CN106677526A - Constructional column formwork capable of being quickly erected - Google Patents

Constructional column formwork capable of being quickly erected Download PDF

Info

Publication number
CN106677526A
CN106677526A CN201710062382.4A CN201710062382A CN106677526A CN 106677526 A CN106677526 A CN 106677526A CN 201710062382 A CN201710062382 A CN 201710062382A CN 106677526 A CN106677526 A CN 106677526A
Authority
CN
China
Prior art keywords
template
constructional column
formwork
barrel
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710062382.4A
Other languages
Chinese (zh)
Other versions
CN106677526B (en
Inventor
彭宝安
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing yueding Construction Engineering Co., Ltd
Original Assignee
Jingmen Chuangjia Machinery Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jingmen Chuangjia Machinery Technology Co Ltd filed Critical Jingmen Chuangjia Machinery Technology Co Ltd
Priority to CN201710062382.4A priority Critical patent/CN106677526B/en
Publication of CN106677526A publication Critical patent/CN106677526A/en
Application granted granted Critical
Publication of CN106677526B publication Critical patent/CN106677526B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/02Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for columns or like pillars; Special tying or clamping means therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention discloses a constructional column formwork capable of being quickly erected. The constructional column formwork capable of being quickly erected is mainly suitable for constructional column formworks in the constructional engineering field, is convenient and fast to install and can be recycled. The constructional column formwork is mainly composed of a formwork body A, a formwork body B, pull rods, nuts, water stop rings and inflation barrels. Each inflation barrel is mainly composed of barrel walls, a cavity and a through hole, wherein the closed cavity is formed by the inner barrel wall, the outer barrel wall, the barrel wall at the left end and the barrel wall at the right end; the cavity is filled with compressed air; and the through hole is formed in the inflation barrel filled with the compressed air in the longitudinal direction. A main mounting method of the constructional column formwork comprises the steps that the formwork body A is installed firstly, the multiple pull rods of the formwork body A are sleeved with the through holes of the multiple inflation barrels one by one, then the formwork body B is installed, the pull rods penetrate through a plurality of holes of the formwork body B, then the multiple pull rods are sleeved with the water stop rings on the outer side of the formwork body B, then the nuts are screwed to external threads of the multiple pull rods, the formwork body A and the formwork body B clamp building blocks on the two sides of a constructional column, and accordingly the formwork erection work is completed.

Description

A kind of construction column template of quick template supporting
Technical field
Present invention is mainly used for building engineering field construction column template.
Background technology
Have enough to meet the need just scrap several times in building engineering field installation constitution column template time-consuming but also template Jing of not only taking a lot of work at present Can not use, cause the waste of material.
The content of the invention
The present invention solves the problems referred to above, and its convenience quick for installation, template can be used repeatedly;The present invention mainly by Template A(1), template B(2), pull bar(3), nut(4), seal ring(5), inflator pump(6)Composition;Multiple pull bars(3)One end with Template A(1)Medial surface fix, template B(2)There are multiple holes(10), pull bar(3)There is external screw thread(13);Inflator pump(6)It is main by Barrel(7), cavity(8), through hole(9)Composition, inside and outside barrel(7)And the barrel at left and right two ends(7)The cavity of one closing of composition (8), cavity(8)It is interior full of compressed air, the inflator pump full of compressed air(6)Be longitudinally formed a through hole(9);The present invention Main operational principle and construction method be:First the routinely building block on construction method constructing structure post both sides, stays and sets gingival cyst of mucous gland in the newborn interface And indwelling tension rib, then installation form A(1), by multiple inflator pumps(6)Through hole(9)Template A is enclosed within one by one(1)Multiple drawings Bar(3)On, then installation form B(2), make template B(2)Multiple holes(10)Through pull bar(3), then in template B(2)Outside By multiple seal rings(5)It is enclosed within multiple pull bars(3)On, then by multiple nuts(4)It is screwed into multiple pull bars(3)External screw thread(13) On, make template A(1)With template B(2)The building block on gripping features post both sides, formwork work is completed, and structure is finally poured according to a conventional method Make the concrete of post;After constructional column concrete reaches some strength, when needing form removal, nut is first turned on(4), pull out sealing Ring(5), then form removal B(2), then by template A(1)And pull bar(3)Pull out inflator pump(6)Through hole(9), remove work complete Into inflator pump(6)To for good and all stay in constructional column concrete, finally by inflator pump(6)Barrel(7)Puncture, bleed off air, Again hole is filled up with mortar, whole Constructional Col-umn Construction is completed;Need explanation:Template A(1)With template B(2)Consistent size, template A (1)Multiple pull bars(3)With template B(2)Multiple holes(10)It is one-to-one relation.
Description of the drawings
Description of reference numerals:1- templates A, 2- templates B, 3- pull bars, 4- nuts, 5- seal rings, 6- inflator pumps, 7- barrels, 8- cavitys, 9- through holes, 10- holes, 11- building blocks, 12- constructional columns, 13- external screw threads.
Fig. 1 is the plan cross-sectional schematic diagram of the present invention.
Fig. 2 is the facade section of inflator pump of the present invention.
Fig. 3 is the cross-sectional view of inflator pump of the present invention.
Fig. 4 is the section plan of template A of the present invention.
Fig. 5 is the section plan of template B of the present invention.
Fig. 6 is elevational schematic view of the present invention.
Specific embodiment
The content of the invention has been described in detail the specific embodiment of the present invention, is not repeated herein;Need explanation:Inflator pump 6 Typically completed by dimensional requirement pre-production by factory, inflator pump 6 or manufactured with plastic sheeting, or use other materials system Make, its Main Function is to isolate pull bar 3 with the concrete of constructional column, be easy to pull bar 3 to pull out from the concrete of hardening;Inflation Cylinder 6 can substitute completely the plastic bushing of current conventional use of Screw arbor with nut at both-ends, and its manufacturing cost is more much lower than plastic bushing;This Invention goes for the constructional column of different cross section size, with good versatility.

Claims (1)

1. a kind of construction column template of quick template supporting, is characterized in that:It is mainly by template A(1), template B(2), pull bar(3), spiral shell It is female(4), seal ring(5), inflator pump(6)Composition;Multiple pull bars(3)One end and template A(1)Medial surface fix, template B (2)There are multiple holes(10), pull bar(3)There is external screw thread(13);Inflator pump(6)Mainly by barrel(7), cavity(8), through hole(9)Group Into inside and outside barrel(7)And the barrel at left and right two ends(7)The cavity of one closing of composition(8), cavity(8)It is interior full of compressed air, Inflator pump full of compressed air(6)Be longitudinally formed a through hole(9);The main operational principle and construction method of the present invention It is:The first routinely building block on construction method constructing structure post both sides, stays and sets gingival cyst of mucous gland in the newborn interface and indwelling tension rib, then installation form A (1), by multiple inflator pumps(6)Through hole(9)Template A is enclosed within one by one(1)Multiple pull bars(3)On, then installation form B(2), Make template B(2)Multiple holes(10)Through pull bar(3), then in template B(2)Outside by multiple seal rings(5)It is enclosed within multiple drawings Bar(3)On, then by multiple nuts(4)It is screwed into multiple pull bars(3)External screw thread(13)On, make template A(1)With template B(2)Folder The building block on tight constructional column both sides, formwork work is completed, and the concrete of constructional column is finally poured according to a conventional method;When constructional column coagulation Soil is reached after some strength, when needing form removal, first turns on nut(4), pull out seal ring(5), then form removal B(2), then By template A(1)And pull bar(3)Pull out inflator pump(6)Through hole(9), remove work and complete, inflator pump(6)To for good and all stay in In constructional column concrete, finally by inflator pump(6)Barrel(7)Puncture, bleed off air, then hole, whole structure are filled up with mortar Make post construction to complete;Need explanation:Template A(1)With template B(2)Consistent size, template A(1)Multiple pull bars(3)With template B (2)Multiple holes(10)It is one-to-one relation.
CN201710062382.4A 2017-02-02 2017-02-02 A kind of construction column template of quick template supporting Expired - Fee Related CN106677526B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710062382.4A CN106677526B (en) 2017-02-02 2017-02-02 A kind of construction column template of quick template supporting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710062382.4A CN106677526B (en) 2017-02-02 2017-02-02 A kind of construction column template of quick template supporting

Publications (2)

Publication Number Publication Date
CN106677526A true CN106677526A (en) 2017-05-17
CN106677526B CN106677526B (en) 2019-02-12

Family

ID=58860271

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710062382.4A Expired - Fee Related CN106677526B (en) 2017-02-02 2017-02-02 A kind of construction column template of quick template supporting

Country Status (1)

Country Link
CN (1) CN106677526B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114232995A (en) * 2021-12-31 2022-03-25 歌山建设集团有限公司 Water stop screw assembly and construction method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0384166A (en) * 1989-08-25 1991-04-09 Sumitomo Rubber Ind Ltd Water-stop packing
CN202969926U (en) * 2012-12-12 2013-06-05 杨中平 Air bag type concrete hole pre-burying device
CN203834934U (en) * 2014-04-01 2014-09-17 中建城市建设发展有限公司 Constructional column template erecting structure
CN204609303U (en) * 2014-12-31 2015-09-02 山东三箭建设工程股份有限公司 A kind of template split bolt device
CN105040864A (en) * 2015-06-30 2015-11-11 中国二十冶集团有限公司 Formwork supporting method for constructional column in limited space

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0384166A (en) * 1989-08-25 1991-04-09 Sumitomo Rubber Ind Ltd Water-stop packing
CN202969926U (en) * 2012-12-12 2013-06-05 杨中平 Air bag type concrete hole pre-burying device
CN203834934U (en) * 2014-04-01 2014-09-17 中建城市建设发展有限公司 Constructional column template erecting structure
CN204609303U (en) * 2014-12-31 2015-09-02 山东三箭建设工程股份有限公司 A kind of template split bolt device
CN105040864A (en) * 2015-06-30 2015-11-11 中国二十冶集团有限公司 Formwork supporting method for constructional column in limited space

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114232995A (en) * 2021-12-31 2022-03-25 歌山建设集团有限公司 Water stop screw assembly and construction method thereof

Also Published As

Publication number Publication date
CN106677526B (en) 2019-02-12

Similar Documents

Publication Publication Date Title
CN106836802A (en) A kind of water-stop opposite-pulling screw rod that can be taken out
CN203441100U (en) Formwork structure of constructional column
CN102296812A (en) Building template molding structure, fastening piece and building template construction method
CN106677526A (en) Constructional column formwork capable of being quickly erected
CN204098486U (en) The concrete of building basement roof ater-casting hangs mould
CN213330018U (en) L type constructional column template reinforcing apparatus
CN101832025B (en) Sealing up screw
CN205677245U (en) A kind of detachable split bolt
CN211228607U (en) Integrally formed construction structure of outer wall and bottom plate of cast-in-place concrete structure of structure
CN201087553Y (en) Oppositely dragging screw for fixing concrete template
CN203579870U (en) Prestress combined support pile steel mold structure
CN208396309U (en) A kind of concrete component formwork opposite-pulling device and concrete component template component
CN106703406A (en) Rapid and convenient constructional column formwork
CN211421847U (en) Building bolt hole block structure
CN210117932U (en) Formwork supporting pull rod with elastic air bag plug
CN201671338U (en) Water-stop screw rod
CN204626973U (en) A kind of sealing up screw for building
CN104328929A (en) Reinforced concrete basin construction and construction method thereof
CN204960328U (en) Movement joint is with supplementary form removal device
CN202483177U (en) Water-stop threaded rod
CN106801513A (en) A kind of fast and easily construction column template of loss prevention
CN204418676U (en) A kind of novel high strength is to drawing inner support
CN220150900U (en) Multistage formula stagnant water bolt consolidates multiple wall body construction structures
CN204551857U (en) Long nut component is used in furred ceiling suspention
CN212428092U (en) Water stop piece construction structure with double water stop pieces

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200508

Address after: 401420 tongziwan community, Fujia village, Yongxin town, Qijiang District, Chongqing

Patentee after: Chongqing yueding Construction Engineering Co., Ltd

Address before: 448000 Hubei Province, Jingmen city Dongbao District Road No. 1 Building 6 401 aquamarine

Patentee before: JINGMEN CHUANGJIA MACHINERY TECHNOLOGY Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190212

Termination date: 20210202