CN106680609A - Automatic line changing device for power transformer routine tests - Google Patents

Automatic line changing device for power transformer routine tests Download PDF

Info

Publication number
CN106680609A
CN106680609A CN201510756535.6A CN201510756535A CN106680609A CN 106680609 A CN106680609 A CN 106680609A CN 201510756535 A CN201510756535 A CN 201510756535A CN 106680609 A CN106680609 A CN 106680609A
Authority
CN
China
Prior art keywords
housing
changing device
power transformer
low
controlled motor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201510756535.6A
Other languages
Chinese (zh)
Inventor
刘道寰
苗军
李胜韬
庞云锋
刘曙光
韩昭亮
孙凤霞
袁帅
刘凯睿
宋易杰
李胜金
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Zibo Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Zibo Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Zibo Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201510756535.6A priority Critical patent/CN106680609A/en
Publication of CN106680609A publication Critical patent/CN106680609A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere

Abstract

The invention relates to a line changing device and specifically relates to an automatic line changing device for power transformer routine tests. The automatic line changing device includes a housing. The upper end of the housing is provided with a high voltage wiring post and a low voltage wiring post. The outer end of the housing is provided with a protection ground line and a working ground line. The housing is therein provided with a high voltage end control motor and a low voltage end control motor. The high voltage end control motor controls the on-off of the high voltage wiring post through controlling a high voltage double-pole switch while the low voltage end control motor controls the on-off of the low voltage wiring post through controlling a low voltage double-pole switch. The outer end of the housing is provided with a control panel and a wireless transmitter. The control panel is provided with an electronic voltmeter and a current meter. The automatic line changing device is simple in structure and convenient to operate. An aim of reducing line changing operation in power transformer test projects is realized and multiple test projects can be implemented with a single wiring process, so that frequency of climbing up and climbing down of test workers is reduced.

Description

The automatic wire-changing device of power transformer routine test
Technical field
The present invention relates to a kind of wire-changing device, and in particular to a kind of automatic wire-changing device of power transformer routine test.
Background technology
Power transformer is one of power plant, the topmost power equipment of transformer station and electricity consumption department, and power transformer is carried out electrically Test is the important measures for ensureing power transformer safe operation, and common testing equipment is using directly direct by experimental test line Manual change's test connection is required to when being connected with transformer body and tested, and testing different tests project, is climbed up repeatedly and is climbed Lower transformer equipment, causes inefficiency, inconvenient operation and there are problems that.
The content of the invention
Deficiency in order to solve above-mentioned technical problem, it is an object of the invention to:There is provided a kind of power transformer routine test certainly Move line apparatus, it is easy to operate, operating efficiency can greatly be improved.
The present invention for the technical scheme that adopted of its technical problem of solution for:
The automatic wire-changing device of the power transformer routine test, including housing, housing upper end is provided with high tension terminal and low pressure connects Terminal, housing outer end is provided with protection ground wire and working grounding cable, and enclosure interior is provided with high-pressure side controlled motor and low-pressure end controlled motor, The break-make that the high-pressure side controlled motor passes through control high pressure double-pole lock switch control rule high tension terminal, low-pressure end controlled motor passes through The break-make of control low pressure double-pole lock switch control rule low tension terminal;The housing outer end is respectively equipped with control panel and wireless launcher, Control panel is provided with electron type voltmeter and ammeter.
Further preferably, high tension terminal is divided into two groups, and 4 per group, low tension terminal is divided into two groups, 3 per group;High-pressure side control Motor processed is 4, and low-pressure end controlled motor is 3.
Further preferably, also including ground connection motor, it is grounded the break-make that motor controls working grounding cable by ground connection connecting rod.
Further preferably, housing is high 1 meter, long 0.6 meter, wide 0.6 meter.
Compared with prior art, the invention has the advantages that:
1st, present configuration is simple, easy to operate, realizes the purpose that power transformer test event reduces thread-changing operation, only needs Want primary connection to test Multitest project, reduce testing crew and climb up the number of times for climbing down transformer.
2nd, control panel is simple and clear, easily operated, is manipulated by motor drive mechanism, lifts the speed and efficiency of thread-changing.
3rd, control panel is provided with electron type voltmeter and ammeter, can monitor in real time test voltage electric current, when voltage x current exceedes During limit value, cut off the electricity supply in time by internal protection, protection test equipment.
4th, this device is provided with wireless launcher, can carry out remote operation, it is ensured that the safety of testing crew.
Description of the drawings
Fig. 1 schematic structural views of the invention.
In figure:1st, low tension terminal;2nd, control panel;3rd, housing;4th, high-pressure side controlled motor;5th, it is grounded motor;6、 Low-pressure end controlled motor;7th, high tension terminal.
Specific embodiment
The embodiment of the present invention is described further below in conjunction with the accompanying drawings:
As shown in figure 1, the automatic wire-changing device of power transformer routine test of the present invention, including housing 3, the upper end of housing 3 is provided with High tension terminal 7 and low tension terminal 1, the outer end of housing 3 is provided with protection ground wire and working grounding cable, and high-pressure side control is provided with inside housing 3 Motor processed 4 and low-pressure end controlled motor 6, the high-pressure side controlled motor 4 is by controlling high pressure double-pole lock switch control rule high tension terminal 7 break-make, the break-make that low-pressure end controlled motor 6 passes through control low pressure double-pole lock switch control rule low tension terminal 1;Outside the housing 3 End is respectively equipped with control panel 2 and wireless launcher, and control panel 2 is provided with electron type voltmeter and ammeter.
Wherein, 7 points of high tension terminal is two groups, and 4 per group, 1 point of low tension terminal is two groups, 3 per group;High-pressure side is controlled Motor 4 is 4, and low-pressure end controlled motor 6 is 3;Also include ground connection motor 5, ground connection motor 5 is by being grounded connecting rod control work The break-make of ground wire;3 high 1 meters of housing, it is long 0.6 meter, it is wide 0.6 meter.
The specifically used process of the present invention:
The push-botton operation therein motor drive mechanism action being manipulated by panel 2, realizes that changing different tests project automatically connects The purpose of line mode, before on-test, it is only necessary to experimental test line is connected on transformer by this device, control panel 2 It is provided with the measurement of transformer high-voltage value group, the measurement of transformer low voltage value group, transformer voltage ratio measurement, on-load tap changers of transformers Measurement, deformation of transformer winding impedance method measure five function buttons, and after on-test, after pressing control button, motor can root According to different instruction actions, the different examinations such as three identical surveys, single-phase test, three-phase ground protection, one-phase ground protection can be reached The testing requirement tested, meets the needs of five pilot projects.

Claims (4)

1. the automatic wire-changing device of a kind of power transformer routine test, including housing (3), it is characterised in that on housing (3) End is provided with high tension terminal (7) and low tension terminal (1), and housing (3) outer end is provided with protection ground wire and working grounding cable, housing (3) internal to be provided with high-pressure side controlled motor (4) and low-pressure end controlled motor (6), the high-pressure side controlled motor (4) passes through The break-make of control high pressure double-pole lock switch control rule high tension terminal (7), low-pressure end controlled motor (6) is by controlling low pressure double-pole The break-make of lock switch control rule low tension terminal (1);Housing (3) outer end is respectively equipped with control panel (2) and wireless transmission Device, control panel (2) is provided with electron type voltmeter and ammeter.
2. the automatic wire-changing device of power transformer routine test according to claim 1, it is characterised in that high tension terminal (7) it is divided into two groups, 4 per group, low tension terminal (1) is divided into two groups, 3 per group;High-pressure side controlled motor (4) is 4, low-pressure end controlled motor (6) is 3.
3. the automatic wire-changing device of power transformer routine test according to claim 1, it is characterised in that also including ground connection Motor (5), is grounded the break-make that motor (5) controls working grounding cable by being grounded connecting rod.
4. the automatic wire-changing device of power transformer routine test according to claim 1, it is characterised in that housing (3) It is high 1 meter, it is long 0.6 meter, it is wide 0.6 meter.
CN201510756535.6A 2015-11-06 2015-11-06 Automatic line changing device for power transformer routine tests Withdrawn CN106680609A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510756535.6A CN106680609A (en) 2015-11-06 2015-11-06 Automatic line changing device for power transformer routine tests

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510756535.6A CN106680609A (en) 2015-11-06 2015-11-06 Automatic line changing device for power transformer routine tests

Publications (1)

Publication Number Publication Date
CN106680609A true CN106680609A (en) 2017-05-17

Family

ID=58864291

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510756535.6A Withdrawn CN106680609A (en) 2015-11-06 2015-11-06 Automatic line changing device for power transformer routine tests

Country Status (1)

Country Link
CN (1) CN106680609A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108508363A (en) * 2018-05-09 2018-09-07 上海电机系统节能工程技术研究中心有限公司 The termination and its working method of producing line on-line checking are manufactured for intelligent motor
CN109066662A (en) * 2018-08-29 2018-12-21 国网河北省电力有限公司电力科学研究院 A kind of switching device and switching systems
CN110542803A (en) * 2018-05-28 2019-12-06 云南电网有限责任公司曲靖供电局 Automatic change owner and become test system
CN114200298A (en) * 2021-12-14 2022-03-18 福建中网电气有限公司 Power frequency voltage withstand capability and partial discharge detection device and method of pole-mounted circuit breaker

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108508363A (en) * 2018-05-09 2018-09-07 上海电机系统节能工程技术研究中心有限公司 The termination and its working method of producing line on-line checking are manufactured for intelligent motor
CN110542803A (en) * 2018-05-28 2019-12-06 云南电网有限责任公司曲靖供电局 Automatic change owner and become test system
CN110542803B (en) * 2018-05-28 2021-12-17 云南电网有限责任公司曲靖供电局 Automatic change owner and become test system
CN109066662A (en) * 2018-08-29 2018-12-21 国网河北省电力有限公司电力科学研究院 A kind of switching device and switching systems
CN114200298A (en) * 2021-12-14 2022-03-18 福建中网电气有限公司 Power frequency voltage withstand capability and partial discharge detection device and method of pole-mounted circuit breaker

Similar Documents

Publication Publication Date Title
CN106680609A (en) Automatic line changing device for power transformer routine tests
CN106226564B (en) Routine test transfer box for high-voltage capacitance type voltage transformer without disassembling lead
CN106771816B (en) Core loss test platform and test method under rewinding material multipoint earth faults
CN105738757A (en) Tester for secondary polarity test of remotely-controllable mutual inductor
CN201514446U (en) High-voltage AC/DC test device for environmental monitoring
CN207181527U (en) A kind of DCR of Transformer and no-load voltage ratio test synthesis instrument
CN210894653U (en) Current transformer polarity measuring device
CN105182012A (en) Distribution test method and wiring device
CN208689112U (en) Power transformer electrical test intelligently switches line apparatus
CN208224365U (en) A kind of load ratio bridging switch controller
CN205067635U (en) Automatic line changing device of power transformer normal test
CN204882632U (en) Multi -functional electric test terminal box of joining in marriage
CN204142887U (en) Wireless remote control type instrument for testing polarity of current transformer
CN210665864U (en) Single-phase grounding capacitance current testing device of high-voltage power grid
CN203422430U (en) Transformer acceptance impact switching-on remote control security tester
CN106771394A (en) A kind of power transformer test mode of connection
CN104931905A (en) High-voltage electroscope starting voltage test apparatus and test method
CN204789879U (en) Test system is put in electrified office of cubical switchboard and voltage signal extraction element thereof
CN204495857U (en) The portable test connection platform of high-potting
CN106932613A (en) A kind of 35kV and 110kV transformers routine test wiring cross box
CN209086368U (en) A kind of power cable fault detection impacting with high pressure electric power source all-in-one machine
CN203054011U (en) Wiring switch device for transformer winding deformation test
CN205620500U (en) But remote control mutual -inductor secondary polarity test tester
CN205861812U (en) A kind of power test circuit switching system with the test of method of frequency response method winding deformation
CN207381682U (en) Relay protection Special short line

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20170517