CN106640194B - A kind of compound coal rock gas dynamic disaster method for early warning - Google Patents

A kind of compound coal rock gas dynamic disaster method for early warning Download PDF

Info

Publication number
CN106640194B
CN106640194B CN201610853264.0A CN201610853264A CN106640194B CN 106640194 B CN106640194 B CN 106640194B CN 201610853264 A CN201610853264 A CN 201610853264A CN 106640194 B CN106640194 B CN 106640194B
Authority
CN
China
Prior art keywords
index
disaster
warning
coal
danger
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610853264.0A
Other languages
Chinese (zh)
Other versions
CN106640194A (en
Inventor
董国伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian University of Science and Technology
Original Assignee
Xian University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian University of Science and Technology filed Critical Xian University of Science and Technology
Priority to CN201610853264.0A priority Critical patent/CN106640194B/en
Publication of CN106640194A publication Critical patent/CN106640194A/en
Application granted granted Critical
Publication of CN106640194B publication Critical patent/CN106640194B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere
    • E21F17/18Special adaptations of signalling or alarm devices

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Alarm Systems (AREA)
  • Emergency Alarm Devices (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The present invention provides a kind of compound coal rock gas dynamic disaster method for early warning, occur according to compound disaster, prevention and treatment feature, building Early-warning Model, the indexs such as objective danger, precautionary measures defect and management defect occur from disaster and sentence knowledge analysis mathematical model, and related early warning technology and system are formed based on downhole sensor, ground-based server, basic data information platform etc..The invention utilizes big data technology, carries out compound disaster alarm prevention from process, it is therefore prevented that the loophole of each link ensure that the success rate of early warning prevention.

Description

A kind of compound coal rock gas dynamic disaster method for early warning
Technical field
The present invention relates to mine gas prevention and control field more particularly to a kind of pre- police of compound coal rock gas dynamic disaster Method.
Background technique
In terms of energy demand angle, China will not change in the energy pattern short time based on coal, coal specific gravity compared with It will remain in 50% or so in long-time, and coal mining 95% or so is based on the pit mining of underground.Currently, coal mining is with every The speed in 10 ~ 20m of year extends to deep, and deep mining has been increasingly becoming normality in the central and east, and brings new coal petrography gas Dynamic disaster problem.Mine coal rock gas dynamic disaster most typical two kinds of forms of expression in China's are coal and gas prominent and impact Ground pressure, but central and east coal seam containing gas dynamic disaster shows a kind of dual dynamic with Burst Tendency and outburst hazard Learn characteristic, bump single by superficial part, independent or coal and gas prominent be changed into it is compound, the various dynamic disasters of coal petrography it Between interaction reinforce, coal rock gas dynamic disaster feature becomes complicated and multiplicity, and it is main, new to have become coal mine one kind The safety hazard of type.Durings breeding, exciting, develop etc., many factors are interweaved compound coal rock gas dynamic disaster, It mutually induces, strengthen, so that the condition occurred is lower, disaster intensity is bigger, causes calamity degree more serious, so that genesis mechanism is more Complexity, prediction, early warning and prevention and treatment are more difficult.But compound coal rock gas dynamic disaster early warning prevention aspect has only carried out just at present The early warning prevention technique using coal and gas prominent and bump of step research or machinery, not yet forms oneself independent early warning Prevention technique.
Summary of the invention
In order to overcome the deficiencies in the prior art described above, the object of the present invention is to provide a kind of compound coal petrography gas Dynamic disaster method for early warning, method include:
S1: the ocurrence of coal seam obtained by geological survey, live underground actual measurement and digging production is abnormal, geological structure is different Often, high methane, Burst Tendency, stress are concentrated and prominent omen data, the compound disaster objective danger in progress coal seam are analyzed, Disaster occurrence degree is obtained, warning index and critical value are set;
S2: obtaining daily prevention and treatment disaster measure, determine control measure type, parameter, according to this measure and Parameter analysis day Not perfect place during normal control measure, establishes warning index, carries out control measure type and parameter according to index and parameter Early warning;
S3: it is each that acquisition is related to the reasonable digging deployment decision of disaster, regional complex control measure, Local synthesis control measure etc. Warning index is established in the habitual error behavior of a link personnel, is managed behavior early warning according to index and codes and standards;
S4: occurring the building warning data storehouses such as objective danger, precautionary measures defect and management defect from disaster, will be daily Prediction index, daily prevention and treatment disaster measure type, parameter, the administration behaviours such as reasonable digging deployment decision of disaster are stored in database, By sentencing in knowledge analysis digging production process with warning index and critical value, whether to exceed warning index critical for prevention and treatment links Value carries out compound coal rock gas dynamic disaster comprehensive pre-warning when exceeding critical value.
Preferably, further comprising the steps of:
S5: objective danger index: ocurrence of coal seam surveys drilling, underground for probing coal borer hole or geophysical prospecting technology with relying primarily on extremely It is detected, determines ocurrence of coal seam exception coefficient;Geological structure surveys drilling, the drilling of underground for probing construction or object with relying primarily on extremely Spy technology carries out detection geological structure type and parameter;Survey coal seam gas-bearing capacity, pressure ginseng in the abnormal underground that mainly passes through of gas Number, determines high methane region;Stress abnormality, which mainly passes through, carries out actual Stress Measurement, digging situation identified sign concentration zones;Impact is inclined It is mainly determined to sexual abnormality by Burst Tendency measurement;In addition disaster precursor information is true by region drilling performance It is fixed;In summary compound calamity danger region is determined;For disasters danger region, determines and investigate prominent omen, daily pre- Survey index and three factor index of monitoring system and critical value;
S6: according to fixed control measure parameter, control range, whole pitch of holes precautionary measures defect index: are determined And in advance away from etc. indexs;
S7: management risk index: according to be related to the reasonable digging deployment decision in disaster region, comprehensive preventive health measures, part it is comprehensive The habitual error behavior for closing the links personnel such as control measure, establishes database, and foundation is, no execution warning index;
S8: any one according to objective danger index, precautionary measures defect index and management defect index is answered Mould assembly coal rock gas dynamic disaster early warning.
Preferably, comprising the following steps:
S9: basic data system: GIS-Geographic Information System, it is main to realize mine digital management;Early warning large database concept, storage Related warning index information needed data;Coal mine safety monitoring system data collection system, is mainly used in collection monitoring system Gas density data;
S10: compound disaster alarm index sentences knowledge analysis system: geology, digging dynamic management system, timely update management Geology, digging situation delta data, provide foundation for objective danger index;Stress dynamic analysis system, as digging changes, It timely updates and manages mine stress distribution change information, provide foundation for objective danger index;The daily early warning system of monitoring system System, relative stress, gas bearing capacity and the Coal Pore Structure index that timely intelligent updating management variation ofgas density is reflected, are objective Risk index provides foundation;Comprehensive preventive health measures management system, the management prognostic that timely updates, control measure performance number According to providing foundation for objective danger and control measure defect index;Administrative staff's behavior analysis system, timely update administrator Member's behavioral data, provides foundation for management risk index;Comprehensive objective danger, control measure defect and management risk index into The compound disaster prewarning and forecasting of row;
S11: underground various parameters determination sensor provides data acquisition, such as monitoring system sensor etc.;
S12: ground early-warning server, for storing warning information data;
S13: early warning result release management system mainly issues alarming result by network, mobile phone.
Preferably, S5 is further comprising the steps of:
Objective danger index: ocurrence of coal seam survey with relying primarily on extremely drilling, underground for probing coal borer hole or geophysical prospecting technology into Row detection determines that ocurrence of coal seam exception coefficient thickness variation coefficient Cm >=0.15 is danger area);Geological structure relies primarily on extremely Ground surveys drilling, the drilling of underground for probing construction or geophysical prospecting technology and carries out detection geological structure type and parameter, apart from geological structural belt≤ 20m is danger area;Survey coal seam gas-bearing capacity, gas bearing capacity W > 6m in the abnormal underground that mainly passes through of gas3/ t or gas pressure > 0.6MPa is danger area;Stress abnormality, which mainly passes through, carries out actual Stress Measurement, digging situation identified sign concentration zones >=stress concentration 3 times of area distance is no danger area;Dynamic failure event DT > 500, the elastic energy that burst trend sexual abnormality mainly passes through coal refer to Number WET < 2, impact energy index KE < 1.5, uniaxial compressive strength RC < 7 and the bending energy index comprehensive descision of UWQ≤10 without Danger of burst;In addition disaster precursor information during region drilling performance situations such as spray orifice, bit freezing mainly by determining;It is comprehensive Close compound calamity danger region determined above;For disasters danger region, determines and investigate daily prediction index, prominent omen With three factor index of monitoring system and critical value, daily prediction index mainly has drilling cuttings desorption of mash gas index K1, △ h2, coal powder quantity of bore Index S, constantly continuous three factors prediction index is A, B, C to monitoring system, determines critical value by live practical investigate, prominent pre- Million be bit freezing, spray orifice, sound coal big gun.
Preferably, S6 is further comprising the steps of:
Precautionary measures defect index: relying primarily on fixed control measure parameter, determines control range, whole pitch of holes And in advance away from etc. indexs, warning index mainly has control range a, pitch of holes b, in advance away from c, according to field conduct effect expedition three Index critical value;
Preferably, S7 is further comprising the steps of:
Management risk index: rely primarily on be related to the reasonable digging deployment decision in disaster region, comprehensive preventive health measures, part it is comprehensive The habitual error behavior for closing the links personnel such as control measure, establishes database, and foundation is, no execution warning index, in advance Alert index is mainly that whether digging deployment is reasonable, whether comprehensive preventive health measures executes, whether Local provisions execute, and index value is 0 or 1.
As can be seen from the above technical solutions, the invention has the following advantages that
By compound coal rock gas dynamic disaster method for early warning, lacked from compound disaster objective danger, control measure Disaster prewarning and forecasting is carried out in terms of sunken and management risk three, realizes the comprehensive process control of disaster, and answering by what is invented Early warning based data service device, warning index are sentenced and know analysis system and coal mine safety monitoring system by mould assembly disaster early warning system Connection realizes the intelligent early-warning of compound disaster and the network of result, mobile phone publication.
Detailed description of the invention
In order to illustrate more clearly of technical solution of the present invention, attached drawing needed in description will be made below simple Ground introduction, it should be apparent that, drawings in the following description are only some embodiments of the invention, for ordinary skill For personnel, without creative efforts, it is also possible to obtain other drawings based on these drawings.
Fig. 1 is the flow chart of compound coal rock gas dynamic disaster method for early warning;
Fig. 2 is the flow chart of compound coal rock gas dynamic disaster method for early warning embodiment;
Fig. 3 is the system diagram of compound coal rock gas dynamic disaster early warning embodiment.
Specific embodiment
It in order to make the invention's purpose, features and advantages of the invention more obvious and easy to understand, below will be with specific Examples and drawings, the technical solution protected to the present invention are clearly and completely described, it is clear that implementation disclosed below Example is only a part of the embodiment of the present invention, and not all embodiment.Based on the embodiment in this patent, the common skill in this field Art personnel all other embodiment obtained without making creative work belongs to the model of this patent protection It encloses.
The present embodiment provides a kind of compound coal rock gas dynamic disaster method for early warning, and as shown in Figures 1 to 3, method includes:
S1: the ocurrence of coal seam obtained by geological survey, live underground actual measurement and digging production is abnormal, geological structure is different Often, high methane, Burst Tendency, stress are concentrated and prominent omen data, the compound disaster objective danger in progress coal seam are analyzed, Disaster occurrence degree is obtained, warning index and critical value are set;
S2: obtaining daily prevention and treatment disaster measure, determine control measure type, parameter, according to this measure and Parameter analysis day Not perfect place during normal control measure, establishes warning index, carries out control measure type and parameter according to index and parameter Early warning;
S3: it is each that acquisition is related to the reasonable digging deployment decision of disaster, regional complex control measure, Local synthesis control measure etc. Warning index is established in the habitual error behavior of a link personnel, is managed behavior early warning according to index and codes and standards;
S4: occurring the building warning data storehouses such as objective danger, precautionary measures defect and management defect from disaster, will be daily Prediction index, daily prevention and treatment disaster measure type, parameter, the administration behaviours such as reasonable digging deployment decision of disaster are stored in database, By sentencing in knowledge analysis digging production process with warning index and critical value, whether to exceed warning index critical for prevention and treatment links Value carries out compound coal rock gas dynamic disaster comprehensive pre-warning when exceeding critical value.
Wherein, further comprising the steps of:
S5: objective danger index: ocurrence of coal seam surveys drilling, underground for probing coal borer hole or geophysical prospecting technology with relying primarily on extremely It is detected, determines ocurrence of coal seam exception coefficient;Geological structure surveys drilling, the drilling of underground for probing construction or object with relying primarily on extremely Spy technology carries out detection geological structure type and parameter;Survey coal seam gas-bearing capacity, pressure ginseng in the abnormal underground that mainly passes through of gas Number, determines high methane region;Stress abnormality, which mainly passes through, carries out actual Stress Measurement, digging situation identified sign concentration zones;Impact is inclined It is mainly determined to sexual abnormality by Burst Tendency measurement;In addition disaster precursor information is true by region drilling performance It is fixed;In summary compound calamity danger region is determined;For disasters danger region, determines and investigate prominent omen, daily pre- Survey index and three factor index of monitoring system and critical value;
S6: according to fixed control measure parameter, control range, whole pitch of holes precautionary measures defect index: are determined And in advance away from etc. indexs;
S7: management risk index: according to be related to the reasonable digging deployment decision in disaster region, comprehensive preventive health measures, part it is comprehensive The habitual error behavior for closing the links personnel such as control measure, establishes database, and foundation is, no execution warning index;
S8: any one according to objective danger index, precautionary measures defect index and management defect index is answered Mould assembly coal rock gas dynamic disaster early warning.
Wherein, comprising the following steps:
S9: basic data system: GIS-Geographic Information System, it is main to realize mine digital management;Early warning large database concept, storage Related warning index information needed data;Coal mine safety monitoring system data collection system, is mainly used in collection monitoring system Gas density data;
S10: compound disaster alarm index sentences knowledge analysis system: geology, digging dynamic management system, timely update management Geology, digging situation delta data, provide foundation for objective danger index;Stress dynamic analysis system, as digging changes, It timely updates and manages mine stress distribution change information, provide foundation for objective danger index;The daily early warning system of monitoring system System, relative stress, gas bearing capacity and the Coal Pore Structure index that timely intelligent updating management variation ofgas density is reflected, are objective Risk index provides foundation;Comprehensive preventive health measures management system, the management prognostic that timely updates, control measure performance number According to providing foundation for objective danger and control measure defect index;Administrative staff's behavior analysis system, timely update administrator Member's behavioral data, provides foundation for management risk index;Comprehensive objective danger, control measure defect and management risk index into The compound disaster prewarning and forecasting of row;
S11: underground various parameters determination sensor provides data acquisition, such as monitoring system sensor etc.;
S12: ground early-warning server, for storing warning information data;
S13: early warning result release management system mainly issues alarming result by network, mobile phone.
In the present embodiment, S5 is further comprising the steps of:
Objective danger index: ocurrence of coal seam survey with relying primarily on extremely drilling, underground for probing coal borer hole or geophysical prospecting technology into Row detection determines that ocurrence of coal seam exception coefficient thickness variation coefficient Cm >=0.15 is danger area);Geological structure relies primarily on extremely Ground surveys drilling, the drilling of underground for probing construction or geophysical prospecting technology and carries out detection geological structure type and parameter, apart from geological structural belt≤ 20m is danger area;Survey coal seam gas-bearing capacity, gas bearing capacity W > 6m in the abnormal underground that mainly passes through of gas3/ t or gas pressure > 0.6MPa is danger area;Stress abnormality, which mainly passes through, carries out actual Stress Measurement, digging situation identified sign concentration zones >=stress concentration 3 times of area distance is no danger area;Dynamic failure event DT > 500, the elastic energy that burst trend sexual abnormality mainly passes through coal refer to Number WET < 2, impact energy index KE < 1.5, uniaxial compressive strength RC < 7 and the bending energy index comprehensive descision of UWQ≤10 without Danger of burst;In addition disaster precursor information during region drilling performance situations such as spray orifice, bit freezing mainly by determining;It is comprehensive Close compound calamity danger region determined above;For disasters danger region, determines and investigate daily prediction index, prominent omen With three factor index of monitoring system and critical value, daily prediction index mainly has drilling cuttings desorption of mash gas index K1, △ h2, coal powder quantity of bore Index S, constantly continuous three factors prediction index is A, B, C to monitoring system, determines critical value by live practical investigate, prominent pre- Million be bit freezing, spray orifice, sound coal big gun.
In the present embodiment, S6 is further comprising the steps of:
Precautionary measures defect index: relying primarily on fixed control measure parameter, determines control range, whole pitch of holes And in advance away from etc. indexs, warning index mainly has control range a, pitch of holes b, in advance away from c, according to field conduct effect expedition three Index critical value;
In the present embodiment, S7 is further comprising the steps of:
Management risk index: rely primarily on be related to the reasonable digging deployment decision in disaster region, comprehensive preventive health measures, part it is comprehensive The habitual error behavior for closing the links personnel such as control measure, establishes database, and foundation is, no execution warning index, in advance Alert index is mainly that whether digging deployment is reasonable, whether comprehensive preventive health measures executes, whether Local provisions execute, and index value is 0 or 1.
The present invention also provides an embodiments, comprising the following steps:
S21: the ocurrence of coal seam obtained by geological survey, live underground actual measurement and digging production is abnormal, geological structure is different Often, high methane, Burst Tendency, stress are concentrated and prominent omen data, the compound disaster objective danger in progress coal seam are analyzed, Disaster occurrence degree is obtained, warning index and critical value are set;
Specific implementation: ocurrence of coal seam is surveyed drilling, underground for probing coal borer hole or geophysical prospecting technology and is detected with relying primarily on extremely, Determine that ocurrence of coal seam exception coefficient thickness variation coefficient Cm >=0.15 is danger area);Geological structure surveys brill with relying primarily on extremely Hole, the drilling of underground for probing construction or geophysical prospecting technology carry out detection geological structure type and parameter, are danger apart from geological structural belt≤20m Danger zone;Survey coal seam gas-bearing capacity, gas bearing capacity W > 6m in the abnormal underground that mainly passes through of gas3/ t or gas pressure > 0.6MPa For danger area;Stress abnormality mainly pass through carry out actual Stress Measurement, digging situation identified sign concentration zones >=stress concentration region 3 again away from From for no danger area;Burst trend sexual abnormality mainly passes through dynamic failure event DT > 500, the elastic energy index WET < of coal 2, impact energy index KE < 1.5, uniaxial compressive strength RC < 7 and the bending energy index comprehensive descision of UWQ≤10 are endangered without impact Danger;In addition disaster precursor information during region drilling performance situations such as spray orifice, bit freezing mainly by determining;In summary Determine compound calamity danger region;For disasters danger region, determines and investigate daily prediction index, prominent omen and monitoring Three factor index of system and critical value, daily prediction index mainly have a drilling cuttings desorption of mash gas index K1, △ h2, coal powder quantity of bore index S, Constantly continuous three factors prediction index is A, B, C to monitoring system, determines critical value by live practical investigate, prominent omen is card Brill, rings coal big gun at spray orifice.
S22: it is investigated by different prevention and treatment disaster measures, control measure type, parameter is determined, according to this measure and parameter The not perfect place of daily control measure is analyzed, warning index is established;
Specific implementation: relying primarily on fixed control measure parameter, determine control range, whole pitch of holes and in advance away from Etc. indexs, warning index mainly have control range a, pitch of holes b, in advance away from c, pass through actual implementation result parameter and design parameter It compares, carries out early warning.
S23: collection is related to the reasonable digging deployment decision in disaster region, comprehensive preventive health measures, Local synthesis control measure etc. The habitual error behavior of links personnel, establishes database, establishes warning index;
Specific implementation: rely primarily on that be related to the reasonable digging deployment decision in disaster region, comprehensive preventive health measures, Local synthesis anti- The habitual error behavior for controlling the links personnel such as measure, establishes database, and foundation is, no execution warning index, and early warning refers to Mark be mainly digging deployment whether rationally, whether comprehensive preventive health measures executes, whether Local provisions execute, index value be 0 or 1, such as not no with legitimate result, index 0 then carries out early warning.
S24: the building warning data storehouses, early warning such as objective danger, precautionary measures defect and management defect occurs from disaster Index and sentence knowledge analysis mathematical model, critical value, carry out compound coal rock gas dynamic disaster comprehensive pre-warning;According to objective danger Property index, precautionary measures defect index and manage any one of defect index to carry out compound coal rock gas dynamic disaster pre- It is alert.
Specific implementation software platform, sensor etc. have:
Basic data system 1: GIS-Geographic Information System is 1., main to realize mine digital management;Early warning large database concept 2., It is main to store related warning index information needed data;3. coal mine safety monitoring system data collection system, is mainly used for acquiring Gas density data in monitoring system;
Compound disaster alarm index, which is sentenced, knows analysis system 2: 4., timely update management for geology, digging dynamic management system Geology, digging situation delta data, provide foundation for objective danger index;Stress dynamic analysis system 5., as digging becomes Change, timely updates and manage mine stress distribution change information, provide foundation for objective danger index;The daily early warning of monitoring system 6., relative stress, gas bearing capacity and the Coal Pore Structure index that timely intelligent updating management variation ofgas density is reflected are system Objective danger index provides foundation;7., the management prognostic that timely updates, control measure implement feelings to comprehensive preventive health measures management system Condition data provide foundation for objective danger and control measure defect index;8. administrative staff's behavior analysis system, timely updates Administrative staff's behavioral data provides foundation for management risk index;Comprehensive objective danger, control measure defect and management risk Index carries out compound disaster prewarning and forecasting.
Underground various parameters determination sensor provides data acquisition 3, such as monitoring system sensor etc.;
Ground early-warning server 4, for storing warning information data;
S25: early warning result release management system 5 mainly issues alarming result by network, mobile phone.
The present invention utilizes Internet technology, by the compound coal rock gas dynamic disaster early warning technology of invention, from compound Disaster prewarning and forecasting is carried out in terms of type disaster objective danger, control measure defect and management risk three, realizes the complete of disaster Orientation process control, and by the compound disaster early warning system of invention, early warning based data service device, warning index are sentenced into knowledge Analysis system and coal mine safety monitoring system connection realize the intelligent early-warning of compound disaster and the network of result, mobile phone hair Cloth.
Each embodiment in this specification is described in a progressive manner, the highlights of each of the examples are with other The difference of embodiment, the same or similar parts in each embodiment refer to mutually.
The foregoing description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, as defined herein General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, of the invention It is not intended to be limited to the embodiments shown herein, and is to fit to and the principles and novel features disclosed herein phase one The widest scope of cause.

Claims (1)

1. a kind of compound coal rock gas dynamic disaster method for early warning, which is characterized in that method includes:
S21: the ocurrence of coal seam obtained by geological survey, live underground actual measurement and digging production is abnormal, geological structure is abnormal, high Gas, Burst Tendency, stress are concentrated and prominent omen data, carries out the compound disaster objective danger analysis in coal seam, obtains Warning index and critical value is arranged in disaster occurrence degree;
Ocurrence of coal seam is surveyed drilling, underground for probing coal borer hole or geophysical prospecting technology with relying on extremely and is detected, and determines ocurrence of coal seam exception Coefficient thickness variation coefficient Cm >=0.15 is danger area;Geological structure surveys drilling, the drilling of underground for probing construction or object with relying on extremely Spy technology carries out detection geological structure type and parameter, is danger area apart from geological structural belt≤20m;Gas passes through underground extremely Survey coal seam gas-bearing capacity, gas bearing capacity W > 6m3/ t or gas pressure > 0.6MPa is danger area;Stress abnormality passes through progress Actual Stress Measurement, digging situation identified sign concentration zones >=3 times of stress concentration region distance are no danger area;Burst trend sexual abnormality is logical Cross dynamic failure event DT > 500, elastic energy index WET < 2, the impact energy index KE < 1.5, uniaxial compressive strength of coal RC < 7 and the bending energy index comprehensive descision of UWQ≤10 are without danger of burst;In addition disaster precursor information is drilled by region and is implemented Spray orifice, bit freezing situation determine during situation;In summary compound calamity danger region is determined;For disasters danger area Domain determines that investigating daily prediction index, prominent omen and three factor index of monitoring system and critical value, daily prediction index has brill Consider desorption of mash gas index K1, △ h2 to be worth doing, coal powder quantity of bore index S, constantly continuous three factors prediction index is A, B, C to monitoring system, is passed through Live practical investigate determines critical value, and prominent omen is bit freezing, spray orifice, rings coal big gun;
S22: it is investigated by different prevention and treatment disaster measures, control measure type, parameter is determined, according to this measure and Parameter analysis The daily not perfect place of control measure, establishes warning index;
By fixed control measure parameter, determines control range, whole pitch of holes and in advance away from index, warning index has control Range a processed, pitch of holes b, in advance away from c, compared by actual implementation result parameter with design parameter, carry out early warning;
S23: collection is related to the reasonable digging deployment decision in disaster region, comprehensive preventive health measures, each ring of Local synthesis control measure The habitual error behavior of section personnel, establishes database, establishes warning index;
By being related to the reasonable digging deployment decision in disaster region, comprehensive preventive health measures, Local synthesis control measure links people The habitual error behavior of member, establishes database, and foundation is, no execution warning index, and warning index is whether digging deployment closes Reason, whether comprehensive preventive health measures executes, whether Local provisions execute, and index value is 0 or 1, and such as not no with legitimate result, index is 0, then carry out early warning;
S24: from disaster occur objective danger, precautionary measures defect and management defect building warning data storehouse, warning index and Sentence knowledge analysis mathematical model, critical value, carries out compound coal rock gas dynamic disaster comprehensive pre-warning;Refer to according to objective danger Mark, precautionary measures defect index and any one the compound coal rock gas dynamic disaster early warning of progress for managing defect index;
Implement software platform, sensor has:
Basic data system 1: 1. GIS-Geographic Information System, realizes mine digital management;2., storage is related for early warning large database concept Warning index information needed data;Coal mine safety monitoring system data collection system is 3., dense for gas in collection monitoring system Degree evidence;
Compound disaster alarm index, which is sentenced, knows analysis system 2: 4., timely update management ground for geology, digging dynamic management system Matter, digging situation delta data, provide foundation for objective danger index;Stress dynamic analysis system 5., as digging changes, It timely updates and manages mine stress distribution change information, provide foundation for objective danger index;The daily early warning system of monitoring system 6., relative stress, gas bearing capacity and the Coal Pore Structure index that timely intelligent updating management variation ofgas density is reflected are objective to system It sees risk index and foundation is provided;Comprehensive preventive health measures management system 7., the management prognostic that timely updates, control measure performance Data provide foundation for objective danger and control measure defect index;8., timely update administrative staff's behavior analysis system pipe Human behavior data are managed, provide foundation for management risk index;Comprehensive objective danger, control measure defect and management risk refer to Mark carries out compound disaster prewarning and forecasting;
Underground various parameters determination sensor provides data acquisition 3, monitoring system sensor;
Ground early-warning server 4, for storing warning information data;
S25: early warning result release management system 5 issues alarming result by network, mobile phone;
Using Internet technology, by compound coal rock gas dynamic disaster early warning technology, from compound disaster objective danger, Disaster prewarning and forecasting is carried out in terms of control measure defect and management risk three, realizes the comprehensive process control of disaster, and is led to Early warning based data service device, warning index are sentenced and know analysis system and coal mine peace by the compound disaster early warning system for crossing invention Full monitoring system connection realizes the intelligent early-warning of compound disaster and the network of result, mobile phone publication.
CN201610853264.0A 2016-09-27 2016-09-27 A kind of compound coal rock gas dynamic disaster method for early warning Active CN106640194B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610853264.0A CN106640194B (en) 2016-09-27 2016-09-27 A kind of compound coal rock gas dynamic disaster method for early warning

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610853264.0A CN106640194B (en) 2016-09-27 2016-09-27 A kind of compound coal rock gas dynamic disaster method for early warning

Publications (2)

Publication Number Publication Date
CN106640194A CN106640194A (en) 2017-05-10
CN106640194B true CN106640194B (en) 2019-02-22

Family

ID=58854663

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610853264.0A Active CN106640194B (en) 2016-09-27 2016-09-27 A kind of compound coal rock gas dynamic disaster method for early warning

Country Status (1)

Country Link
CN (1) CN106640194B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110159347B (en) * 2019-05-05 2020-05-08 北京科技大学 Dynamic disaster monitoring and early warning method for deep high-stress hard roof stope
CN110130990B (en) * 2019-05-31 2021-01-15 煤科集团沈阳研究院有限公司 Gas overrun early warning system and method
CN113137279A (en) * 2021-04-02 2021-07-20 山东科技大学 Coal mine thermal power disaster monitoring and early warning system and method based on 5G private network
CN117172618B (en) * 2023-11-01 2024-02-23 天津矿智科技有限公司 Coal mine outburst prevention measure engineering quality early warning method, early warning system, equipment and medium
CN117686167B (en) * 2024-01-29 2024-04-19 深蓝(天津)智能制造有限责任公司 Pressure monitoring and early warning method and system for underground electric control isolation valve

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2329313A1 (en) * 1998-04-30 1999-11-04 William D. Mayercheck Intrinsically-safe roof hazard alert module
CN203452850U (en) * 2013-08-05 2014-02-26 成都飞逸计算机服务有限公司 Alarm system based on gas monitoring
CN103899356A (en) * 2014-02-21 2014-07-02 北京华安奥特科技有限公司 Integrated information system for monitoring, early warning, management and control of mine water disasters
CN204357488U (en) * 2014-12-22 2015-05-27 中国矿业大学(北京) Based on the driving face in coal mine bump warning system of image
CN105179018B (en) * 2015-10-16 2018-08-21 辽宁工程技术大学 A kind of coal mine rock burst detection method
CN105240052B (en) * 2015-11-11 2017-07-04 中煤科工集团重庆研究院有限公司 Coal mine gas disaster monitoring and early warning information acquisition system and acquisition method
CN105484802B (en) * 2016-01-15 2018-05-15 神华集团有限责任公司 A kind of coal mine rock burst combined monitoring early warning system and its monitoring and pre-alarming method
CN105626151B (en) * 2016-02-28 2018-04-24 辽宁工程技术大学 Press method for early warning stope of coal mines roadway bump
CN105781620B (en) * 2016-04-26 2018-02-02 北京科技大学 Dynamic disaster method for early warning based on roadway surrounding rock rupture via hole monitoring

Also Published As

Publication number Publication date
CN106640194A (en) 2017-05-10

Similar Documents

Publication Publication Date Title
CN106640194B (en) A kind of compound coal rock gas dynamic disaster method for early warning
CN106437853B (en) A kind of coal petrography bump dynamic disaster method for early warning
CN106224005B (en) A kind of monitoring method based on long-range electric data interaction electric signal transmission
He et al. Integrated rockburst early warning model based on fuzzy comprehensive evaluation method
CN101787897A (en) System and method for predicting coal and gas outburst risk of mine in real time
CN108510112A (en) A kind of mine disaster prediction and warning method that field monitoring is combined with numerical simulation
CN104159087B (en) Field monitoring platform for drilling machine
Verdon et al. Examining the capability of statistical models to mitigate induced seismicity during hydraulic fracturing of shale gas reservoirs
CN102628373A (en) Impact ground pressure split source comprehensive early-warning method of coal mine
CN103244187B (en) Coal and gas prominent breeds evolution early warning comprehensive index system
Niu et al. Types and occurrence time of rockbursts in tunnel affected by geological conditions and drilling & blasting procedures
CN103244186B (en) Identification and the tracking and early warning system of evolution is bred based on coal and gas prominent
Yeck et al. Rapid response, monitoring, and mitigation of induced seismicity near Greeley, Colorado
Tan et al. Multi‐Index Monitoring and Evaluation on Rock Burst in Yangcheng Mine
CN109854303A (en) Rock burst monitoring and early warning method for underground mining
Grasso et al. Patterns of reservoir‐triggered seismicity in a low‐seismicity region of France
Qin et al. Combined early warning method for rock burst and its engineering application
CN112324506A (en) Dynamic early warning method for preventing and controlling rock burst of coal mine based on micro-seismic
Wang et al. Early warning method for coal and gas outburst prediction based on indexes of deep learning model and statistical model
Wang et al. Research progress of disaster factors and a prevention alarm index of coal and gas outbursts
Jiang et al. A new quantitative method for risk assessment of coal floor water inrush based on PSR theory and extension cloud model
CN204013912U (en) Rig on-site supervision platform
Qiu et al. Risk prediction of coal and gas outburst based on abnormal gas concentration in blasting driving face
Ramis et al. Volcanic and volcano-tectonic activity forecasting: A review on seismic approaches
Liu et al. Multi-level of fracture network imaging: A HFTS use case and knowledge transferring

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant