CN106677794B - The interflow of boring construction is regulated and stored moldeed depth layer arched tunnel and its construction method - Google Patents

The interflow of boring construction is regulated and stored moldeed depth layer arched tunnel and its construction method Download PDF

Info

Publication number
CN106677794B
CN106677794B CN201710023731.1A CN201710023731A CN106677794B CN 106677794 B CN106677794 B CN 106677794B CN 201710023731 A CN201710023731 A CN 201710023731A CN 106677794 B CN106677794 B CN 106677794B
Authority
CN
China
Prior art keywords
cabin
tunnel
rainwater
layer
interflow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710023731.1A
Other languages
Chinese (zh)
Other versions
CN106677794A (en
Inventor
张延年
常磊
海洪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Inner Mongolia Xinkaiyuan Construction Co ltd
Original Assignee
Shenyang Jianzhu University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Jianzhu University filed Critical Shenyang Jianzhu University
Priority to CN201710023731.1A priority Critical patent/CN106677794B/en
Publication of CN106677794A publication Critical patent/CN106677794A/en
Application granted granted Critical
Publication of CN106677794B publication Critical patent/CN106677794B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/14Layout of tunnels or galleries; Constructional features of tunnels or galleries, not otherwise provided for, e.g. portals, day-light attenuation at tunnel openings
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/08Lining with building materials with preformed concrete slabs
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/107Reinforcing elements therefor; Holders for the reinforcing elements
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F16/00Drainage
    • E21F16/02Drainage of tunnels

Abstract

It regulates and stores moldeed depth layer arched tunnel and its construction method the present invention provides a kind of interflow of boring construction, the interflow of boring construction moldeed depth layer arched tunnel of regulating and storing is excavated and lining cutting is formed by class ellipse shield machine, and deep layer tunnel bulkhead is class elliptic cross-section;Tunnel is separated into three cabins by vertical arc partition wall;Two rainwater cabins are arranged in left and right sides cabin, and directly as the storage and transportation nacelle of rainwater, garage's access path is arranged in rainwater bilge portion in rainwater cabin;Bilge tank and maintenance cabin is arranged in centre position;In bilge tank and maintenance cabin top, sewage pipe is set.The beneficial effects of the invention are as follows efficiently separating for rainwater and sewage, utmostly prevent water pollution, ensure efficiently, reliable, safety maintenance system and service clearance, improve space availability ratio.

Description

The interflow of boring construction is regulated and stored moldeed depth layer arched tunnel and its construction method
Technical field
The present invention relates to deep layer tunneling techniques, more particularly to a kind of interflow of boring construction is regulated and stored moldeed depth layer arched tunnel And its construction method.
Background technology
Deep layer tunnel of regulating and storing refers to being embedded in Deep underground space(Refer generally to below ground and is more than 20m deep spaces)It is big Type, super-huge outlet tunnel.Usually waterlogging is easily sent out, is densely populated, underground utilities are complicated, existing drainage system transformation difficulty is higher Area, deep layer can be set and regulated and stored tunnel.It takes and source diameter flow control is aided with Large Deep tunnel of regulating and storing, be to implement " sponge City " construction requirements are embodied because of water suiting measures to different conditions, the mitigation of adaptation to local conditions, and drainage waterlogging prevention mark is improved in external built region Accurate usual way.
Pavement excavation is avoided using deep tunnel engineering control sewage, the destruction to traffic and environment is made to minimize;It avoids and existing Some subsurface utilities or infrastructure generate conflict;Due to avoiding buildings pile, linear design may be used, without It is influenced by existing road network.
Effectively to mitigate urban waterlogging and the water pollution in Chicago, the water body environments such as protection Lake Michigan, Chicago reality It has applied and has collaborated moldeed depth layer tunnel system engineering of regulating and storing, built the tunnel of a long 176km, 2.5 ~ 10m of diameter, 45 ~ 106m of buried depth Road.Mexico, Paris, FRA, London Times etc. also implement interflow and regulate and store moldeed depth layer tunnel system engineering in succession.
However these is used to collaborate moldeed depth layer tunnel system engineering costly or utilization rate in terms of repairing improvement of regulating and storing It is relatively low, it is therefore desirable to exploitation convenient for safeguard and can the interflow of space efficient regulate and store moldeed depth layer tunnel.
Invention content
It is an object of the invention to solve efficiently separating for rainwater and sewage, water pollution is utmostly prevented, is ensured high Effect, reliable, safety maintenance system and service clearance, improve space availability ratio.
To achieve the goals above, the technical solution adopted by the present invention is:
A kind of interflow of boring construction is regulated and stored moldeed depth layer arched tunnel, is that the interflow of class ellipse shield machine construction is regulated and stored type Deep layer tunnel, by class ellipse shield machine excavate and lining cutting form, structure include deep layer tunnel bulkhead, vertical arc partition wall, Rainwater cabin, bilge tank and maintenance cabin, ventilation and lighting system, sewage pipe, sewage pipe hanging basket, tool car, garage's access path, row Vehicle overhauling platform and percolating water promptly store up cabin;The deep layer tunnel bulkhead cross section is class ellipse, in deep layer tunnel bulkhead Top center is provided with sewage pipe, and is fixed to sewage pipe by sewage pipe hanging basket;The top sewage pipe of bulkhead in deep layer tunnel Ventilation and lighting system is respectively set in both sides;Tunnel is separated into three cabins by vertical arc partition wall, and two cabins of outermost are Rainwater cabin, intermediate cabin are bilge tank and maintenance cabin, storage and transportation nacelle of the rainwater cabin directly as rainwater;Rainwater bilge portion is arranged The height of garage's access path, garage's access path is 300 ~ 600mm, and width is 2 meters ~ 3 meters;Under bilge tank and maintenance cabin Travelling crane inspection platform is arranged in portion, is tool car on the upside of travelling crane inspection platform, and travelling crane inspection platform underside setting percolating water promptly stores up Cabin;The height of travelling crane inspection platform is 1 ~ 2 meter.
Garage's access path, travelling crane inspection platform height ensure deep layer tunnel of the urgent percolating water except the two Bulkhead bottom space forms the urgent storage space of percolating water;500 ~ 800mm is formed in rainwater cabin, bilge tank and the lower section in maintenance cabin Clear space, ensure that the personnel of garage access path promptly quickly pass through;There is cavity in the inside of the travelling crane inspection platform, is expert at The both sides of vehicle overhauling platform open up several paddle holes respectively, and paddle hole uses round or ellipse, along the flow side of nacelle To being uniformly distributed.
Deep layer tunnel bulkhead uses water-proof concrete, and adds barrier coat in its ectonexine, and barrier coat is adopted With cement mortar waterproof layer, coil waterproof layer, coating waterproof layer, drainage systems waterproof layer, bentonite waterproof material waterproofing layer It is one or more, when using single waterproof layer as barrier coat when, using two layers or more of waterproof layer as antiseepage painting Layer.
The sewage pipe uses waterproof material, preferentially uses impervious concrete, and apply impermeable coating in its inside and outside, prevents It oozes coating and high molecular material is synthesized using pitch;Internal spray inner wall nontoxic type epoxy coating in rainwater cabin, bilge tank and inspection It repaiies cabin and high molecular material is synthesized using pitch.
The regulate and store construction method of moldeed depth layer arched tunnel of the interflow of above-mentioned boring construction is:
1st step:The excavation that rainwater freight space is set first is carried out, and is excavated simultaneously from both sides, and carries out primary supporting;
2nd step:The lining cutting of progress tunnel duct piece is set to having excavated rainwater freight space, and carries out primary supporting;
3rd step:Carry out gib is set to rainwater freight space, then bilge tank and maintenance cabin top half are excavated, And carry out primary supporting;
4th step:The lining cutting of tunnel duct piece is carried out to bilge tank and the top half position in maintenance cabin, and carries out primary branch Shield;
5th step:The top half excavated with maintenance cabin to bilge tank carries out gib, then to bilge tank and maintenance Cabin lower half portion is excavated, and carries out primary supporting;
6th step:The lining cutting of tunnel duct piece is carried out to bilge tank and maintenance cabin lower half portion position, and carries out primary supporting.
The interflow of the boring construction is regulated and stored the construction method of moldeed depth layer arched tunnel, and the 1st step specifically includes:
1)The vertical arc partition wall in both sides is first sprayed, from bottom to top;
2)Fill-before-fire both sides tunnel wall, from bottom to top;
3), can be without first pneumatically placed concrete when country rock surface is more whole, and bar-mat reinforcement is first hung, bar-mat reinforcement need to be close to palisades, Pneumatically placed concrete covers again;
4)When using double layer bar, second layer bar-mat reinforcement is laid with after first layer bar-mat reinforcement is covered by concrete, is covered Lid thickness is not less than 3cm;
5)Bar-mat reinforcement is connected firmly with anchor pole;
6) cross dimensions inspection is carried out before installing, timely processing owes to dig intrusion headroom part;
7)Carry out secondary injection concrete.
Tunnel pipe sheet built should meet deviation as defined in specification when installing;It is ensured that bolt fastens, Tightening moment will reach Design requirement;The adjacent position of each section of jurisdiction should meet design drawing requirement in same ring, non-interchangeable;There is section of jurisdiction per endless tube on piece Type mark, style type label, longitudinal joint docking label, should conscientiously check these labels, ensure section of jurisdiction installation just when installing section of jurisdiction Really.
Compared with prior art, the beneficial effects of the invention are as follows:
1, the mode that rainwater cabin is detached with bilge tank so that rainwater and sewage efficiently separate, utmostly anti-water-stop body Pollution.
2, symmetrical construction first is carried out to both sides rainwater cabin simultaneously, working procedure is by a relatively simple, is convenient for site operation group Knit management.
3, vertical arc partition wall improves space availability ratio, and improves service efficiency, and with the repair body of reliable safety System and service clearance.
4, vertical arc partition wall not only accelerates speed of application, and safety is obviously improved as support without removing.
5, by the way of excavation section by section, reduce interfering with each other between multi-process, there is faster speed of application, machinery Utilization rate is high, and the construction period is greatly reduced.
6, without excessive gib, reduce the waste of the energy, save construction cost, safe mass can be reduced and paid in advance Cost, construction environment can be also very significantly improved.
Description of the drawings
It regulates and stores moldeed depth layer arched tunnel and its construction method to the interflow of the boring construction in the present invention below in conjunction with the accompanying drawings It is described further:
Fig. 1 is non-tunneling;
Fig. 2 is to have excavated rainwater cabin tunnel schematic cross-section;
Fig. 3 is to have excavated rainwater cabin and bilge tank and maintenance cabin top half schematic cross-section;
Fig. 4 is that tunnel excavation terminates schematic cross-section;
Fig. 5 is that the interflow of boring construction is regulated and stored moldeed depth stringcourse shape tunnel cross sectional schematic diagram;
In figure:1 is deep layer tunnel bulkhead;1-1 is non-tunneling section;2 be vertical arc partition wall;3 be rainwater cabin;4 For bilge tank and maintenance cabin;4-1 is bilge tank and maintenance cabin top half;4-2 is bilge tank and maintenance cabin lower half portion;5 are Ventilation and lighting system;6 be sewage pipe;7 be sewage pipe hanging basket;8 be tool car;9 be garage's access path;10 be travelling crane inspection Platform;11 promptly store up cabin for percolating water.
Specific implementation mode
In order to further illustrate the present invention, the present invention is described in detail with reference to the accompanying drawings and embodiments, but not They can be interpreted as limiting the scope of the present invention.
A kind of interflow of boring construction is regulated and stored moldeed depth layer arched tunnel, as shown in figure 5, it is class ellipse shield machine construction Collaborate moldeed depth layer tunnel of regulating and storing, excavated by class ellipse shield machine and lining cutting forms, structure includes deep layer tunnel bulkhead 1, erects To arc partition wall 2, rainwater cabin 3, bilge tank and maintenance cabin 4, ventilation and lighting system 5, sewage pipe 6, sewage pipe hanging basket 7, maintenance Vehicle 8, garage's access path 9, travelling crane inspection platform 10 and percolating water promptly store up cabin 11, which is characterized in that deep layer tunnel cabin 1 cross section of wall is class ellipse, is provided with sewage pipe 6 among 1 inner top of deep layer tunnel bulkhead, and pass through sewage pipe hanging basket 7 Sewage pipe 6 is fixed;In deep layer tunnel, ventilation and lighting system 5 is respectively set in 6 both sides of top sewage pipe of bulkhead 1;Vertical arc Tunnel is separated into three cabins by shape partition wall 2, and two cabins of outermost are rainwater cabin 3, and intermediate cabin is bilge tank and maintenance Cabin 4, storage and transportation nacelle of the rainwater cabin 3 directly as rainwater;Garage's access path 9, garage's access path 9 is arranged in 3 bottom of rainwater cabin Height be 300 ~ 600mm, width be 2 meters ~ 3 meters;Lower part setting travelling crane inspection platform 10 in bilge tank with maintenance cabin 4, row 10 upside of vehicle overhauling platform is tool car 8, and 10 downside setting percolating water of travelling crane inspection platform promptly stores up cabin 11.Travelling crane inspection platform (10) height is 1 ~ 2 meter.
Garage's access path 9, travelling crane inspection platform 10 height ensure deep layer of the urgent percolating water except the two Bulkhead 1 bottom space in tunnel forms the urgent storage space of percolating water;It is formed in rainwater cabin 3, bilge tank and the lower section in maintenance cabin 4 The clear space of 500 ~ 800mm ensures that the personnel of garage's access path 9 promptly quickly pass through;The travelling crane inspection platform 10 it is interior There is cavity in portion, and several paddle holes are opened up respectively in the both sides of travelling crane inspection platform 10, and paddle hole uses round or ellipse, Water (flow) direction along nacelle is uniformly distributed.
Deep layer tunnel bulkhead 1 uses water-proof concrete, and adds barrier coat in its ectonexine, and barrier coat is adopted With cement mortar waterproof layer, coil waterproof layer, coating waterproof layer, drainage systems waterproof layer, bentonite waterproof material waterproofing layer It is one or more, when using single waterproof layer as barrier coat when, using two layers or more of waterproof layer as antiseepage painting Layer.
The sewage pipe 6 uses impervious concrete material, and applies impermeable coating in its inside and outside, and impermeable coating is using drip Blueness synthesis high molecular material;Internal spray inner wall nontoxic type epoxy coating in rainwater cabin 3, bilge tank is with maintenance cabin 4 using drip Blueness synthesis high molecular material.
As Figure 1-Figure 5, the regulate and store construction method of moldeed depth layer arched tunnel of the interflow of the boring construction is:
1st step:The excavation of 3 position of rainwater cabin is first carried out, and is excavated simultaneously from both sides, and carries out primary supporting;
2nd step:The lining cutting of tunnel duct piece is carried out to having excavated 3 position of rainwater cabin, and carries out primary supporting;
3rd step:Gib is carried out to 3 position of rainwater cabin, then bilge tank and 4 top half 4-1 of maintenance cabin are carried out It excavates, and carries out primary supporting;
4th step:The lining cutting of tunnel duct piece is carried out to bilge tank and the positions top half 4-1 in maintenance cabin 4, and carries out primary Supporting;
5th step:The top half 4-1 excavated with maintenance cabin 4 to bilge tank carries out gib, then to bilge tank with Maintenance 4 lower half portion 4-2 of cabin is excavated, and carries out primary supporting;
6th step:The lining cutting of tunnel duct piece is carried out to bilge tank and the maintenance 4 lower half portion positions 4-2 of cabin, and carries out primary branch Shield.
The interflow of the boring construction is regulated and stored the construction method of moldeed depth layer arched tunnel, and the 1st step specifically includes:
1 first sprays the vertical arc partition wall 2 in both sides, from bottom to top;
2 fill-before-fire both sides tunnel walls, from bottom to top;
, can be without first pneumatically placed concrete when 3 country rock surfaces are more whole, and bar-mat reinforcement is first hung, bar-mat reinforcement need to be close to palisades, then Pneumatically placed concrete covers;
When 4 use double layer bar, second layer bar-mat reinforcement is laid with after first layer bar-mat reinforcement is covered by concrete, covering Thickness is not less than 3cm;
5 bar-mat reinforcements are connected firmly with anchor pole;
6 install preceding progress cross dimensions inspection, and timely processing owes to dig intrusion headroom part;
7 carry out secondary injection concrete.
The above is only a preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, various improvements and modifications may be made without departing from the principle of the present invention, these improvements and modifications are also answered It is considered as protection scope of the present invention.

Claims (6)

  1. The moldeed depth layer arched tunnel 1. the interflow of boring construction is regulated and stored, structure include deep layer tunnel bulkhead (1), vertical arc partition wall (2), rainwater cabin (3), bilge tank and maintenance cabin (4), ventilation and lighting system (5), sewage pipe (6), sewage pipe hanging basket (7), inspection It repairs (8), garage's access path (9), travelling crane inspection platform (10) and percolating water promptly store up cabin (11), which is characterized in that described Deep layer tunnel bulkhead (1) cross section is class ellipse, and sewage pipe (6) is provided among deep layer tunnel bulkhead (1) inner top, And it is fixed to sewage pipe (6) by sewage pipe hanging basket (7);It is set respectively in top sewage pipe (6) both sides of deep layer tunnel bulkhead (1) Set ventilation and lighting system (5);Tunnel is separated into three cabins by vertical arc partition wall (2), and two cabins of outermost are rainwater Cabin (3), intermediate cabin are bilge tank and maintenance cabin (4), the storage and transportation nacelle of rainwater cabin (3) directly as rainwater;Rainwater cabin (3) Garage's access path (9) is arranged in bottom, and the height of garage's access path (9) is 300 ~ 600mm, and width is 2 meters ~ 3 meters;In sewage The lower part setting travelling crane inspection platform (10) in cabin and maintenance cabin (4), travelling crane inspection platform (10) upside are tool car (8), driving Setting percolating water promptly stores up cabin (11) on the downside of inspection platform (10);The height of travelling crane inspection platform (10) is 1 ~ 2 meter.
  2. 2. the interflow of boring construction is regulated and stored moldeed depth layer arched tunnel according to claim 1, which is characterized in that garage's inspection Repair channel (9), the height of travelling crane inspection platform (10) ensures deep layer tunnel bulkhead (1) bottom of urgent percolating water except the two Space forms the urgent storage space of percolating water;There is cavity in the inside of the travelling crane inspection platform (10), in travelling crane inspection platform (10) both sides open up several paddle holes respectively, and paddle hole uses round or ellipse, the water (flow) direction along nacelle uniform Distribution.
  3. 3. the interflow of boring construction is regulated and stored moldeed depth layer arched tunnel according to claim 1, which is characterized in that the deep layer tunnel Road bulkhead (1) uses water-proof concrete, and adds barrier coat in its ectonexine, and barrier coat uses cement mortar waterproof Layer, coil waterproof layer, coating waterproof layer, drainage systems waterproof layer, bentonite waterproof material waterproofing layer it is one or more, when When using single waterproof layer as barrier coat, using two layers or more of waterproof layer as barrier coat.
  4. 4. the interflow of boring construction is regulated and stored moldeed depth layer arched tunnel according to claim 1, which is characterized in that the sewage pipe (6) impervious concrete material is used, and impermeable coating is applied in its inside and outside, impermeable coating synthesizes macromolecule material using pitch Material;Internal spray inner wall nontoxic type epoxy coating in rainwater cabin (3), bilge tank synthesize high score with maintenance cabin (4) using pitch Sub- material.
  5. 5. the interflow of boring construction is regulated and stored moldeed depth layer arched tunnel according to claim 1, which is characterized in that its construction method For:
    1st step:The excavation of rainwater cabin (3) position is first carried out, and is excavated simultaneously from both sides, and carries out primary supporting;
    2nd step:The lining cutting of tunnel duct piece is carried out to having excavated rainwater cabin (3) position, and carries out primary supporting;
    3rd step:To rainwater cabin (3) position carry out gib, then to bilge tank with maintenance cabin (4) top half (4-1) into Row excavates, and carries out primary supporting;
    4th step:The lining cutting of tunnel duct piece is carried out with position top half (4-1) of maintenance cabin (4) to bilge tank, and carries out primary Supporting;
    5th step:Gib is carried out to bilge tank and maintenance cabin (4) top half (4-1) for having excavated, then to bilge tank with Maintenance cabin (4) lower half portion (4-2) is excavated, and carries out primary supporting;
    6th step:The lining cutting of tunnel duct piece is carried out to bilge tank and maintenance position cabin (4) lower half portion (4-2), and carries out primary branch Shield.
  6. 6. the interflow of boring construction is regulated and stored the construction method of moldeed depth layer arched tunnel according to claim 5, which is characterized in that 1st step specifically includes:
    1) the vertical arc partition wall (2) in both sides is first sprayed, from bottom to top;
    2) fill-before-fire both sides tunnel wall, from bottom to top;
    3), can be without first pneumatically placed concrete when country rock surface is more whole, and bar-mat reinforcement is first hung, bar-mat reinforcement need to be close to palisades, then spray Concrete covers;
    4) when using double layer bar, second layer bar-mat reinforcement is laid with after first layer bar-mat reinforcement is covered by concrete, and covering is thick Degree is not less than 3cm;
    5) bar-mat reinforcement is connected firmly with anchor pole;
    6) cross dimensions inspection is carried out before installing, timely processing owes to dig intrusion headroom part;
    7) secondary injection concrete is carried out.
CN201710023731.1A 2017-01-13 2017-01-13 The interflow of boring construction is regulated and stored moldeed depth layer arched tunnel and its construction method Active CN106677794B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710023731.1A CN106677794B (en) 2017-01-13 2017-01-13 The interflow of boring construction is regulated and stored moldeed depth layer arched tunnel and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710023731.1A CN106677794B (en) 2017-01-13 2017-01-13 The interflow of boring construction is regulated and stored moldeed depth layer arched tunnel and its construction method

Publications (2)

Publication Number Publication Date
CN106677794A CN106677794A (en) 2017-05-17
CN106677794B true CN106677794B (en) 2018-08-07

Family

ID=58858845

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710023731.1A Active CN106677794B (en) 2017-01-13 2017-01-13 The interflow of boring construction is regulated and stored moldeed depth layer arched tunnel and its construction method

Country Status (1)

Country Link
CN (1) CN106677794B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107355234B (en) * 2017-09-10 2023-06-06 沈阳建筑大学 Seepage-proofing corrosion-proofing durable confluence regulation type deep tunnel
CN108757027B (en) * 2018-05-23 2023-11-21 中铁二院工程集团有限责任公司 Multifunctional drainage system in tunnel

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5007312B2 (en) * 2009-02-10 2012-08-22 大成建設株式会社 Underground structure and method for constructing underground structure
CN203239354U (en) * 2013-03-04 2013-10-16 中国水电顾问集团华东勘测设计研究院 Arranging structure utilizing large-tunnel construction space comprehensively
CN204532378U (en) * 2015-01-27 2015-08-05 中铁二院工程集团有限责任公司 Subway tunneling boring rock tunnel development machine engineering method tunnel water handling constructs
CN104746531B (en) * 2015-04-22 2016-08-03 谢志树 A kind of stainless steel composite pipe gallery
CN205400736U (en) * 2016-03-28 2016-07-27 北京市政建设集团有限责任公司 CRD undercut tunnel utility tunnel
CN205400742U (en) * 2016-03-28 2016-07-27 北京市政建设集团有限责任公司 Major diameter shield tunnel utility tunnel with highway tunnel combination
CN106013236A (en) * 2016-07-19 2016-10-12 上海宝冶集团有限公司 Underground comprehensive pipe gallery with water storage function
CN206554944U (en) * 2017-01-13 2017-10-13 沈阳建筑大学 The interflow of boring construction regulate and store moldeed depth layer arched tunnel

Also Published As

Publication number Publication date
CN106677794A (en) 2017-05-17

Similar Documents

Publication Publication Date Title
CN108868778A (en) A kind of Large Underground Structure no-dig technique construction method
CN106013225A (en) Six-layer circular traffic, comprehensive pipe rack and sponge urban underground complex
CN207685859U (en) A kind of underground pipe gallery
US20240003254A1 (en) Vertical orthogonal top exhausting air duct structure of deeply-buried subway station and construction method therefor
CN107514262A (en) The construction method of shield piping lane
CN109667603A (en) A kind of super shallow-buried tunnel structure and construction method
CN106677794B (en) The interflow of boring construction is regulated and stored moldeed depth layer arched tunnel and its construction method
CN106869940B (en) Shockproof damping type collaborates moldeed depth layer tunnel of regulating and storing
CN204492847U (en) A kind of supporting and protection structure of underground space reverse construction
CN106869959B (en) The interflow of semicircle shield machine construction is regulated and stored moldeed depth layer tunnel
CN207499898U (en) Double-deck fire-fighting life-saving tunnel
CN206554944U (en) The interflow of boring construction regulate and store moldeed depth layer arched tunnel
CN206554930U (en) It is a kind of it is round overlap joint shape shield machine construction interflow regulate and store moldeed depth layer tunnel
CN206554937U (en) A kind of interflow of class rectangle shield machine construction regulate and store moldeed depth layer tunnel
CN205893922U (en) T roof beam precasting yard that sets up on having longitudinal gradient's road bed
CN106812535A (en) Circle overlap joint shape shield machine construction interflow regulate and store moldeed depth layer tunnel
CN209523759U (en) A kind of super shallow-buried tunnel structure
CN113187487B (en) Construction method of double-layer full-section frozen underground excavation station structure of subway
CN106640094B (en) It regulates and stores moldeed depth layer double-hole tunnel and its construction process at interflow with repair track
CN106837349B (en) It regulates and stores moldeed depth layer tunnel at the interflow of double circle overlap joint shape shield machines construction
CN106837350B (en) The interflow of class rectangle shield machine construction is regulated and stored moldeed depth layer tunnel
CN108239996A (en) A kind of rain sewage of combination pipe gallery construction enters corridor structure
CN206554932U (en) A kind of interflow of oval shield machine construction regulate and store moldeed depth layer tunnel
CN206554929U (en) A kind of interflow of the ungulate shield machine construction of span regulate and store moldeed depth layer tunnel
CN206554931U (en) A kind of interflow of semicircle shield machine construction regulate and store moldeed depth layer tunnel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210322

Address after: 510000 Fudu Building, 5th Floor, No. 11-13 Jiejin Middle Road, Shiqiao Street, Panyu District, Guangzhou, Guangdong Province

Patentee after: GUANGZHOU SHENZHUO INFORMATION TECHNOLOGY Co.,Ltd.

Address before: 110168 Liaoning province Shenyang Hunnan Hunnan Road No. 9

Patentee before: SHENYANG JIANZHU University

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230511

Address after: 014017 Building 106, No. 5, Xiaojingyuan, Tiexi District, Donghe District, Baotou City, Inner Mongolia Autonomous Region

Patentee after: Inner Mongolia xinkaiyuan Construction Co.,Ltd.

Address before: 510000 Fudu Building, 5th Floor, No. 11-13 Jiejin Middle Road, Shiqiao Street, Panyu District, Guangzhou, Guangdong Province

Patentee before: GUANGZHOU SHENZHUO INFORMATION TECHNOLOGY CO.,LTD.

TR01 Transfer of patent right