CN105626151B - Press method for early warning stope of coal mines roadway bump - Google Patents

Press method for early warning stope of coal mines roadway bump Download PDF

Info

Publication number
CN105626151B
CN105626151B CN201610125561.3A CN201610125561A CN105626151B CN 105626151 B CN105626151 B CN 105626151B CN 201610125561 A CN201610125561 A CN 201610125561A CN 105626151 B CN105626151 B CN 105626151B
Authority
CN
China
Prior art keywords
data
stope
early warning
module
generation module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610125561.3A
Other languages
Chinese (zh)
Other versions
CN105626151A (en
Inventor
兰天伟
张宏伟
李胜
韩军
宋卫华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaoning Technical University
Original Assignee
Liaoning Technical University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liaoning Technical University filed Critical Liaoning Technical University
Priority to CN201610125561.3A priority Critical patent/CN105626151B/en
Publication of CN105626151A publication Critical patent/CN105626151A/en
Application granted granted Critical
Publication of CN105626151B publication Critical patent/CN105626151B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere
    • E21F17/18Special adaptations of signalling or alarm devices
    • E21F17/185Rock-pressure control devices with or without alarm devices; Alarm devices in case of roof subsidence

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Testing Or Calibration Of Command Recording Devices (AREA)
  • Emergency Alarm Devices (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

Method for early warning is pressed the invention discloses a kind of stope of coal mines roadway bump, is included the following steps:Calculate the dynamic failure stress exponent of coal body;After radiofrequency launcher is installed in each need sensitive pressure sensor to be used, pore pressure gauge and roof dynamic monitor, it is installed on according to the threshold values and requirement of setting in tunnel, and sensor signal is connected by radiofrequency launcher with data collection processor;Three-dimensional generation module is set up, and data collection processor is connected with three-dimensional generation module.Redundancy between sensor and complementary information are combined by the present invention by rule, realize the monitoring to stope of coal mines roadway bump and send safety alarm, improve the work efficiency of manager, strengthen the security of roadway construction, early warning positive effect, and tunnel situation can be presented in face of staff by three-dimensional generation module, allow the situation of change in staff observation tunnel on the spot in person, further increase the effect of early warning.

Description

Press method for early warning stope of coal mines roadway bump
Technical field
The present invention relates to a kind of bump method for early warning, and in particular to a kind of stope of coal mines roadway bump Di Yayu police Method.
Background technology
Bump is that a kind of elastic energy for being gathered due to coal and rock in mining work activities that underground coal mine occurs is unexpected Discharge and cause coal and rock moment to be dished out, the roadway damage even dynamic disaster of casualties.Bump is coal body In the external manifestation that stress concentration occurs to destroy suddenly to a certain extent afterwards, stress and its change to coal body be monitored be into A kind of means of row bump early warning.
But for current conventional method for early warning since warning index selection is improper, early warning effect is unsatisfactory.
The content of the invention
To solve the above problems, method for early warning is pressed the present invention provides a kind of stope of coal mines roadway bump, by sensor Between redundancy and complementary information be combined by rule, realize the monitoring to stope of coal mines roadway bump and send safe police Report, improves the work efficiency of manager, strengthens the security of roadway construction, early warning positive effect, and can be generated by three-dimensional Module, tunnel situation is presented in face of staff so that the observation and experience tunnel that staff can be on the spot in person Situation of change, further increase the effect of early warning.
To achieve the above object, the technical solution taken of the present invention is:
Press method for early warning stope of coal mines roadway bump, include the following steps:
Step 1: carrying out coal body sample collection to intending early warning stope drift active workings, carrying out uniaxial compression to coal body sample destroys examination Test, obtain the dynamic failure curve of coal body, calculate coal body dynamic failure stress exponent;The dynamic failure stress exponent of coal body Refer in uniaxial compression test, the ultimate strength of coal and the ratio of the difference of residual strength and dynamic destruction time, unit is MPa/ms, wherein, dynamic destruction time refers to the standard specimen of coal under uniaxial compressed state, is destroyed from ultimate strength to complete The time undergone, the dynamic destruction time of coal body are an important indicators for characterizing its Burst Tendency, have burst trend The dynamic destruction time of property coal body is generally lower than 500ms.
Step 2: installed in each need sensitive pressure sensor to be used, pore pressure gauge and roof dynamic monitor Radiofrequency launcher;
Step 3: drilling into country rock, multigroup sensitive pressure sensor obtained by step 2 and pore pressure gauge are poured Build in the borehole, the spacing between group and group is set to 30~50m according to stress distribution law, and every group is buried 3-5, spacing The 1-3 sensitive pressure sensor and 1-3 pore pressure gauge of 0.4m-0.6m, every group of sensor is on different depth;Often The roof dynamic monitor obtained by 12-23m one step 2 of arrangement is spaced, and sensor signal is adopted by radiofrequency launcher and data Set processor is connected;
Step 4: three-dimensional generation module is set up, including 180 ° of three-dimensional column ring curtains, high performance graphics cluster servers and six Group 3D projecting apparatus, towards six Channel Synchronous parallel image computings, covers various stope of coal mines tunnel situation map pictures, and gives in detail Portray;
Step 5: data collection processor is connected with three-dimensional generation module, by data collection processor, will be gathered To pressure value be converted into the data that three-dimensional generation module can identify, so as to be sent to three-dimensional generation module, three-dimensional generation Module is used to receive the data that data collection processor is sent, and generates various simulation stope of coal mines tunnels scene.
Preferably, graphic plotting module is installed in the data collection processor, for the monitoring data according to input, Generation shows the initial data of each monitoring point with time, the tense curve and three-dimensional effect curve of spatial variations, tense curve Or transfer data change with time situation, three-dimensional effect curve highlights the monitoring result of same time different measuring points with excavation The changing rule that face promotes.
Preferably, it is also equipped with the data collection processor
Computing module is returned, for carrying out recurrence calculating to measured data curve by different functions;
Forecast analysis module, for according to the comparative analysis with former measured curve, being predicted, judging top plate and tunnel knot The stability and amendment design parameter of structure, guiding construction;
Tunnel health discrimination module, for the size according to pressure in monitoring data or top plate abnormal sudden change point according to construction Managerial class provides solution;
Alarm module, for reaching the early warning ginseng of system setting when the pressure data and the sinking data of top plate that detect During number, alarm.
The invention has the advantages that:
Redundancy between sensor and complementary information are combined by rule, realize the prison to stope of coal mines roadway bump Safety alarm is surveyed and sent, improves the work efficiency of manager, strengthens the security of roadway construction, early warning positive effect, and can By three-dimensional generation module, tunnel situation is presented in face of staff so that staff can be on the spot in person The situation of change in tunnel is observed and experienced, further increases the effect of early warning.
Embodiment
In order to which objects and advantages of the present invention are more clearly understood, the present invention is carried out with reference to embodiments further Describe in detail.It should be appreciated that specific embodiment described herein is not intended to limit the present invention only to explain the present invention.
Method for early warning is pressed an embodiment of the present invention provides a kind of stope of coal mines roadway bump, is included the following steps:
Step 1: carrying out coal body sample collection to intending early warning stope drift active workings, carrying out uniaxial compression to coal body sample destroys examination Test, obtain the dynamic failure curve of coal body, calculate coal body dynamic failure stress exponent;
Step 2: installed in each need sensitive pressure sensor to be used, pore pressure gauge and roof dynamic monitor Radiofrequency launcher;
Step 3: drilling into country rock, multigroup sensitive pressure sensor obtained by step 2 and pore pressure gauge are poured Build in the borehole, the spacing between group and group is set to 30~50m according to stress distribution law, and every group is buried 3-5, spacing The 1-3 sensitive pressure sensor and 1-3 pore pressure gauge of 0.4m-0.6m, every group of sensor is on different depth;Often The roof dynamic monitor obtained by 12-23m one step 2 of arrangement is spaced, and sensor signal is adopted by radiofrequency launcher and data Set processor is connected;
Step 4: three-dimensional generation module is set up, including 180 ° of three-dimensional column ring curtains, high performance graphics cluster servers and six Group 3D projecting apparatus, towards six Channel Synchronous parallel image computings, covers various stope of coal mines tunnel situation map pictures, and gives in detail Portray;
Step 5: data collection processor is connected with three-dimensional generation module, by data collection processor, will be gathered To pressure value be converted into the data that three-dimensional generation module can identify, so as to be sent to three-dimensional generation module, three-dimensional generation Module is used to receive the data that data collection processor is sent, and generates various simulation stope of coal mines tunnels scene.
Graphic plotting module is installed in the data collection processor, for the monitoring data according to input, generate with Time, the tense curve and three-dimensional effect curve of spatial variations, tense curve show initial data or the transfer of each monitoring point Data change with time situation, and the monitoring result that three-dimensional effect curve highlights same time different measuring points is promoted with excavation face Changing rule.
Preferably, it is also equipped with the data collection processor
Computing module is returned, for carrying out recurrence calculating to measured data curve by different functions;
Forecast analysis module, for according to the comparative analysis with former measured curve, being predicted, judging top plate and tunnel knot The stability and amendment design parameter of structure, guiding construction;
Tunnel health discrimination module, for the size according to pressure in monitoring data or top plate abnormal sudden change point according to construction Managerial class provides solution;
Alarm module, for reaching the early warning ginseng of system setting when the pressure data and the sinking data of top plate that detect During number, alarm.
The above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, without departing from the principle of the present invention, some improvements and modifications can also be made, these improvements and modifications also should It is considered as protection scope of the present invention.

Claims (3)

1. press method for early warning, it is characterised in that include the following steps stope of coal mines roadway bump:
Step 1: carrying out coal body sample collection to intending early warning stope drift active workings, uniaxial compression failure test is carried out to coal body sample, is obtained Coal body dynamic failure curve, calculate coal body dynamic failure stress exponent;
Step 2: radio frequency is installed in each need sensitive pressure sensor to be used, pore pressure gauge and roof dynamic monitor Transmitter;
Step 3: drilling into country rock, multigroup sensitive pressure sensor obtained by step 2 and pore pressure gauge are cast in In drilling, the spacing between group and group is set to 30~50m according to stress distribution law, and every group is buried 3-5, spacing 0.4m- The 1-3 sensitive pressure sensor and 1-3 pore pressure gauge of 0.6m, every group of sensor is on different depth;At interval of 12-23m arranges the roof dynamic monitor obtained by a step 2, and sensor signal is passed through at radiofrequency launcher and data acquisition Reason device is connected, i.e., the signal collected sensor is sent to data collection processor by radiofrequency launcher;
Step 4: three-dimensional generation module is set up, including 180 ° of three-dimensional column ring curtain, high performance graphics cluster server and six groups of 3D Projecting apparatus, towards six Channel Synchronous parallel image computings, covers various stope of coal mines tunnel situation map pictures, and carve in detail Draw;
Step 5: data collection processor is connected with three-dimensional generation module, by data collection processor, by what is collected Pressure value is converted into the data that three-dimensional generation module can identify, so that three-dimensional generation module is sent to, three-dimensional generation module The data sent for receiving data collection processor, and generate various simulation stope of coal mines tunnels scene;
There are forecast analysis module, tunnel health discrimination module and alarm module in the data collection processor;
Step 6, the forecast analysis module, for according to the comparative analysis with former measured curve, being predicted, judging top plate With the stability and amendment design parameter of tunnel structure, guiding construction;
Step 7, the tunnel health discrimination module, for the size according to pressure in monitoring data or top plate abnormal sudden change point Solution is provided according to construction management grade;
Step 8, the alarm module, for being answered when what the pressure data, the sinking data of top plate and the monitoring that detect obtained Force data be calculated in real time coal body impact failure stress exponent reach system setting early-warning parameters when, alarm.
2. press method for early warning, it is characterised in that the data acquisition stope of coal mines roadway bump according to claim 1 Graphic plotting module is installed in processor, for the monitoring data according to input, is generated bent with the tense of time, spatial variations Line and three-dimensional effect curve, tense curve show that the initial data of each monitoring point or transfer data change with time situation, Three-dimensional effect curve highlights the changing rule that the monitoring result of same time different measuring points is promoted with excavation face.
3. press method for early warning, it is characterised in that the data acquisition stope of coal mines roadway bump according to claim 1 It is also equipped with returning computing module in processor, for carrying out recurrence calculating to measured data curve by different functions.
CN201610125561.3A 2016-02-28 2016-02-28 Press method for early warning stope of coal mines roadway bump Active CN105626151B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610125561.3A CN105626151B (en) 2016-02-28 2016-02-28 Press method for early warning stope of coal mines roadway bump

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610125561.3A CN105626151B (en) 2016-02-28 2016-02-28 Press method for early warning stope of coal mines roadway bump

Publications (2)

Publication Number Publication Date
CN105626151A CN105626151A (en) 2016-06-01
CN105626151B true CN105626151B (en) 2018-04-24

Family

ID=56041441

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610125561.3A Active CN105626151B (en) 2016-02-28 2016-02-28 Press method for early warning stope of coal mines roadway bump

Country Status (1)

Country Link
CN (1) CN105626151B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106202633B (en) * 2016-06-24 2020-03-10 华东交通大学 Rock burst prediction system and measurement method based on STM32F103 microprocessor
CN106285782B (en) * 2016-08-30 2018-11-13 中国矿业大学(北京) A kind of bump method for early warning under complicated geological environmental effect and system
CN106640194B (en) * 2016-09-27 2019-02-22 西安科技大学 A kind of compound coal rock gas dynamic disaster method for early warning
CN106437853B (en) * 2016-09-27 2019-02-15 西安科技大学 A kind of coal petrography bump dynamic disaster method for early warning
CN109359393B (en) * 2018-10-22 2023-04-25 山西焦煤集团有限责任公司 Mine four-quantity reasonable mining period determining method under uncertain information condition
CN110630330B (en) * 2019-09-23 2021-01-05 辽宁工程技术大学 Rock burst classification and judgment method based on energy release main body
CN110967466B (en) * 2019-11-13 2022-05-17 鞍钢集团矿业有限公司 Method for evaluating stability of goaf of stope
CN112483184A (en) * 2020-12-18 2021-03-12 山东科技大学 Prediction method for rock burst induced by working face lateral hard top plate

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1619340A (en) * 2004-11-19 2005-05-25 中国矿业大学 Real time monitoring forecasting device of coal rock dynamic disaster and forecasting method
CN102392685A (en) * 2011-09-12 2012-03-28 山东科技大学 Dense roadway group rock burst hazard prediction method
CN102644482A (en) * 2012-05-18 2012-08-22 河南大有能源股份有限公司 Rock burst predicting and warning method
CN203296821U (en) * 2013-06-21 2013-11-20 北京微赛思技术有限公司 Mine disaster multi-factor micro-seismic monitoring system
CN104074547A (en) * 2014-06-25 2014-10-01 天地科技股份有限公司 Coal mine mining roadway rock burst early warning method
CN104132761A (en) * 2014-08-04 2014-11-05 中国矿业大学 Multipoint coal and rock mass stress real-time monitoring device and method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1619340A (en) * 2004-11-19 2005-05-25 中国矿业大学 Real time monitoring forecasting device of coal rock dynamic disaster and forecasting method
CN102392685A (en) * 2011-09-12 2012-03-28 山东科技大学 Dense roadway group rock burst hazard prediction method
CN102644482A (en) * 2012-05-18 2012-08-22 河南大有能源股份有限公司 Rock burst predicting and warning method
CN203296821U (en) * 2013-06-21 2013-11-20 北京微赛思技术有限公司 Mine disaster multi-factor micro-seismic monitoring system
CN104074547A (en) * 2014-06-25 2014-10-01 天地科技股份有限公司 Coal mine mining roadway rock burst early warning method
CN104132761A (en) * 2014-08-04 2014-11-05 中国矿业大学 Multipoint coal and rock mass stress real-time monitoring device and method

Also Published As

Publication number Publication date
CN105626151A (en) 2016-06-01

Similar Documents

Publication Publication Date Title
CN105626151B (en) Press method for early warning stope of coal mines roadway bump
CN105179018B (en) A kind of coal mine rock burst detection method
CN111648826B (en) Coal mine rock burst prediction early warning system and method
CN106779231B (en) A kind of coal mine gob hurricane disaster method for early warning based on goaf pressure monitoring
CN103233777B (en) A kind of roof safety ore pressure monitor method and device
CN106089304B (en) One kind controlling early warning communication system based on stratum construction multifunctional electric
CN104653226B (en) A kind of division methods of the coal mine rock burst danger zone based on stress gradient
CN108412547B (en) Pressure-bearing fault activation water inrush multi-field information collaborative monitoring impending forecasting method and monitoring system
CN105741029B (en) A kind of danger of burst evaluation method based on cumulative stress coefficient of concentration
CN105257339A (en) Multi-parameter integrated monitoring and early-warning method for excavation working face
CN103104294B (en) Rock burst prediction method
CN202300529U (en) Slight shock monitoring sensor arrangement structure in deeply buried long tunnel boring machine (TBM) tunneling process
CN105781620B (en) Dynamic disaster method for early warning based on roadway surrounding rock rupture via hole monitoring
CN102506993A (en) Coal mine downhole country rock slight shock detection method
CN106370306B (en) Method for identifying rock burst disaster through infrared thermal image early warning
CN103267977B (en) Underground engineering wall rock disaster whole time interval induced polarization monitoring method
CN103726851B (en) Excavation method capable of lowering rockburst risk of deep tunnel in process of passing through fault area
CN110307038B (en) Full-digital comprehensive monitoring and early warning system and method for mine power disasters
CN105179017B (en) Displacement strains anchor pole Integrated Early Warning System
CN104296944A (en) Testing method for air leakage of goaf under mine in earth surface direction of shallow coal seam coal mine
CN104832163A (en) Method for monitoring rock burst dangerousness in coal underground mining process
CN101963071A (en) Equivalent drilling cuttings weight continuous monitoring device and method
CN111350545A (en) Mine dynamic disaster system and method based on multi-dimensional monitoring
CN104157099A (en) Railway disaster prevention monitoring system and method based on Internet of Things
CN105045969B (en) A kind of crustal stress type bump danger multiple information coupling prediction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant