upper inflation ring and lower inflation ring connect a wireway respectively;
3)Inflation ring and lower inflation ring position in adjustment, lower inflation ring is adjusted to from the position of mini-valve tube bottom 0.5m ~ 1.0m, and the distance between upper inflation ring and lower inflation ring are ground floor stratum slip casting thickness;
4)The mini-valve tube of bottom end closure is inserted in the brill injected hole together with upper inflation ring and lower inflation ring, until mini-valve tube bottom reaches injected hole bottom;
5)Upper inflation ring and lower inflation ring are inflated respectively by wireway on ground, inflation ring and lower inflation ring inner side is set to be close to mini-valve tube outer surface, slip casting hole wall is close in outside, so as to form the slip casting gap of closing between mini-valve tube outer surface and slip casting hole wall and upper inflation ring and lower inflation ring;
6)The grouting tube with upper and lower stop grouting plug is inserted into mini-valve tube, distance between upper and lower stop grouting plug is adjusted, the slip casting of ground floor stratum is carried out by Grouting Pipe;
7)After completing ground floor stratum slip casting, the gas in inflation ring is drained, and the position of upper inflation ring is lifted up along mini-valve tube, range of lift is second layer stratum slip casting thickness;
8)Upper inflation ring is inflated, then corresponding lifting sleeve floral tube and upper and lower stop grouting plug carry out the slip casting of second layer stratum;
9)Repeat step 7)~8), until completing the slip casting operation of whole injected hole;
10)Before injection slurry condenses completely, mini-valve tube is extracted, once purged reuse;
11)Recharge slurries in the hole that mini-valve tube leaves are being extracted, until filling.
Further, step 5)In, the blowing pressure of the upper inflation ring and lower inflation ring is 2 ~ 20 atmospheric pressure.
Further, the upper inflation ring and lower inflation ring are made up of rubber or earth working material.
Compared to existing technology, the present invention not only has all advantages of conventional sleeve valve barrel grouting, and overcomes the main deficiency of conventional sleeve valve barrel grouting, and its advantage is:
(1)Using the bicyclic sealing function for playing the layered seal substitution sheath body bed of material is inflated, cancel the sheath body bed of material, reduce material consumption, and the time saved needed for reaching some strength because of the solidification of the sheath body bed of material, substantially increase speed of application;
(2)Mini-valve tube can extract reuse, it is to avoid consumption tube material;
(3)Due to eliminating the sheath body bed of material, slurries can uniformly fill the gap between mini-valve tube and slip casting hole wall, uniformly be spread in Rock And Soil, it is to avoid injecting cement paste non-continuous event caused by being difficult to control because of slip casting diffusion, hence it is evident that improve slip casting effect;
(4)By adjusting the distance between upper and lower inflation ring, the lift height of slip casting can be adjusted according to stratum actual conditions;
(5)It is reusable due to cancelling the sheath body bed of material and sleeve valve steel pipe, significantly reduce construction cost.
Brief description of the drawings
Fig. 1 is mini-valve tube, inflation ring, the grouting tube structural representation of the embodiment of the present invention.
Fig. 2 is the slip casting rapid constructing method schematic diagram of the embodiment of the present invention.
It is shown in figure:1- mini-valve tubes, grouting tubes of the 2- with upper and lower stop grouting plug, the upper inflation rings of 3-, inflation ring under 4-, 5- Grouting Pipes, the upper ring inflating catheters of 6-, ring inflating catheter under 7-, 8- ground floor slip castings region.
Specific embodiment
In order in detail and clearly show the present invention implementation purpose and technical scheme, the present invention will be explained in further detail below in conjunction with accompanying drawing and example.Described example is only used for illustrating the present invention, is not whole examples of the invention, is not intended to limit the scope of protection of the invention.
As shown in Fig. 2 one kind is without sheath body bed of material sleeve valve barrel grouting rapid constructing method, including step:
1)Mud off vertical drilling is carried out in foundation soil using geological drilling rig, injected hole is obtained;
2)Upper inflation ring 3 and lower inflation ring 4 are from top to bottom enclosed within the outer surface of mini-valve tube 1, the upper inflation ring 3 and lower inflation ring 4 are made up of rubber or earth working material, the upper ring inflating catheter 6 of the connection of upper inflation ring 3, lower lower ring inflating catheter 7 of the connection of inflation ring 4 (see Fig. 1);
3)Inflation ring 3 and the lower position of inflation ring 4 in adjustment, lower inflation ring 4 is adjusted to from the position of the bottom 0.5m of mini-valve tube 1 ~ 1.0m, and the distance between upper inflation ring 3 and lower inflation ring 4 are ground floor stratum slip casting thickness;
4)The mini-valve tube 1 of bottom end closure is inserted in the brill injected hole together with upper inflation ring 3 and lower inflation ring 4, until the bottom of mini-valve tube 1 reaches injected hole bottom;
5)Upper inflation ring 3 and lower inflation ring 4 are inflated respectively by wireway on ground, the blowing pressure is 2 ~ 20 atmospheric pressure, inflation ring 3 and the inner side of lower inflation ring 4 is set to be close to the outer surface of mini-valve tube 1, slip casting hole wall is close in outside, so as to form the slip casting gap of closing between the outer surface of mini-valve tube 1 and slip casting hole wall and upper inflation ring 3 and lower inflation ring 4;
6)The grouting tube 2 with upper and lower stop grouting plug is inserted into mini-valve tube 1, distance between upper and lower stop grouting plug is adjusted, the slip casting of ground floor stratum is carried out by Grouting Pipe 5, form ground floor slip casting region 8;
7)After completing ground floor stratum slip casting, the gas in inflation ring 3 is drained, and the position of upper inflation ring 3 is lifted up along mini-valve tube 1, range of lift is second layer stratum slip casting thickness;
8)Upper inflation ring 3 is inflated, then corresponding lifting sleeve floral tube and upper and lower stop grouting plug carry out the slip casting of second layer stratum;
9)Repeat step 7)~8), until completing the slip casting operation of whole injected hole;
10)Before injection slurry condenses completely, mini-valve tube 1 is extracted, once purged reuse;
11)Recharge slurries in the hole that mini-valve tube 1 leaves are being extracted, until filling.
The present embodiment plays the sealing function that layered seal replaces the sheath body bed of material using inflation is bicyclic, both by adjusting the distance between upper and lower inflation ring, the lift height of slip casting can be adjusted according to stratum actual conditions, and because cancelling the sheath body bed of material, reduces material consumption, and the time saved needed for reaching some strength because of the solidification of the sheath body bed of material, speed of application is substantially increased, meanwhile, mini-valve tube can extract reuse, avoid consuming tube material, significantly reduce construction cost.Additionally, due to eliminating the sheath body bed of material, slurries can uniformly fill the gap between mini-valve tube and slip casting hole wall, uniformly be spread in Rock And Soil, it is to avoid injecting cement paste non-continuous event caused by being difficult to control because of slip casting diffusion, slip casting effect is significantly improved, with extraordinary application prospect and market prospects.
The above embodiment of the present invention is only intended to clearly illustrate example of the present invention, and is not the restriction to embodiments of the present invention.For those of ordinary skill in the field, can also make other changes in different forms on the basis of the above description.There is no need and unable to be exhaustive to all of implementation method.All any modification, equivalent and improvement made within the spirit and principles in the present invention etc., should be included within the protection domain of the claims in the present invention.

Claims (3)

1. one kind is without sheath body bed of material sleeve valve barrel grouting rapid constructing method, it is characterised in that including step:
1)Mud off vertical drilling is carried out in foundation soil using geological drilling rig, injected hole is obtained;
2)Upper inflation ring (3) and lower inflation ring (4) are from top to bottom enclosed within mini-valve tube (1) outer surface, upper inflation ring (3) and lower inflation ring (4) connect a wireway respectively;
3)Inflation ring in adjustment(3)With lower inflation ring (4) position, lower inflation ring (4) is adjusted to from the position of mini-valve tube (1) bottom 0.5m ~ 1.0m, the distance between upper inflation ring (3) and lower inflation ring (4) are ground floor stratum slip casting thickness;
4)The mini-valve tube (1) of bottom end closure is inserted in the brill injected hole together with upper inflation ring (3) and lower inflation ring (4), until mini-valve tube (1) bottom reaches injected hole bottom;
5)Upper inflation ring (3) and lower inflation ring (4) are inflated respectively by wireway on ground, inflation ring (3) and lower inflation ring (4) inner side is set to be close to mini-valve tube (1) outer surface, slip casting hole wall is close in outside, so as to form the slip casting gap of closing between mini-valve tube (1) outer surface and slip casting hole wall and upper inflation ring (3) and lower inflation ring (4);
6)The grouting tube (2) with upper and lower stop grouting plug is inserted into mini-valve tube (1), distance between upper and lower stop grouting plug is adjusted, the slip casting of ground floor stratum is carried out by Grouting Pipe (5);
7)After completing ground floor stratum slip casting, the gas in inflation ring (3) is drained, and the position of upper inflation ring (3) is lifted up along mini-valve tube (1), range of lift is second layer stratum slip casting thickness;
8)Upper inflation ring (3) is inflated, then corresponding lifting sleeve floral tube and upper and lower stop grouting plug carry out the slip casting of second layer stratum;
9)Repeat step 7)~8), until completing the slip casting operation of whole injected hole;
10)Before injection slurry condenses completely, mini-valve tube (1) is extracted, once purged reuse;
11)Recharge slurries in the hole that mini-valve tube (1) leaves are being extracted, until filling.
2. according to claim 1 without sheath body bed of material sleeve valve barrel grouting rapid constructing method, it is characterised in that:Step 5)In, the blowing pressure of the upper inflation ring (3) and lower inflation ring (4) is 2 ~ 20 atmospheric pressure.
3. according to claim 1 without sheath body bed of material sleeve valve barrel grouting rapid constructing method, it is characterised in that:The upper inflation ring (3) and lower inflation ring (4) are made up of rubber or earth working material.
CN201510769041.1A 2015-11-12 2015-11-12 A kind of no sheath body bed of material sleeve valve barrel grouting rapid constructing method Expired - Fee Related CN106703010B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510769041.1A CN106703010B (en) 2015-11-12 2015-11-12 A kind of no sheath body bed of material sleeve valve barrel grouting rapid constructing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510769041.1A CN106703010B (en) 2015-11-12 2015-11-12 A kind of no sheath body bed of material sleeve valve barrel grouting rapid constructing method

Publications (2)

Publication Number Publication Date
CN106703010A true CN106703010A (en) 2017-05-24
CN106703010B CN106703010B (en) 2019-01-29

Family

ID=58929543

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510769041.1A Expired - Fee Related CN106703010B (en) 2015-11-12 2015-11-12 A kind of no sheath body bed of material sleeve valve barrel grouting rapid constructing method

Country Status (1)

Country Link
CN (1) CN106703010B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108677959A (en) * 2018-05-29 2018-10-19 河北建设勘察研究院有限公司 A kind of grouting tube and grouting construction method suitable for mortar depositing construction under the conditions of limited space
CN111074899A (en) * 2019-11-11 2020-04-28 中铁七局集团第二工程有限公司 Grouting method for karst caves with different filling types
CN111424669A (en) * 2020-03-27 2020-07-17 上海长凯岩土工程有限公司 Pile end grouting process and device of quick and recyclable grouting device
CN111794206A (en) * 2020-07-20 2020-10-20 兰州理工大学 Earthen site anchoring and grouting system and anchoring and grouting method thereof
CN113250200A (en) * 2021-05-20 2021-08-13 中电建路桥集团有限公司 Novel environmental protection fibre cement layering slip casting device
CN116892210A (en) * 2023-09-08 2023-10-17 沈阳北方建设股份有限公司 Sleeve valve pipe grouting device and grouting method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102444118A (en) * 2010-10-15 2012-05-09 中铁五局(集团)有限公司 Construction method for grouting reinforcement of sleeve valve pipe
KR101210956B1 (en) * 2011-03-28 2012-12-11 윤상준 Apparatus for injecting grout using a carbon fiber reinforcement pipe and method thereof
CN104060965A (en) * 2014-06-23 2014-09-24 贾希成 Adjustable annular double-layer air bag hole sealing device and method for performing hole sealing

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102444118A (en) * 2010-10-15 2012-05-09 中铁五局(集团)有限公司 Construction method for grouting reinforcement of sleeve valve pipe
KR101210956B1 (en) * 2011-03-28 2012-12-11 윤상준 Apparatus for injecting grout using a carbon fiber reinforcement pipe and method thereof
CN104060965A (en) * 2014-06-23 2014-09-24 贾希成 Adjustable annular double-layer air bag hole sealing device and method for performing hole sealing

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108677959A (en) * 2018-05-29 2018-10-19 河北建设勘察研究院有限公司 A kind of grouting tube and grouting construction method suitable for mortar depositing construction under the conditions of limited space
CN111074899A (en) * 2019-11-11 2020-04-28 中铁七局集团第二工程有限公司 Grouting method for karst caves with different filling types
CN111424669A (en) * 2020-03-27 2020-07-17 上海长凯岩土工程有限公司 Pile end grouting process and device of quick and recyclable grouting device
CN111794206A (en) * 2020-07-20 2020-10-20 兰州理工大学 Earthen site anchoring and grouting system and anchoring and grouting method thereof
CN113250200A (en) * 2021-05-20 2021-08-13 中电建路桥集团有限公司 Novel environmental protection fibre cement layering slip casting device
CN116892210A (en) * 2023-09-08 2023-10-17 沈阳北方建设股份有限公司 Sleeve valve pipe grouting device and grouting method
CN116892210B (en) * 2023-09-08 2023-12-01 沈阳北方建设股份有限公司 Sleeve valve pipe grouting device and grouting method

Also Published As

Publication number Publication date
CN106703010B (en) 2019-01-29

Similar Documents

Publication Publication Date Title
CN106703010A (en) Jacket-material-bed-free sleeve valve pipe grouting quick construction method
CN209277160U (en) A kind of inflatable stop grouting plug for sleeve valve barrel grouting
CN106320354B (en) The Seepage method on solution cavity development stratum under coating
CN105200978B (en) A kind of protrusive localization two-liquid grouting device and construction method
CN104975594B (en) A kind of Grouting Pipe and construction method for miscellaneous fill stratum
CN104499479B (en) It is a kind of to pass through the dug pile construction method that sand gravel backfills layer
CN100510274C (en) Construction method of enclosing level rotary-jet pile hole-mouth using double-liquid slip jection method
CN103924987B (en) A kind of SMW engineering method stake tunnel shielding portal seepage-proof structure and construction method thereof
CN101644049B (en) Slurry injection technique of double-valve sleeve valve tube of cloth bag
CN107605498A (en) Rich water sand-pebble layer shield tunnel termination horizontal grouting ruggedized construction construction method
CN101644048B (en) Slurry injection technique of sleeve valve tube of cloth bag
CN106761835A (en) A kind of Karst Tunnel leak segmenting slip casting construction method
CN107524455A (en) Multistage densification formula mini-valve tube and its grouting method
CN106894428A (en) Multi-channel waterproof plugging method for dewatering well of thick and large raft foundation
CN106837340B (en) The construction method of wall clearance grouting waterproof and reinforcing shaft wall structure under frost wall protection
CN107178077A (en) Overburden layer grouting and reinforcing structure and its design method on a kind of karst area solution cavity
CN105731978A (en) Grouting slurry for reinforcing tunnel face of jacking culvert of fine-sand layer and grouting method
CN107675707A (en) Inclined rock base steel pile casting is fixed and bottom blocking method
CN110685272A (en) Method for treating soft foundation settlement overrun by utilizing inclined-hole cloth bag pile
CN105178342B (en) Precipitation well casing and method for blocking reserved hole of foundation pit through precipitation well casing
CN207161107U (en) Multistage densification formula mini-valve tube
CN104533448B (en) The construction method of shield tunnel termination water sealing consolidation in a kind of lithostratigraphy
CN215804475U (en) Sleeve valve pipe slip casting component and be used for hole sealing subassembly of rich water karst
CN214423394U (en) Dewatering well reinforced by annular capsule
CN113152467A (en) Grouting method for easily collapsed stratum

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190129