CN106677793A - 用于大口径涵管顶进切土和调整偏差的掘进机头 - Google Patents

用于大口径涵管顶进切土和调整偏差的掘进机头 Download PDF

Info

Publication number
CN106677793A
CN106677793A CN201510765599.2A CN201510765599A CN106677793A CN 106677793 A CN106677793 A CN 106677793A CN 201510765599 A CN201510765599 A CN 201510765599A CN 106677793 A CN106677793 A CN 106677793A
Authority
CN
China
Prior art keywords
steel ring
head
driving head
machine head
stage casing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510765599.2A
Other languages
English (en)
Inventor
徐大平
张鹏忠
罗嵩
杨胜华
沈春清
陈涛涛
刘子田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 18th Bureau Group Co Ltd
Fourth Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd
Original Assignee
China Railway 18th Bureau Group Co Ltd
Fourth Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 18th Bureau Group Co Ltd, Fourth Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd filed Critical China Railway 18th Bureau Group Co Ltd
Priority to CN201510765599.2A priority Critical patent/CN106677793A/zh
Publication of CN106677793A publication Critical patent/CN106677793A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

一种用于大口径混凝土涵管顶进切土和调整偏差掘进机头,由掘进机头前端、中段和后端组成,它们均由内、外两层钢圈拼接而成,且两层钢圈之间装有连接板;所述掘进机头中段内部安装四组千斤顶,每组由两个千斤顶组成,掘进机头后端与掘进机头中段内千斤顶活动连接,掘进机头前端与掘进机头中段内千斤顶固定焊接,且中心线同轴;所述掘进机头前端、中段和后端内部均固装有多个支撑骨架。本发明的优点是:1、可控制超挖方,防止开挖过程中地基土塌方,确保路基稳定安全。2、可为顶进方向控制提供约束力,有效控制顶进方向。3、安装拆除简便,使用于多个涵管施工循环倒用,经济合理。

Description

用于大口径涵管顶进切土和调整偏差的掘进机头
技术领域
本发明属于一种建筑施工用设备,特别涉及一种用于大口径涵管顶进切土和调整偏差的掘进机头。
背景技术
掘进机是指用于开凿平直巷道的机器。掘进机在穿越大口径涵管进行顶进施工时,为确保路基的稳定和控制顶进方向,必须采用切土顶进和调整偏差的装置,一般对于大口径涵管顶进前方需要设置掘进机头。受掘进机头设计原理、制作方法、切土效果、调整偏差效果、防护功能、经济因素、施工工期等综合因素限制,需要设计合理有效的掘进机头结构。
发明内容
本发明的目的就在于要解决大口径涵管顶进切土和调整偏差的技术问题,而提供的一种用于大口径涵管顶进切土和调整偏差的掘进机头。
本发明的技术方案是:一种用于大口径混凝土涵管顶进切土和调整偏差掘进机头,其特点在于:由掘进机头前端、中段和后端组成,它们均由内外两层钢圈拼接而成,且两层钢圈之间装有连接板;所述掘进机头中段内部安装四组千斤顶,每组由两个千斤顶组成,掘进机头后端与掘进机头中段内千斤顶活动连接,掘进机头前端与掘进机头中段内千斤顶固定焊接,且中心线同轴;所述掘进机头前端、中段和后端内部均固装有多个支撑骨架。
上述掘进机头前端长1m,内层钢圈直径4m,外层钢圈直径4.77m。
上述掘进机头中段长1m,内层钢圈直径4m、外层钢圈直径4.83m。
上述掘进机头后端长1m,内层钢圈直径4m、外层钢圈直径4.83m。
上述掘进机头前端内、外钢圈之间每15°焊接一个三角加强肋,各顶点在三角中点上。
上述掘进机头中段和掘进机头后端的内、外钢圈之间每15°焊接一加劲板。
上述掘进机头前端外径与掘进机头中段外径之间留有3cm间隙用于调整偏差。
上述掘进机头前端、中段和后端内部每隔1.0m焊接一道支撑骨架,每个支撑骨架采用槽钢焊接连接,支撑骨架电焊连接在掘进机头前端、中段和后端内侧钢圈上的牛腿上。
本发明具有如下的优点和积极效果:
1、本发明掘进机头切入路基土体中可控制超挖方,防止开挖过程中路基土方坍塌,确保既有铁路安全。
2、本发明掘进机头切入土体中,为顶进方向控制提供约束力。当掘进机头前端在顶进过程中出现偏差时,通过千斤顶的相对伸长量来改变掘进机头前端的角度,从而控制偏差。当偏差调整到规范值内,利用千斤顶将掘进机头前端调至于顶进方向平行,然后对千斤顶进行回油,利用土体阻力将掘进机头前端调整到初始状态。
3、本发明掘进机头后端与掘进机头中段内千斤顶活动连接,安装拆除简便,适用大口径涵管施工循环倒用,经济合理。
4、本发明掘进机头前端、中段和后端内部均固装有多个支撑骨架,可防止其因管径过大而出现的变形现象。
附图说明
图1掘进机头立面图;
图2掘进机头1-1剖面图;
图3掘进机头后端立面图;
图4掘进机头后端1-1剖面图;
图5掘进机头中段立面图;
图6掘进机头中段1-1剖面图;
图7掘进机头中段2-2剖面图;
图8掘进机前端立面图;
图9掘进机前端1-1剖面图;
图10槽钢骨架中轴线细部构造图;
图11槽钢骨架与掘进机头连接细部构造图。
具体实施方式
如图1、2所示,一种用于大口径涵管顶进切土和偏差调整的掘进机头,包括掘进机头前端1、中段2和后端3,它们均由内、外两层钢圈4、5拼接而成。其中中段内部安装四组千斤顶6,每组由两个180T千斤顶组成,掘进机头后端与掘进机头中段内千斤顶用螺栓连接,掘进机头前端与掘进机头中段内千斤顶固定焊接,且中心线同轴;所述掘进机头前端、中段和后端内部均固装有多个支撑骨架5。
如图3、4所示:掘进机头后端长1m,内层钢圈直径4m、外层钢圈直径4.83m,且内、外钢圈之间焊接有加劲板7,每15°一道。
如图5、6、7所示:掘进机头中段长1m,内层钢圈直径4m、外层钢圈直径4.83m,且内、外钢圈之间焊接有加劲板8,每15°一道。
如图8、9所示:掘进机头前端长1,m,内层钢圈直径4m,外层钢圈直径4.77m。内、外钢圈之间焊接三角加强肋9,每15°一道,且各顶点在三角中点上。
如图10、11所示:支撑骨架采用20a型槽钢10焊接连接,支撑骨架电焊连接在掘进机头前端、中段和后端内侧钢圈上的牛腿11上。
本掘进机头使用钢板采用Q345R,钢板厚度为30mm。顶进施工时,挖土设备在大口径涵管内操作,开挖掘进机头中段和后端范围内土方。
本发明的使用过程是:
1、在顶进前,先对掘进机头进行组装连接,并安装在涵管前端,调整方位和角度。
2、开始顶进时掘进机头切入路基土方后,涵管内土方设备方可开挖施工。
3、当掘进机头前端在顶进过程中出现偏差时,通过千斤顶控制掘进机头前端之间的相对伸长量,调整掘进机头前端的与顶进轴线的夹角,来改变顶进方向,从而控制偏差。当偏差调整到规范值内,利用千斤顶将掘进机头前端调至于顶进方向平行,然后对千斤顶进行回油,利用土体阻力将掘进机头前端调整到初始状态。
4、随挖随顶直至涵管顶进就位,拆除掘进机头。下一个涵管顶进前再安装。

Claims (8)

1.一种用于大口径混凝土涵管顶进切土和调整偏差掘进机头,其特点在于:由掘进机头前端、中段和后端组成,它们均由内、外两层钢圈拼接而成,且两层钢圈之间装有连接板;所述掘进机头中段内部安装四组千斤顶,每组由两个千斤顶组成,掘进机头后端与掘进机头中段内千斤顶活动连接,掘进机头前端与掘进机头中段内千斤顶固定焊接,且中心线同轴;所述掘进机头前端、中段和后端内部均固装有多个支撑骨架。
2.根据权利要求1所述的用于大口径混凝土涵管顶进切土和调整偏差掘进机头,其特点在于:上述掘进机头前端长1m,内层钢圈直径4m,外层钢圈直径4.77m。
3.根据权利要求1所述的用于大口径混凝土涵管顶进切土和调整偏差掘进机头,其特点在于:上述掘进机头中段长1m,内层钢圈直径4m、外层钢圈直径4.83m。
4.根据权利要求1所述的用于大口径混凝土涵管顶进切土和调整偏差掘进机头,其特点在于:上述掘进机头后端长1m,内层钢圈直径4m、外层钢圈直径4.83m。
5.根据权利要求1所述的用于大口径混凝土涵管顶进切土和调整偏差掘进机头,其特点在于:上述掘进机头前端内、外钢圈之间每15°焊接一个三角加强肋,各顶点在三角中点上。
6.根据权利要求1所述的用于大口径混凝土涵管顶进切土和调整偏差掘进机头,其特点在于:上述掘进机头中段和掘进机头后端的内、外钢圈之间每15°焊接一加劲板。
7.根据权利要求1所述的用于大口径混凝土涵管顶进切土和调整偏差掘进机头,其特点在于:上述掘进机头前端外径与掘进机头中段外径之间留有3cm间隙用于调整偏差。
8.根据权利要求1所述的用于大口径混凝土涵管顶进切土和调整偏差掘进机头,其特点在于:上述掘进机头前端、中段和后端内部每隔1.0m焊接一道支撑骨架,每个支撑骨架采用槽钢焊接连接,支撑骨架电焊连接在掘进机头前端、中段和后端内侧钢圈上的牛腿上。
CN201510765599.2A 2015-11-11 2015-11-11 用于大口径涵管顶进切土和调整偏差的掘进机头 Pending CN106677793A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510765599.2A CN106677793A (zh) 2015-11-11 2015-11-11 用于大口径涵管顶进切土和调整偏差的掘进机头

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510765599.2A CN106677793A (zh) 2015-11-11 2015-11-11 用于大口径涵管顶进切土和调整偏差的掘进机头

Publications (1)

Publication Number Publication Date
CN106677793A true CN106677793A (zh) 2017-05-17

Family

ID=58865050

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510765599.2A Pending CN106677793A (zh) 2015-11-11 2015-11-11 用于大口径涵管顶进切土和调整偏差的掘进机头

Country Status (1)

Country Link
CN (1) CN106677793A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108930678A (zh) * 2018-08-16 2018-12-04 安徽卓科智能装备有限公司 一种顶管机四点式纠偏系统
CN111485888A (zh) * 2019-12-26 2020-08-04 中铁第六勘察设计院集团有限公司 一种先行预制分块衬砌隧道系统及实施方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4213332C1 (en) * 1992-04-23 1993-06-17 Wolfgang Dipl.-Ing. 2000 Hamburg De Miegel Drive for underground prodn. of conduits - comprises outer appts. area in which a striker and floor compressor are integrated
CN203867579U (zh) * 2014-05-12 2014-10-08 泸州市龙马潭区长江液压件有限公司 一种复合式泥水平衡顶管机的机头
CN204002818U (zh) * 2014-06-05 2014-12-10 中铁上海工程局集团有限公司 一种用于超大直径顶管掘进机的模块化拼装壳体
CN104481545A (zh) * 2014-09-23 2015-04-01 上海隧道工程有限公司 一种矩形顶管机的中继间纠偏装置
CN205225267U (zh) * 2015-11-11 2016-05-11 中铁十八局集团第四工程有限公司 用于大口径涵管顶进切土和调整偏差的掘进机头

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4213332C1 (en) * 1992-04-23 1993-06-17 Wolfgang Dipl.-Ing. 2000 Hamburg De Miegel Drive for underground prodn. of conduits - comprises outer appts. area in which a striker and floor compressor are integrated
CN203867579U (zh) * 2014-05-12 2014-10-08 泸州市龙马潭区长江液压件有限公司 一种复合式泥水平衡顶管机的机头
CN204002818U (zh) * 2014-06-05 2014-12-10 中铁上海工程局集团有限公司 一种用于超大直径顶管掘进机的模块化拼装壳体
CN104481545A (zh) * 2014-09-23 2015-04-01 上海隧道工程有限公司 一种矩形顶管机的中继间纠偏装置
CN205225267U (zh) * 2015-11-11 2016-05-11 中铁十八局集团第四工程有限公司 用于大口径涵管顶进切土和调整偏差的掘进机头

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
叶可明: "《土木工程施工机械实用手册》", 31 August 2005, 山东科学技术出版社 *
田长勋等: "《施工员岗位知识与专业技能》", 31 December 2013, 黄河水利出版社 *
邵林广: "《给水排水管道工程施工》", 30 June 1999, 中国建筑工业出版社 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108930678A (zh) * 2018-08-16 2018-12-04 安徽卓科智能装备有限公司 一种顶管机四点式纠偏系统
CN111485888A (zh) * 2019-12-26 2020-08-04 中铁第六勘察设计院集团有限公司 一种先行预制分块衬砌隧道系统及实施方法

Similar Documents

Publication Publication Date Title
WO2021203625A1 (zh) 一种复合式支护结构、施工系统及方法
CN105041328A (zh) 一种用于大马蹄形断面隧道的可现浇支护的盾构机
CN105781562B (zh) 隧洞掘进机施工时的卡机脱困方法
CN110656951A (zh) 全断面隧道掘进机掘进挤压变形卡机灾害安全控制方法
CN104863597A (zh) 一种浅埋暗挖大型地下空间施工的横向洞盖法
CN103603679A (zh) 用于支护隧道拱部的拱顶钢架与隧道施工方法
CN104929649A (zh) 隧道横洞进主洞挑顶工法及挑顶结构
CN109026035A (zh) 隧道环向变截面扩挖方法
CN108729922B (zh) 一种顶管机及可退回式顶管施工方法
CN110748349A (zh) 一种小净距双线隧道盾构的双分体始发方法
JP2008267118A (ja) セグメントの連結構造
CN108222978A (zh) 一种地铁盾构掘进与联络通道冷冻同步作业用环形应力支架系统及安装方法
CN112343610A (zh) 一种斜井用导洞扩孔悬切tbm及施工方法
CN112554899A (zh) 一种硬岩隧道掘进机
CN106677793A (zh) 用于大口径涵管顶进切土和调整偏差的掘进机头
CN106368714A (zh) 一种用于隧道开挖施工的轮胎式自动升降组装台架
US11965420B2 (en) Shield tunnel segment structure and construction method thereof
CN108691553B (zh) 一种联络通道施工用类矩形顶管机
CN109372521A (zh) 新管幕法施工技术及施工管支护装置
CN205225267U (zh) 用于大口径涵管顶进切土和调整偏差的掘进机头
CN104088646A (zh) 一种马蹄形开敞式盾构机的施工方法
CN114876473A (zh) 一种基于水平全回转的地铁联络通道掘进设备及施工方法
CN114607389A (zh) 城市超大断面浅埋车站的改进型双侧壁导洞施工方法
CN111287749B (zh) 冲击地压煤层临空巷道宽掘窄用防冲方法
CN113309533B (zh) 一种敞开式tbm扩挖防栽头方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170517