CN106643967A - Protecting hole for monitoring underground water level, hole sealing device and combination method thereof - Google Patents

Protecting hole for monitoring underground water level, hole sealing device and combination method thereof Download PDF

Info

Publication number
CN106643967A
CN106643967A CN201710092773.0A CN201710092773A CN106643967A CN 106643967 A CN106643967 A CN 106643967A CN 201710092773 A CN201710092773 A CN 201710092773A CN 106643967 A CN106643967 A CN 106643967A
Authority
CN
China
Prior art keywords
hole
pipe
hole sealing
tube
soakaway trench
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710092773.0A
Other languages
Chinese (zh)
Inventor
蒋崇节
李安妮
周茜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Lantian Polytron Technologies Inc
Original Assignee
Guangxi Lantian Polytron Technologies Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Lantian Polytron Technologies Inc filed Critical Guangxi Lantian Polytron Technologies Inc
Priority to CN201710092773.0A priority Critical patent/CN106643967A/en
Publication of CN106643967A publication Critical patent/CN106643967A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01FMEASURING VOLUME, VOLUME FLOW, MASS FLOW OR LIQUID LEVEL; METERING BY VOLUME
    • G01F23/00Indicating or measuring liquid level or level of fluent solid material, e.g. indicating in terms of volume or indicating by means of an alarm

Abstract

The invention discloses a protecting hole for monitoring the underground water level, a hole sealing device and a combination method thereof, and relates to the technical field of geotechnical engineering investigation and monitoring. The protecting hole comprises a water seepage pipe (1), a hole sealing pipe (2), and a hole protecting pipe (3). The water seepage pipe (1) comprises a water seepage pipe outer pipe (6), a water seepage pipe inner pipe (7), a plug (8) and a water seepage filter layer (9), water passing holes are arranged on the pipe wall, the plug (8) is located on the bottom of the water seepage pipe outer pipe (6), and the water seepage filter layer (9) is located on the place between the inner and the outer pipes. The hole sealing pipe (2) comprises an upper segment and a lower segment, drilled grout holes (13) are arranged on the pipe wall, and the outer wall of the connection part of the bottom of the hole sealing pipe lower section (4) and water seepage pipe (1) is wrapped by the hemp thread (12). The protecting hole and the hole sealing device are low in cost and strong in functionality, the monitoring work of the underground water level can be replaced by replacing the original hole protecting pipe and plug with one device, the quality of underground water level monitoring and hole sealing is guaranteed; the protecting hole and the hole sealing device have the advantages that the operation is easy, the work cycle for inspections is shortened, risk is lowered, the environment is clean and protected, and promotions are easy.

Description

A kind of guard aperture, hole sealing device for water table measure and combinations thereof method
Technical field
The present invention relates to geotechnical engineering investigation and monitoring technical field, concretely relate to a kind of for level of ground water prison Guard aperture, the hole sealing device of survey and combinations thereof method, is particularly suited for special rock soil(Such as swelling weak rock), baleful geological processes (Such as karst)Region.
Background technology
The measurement of level of ground water and the important content that monitoring is geotechnical engineering investigation.The authenticity and standard of level of ground water Really property is the foundation of assay place foundation stability and hydrostatic water table.Level of ground water refers to the height of the water surface in underground reservoir Journey, can be divided into drilling disclose water-bearing layer when find first initial water level, vary less and rise or fall trend without system Fixed level etc..
At present, the measurement of level of ground water is generally divided into drilling, monitoring, sealing of hole three phases with monitoring.
1. drilling stage:Use rig fixed-point drill on the ground, to prevent hole wall collapse, need according to place actual requirement Guard aperture pipe is laid while drilling(Typically adopt seamless geology steel tube), a drilling need to match somebody with somebody a contour guard aperture pipe.
2. monitor the stage:Need unified measurement initial water level, fixed level.Initial water level is easy to measure, and fixed level is usual Start measurement after the completion of all drillings in place, be both needed to treat that water level recovers and water level affects to eliminate every time before measurement.It is steady measuring After determining water level, also need to arrange monitoring holes, draw the level of ground water in place is affected size, seasonal variety situation, institute by rainfall Survey the parameters such as peak level.
3. sealing of hole stage:It is unified after all level of ground water parameters in place are obtained to start sealing of hole.It is general first to transfer thing along pipe Material(Such as stopper)As plug, completely cut off water-bearing layer, reuse grouter cement injection slurries, risen using rig after grout cures Pull out guard aperture pipe.
The three phases of water table measure are both needed to be completed using guard aperture pipe, and period can not extract guard aperture pipe.Because seamless Geology steel tube cost is of a relatively high, in the monitoring stage, there is survey crew to reduce the situation of the effective amount of guard aperture and violation operation: Surveyed fixed level extract guard aperture pipe use it for other drilling, lack arrange monitoring holes process, simply by search phase Pass data draws inaccurate monitoring parameter.The parameter can not strictly according to the facts reflect place situation, be not reaching to the purpose monitored, directly Affect follow-up work.
In the sealing of hole stage, because guard aperture pipe only has guard aperture function, need to separately set plug and complete packing.Workmen is the side of asking Just, packing work is often ignored, not sealing of hole or the plug sealing of hole from sealing difference.Not completely cutting off water-bearing layer completely during packing may The slurries that underground water poured in or be used in sealing of hole from drilling are made to leak in water-bearing layer, especially in special rock soil, bad Geologic process region, easily causes foundation pit construction water burst, foundation softening, induction periphery karst ground subsidence and polluted underground water etc. ground Matter environmental problem, wherein periphery karst ground subsidence and polluted underground water mostly occur after the completion of water table measure, it is difficult to chase after Look into and remedy, there is greatly safety in production hidden danger.
For conventional steel guard aperture pipe because cost is of a relatively high, single function can not be effectively ensured water table measure, envelope The problem of hole quality, invents a kind of guard aperture, hole sealing device for water table measure and combinations thereof method and has important work Cheng Yiyi.
The content of the invention
The technical problem to be solved is conventional steel guard aperture pipe because cost is of a relatively high, single function can not have Effect ensures water table measure, the problem of sealing quality.
To solve above-mentioned technical problem, the technical solution used in the present invention is:A kind of shield for water table measure Hole, hole sealing device and combinations thereof method, is connected successively from the bottom to top by soakaway trench, hole sealing tube, the part of guard aperture pipe three.
The soakaway trench is located at device lower section, including outer tube, inner tube, plug and water-permeable filter layer.Outer tube, inner pipe wall are opened There is permeable hole, porous allows the underground water in water-bearing layer to penetrate into device, draws the related data of level of ground water.Plug position In outer pipe bottom, insulating effect is played.Water-permeable filter layer be located between inner tube, outer tube, monitoring when porous, prevent hole wall soil Blocking soakaway trench, avoids slurries from entering water-bearing layer in sealing of hole.
The hole sealing tube is located at device middle part, including hypomere and epimere.Hypomere connects with soakaway trench, caliber be device in most Greatly, whole device, hypomere bottom is supported to be wrapped up by flax silk with soakaway trench joint outer wall for fixed, flax silk can increase hole sealing tube External diameter so as to be easy to placement, while avoiding slurries from entering underground reservoir in grouting.Epimere connects with guard aperture pipe.Upper-lower section Grout hole is provided with tube wall, in grouting, slurries can be made to flow out from hole, fill up the gap between device and borehole wall.
The guard aperture pipe is located at device top, and top is above the ground level, and can prevent hole wall collapse and earth's surface soil from falling.
The Guan Yuguan connects using adhesive means.
The soakaway trench, hole sealing tube, guard aperture Guan Jun adopt PE(Polyethylene)Pipe.
The water-permeable filter layer adopts geotextiles.
The invention has the beneficial effects as follows:
It is with low cost.Institute using PE materials in the case where same effect is reached compared with original guard aperture pipe cost less than ten/ One.
Feature is strong.Have guard aperture, sealing of hole function concurrently, be that alternative original guard aperture pipe, plug are completed only using a kind of device The three phases of water table measure, solve the problems, such as original guard aperture pipe single function.
It is easy to use, shorten prospecting duration, reduce risk.Drilling stage, survey crew often completes a drilling, you can put Enter this device, using this device guard aperture, can will lay, rise and pull out the unification of guard aperture pipe two procedures, rig is moved in reduction of erection time, reduction Security risk.
Environmental protection.The geologic Environment Problems such as the underground water pollution that causes because of packing effect difference can effectively be prevented.
It is easy to spread.The present invention on-the-spot purchasing material and can connect;Institute is easy to using the more former seamless geology steel tube of PE materials Buying, also with antirust treatment, the production low advantage of power consumption need not be done.
Description of the drawings
Fig. 1 is the profilograph of the embodiment of the present invention.
Fig. 2 is the elevation of this device soakaway trench.
Fig. 3 is the profile of Fig. 2.
Fig. 4 is the elevation of this device hole sealing tube.
Reference:1- soakaway trench;2- hole sealing tubes;3- guard aperture pipes;4- hole sealing tube hypomeres;5- hole sealing tube epimeres;6- seeps water Pipe outer tube;7- soakaway trench inner tubes;8- plugs;9- water-permeable filter layers;10- outer tube permeable holes;11- inner tube permeable holes;12- flax silks; 13- grout holes;21- rock stratum;22- borehole walls;23- drilling reducings;24- universal meter water-level gauges(Illustrate);25- measures water level.
Specific embodiment
The present invention is described in further detail with reference to the accompanying drawings and detailed description.
A kind of guard aperture, hole sealing device for water table measure as shown in Figure 1 and combinations thereof method, by soakaway trench 1, Hole sealing tube 2, the part of guard aperture pipe 3 three connect successively from the bottom to top, and hole sealing tube 2 includes hole sealing tube hypomere 4 and hole sealing tube epimere 5, envelope Wrapped up by flax silk 12 with the joint outer wall of soakaway trench 1 bottom of hole pipe hypomere 4.
As shown in Figure 2,3, the soakaway trench 1 includes soakaway trench outer tube 6, soakaway trench inner tube 7, plug 8 and water-permeable filter layer 9.The tube wall of soakaway trench outer tube 6 is provided with outer tube permeable hole 10, and the tube wall of soakaway trench inner tube 7 is provided with inner tube permeable hole 11, plug 8 In the bottom of soakaway trench outer tube 6, water-permeable filter layer 9 is located between soakaway trench outer tube 6 and soakaway trench inner tube 7.
As shown in figure 4, the hole sealing tube 2 includes hole sealing tube hypomere 4 and hole sealing tube epimere 5, hole sealing tube hypomere 4 and hole sealing tube The tube wall of epimere 5 is provided with grout hole 13.
For the drilling that hatch bore diameter is 130mm, rock stratum reducing is 91mm, using the present invention water table measure is carried out Step is as follows.
Step one, chooses five sections of PE(Polyethylene)Pipe, is used separately as soakaway trench outer tube 6, soakaway trench inner tube 7, hole sealing tube Hypomere 4, hole sealing tube epimere 5, guard aperture pipe 3.
The caliber 50mm of soakaway trench outer tube 6, long 500mm, tube wall opens ten layers of outer tube permeable hole 10.The each interlayer of outer tube permeable hole 10 Away from 40mm, 4 per layer, right-angled intersection is arranged, aperture 12mm, and different interlayer holes arrange in isosceles triangle.
The caliber 40mm of soakaway trench inner tube 7, long 500mm, tube wall opens ten layers of inner tube permeable hole 11.The each interlayer of inner tube permeable hole 11 Away from 40mm, 4 per layer, right-angled intersection is arranged, aperture 10mm, and different interlayer holes arrange in isosceles triangle.
The caliber 110mm of hole sealing tube hypomere 4, long 500mm, tube wall opens two-layer grout hole 13.The each interlamellar spacing of grout hole 13 100mm, 6 per layer, is uniformly distributed, aperture 12mm, and different interlayer holes arrange in isosceles triangle.
The caliber 50mm of hole sealing tube epimere 5, long 500mm, tube wall opens two-layer grout hole 13.Each interlamellar spacing 100mm of grout hole 13, 4 per layer, right-angled intersection arrangement, aperture 8mm, different interlayer holes arrange in isosceles triangle.
The caliber 50mm of guard aperture pipe 3, depending on length is according to drilling depth so as to top 200mm above ground level.
Step 2, using geotextiles as water-permeable filter layer 9, by soakaway trench outer tube 6, soakaway trench inner tube 7, plug 8 and thoroughly Water filtering layer 9 is combined as soakaway trench 1;By soakaway trench 1, hole sealing tube hypomere 4, hole sealing tube epimere 5, guard aperture pipe 3 by gluing combination For this device;Flax silk 12 is wrapped in into the bottom of hole sealing tube hypomere 4 and the joint outer wall of soakaway trench 1.
Step 3, often completes a drilling, you can this device is transferred to rock stratum 21 along borehole wall 22 in drilling stage, It is installed at the drilling reducing 23 at the top of rock stratum, you can risen using rig and pull out original steel guard aperture pipe.
Step 4, monitors the stage, and using universal meter water-level gauge 24 measurement water level 25 is measured.
Step 5, in the sealing of hole stage, using grouter unification sealing of hole is carried out, and cement mortar is filled up inside device, device and brill Gap between the hole wall of hole.
Above-described embodiment be only the present invention a kind of preferred embodiment and be not limited to protection scope of the present invention.Should refer to Go out, after present disclosure has been read, those skilled in the art is on the premise of without departing from the principle of the invention or thinking Some improvement or modification can be made to the present invention, these equivalent form of values equally also should be regarded as protection scope of the present invention.

Claims (6)

1. a kind of guard aperture, hole sealing device for water table measure and combinations thereof method, is characterized in that:By soakaway trench(1), envelope Kong Guan(2), guard aperture pipe(3)Three parts are constituted;The soakaway trench(1)Including soakaway trench outer tube(6), soakaway trench inner tube(7), plug (8)And water-permeable filter layer(9), the soakaway trench outer tube(6)Tube wall is provided with outer tube permeable hole(10), soakaway trench inner tube(7)Tube wall It is provided with inner tube permeable hole(11), plug(8)Positioned at soakaway trench outer tube(6)Bottom, water-permeable filter layer(9)Positioned at soakaway trench outer tube (6)With soakaway trench inner tube(7)Between;The hole sealing tube(2)Including hole sealing tube hypomere(4)With hole sealing tube epimere(5), under hole sealing tube Section(4)With hole sealing tube epimere(5)Tube wall is provided with grout hole(13).
2. guard aperture, hole sealing device for being used for water table measure as claimed in claim 1 and combinations thereof method, is characterized in that: The soakaway trench(1), hole sealing tube(2), guard aperture pipe(3)Three parts connect successively from the bottom to top.
3. guard aperture, hole sealing device for being used for water table measure as claimed in claim 1 and combinations thereof method, is characterized in that: The Guan Yuguan connects using adhesive means.
4. guard aperture, the hole sealing device for being used for water table measure as claimed in claim 1, is characterized in that:The soakaway trench (1), hole sealing tube(2), guard aperture pipe(3)Adopt PE(Polyethylene)Pipe.
5. guard aperture, the hole sealing device for being used for water table measure as claimed in claim 1, is characterized in that:Under the hole sealing tube Section(4)With soakaway trench(1)Joint outer wall is by flax silk(12)Parcel.
6. guard aperture, the hole sealing device for being used for water table measure as claimed in claim 1, is characterized in that:The permeable filtration Layer adopts geotextiles.
CN201710092773.0A 2017-02-21 2017-02-21 Protecting hole for monitoring underground water level, hole sealing device and combination method thereof Pending CN106643967A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710092773.0A CN106643967A (en) 2017-02-21 2017-02-21 Protecting hole for monitoring underground water level, hole sealing device and combination method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710092773.0A CN106643967A (en) 2017-02-21 2017-02-21 Protecting hole for monitoring underground water level, hole sealing device and combination method thereof

Publications (1)

Publication Number Publication Date
CN106643967A true CN106643967A (en) 2017-05-10

Family

ID=58845821

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710092773.0A Pending CN106643967A (en) 2017-02-21 2017-02-21 Protecting hole for monitoring underground water level, hole sealing device and combination method thereof

Country Status (1)

Country Link
CN (1) CN106643967A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110208045A (en) * 2019-07-15 2019-09-06 深圳市勘察测绘院(集团)有限公司 Prospecting drilling water fetching device
CN111103027A (en) * 2019-12-24 2020-05-05 北京中煤矿山工程有限公司 Water level observation tube capable of realizing layered reporting of freezing wall intersection condition
CN111351545A (en) * 2020-02-20 2020-06-30 石家庄铁道大学 Assembled water level measuring pipe and water level monitoring method
CN113863935A (en) * 2021-08-06 2021-12-31 中铁十六局集团有限公司 Multistage telescopic operation method for monitoring hole sealing quality of exploration hole of mudstone stratum
CN115030680A (en) * 2022-06-30 2022-09-09 中国地质科学院岩溶地质研究所 Automatic monitoring method for groundwater in pressure maintaining influence range of slurry balance shield

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB9410471D0 (en) * 1994-05-25 1994-07-13 Bp Exploration Operating Cementing process and apparatus
JPH10122930A (en) * 1996-10-18 1998-05-15 Oyo Corp Maximum water level detecting device for underground water
JP2003056756A (en) * 2001-08-10 2003-02-26 Japan Drilling Co Ltd Perforated pipe and its placing method
CN201144696Y (en) * 2008-01-17 2008-11-05 河海大学 Drilling oscillatory type permeability coefficient value test device
CN102494730A (en) * 2011-12-20 2012-06-13 鞍钢集团矿业公司 Auxiliary device for observing water level by tailing pond saturation line and construction method
CN103061796A (en) * 2011-10-19 2013-04-24 淮南矿业(集团)有限责任公司 Extraction pipe, extraction system and downwards-drilling extraction method
CN204085433U (en) * 2014-08-14 2015-01-07 浙江华东建设工程有限公司 Tunnel vault rock deformation measurement device
CN104481450A (en) * 2014-11-07 2015-04-01 北京中煤矿山工程有限公司 Sealing method for hydrological hole
CN104775787A (en) * 2015-02-27 2015-07-15 河南工程学院 Hydraulic fracturing crossing hole pitchup hole sealing method of broken surrounding rock
CN105041341A (en) * 2015-08-18 2015-11-11 山东大学 Hole opening sealing device used for static pressure permeating rotary grouting of drill hole and using method thereof
CN106401567A (en) * 2016-08-30 2017-02-15 湖南中大经纬地热开发科技有限公司 Water level and water temperature automatic monitoring system based on superficial layer geothermal well
CN206504768U (en) * 2017-02-21 2017-09-19 广西蓝天科技股份有限公司 A kind of guard aperture, hole sealing device for water table measure

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB9410471D0 (en) * 1994-05-25 1994-07-13 Bp Exploration Operating Cementing process and apparatus
JPH10122930A (en) * 1996-10-18 1998-05-15 Oyo Corp Maximum water level detecting device for underground water
JP2003056756A (en) * 2001-08-10 2003-02-26 Japan Drilling Co Ltd Perforated pipe and its placing method
CN201144696Y (en) * 2008-01-17 2008-11-05 河海大学 Drilling oscillatory type permeability coefficient value test device
CN103061796A (en) * 2011-10-19 2013-04-24 淮南矿业(集团)有限责任公司 Extraction pipe, extraction system and downwards-drilling extraction method
CN102494730A (en) * 2011-12-20 2012-06-13 鞍钢集团矿业公司 Auxiliary device for observing water level by tailing pond saturation line and construction method
CN204085433U (en) * 2014-08-14 2015-01-07 浙江华东建设工程有限公司 Tunnel vault rock deformation measurement device
CN104481450A (en) * 2014-11-07 2015-04-01 北京中煤矿山工程有限公司 Sealing method for hydrological hole
CN104775787A (en) * 2015-02-27 2015-07-15 河南工程学院 Hydraulic fracturing crossing hole pitchup hole sealing method of broken surrounding rock
CN105041341A (en) * 2015-08-18 2015-11-11 山东大学 Hole opening sealing device used for static pressure permeating rotary grouting of drill hole and using method thereof
CN106401567A (en) * 2016-08-30 2017-02-15 湖南中大经纬地热开发科技有限公司 Water level and water temperature automatic monitoring system based on superficial layer geothermal well
CN206504768U (en) * 2017-02-21 2017-09-19 广西蓝天科技股份有限公司 A kind of guard aperture, hole sealing device for water table measure

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110208045A (en) * 2019-07-15 2019-09-06 深圳市勘察测绘院(集团)有限公司 Prospecting drilling water fetching device
CN110208045B (en) * 2019-07-15 2024-02-09 深圳市勘察测绘院(集团)有限公司 Investigation drilling water intaking device
CN111103027A (en) * 2019-12-24 2020-05-05 北京中煤矿山工程有限公司 Water level observation tube capable of realizing layered reporting of freezing wall intersection condition
CN111351545A (en) * 2020-02-20 2020-06-30 石家庄铁道大学 Assembled water level measuring pipe and water level monitoring method
CN111351545B (en) * 2020-02-20 2022-03-25 石家庄铁道大学 Assembled water level measuring pipe and water level monitoring method
CN113863935A (en) * 2021-08-06 2021-12-31 中铁十六局集团有限公司 Multistage telescopic operation method for monitoring hole sealing quality of exploration hole of mudstone stratum
CN113863935B (en) * 2021-08-06 2023-06-02 中铁十六局集团有限公司 Multistage telescopic operation method for monitoring mudstone stratum exploration hole sealing quality
CN115030680A (en) * 2022-06-30 2022-09-09 中国地质科学院岩溶地质研究所 Automatic monitoring method for groundwater in pressure maintaining influence range of slurry balance shield

Similar Documents

Publication Publication Date Title
CN106643967A (en) Protecting hole for monitoring underground water level, hole sealing device and combination method thereof
CN103266638B (en) A kind of detection method of underground concrete diaphragm wall breakthrough position
CN104329076B (en) A kind of deviational survey hole osmotic pressure counter device and installation method
CN105239563A (en) Dry-method hole forming filling pile structure for post-grouting matched rotary drilling rig and construction method
CN106192971B (en) A kind of artesian water water-level observation well construction and the method for multilayer water-level observation
CN101638987A (en) Tunnel construction method for crossing high-pressure water-enriched fracture zone with curtain grouting and grout stopping wall
CN104563164B (en) A kind of ground-connecting-wall seam leak detection and grouting for water plugging method
CN111827879B (en) Horizontal drilling construction method for large-diameter pipe shed in shallow-earth-covered weak stratum
CN110258658B (en) Construction method for pre-judging and treating leakage of underground diaphragm wall
CN206627405U (en) The double embolism original position injection pressure water penetration detectors of expansion type
CN206504768U (en) A kind of guard aperture, hole sealing device for water table measure
CN211621548U (en) Karst foundation local adds thick liquid reinforcing apparatus
WO2021139063A1 (en) Grouting pipe and method of reinforcing tunnel by surface grouting
CN111254933B (en) Karst grouting construction method for sleeve valve pipe
CN114233385A (en) Treatment method for mud burst and water burst of inclined shaft
CN103573269B (en) Shield tunnel grouting layer performance detection method
CN110485482A (en) A kind of miniature steel pipe stake body soil pressure and displacement monitor
CN106320397B (en) The advanced prediction of Leakage of Foundation Pit and advanced regulation method
CN103352700B (en) Method for preventing shaft from cracking in alleviation water-bearing layer by utilizing automatic supply water loss method
CN108005662A (en) A kind of processing method of underground water seal cave depot bank area geology crushed zone
CN107386251A (en) A kind of block form single hole multi-layer Underground Water monitoring holes pipe method for embedding
CN108612546B (en) Horizontal grouting construction method in closed environment
CN110847155A (en) Waterproof seam pretreatment method in underground continuous wall construction process
CN105544547A (en) Covering type soil filled and soft soil stratum segmented reinforcing device and method
CN205999876U (en) A kind of artesian water water-level observation well construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination