CN106697956A - Removal device and method for scattered coal at shaft bottom and layout method - Google Patents
Removal device and method for scattered coal at shaft bottom and layout method Download PDFInfo
- Publication number
- CN106697956A CN106697956A CN201710092090.5A CN201710092090A CN106697956A CN 106697956 A CN106697956 A CN 106697956A CN 201710092090 A CN201710092090 A CN 201710092090A CN 106697956 A CN106697956 A CN 106697956A
- Authority
- CN
- China
- Prior art keywords
- coal
- water
- funnel
- water tank
- pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G53/00—Conveying materials in bulk through troughs, pipes or tubes by floating the materials or by flow of gas, liquid or foam
- B65G53/30—Conveying materials in bulk through pipes or tubes by liquid pressure
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G45/00—Lubricating, cleaning, or clearing devices
- B65G45/10—Cleaning devices
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G2201/00—Indexing codes relating to handling devices, e.g. conveyors, characterised by the type of product or load being conveyed or handled
- B65G2201/04—Bulk
- B65G2201/045—Sand, soil and mineral ore
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Disintegrating Or Milling (AREA)
Abstract
The invention discloses a removal device and method for scattered coal at the shaft bottom and a layout method. A coal smashing machine is arranged above a water tank. A coal outlet of the coal smashing machine communicates with the water tank. A scattered coal collecting structure is arranged above a coal inlet of the coal smashing machine. The water tank is provided with a water inlet pipe and a water pumping pipe, and the water pumping pipe communicates with external coal washing equipment. Coal is grinded into particles firstly, the particles are mixed with water, then the coal-water mixture is conveyed in a suspended state through a pipeline at a reasonable conveying speed, and the mixture is conveyed to a ground coal bunker or a coal cleaning plant for subsequent processing. Inconvenience caused by coal slurry is solved fundamentally, assisting operation by workers is not needed, the removing technique is greatly simplified, full automation of scattered coal removal is achieved, and operability and practicability are extremely high.
Description
Technical field
Coal cleaning field, more particularly to a kind of cleaning plant, cleaning side that coal is spread for shaft bottom are spread the present invention relates to shaft bottom
Method and layout method.
Background technology
It refers to, using vertical shaft skip lifting, well to be fallen into skip bucket loading and unloading or lifting process that coal is spread in coal master's vertical shaft bottom
The coal at bottom.And old-fashioned bend is used main vertical shaft hoisting uninstalling system in the past more, and spreading that coal is more, skip shaft spreads coal and accounts for mine daily output
3 ‰~the 5 ‰ of amount, and spread system clearly and coal is typically spread using Rabble mine winch cleaning, chamber mainly has main vertical shaft bottom funnel, spreads coal
Chamber, Rabble mine winch chamber and gole etc..Cleaning technology is:The coal and water in shaft bottom are fallen into by the conversion chute point under funnel
Not Jin Ru gole both sides slusher road, coal is loaded by mine car by rope traction slusher by Rabble mine winch;Black water passes through
Dehydration plate flows into gole, after precipitation outflow cleaning scattered coal chamber.When pit shaft water drenching is more, coal water is caused to mix, shape
Into coal slime, cleaning is difficult, and easily blocks buccal funnel under pit shaft.
In recent years, main Shaft Hoist Equipment and loading and unloading equipment have larger improvement, main vertical shaft bottom is spread coal amount big
It is big to reduce, spread coal amount is reduced to the mine daily output 1 ‰~less than 2 ‰;And new type of shaft structure is used shaft of vertical well more, plus
High-strength concrete and waterproof material application, pit shaft water drenching is greatly lowered, typically in 5m3/ below h, but
Existing coal Removal Technology of spreading still suffers from many problems.Such as:Existing coal Removal Technology of spreading needs to tunnel a tunnel again, with
Main shaft bottom is connected, and cleaning equipment is influenceed by black water in pit shaft, in most cases needs artificial assist process,
Cleaning efficiency is relatively low.
The content of the invention
In view of above-mentioned the deficiencies in the prior art, it is an object of the invention to provide a kind of cleaning dress that coal is spread for shaft bottom
Put, method for cleaning and layout method, improve the cleaning efficiency that coal is spread in shaft bottom.
In order to solve the above technical problems, the present invention program includes:
A kind of cleaning plant that coal is spread for shaft bottom, it includes the water tank being arranged on vertical base plate, wherein, water tank top
Coal pulverizer is provided with, the coal outlet of coal pulverizer is connected with water tank, the coal feed point top of coal pulverizer is provided with
Spread coal collection structure;Water inlet pipe and drinking-water pipe are provided with water tank, drinking-water pipe is connected with extraneous wash coaling equipment.
Described cleaning plant, wherein, the above-mentioned coal collection structure that spreads includes funnel top plate and funnel lower plywood, on funnel
Laminate, funnel lower plywood are each attached on water inlet pipe and drinking-water pipe, collection funnel between funnel top plate and funnel lower plywood, are received
Collection funnel is connected with the coal feed point of above-mentioned coal pulverizer.
Described cleaning plant, wherein, above-mentioned funnel top plate is in tilted layout with funnel lower plywood, funnel top plate with
Funnel lower plywood forms angle portion, and above-mentioned collection funnel is arranged on the folder corner portion.
A kind of method for cleaning using the cleaning plant, it is comprised the following steps:
A, by water tank with water from water inlet pipe to shaft bottom, when Water in Water Tanks position reaches reasonable altitudes, ground water pump starts to lead to
Cross drinking-water pipe to draw water, form water circulation;
B, unlatching coal pulverizer, then start skip hoisting fortune coal, are trickled down when lump coal occurs in lifting process in skip bucket
When, coal cinder can be dropped on funnel top plate and fall funnel lower plywood under continuing, and then be collected collection funnel to coal powder
In broken machine and complete crush;
C, by the water tank that the coal dust after crushing can automatically fall into bottom, and be mixed to form coal water with the water in water tank,
Transport carries out subsequent treatment to ground coal washery in the presence of recirculated water afterwards.
A kind of layout method for arranging the cleaning plant, it is comprised the following steps:
Step one, the depth h according to vertical, diameter d, net sectional area s determines the length L of water inlet pipe and drinking-water pipe and spreads coal
Collection structure size dimension;
L=h ± l "
D '=d
Wherein, l " is with size actually required on well;L is length of pipe, and unit is m;D' is to spread coal collection structure
Minimum diameter, unit is m;C is the discrepancy in elevation for spreading coal collection structure, and unit is m;
Step 2, spreading coal amount n, the mesh number w of pulverized coal particle can be transported, the big of coal cinder need to be processed according to actually required cleaning
Small k, selects corresponding coal pulverizer;
Step 3, according to coal-water ratio r when can transport, the output x of pulverizer determine the unit interval needed for water m,
The density p of water, according to required travelling speed v, selects the road cross dimensions S of reasonable water inlet pipe and drinking-water pipea、Sb(m2);
M=x/r;
R is coal-water ratio when can transport;
Travelling speeds of the v for needed for;
Step 4, water m, water velocity v, water pipe section that the water pump of extraneous wash coaling equipment will be according to needed for the unit interval
Area Sa、Sb, carry out corresponding configuration;The design of water tank uses cylindrical design, material selection high intensity mixed mud;
D "=d × 75%
H "=d × 150%
D " is the diameter of water tank, m;
H " is the height of water tank;
And then obtain above-mentioned cleaning plant.
A kind of cleaning plant, method for cleaning and layout method that coal is spread for shaft bottom that the present invention is provided, first grinds coal
Broken is powder, coal-water mixture is conveyed in suspended state with rational travelling speed by pipeline after mixing with water, until
Ground coal bunker or coal washery carry out subsequent treatment;Above-mentioned travelling speed requirement remains constant, and to prevent, speed is too high to be made
Coal powder rubs inner-walls of duct as sand paper, accelerates loss;And speed is too low that coal powder can be made to lose suspended state,
It is deposited in duct bottom;With it is conventional spread coal Removal Technology compared with, The present invention reduces tunnel driving and safeguard, simplify and spread
Coal processing equipment, has saved a series of costs, while solving the inconvenience that black water is brought from root, it is not required that workman
Assistance operation, great simplification is made that in Removal Technology, the cleaning to spreading coal realizes full-automation, great operability
And practicality.
Brief description of the drawings
Fig. 1 is the structural representation of cleaning plant in the present invention;
Fig. 2 is the cross-sectional view of cleaning plant in the present invention;
Fig. 3 is the structural representation that coal collection structure is spread in the present invention;
Wherein, 1 is shaft of vertical well, and 2 is water inlet pipe, and 3 is drinking-water pipe, and 4 is coal pulverizer, and 5 is coal pulverizer support,
6 is water tank, and 7 is vertical base plate, and 8 is funnel top plate, and 9 is funnel lower plywood, and 10 is collection funnel, and 11 is coal outlet, and 12 are
Coal feed point.
Specific embodiment
The invention provides a kind of cleaning plant, method for cleaning and layout method that coal is spread for shaft bottom, to make the present invention
Purpose, technical scheme and effect it is clearer, clear and definite, the present invention is described in more detail below.It should be appreciated that this place
The specific embodiment of description is only used to explain the present invention, is not intended to limit the present invention.
The invention provides a kind of cleaning plant that coal is spread for shaft bottom, as shown in Figure 1, Figure 2 with shown in Fig. 3, it includes cloth
The water tank 6 on vertical base plate 7 is put, the periphery of water tank 6 is provided with coal pulverizer support 5, set on coal pulverizer support 5
There is coal pulverizer 4, coal pulverizer 4 is located at the top of water tank 6, and the coal outlet 11 of coal pulverizer 4 is connected with water tank 6, coal
The top of coal feed point 12 of charcoal pulverizer 4 is provided with spreads coal collection structure;Water inlet pipe 2 and drinking-water pipe 3 are provided with water tank 6, are drawn water
Pipe 3 is connected with extraneous wash coaling equipment.
Further, as shown in Figure 3, the above-mentioned coal collection structure that spreads includes funnel top plate 8 and funnel lower plywood 9,
Funnel top plate 8, funnel lower plywood 9 are each attached on water inlet pipe 2 and drinking-water pipe 3, funnel top plate 8 and funnel lower plywood 9 it
Between collection funnel 10, collection funnel 10 is connected with the coal feed point 12 of above-mentioned coal pulverizer 4.And above-mentioned funnel top plate 8
It is in tilted layout with funnel lower plywood 9, funnel top plate 8 forms angle portion with funnel lower plywood 9, above-mentioned collection funnel 10 is set
In the folder corner portion.
Present invention also offers a kind of method for cleaning using above-mentioned cleaning plant, it is comprised the following steps:
A, by the water filling of water tank 6 from water inlet pipe 2 to shaft bottom, when water level reaches reasonable altitudes in water tank 6, ground water pump is opened
Beginning is drawn water by drinking-water pipe 3, forms water circulation;
B, unlatching coal pulverizer 4, then start skip hoisting fortune coal, are trickled down when lump coal occurs in lifting process in skip bucket
When, coal cinder can be dropped on funnel top plate 8 and fall funnel lower plywood 9 under continuing, and be then collected funnel 10 and be collected into coal
In charcoal pulverizer 4 and complete crush;
C, by the water tank 6 that the coal dust after crushing can automatically fall into bottom, and be mixed to form coal with the water in water tank 6
Water, transport carries out subsequent treatment to ground coal washery in the presence of recirculated water afterwards.Reduce driving and maintenance, the letter in tunnel
Change and spread coal processing equipment, saved a series of costs, while solving the inconvenience that black water is brought from root, be also not required to
Want the assistance of workman to operate, great simplification be made that in Removal Technology, the cleaning to spreading coal realizes full-automation, it is great can
Operability and practicality
Especially for making, layout of the invention is more scientific and reasonable, present invention also offers the above-mentioned cleaning dress of one kind arrangement
The layout method put, it is comprised the following steps:
Step one, the depth h according to shaft of vertical well 1, diameter d, net sectional area s determines the length of water inlet pipe 2 and drinking-water pipe 3
L and spread coal collection structure size dimension;
L=h ± l "
D '=d
Wherein, l " is with size actually required on well;L is length of pipe, and unit is m;D' is to spread coal collection structure
Minimum diameter, unit is m;C is the discrepancy in elevation for spreading coal collection structure, and unit is m;
Step 2, spreading coal amount n, the mesh number w of pulverized coal particle can be transported, the big of coal cinder need to be processed according to actually required cleaning
Small k, selects corresponding coal pulverizer 4;
Step 3, according to coal-water ratio r when can transport, the output x of pulverizer determine the unit interval needed for water m,
The density p of water, according to required travelling speed v, selects the road cross dimensions S of reasonable water inlet pipe and drinking-water pipea、Sb(m2);
M=x/r;
R is coal-water ratio when can transport;
Travelling speeds of the v for needed for;
Step 4, water m, water velocity v, water pipe section that the water pump of extraneous wash coaling equipment will be according to needed for the unit interval
Area Sa、Sb, carry out corresponding configuration;The design of water tank 6 uses cylindrical design, material selection high intensity mixed mud;
D "=d × 75%
H "=d × 150%
D " is the diameter of water tank, m;
H " is the height of water tank;
And then obtain above-mentioned cleaning plant.
Certainly, described above is only presently preferred embodiments of the present invention, and the present invention is not limited to enumerate above-described embodiment, should
When explanation, any those of ordinary skill in the art are all equivalent substitutes for being made, bright under the teaching of this specification
Aobvious variant, all falls within the essential scope of this specification, ought to be subject to protection of the invention.
Claims (5)
1. a kind of cleaning plant that coal is spread for shaft bottom, it includes the water tank being arranged on vertical base plate, it is characterised in that water tank
Top is provided with coal pulverizer, and the coal outlet of coal pulverizer is connected with water tank, and the coal feed point top of coal pulverizer sets
It is equipped with and spreads coal collection structure;Water inlet pipe and drinking-water pipe are provided with water tank, drinking-water pipe is connected with extraneous wash coaling equipment.
2. cleaning plant according to claim 1, it is characterised in that it is above-mentioned spread coal collection structure including funnel top plate with
Funnel lower plywood, funnel top plate, funnel lower plywood are each attached on water inlet pipe and drinking-water pipe, funnel top plate and funnel lower floor
Collection funnel between plate, collection funnel is connected with the coal feed point of above-mentioned coal pulverizer.
3. cleaning plant according to claim 2, it is characterised in that above-mentioned funnel top plate is inclined with funnel lower plywood
Arrangement, funnel top plate forms angle portion with funnel lower plywood, and above-mentioned collection funnel is arranged on the folder corner portion.
4. a kind of method for cleaning using cleaning plant as claimed in claim 1, it is comprised the following steps:
A, by water tank with water from water inlet pipe to shaft bottom, when Water in Water Tanks position reaches reasonable altitudes, ground water pump begins through and takes out
Water pipe draws water, and forms water circulation;
B, unlatching coal pulverizer, then start skip hoisting fortune coal, when lump coal occurs in lifting process in skip bucket to be trickled down, coal
Block can be dropped on funnel top plate and fall funnel lower plywood under continuing, and then be collected collection funnel in coal pulverizer
And complete to crush;
C, by the water tank that the coal dust after crushing can automatically fall into bottom, and be mixed to form coal water with the water in water tank, afterwards
Transport carries out subsequent treatment to ground coal washery in the presence of recirculated water.
5. a kind of layout method for arranging cleaning plant as claimed in claim 1, it is comprised the following steps:
Step one, the depth h according to vertical, diameter d, net sectional area s determines the length L of water inlet pipe and drinking-water pipe and spreads coal collection
Structure size size;
L=h ± l "
D '=d
Wherein, l " is with size actually required on well;L is length of pipe, and unit is m;D' is the minimum for spreading coal collection structure
Diameter, unit is m;C is the discrepancy in elevation for spreading coal collection structure, and unit is m;
Step 2, spreading coal amount n, the mesh number w of pulverized coal particle can be transported, the size k of coal cinder need to be processed according to actually required cleaning,
Select corresponding coal pulverizer;
Step 3, according to coal-water ratio r when can transport, the output x of pulverizer determine the unit interval needed for water m, water
Density p, according to required travelling speed v, selects the road cross dimensions S of reasonable water inlet pipe and drinking-water pipea、Sb(㎡);
M=x/r;
R is coal-water ratio when can transport;
Travelling speeds of the v for needed for;
Step 4, water m, water velocity v, water pipe cross-sectional area that the water pump of extraneous wash coaling equipment will be according to needed for the unit interval
Sa、Sb, carry out corresponding configuration;The design of water tank uses cylindrical design, material selection high intensity mixed mud;
D "=d × 75%
H "=d × 150%
D " is the diameter of water tank, m;
H " is the height of water tank;
And then obtain above-mentioned cleaning plant.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710092090.5A CN106697956B (en) | 2017-02-21 | 2017-02-21 | A kind of cleaning plant, method for cleaning and layout method spreading coal for shaft bottom |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710092090.5A CN106697956B (en) | 2017-02-21 | 2017-02-21 | A kind of cleaning plant, method for cleaning and layout method spreading coal for shaft bottom |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106697956A true CN106697956A (en) | 2017-05-24 |
CN106697956B CN106697956B (en) | 2018-11-20 |
Family
ID=58916952
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710092090.5A Expired - Fee Related CN106697956B (en) | 2017-02-21 | 2017-02-21 | A kind of cleaning plant, method for cleaning and layout method spreading coal for shaft bottom |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106697956B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109969687A (en) * | 2019-04-22 | 2019-07-05 | 山西工程技术学院 | Coal cleaning plant is spread in a kind of vertical shaft bottom |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11130256A (en) * | 1997-10-29 | 1999-05-18 | Shin Nikka Kankyo Engineering:Kk | Removal of sludge deposited in oil tank |
CN105692165A (en) * | 2016-05-03 | 2016-06-22 | 西安科技大学 | Spirally elevating type mechanical scattered-coal cleaning system |
CN105731010A (en) * | 2016-05-03 | 2016-07-06 | 西安科技大学 | Coal box lifting mechanical leaking coal cleaning system |
CN105858189A (en) * | 2016-05-03 | 2016-08-17 | 西安科技大学 | Vertical claw elevating type mechanical cleaning leak coal system |
CN105905554A (en) * | 2016-05-03 | 2016-08-31 | 西安科技大学 | Small bucket lifting type mechanical cleaning system for leaking coal |
-
2017
- 2017-02-21 CN CN201710092090.5A patent/CN106697956B/en not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11130256A (en) * | 1997-10-29 | 1999-05-18 | Shin Nikka Kankyo Engineering:Kk | Removal of sludge deposited in oil tank |
CN105692165A (en) * | 2016-05-03 | 2016-06-22 | 西安科技大学 | Spirally elevating type mechanical scattered-coal cleaning system |
CN105731010A (en) * | 2016-05-03 | 2016-07-06 | 西安科技大学 | Coal box lifting mechanical leaking coal cleaning system |
CN105858189A (en) * | 2016-05-03 | 2016-08-17 | 西安科技大学 | Vertical claw elevating type mechanical cleaning leak coal system |
CN105905554A (en) * | 2016-05-03 | 2016-08-31 | 西安科技大学 | Small bucket lifting type mechanical cleaning system for leaking coal |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109969687A (en) * | 2019-04-22 | 2019-07-05 | 山西工程技术学院 | Coal cleaning plant is spread in a kind of vertical shaft bottom |
CN109969687B (en) * | 2019-04-22 | 2024-01-26 | 山西工程技术学院 | Vertical shaft bottom coal scattering cleaning device |
Also Published As
Publication number | Publication date |
---|---|
CN106697956B (en) | 2018-11-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101482005B (en) | Down-hole gross coal dirt-discharging and mine water treating combined process | |
CN105819664B (en) | A kind of river and lake silt processing disposal system | |
CN110292807B (en) | Concentration dehydration process for superfine tailings | |
CN212241583U (en) | Concrete mixing device with comminuted structure | |
CN112521119A (en) | Preparation method and filling system of coal-based solid waste filling paste | |
CN206746803U (en) | Sand washing sand all-in-one processed | |
CN205851324U (en) | The online broken crushing system of steel slag rotary drum screening bypass | |
CN209379169U (en) | A kind of building waste grinding device | |
CN205659763U (en) | Underground mine grit preparation system | |
CN110482915A (en) | A kind of riverway sludge curing process | |
CN106697956B (en) | A kind of cleaning plant, method for cleaning and layout method spreading coal for shaft bottom | |
CN210885588U (en) | Industry tail water environmental protection treatment system | |
CN106703104A (en) | Automatic dredging system for sump | |
CN111825297A (en) | Intelligent slurry processing system and method | |
CN207169831U (en) | One kind mining waste material recovery device | |
CN109432878A (en) | Fine tailings classification of sedimentation anti-filter dehydration dried stack method | |
CN215611805U (en) | Production facility that mining barren rock preparation aggregate was with having high-efficient dust removal | |
CN115445741A (en) | Method for preparing sand by utilizing rock waste high-yield preparation machine | |
CN206089401U (en) | Processing system is handled to river lake silt | |
CN211026695U (en) | Titanium zirconium placer is washed ore deposit in succession and is desliming, edulcoration device | |
CN206635850U (en) | Sump automatic dredging system | |
CN205988954U (en) | A kind of building waste dry and wet specification processing system | |
CN206337129U (en) | A kind of sludge slurry processing equipment | |
CN206315554U (en) | Recovery system more than a kind of mud shaker | |
CN104588389A (en) | Fuel waste residue recovery and treatment system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181120 |