CN106677794B - The interflow of boring construction is regulated and stored moldeed depth layer arched tunnel and its construction method - Google Patents
The interflow of boring construction is regulated and stored moldeed depth layer arched tunnel and its construction method Download PDFInfo
- Publication number
- CN106677794B CN106677794B CN201710023731.1A CN201710023731A CN106677794B CN 106677794 B CN106677794 B CN 106677794B CN 201710023731 A CN201710023731 A CN 201710023731A CN 106677794 B CN106677794 B CN 106677794B
- Authority
- CN
- China
- Prior art keywords
- cabin
- tunnel
- rainwater
- layer
- interflow
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/14—Layout of tunnels or galleries; Constructional features of tunnels or galleries, not otherwise provided for, e.g. portals, day-light attenuation at tunnel openings
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/08—Lining with building materials with preformed concrete slabs
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
- E21D11/107—Reinforcing elements therefor; Holders for the reinforcing elements
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/38—Waterproofing; Heat insulating; Soundproofing; Electric insulating
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D20/00—Setting anchoring-bolts
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F16/00—Drainage
- E21F16/02—Drainage of tunnels
Abstract
Description
Claims (6)
- The moldeed depth layer arched tunnel 1. the interflow of boring construction is regulated and stored, structure include deep layer tunnel bulkhead (1), vertical arc partition wall (2), rainwater cabin (3), bilge tank and maintenance cabin (4), ventilation and lighting system (5), sewage pipe (6), sewage pipe hanging basket (7), inspection It repairs (8), garage's access path (9), travelling crane inspection platform (10) and percolating water promptly store up cabin (11), which is characterized in that described Deep layer tunnel bulkhead (1) cross section is class ellipse, and sewage pipe (6) is provided among deep layer tunnel bulkhead (1) inner top, And it is fixed to sewage pipe (6) by sewage pipe hanging basket (7);It is set respectively in top sewage pipe (6) both sides of deep layer tunnel bulkhead (1) Set ventilation and lighting system (5);Tunnel is separated into three cabins by vertical arc partition wall (2), and two cabins of outermost are rainwater Cabin (3), intermediate cabin are bilge tank and maintenance cabin (4), the storage and transportation nacelle of rainwater cabin (3) directly as rainwater;Rainwater cabin (3) Garage's access path (9) is arranged in bottom, and the height of garage's access path (9) is 300 ~ 600mm, and width is 2 meters ~ 3 meters;In sewage The lower part setting travelling crane inspection platform (10) in cabin and maintenance cabin (4), travelling crane inspection platform (10) upside are tool car (8), driving Setting percolating water promptly stores up cabin (11) on the downside of inspection platform (10);The height of travelling crane inspection platform (10) is 1 ~ 2 meter.
- 2. the interflow of boring construction is regulated and stored moldeed depth layer arched tunnel according to claim 1, which is characterized in that garage's inspection Repair channel (9), the height of travelling crane inspection platform (10) ensures deep layer tunnel bulkhead (1) bottom of urgent percolating water except the two Space forms the urgent storage space of percolating water;There is cavity in the inside of the travelling crane inspection platform (10), in travelling crane inspection platform (10) both sides open up several paddle holes respectively, and paddle hole uses round or ellipse, the water (flow) direction along nacelle uniform Distribution.
- 3. the interflow of boring construction is regulated and stored moldeed depth layer arched tunnel according to claim 1, which is characterized in that the deep layer tunnel Road bulkhead (1) uses water-proof concrete, and adds barrier coat in its ectonexine, and barrier coat uses cement mortar waterproof Layer, coil waterproof layer, coating waterproof layer, drainage systems waterproof layer, bentonite waterproof material waterproofing layer it is one or more, when When using single waterproof layer as barrier coat, using two layers or more of waterproof layer as barrier coat.
- 4. the interflow of boring construction is regulated and stored moldeed depth layer arched tunnel according to claim 1, which is characterized in that the sewage pipe (6) impervious concrete material is used, and impermeable coating is applied in its inside and outside, impermeable coating synthesizes macromolecule material using pitch Material;Internal spray inner wall nontoxic type epoxy coating in rainwater cabin (3), bilge tank synthesize high score with maintenance cabin (4) using pitch Sub- material.
- 5. the interflow of boring construction is regulated and stored moldeed depth layer arched tunnel according to claim 1, which is characterized in that its construction method For:1st step:The excavation of rainwater cabin (3) position is first carried out, and is excavated simultaneously from both sides, and carries out primary supporting;2nd step:The lining cutting of tunnel duct piece is carried out to having excavated rainwater cabin (3) position, and carries out primary supporting;3rd step:To rainwater cabin (3) position carry out gib, then to bilge tank with maintenance cabin (4) top half (4-1) into Row excavates, and carries out primary supporting;4th step:The lining cutting of tunnel duct piece is carried out with position top half (4-1) of maintenance cabin (4) to bilge tank, and carries out primary Supporting;5th step:Gib is carried out to bilge tank and maintenance cabin (4) top half (4-1) for having excavated, then to bilge tank with Maintenance cabin (4) lower half portion (4-2) is excavated, and carries out primary supporting;6th step:The lining cutting of tunnel duct piece is carried out to bilge tank and maintenance position cabin (4) lower half portion (4-2), and carries out primary branch Shield.
- 6. the interflow of boring construction is regulated and stored the construction method of moldeed depth layer arched tunnel according to claim 5, which is characterized in that 1st step specifically includes:1) the vertical arc partition wall (2) in both sides is first sprayed, from bottom to top;2) fill-before-fire both sides tunnel wall, from bottom to top;3), can be without first pneumatically placed concrete when country rock surface is more whole, and bar-mat reinforcement is first hung, bar-mat reinforcement need to be close to palisades, then spray Concrete covers;4) when using double layer bar, second layer bar-mat reinforcement is laid with after first layer bar-mat reinforcement is covered by concrete, and covering is thick Degree is not less than 3cm;5) bar-mat reinforcement is connected firmly with anchor pole;6) cross dimensions inspection is carried out before installing, timely processing owes to dig intrusion headroom part;7) secondary injection concrete is carried out.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710023731.1A CN106677794B (en) | 2017-01-13 | 2017-01-13 | The interflow of boring construction is regulated and stored moldeed depth layer arched tunnel and its construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710023731.1A CN106677794B (en) | 2017-01-13 | 2017-01-13 | The interflow of boring construction is regulated and stored moldeed depth layer arched tunnel and its construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106677794A CN106677794A (en) | 2017-05-17 |
CN106677794B true CN106677794B (en) | 2018-08-07 |
Family
ID=58858845
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710023731.1A Active CN106677794B (en) | 2017-01-13 | 2017-01-13 | The interflow of boring construction is regulated and stored moldeed depth layer arched tunnel and its construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106677794B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107355234B (en) * | 2017-09-10 | 2023-06-06 | 沈阳建筑大学 | Seepage-proofing corrosion-proofing durable confluence regulation type deep tunnel |
CN108757027B (en) * | 2018-05-23 | 2023-11-21 | 中铁二院工程集团有限责任公司 | Multifunctional drainage system in tunnel |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP5007312B2 (en) * | 2009-02-10 | 2012-08-22 | 大成建設株式会社 | Underground structure and method for constructing underground structure |
CN203239354U (en) * | 2013-03-04 | 2013-10-16 | 中国水电顾问集团华东勘测设计研究院 | Arranging structure utilizing large-tunnel construction space comprehensively |
CN204532378U (en) * | 2015-01-27 | 2015-08-05 | 中铁二院工程集团有限责任公司 | Subway tunneling boring rock tunnel development machine engineering method tunnel water handling constructs |
CN104746531B (en) * | 2015-04-22 | 2016-08-03 | 谢志树 | A kind of stainless steel composite pipe gallery |
CN205400736U (en) * | 2016-03-28 | 2016-07-27 | 北京市政建设集团有限责任公司 | CRD undercut tunnel utility tunnel |
CN205400742U (en) * | 2016-03-28 | 2016-07-27 | 北京市政建设集团有限责任公司 | Major diameter shield tunnel utility tunnel with highway tunnel combination |
CN106013236A (en) * | 2016-07-19 | 2016-10-12 | 上海宝冶集团有限公司 | Underground comprehensive pipe gallery with water storage function |
CN206554944U (en) * | 2017-01-13 | 2017-10-13 | 沈阳建筑大学 | The interflow of boring construction regulate and store moldeed depth layer arched tunnel |
-
2017
- 2017-01-13 CN CN201710023731.1A patent/CN106677794B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN106677794A (en) | 2017-05-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108868778A (en) | A kind of Large Underground Structure no-dig technique construction method | |
CN106013225A (en) | Six-layer circular traffic, comprehensive pipe rack and sponge urban underground complex | |
CN207685859U (en) | A kind of underground pipe gallery | |
US20240003254A1 (en) | Vertical orthogonal top exhausting air duct structure of deeply-buried subway station and construction method therefor | |
CN107514262A (en) | The construction method of shield piping lane | |
CN109667603A (en) | A kind of super shallow-buried tunnel structure and construction method | |
CN106677794B (en) | The interflow of boring construction is regulated and stored moldeed depth layer arched tunnel and its construction method | |
CN106869940B (en) | Shockproof damping type collaborates moldeed depth layer tunnel of regulating and storing | |
CN204492847U (en) | A kind of supporting and protection structure of underground space reverse construction | |
CN106869959B (en) | The interflow of semicircle shield machine construction is regulated and stored moldeed depth layer tunnel | |
CN207499898U (en) | Double-deck fire-fighting life-saving tunnel | |
CN206554944U (en) | The interflow of boring construction regulate and store moldeed depth layer arched tunnel | |
CN206554930U (en) | It is a kind of it is round overlap joint shape shield machine construction interflow regulate and store moldeed depth layer tunnel | |
CN206554937U (en) | A kind of interflow of class rectangle shield machine construction regulate and store moldeed depth layer tunnel | |
CN205893922U (en) | T roof beam precasting yard that sets up on having longitudinal gradient's road bed | |
CN106812535A (en) | Circle overlap joint shape shield machine construction interflow regulate and store moldeed depth layer tunnel | |
CN209523759U (en) | A kind of super shallow-buried tunnel structure | |
CN113187487B (en) | Construction method of double-layer full-section frozen underground excavation station structure of subway | |
CN106640094B (en) | It regulates and stores moldeed depth layer double-hole tunnel and its construction process at interflow with repair track | |
CN106837349B (en) | It regulates and stores moldeed depth layer tunnel at the interflow of double circle overlap joint shape shield machines construction | |
CN106837350B (en) | The interflow of class rectangle shield machine construction is regulated and stored moldeed depth layer tunnel | |
CN108239996A (en) | A kind of rain sewage of combination pipe gallery construction enters corridor structure | |
CN206554932U (en) | A kind of interflow of oval shield machine construction regulate and store moldeed depth layer tunnel | |
CN206554929U (en) | A kind of interflow of the ungulate shield machine construction of span regulate and store moldeed depth layer tunnel | |
CN206554931U (en) | A kind of interflow of semicircle shield machine construction regulate and store moldeed depth layer tunnel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20210322 Address after: 510000 Fudu Building, 5th Floor, No. 11-13 Jiejin Middle Road, Shiqiao Street, Panyu District, Guangzhou, Guangdong Province Patentee after: GUANGZHOU SHENZHUO INFORMATION TECHNOLOGY Co.,Ltd. Address before: 110168 Liaoning province Shenyang Hunnan Hunnan Road No. 9 Patentee before: SHENYANG JIANZHU University |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20230511 Address after: 014017 Building 106, No. 5, Xiaojingyuan, Tiexi District, Donghe District, Baotou City, Inner Mongolia Autonomous Region Patentee after: Inner Mongolia xinkaiyuan Construction Co.,Ltd. Address before: 510000 Fudu Building, 5th Floor, No. 11-13 Jiejin Middle Road, Shiqiao Street, Panyu District, Guangzhou, Guangdong Province Patentee before: GUANGZHOU SHENZHUO INFORMATION TECHNOLOGY CO.,LTD. |
|
TR01 | Transfer of patent right |