CN204495857U - The portable test connection platform of high-potting - Google Patents

The portable test connection platform of high-potting Download PDF

Info

Publication number
CN204495857U
CN204495857U CN201520176398.4U CN201520176398U CN204495857U CN 204495857 U CN204495857 U CN 204495857U CN 201520176398 U CN201520176398 U CN 201520176398U CN 204495857 U CN204495857 U CN 204495857U
Authority
CN
China
Prior art keywords
binding post
connection platform
casing
test connection
portable test
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520176398.4U
Other languages
Chinese (zh)
Inventor
石峰
董军
岳程城
兰伟
龚晨斌
裴玉杰
张磊
方勃
关春梅
高崴
黄东伟
陈晶阳
石岩
徐建国
程硕
胡杨
海天舒
刘国斌
王克娜
薛俊
韩涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Liaoning Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Liaoning Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Liaoning Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201520176398.4U priority Critical patent/CN204495857U/en
Application granted granted Critical
Publication of CN204495857U publication Critical patent/CN204495857U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Testing Relating To Insulation (AREA)

Abstract

The utility model relates to the portable test connection platform of a kind of large-scale transformation high-potting, and its structure is, arranges insulcrete in casing, and insulcrete is provided with patch jack; The side of casing arranges hi-line jack, and hi-line jack and patch jack are respectively equipped with binding post I and binding post II, the outside surface suit insulator of binding post I and binding post II; Connection bus row between binding post I and binding post II.The utility model is the pilot project by transformer commissioning test and routine test, and instrument integration of equipments is configured on testing table, uses test battery line to complete comprehensive switching, just can complete corresponding pilot project.

Description

The portable test connection platform of high-potting
Technical field
The utility model relates to a kind of testing table, particularly relates to the portable test connection platform of a kind of high-potting, is applicable to the commissioning test of 220kV transformer field and routine test, belongs to electric power application.
Background technology
The test of 220kV transformer field has numerous pilot project, the different instrument and equipment of multiple stage usually will be used to test, in process of the test, repeatedly will change instrument and equipment, repeatedly change test connection.220kV high voltage side of transformer sleeve pipe and medium voltage side sleeve pipe very high, climb down transformer operate as testing crew will repeatedly be climbed up, this mode of operation not only labour intensity is large, on-the-spot chaotic, and is easy to occur security incident.
Summary of the invention
The utility model, for above-mentioned problems of the prior art, provides the portable test connection platform of a kind of high-potting, solves the problem that labour intensity in prior art is large, there is potential safety hazard.
The technical solution of the utility model is as follows:
Arrange insulcrete in casing, insulcrete is provided with patch jack; The side of casing arranges hi-line jack, and hi-line jack and patch jack are respectively equipped with binding post I and binding post II, the outside surface suit insulator of binding post I and binding post II; Connection bus row between binding post I and binding post II.
Described interior is provided with screen layer.
Described bus bar is capacitor type bus bar.
Be provided with above described casing and renovate.
The end face of described casing is provided with switching door.
The long 240mm of described casing, wide 200mm, high 160mm.
Described binding post I and binding post II is equipped with 8.
The utility model advantageous effect is as follows:
1, the utility model conventional transformer pilot project (straight resistance, no-load voltage ratio, low-voltage impedance, loaded switch, dielectric loss, insulation etc.) testing equipment is switched instrument integration of equipments be configured in chamber.Use test battery wiring to complete wiring comprehensively to switch, just can complete corresponding pilot project.Process of the test is simply orderly, and high-power transformer is climbed in a large amount of minimizing and bushing shell for transformer changes connection times and changes instrument number of times, greatly reduces the quantity of labour intensity minimizing testing crew, meets the requirement of experimental safe.
2, testing table is that portable construction is convenient to carrying and deposits.
3, configuration test handoff functionality, directly can hinder, no-load voltage ratio, low-voltage impedance, loaded switch, dielectric loss, the testing equipment such as insulation switch.Increase work efficiency, make work safer, quick.
4, reduce site test personnel labor intensity, eminence when reducing transformer field test is dropped, is got an electric shock and mis-wired risk, and greatly shorten working hours, significantly reduce a staff quantity, experimental safe is guaranteed.
5, casing alloy material makes, external box of microvave reliable ground, and box house adopts masking foil to shield, and reduces external interference source and makes measurement more accurate.In casing, bus bar adopts capacitor type busbar to prevent corona from avoiding impact to measure.
6, be provided with above described casing and renovate, be convenient to wiring; End face is provided with switching door, is convenient to deposit replacing testing equipment; Box sizes design experiences is demonstrate,proved, can by testing equipment effective integration, again reduced volume to greatest extent.
Accompanying drawing explanation
fig. 1 is the structural representation of the utility model testing table.
Fig. 2 is the utility model testing table top surface outgoing schematic diagram.
In figure, 1, casing, 2, insulcrete, 3, insulator, 4, bus bar, 5, renovate, 6, switching door.
Embodiment
Referring to accompanying drawing, in conjunction with specific embodiments, the utility model is described in detail.
Embodiment
As shown in Figure 1-2, casing 1 adopts full alloy material to make, and the long 240mm of casing, wide 200mm, high 160mm, be provided with above casing and renovate 5, and the end face of casing is provided with switching door 6, and interior is provided with screen layer.Arrange insulcrete 2 in casing, insulcrete is provided with 8 patch jacks; The side of casing arranges 8 hi-line jacks, and hi-line jack and patch jack are respectively equipped with 8 binding post I and 8 binding post II, the outside surface suit insulator 3 of binding post I and binding post II; Capacitor type bus bar 4 is connected between binding post I and binding post II.
During use, testing crew is arranged on 8 hi-lines on transformer high-voltage bushing O, A, B, C three-phase and medium-tension bushing Om, Am, Bm, Cm respectively; Connect hi-line jack 8 of 8 hi-lines access testing table sides, then return insulcrete in testing table, with the conversion head of instrument and test connection platform, change respectively.The utility model is tested in new upper 220kV transformer station 220kV mono-, No. two transformer commissioning tests, 220kV transformer station 220kV mono-, No. two transformer commissioning tests; After 220kV transformer station 220kV No. bis-transformer overhauls, test, 220kV transformer station 220kV mono-, two, No. five transformer routine tests, all receive good effect and improve test mass and safe reliability.

Claims (7)

1. the portable test connection platform of high-potting, it is characterized in that arranging insulcrete in casing, insulcrete is provided with patch jack; The side of casing arranges hi-line jack, and hi-line jack and patch jack are respectively equipped with binding post I and binding post II, the outside surface suit insulator of binding post I and binding post II; Connection bus row between binding post I and binding post II.
2. the portable test connection platform of high-potting according to claim 1, is characterized in that described interior is provided with screen layer.
3. the portable test connection platform of high-potting according to claim 1, is characterized in that described bus bar is capacitor type bus bar.
4. the portable test connection platform of high-potting according to claim 1, is characterized in that being provided with above described casing renovating.
5. the portable test connection platform of high-potting according to claim 1, is characterized in that the end face of described casing is provided with switching door.
6. the portable test connection platform of high-potting according to claim 1, is characterized in that the long 240mm of described casing, wide 200mm, high 160mm.
7. the portable test connection platform of high-potting according to claim 1, is characterized in that described binding post I and binding post II is equipped with 8.
CN201520176398.4U 2015-03-26 2015-03-26 The portable test connection platform of high-potting Active CN204495857U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520176398.4U CN204495857U (en) 2015-03-26 2015-03-26 The portable test connection platform of high-potting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520176398.4U CN204495857U (en) 2015-03-26 2015-03-26 The portable test connection platform of high-potting

Publications (1)

Publication Number Publication Date
CN204495857U true CN204495857U (en) 2015-07-22

Family

ID=53575162

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520176398.4U Active CN204495857U (en) 2015-03-26 2015-03-26 The portable test connection platform of high-potting

Country Status (1)

Country Link
CN (1) CN204495857U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104865415A (en) * 2015-03-26 2015-08-26 国网辽宁省电力有限公司抚顺供电公司 Portable test wiring bench for high-voltage test
CN107831345A (en) * 2017-12-26 2018-03-23 国网冀北电力有限公司唐山供电公司 A kind of transformer voltage ratio test and direct resistance metering mode of connection and terminal box

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104865415A (en) * 2015-03-26 2015-08-26 国网辽宁省电力有限公司抚顺供电公司 Portable test wiring bench for high-voltage test
CN107831345A (en) * 2017-12-26 2018-03-23 国网冀北电力有限公司唐山供电公司 A kind of transformer voltage ratio test and direct resistance metering mode of connection and terminal box

Similar Documents

Publication Publication Date Title
CN202749782U (en) Transmission line ice melting system implemented by switching operation in whole process
CN102156242B (en) Method for testing transformer insulation combination
CN204495857U (en) The portable test connection platform of high-potting
CN104535804A (en) Portable current transformer test clamp
CN109254243A (en) A kind of high-voltage circuitbreaker test short jumper device
CN202231361U (en) 10kV multifunctional safe tool
CN104865415A (en) Portable test wiring bench for high-voltage test
CN202256512U (en) Multifunctional phase check instrument
CN205450042U (en) Experimental switching operation platform of power transformer
CN202221437U (en) Special-purpose test tool for electrified lightning arrester
CN202330518U (en) Anti-induction electric operation cabinet for parameter test of overhead power transmission lines
CN202041553U (en) Combined wiring device for transformer test
CN204020677U (en) Intelligent high-pressure test car
CN101216519A (en) Distribution cable line live working measurement method
CN204241645U (en) Be applied to device of plugging into of switch dolly mechanism characteristic test
CN204882632U (en) Multi -functional electric test terminal box of joining in marriage
CN203881840U (en) 10kV and 35kV dual-voltage-grade electroscope
CN103983814A (en) Comprehensive test case for transformer
CN103454536A (en) Power transformer test method
CN103293413A (en) Special high-voltage testing device for transformers
CN203519814U (en) Multipurpose junction box for secondary voltage drop test line
CN203551720U (en) Mutual inductor polarity testing device
CN203479920U (en) Special high-voltage testing device for transformers
CN105301550A (en) Split series combined voltage transformer
CN205176251U (en) Components of a whole that can function independently tandem compound formula voltage transformer

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant