CN106638645A - Layering prefabricated structure and building method of basement bottom board water collection pit reinforcing mesh - Google Patents

Layering prefabricated structure and building method of basement bottom board water collection pit reinforcing mesh Download PDF

Info

Publication number
CN106638645A
CN106638645A CN201611246113.5A CN201611246113A CN106638645A CN 106638645 A CN106638645 A CN 106638645A CN 201611246113 A CN201611246113 A CN 201611246113A CN 106638645 A CN106638645 A CN 106638645A
Authority
CN
China
Prior art keywords
catch pit
bar
reinforcement
net
mat reinforcement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611246113.5A
Other languages
Chinese (zh)
Other versions
CN106638645B (en
Inventor
段博
黄轶
汪小林
朱浩
徐鹏程
朱利君
韩旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction No 4 Group Co Ltd
Original Assignee
Shanghai Construction No 4 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction No 4 Group Co Ltd filed Critical Shanghai Construction No 4 Group Co Ltd
Priority to CN201611246113.5A priority Critical patent/CN106638645B/en
Publication of CN106638645A publication Critical patent/CN106638645A/en
Application granted granted Critical
Publication of CN106638645B publication Critical patent/CN106638645B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/22Lining sumps in trenches or other foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water

Abstract

The invention discloses a layering prefabricated structure and building method of a basement bottom board water collection pit reinforcing mesh. Water collection pit board bottom and board surface reinforcing meshes are prefabricated in a project field or a processing plant in advance in a layering manner; and the water collection pit board bottom reinforcing mesh is firstly hoisted and arranged on a cushion layer or a brick moulding bed of a water collection pit through a tower crane, then the water collection pit board surface reinforcing mesh is hoisted and arranged on the water collection pit board bottom reinforcing mesh, the reinforcing meshes are spliced into a whole in the pit, a prefabricated reinforcing mesh is manually connected with peripheral bottom board steel bars, and finally a concrete pouring construction process is achieved. Due to separated prefabrication, a large amount of field steel bar binding work in the water collection pit can be effectively reduced, the construction efficiency can be improved, and the construction period can be shortened; and by means of advance prefabrication, the steel bar locating and connecting precision can be improved easily, and therefore the problems that steel bar binding work conditions in the water collection pit are poor, steel bar locating is hard, and construction is complex are solved, and the problem that the hoisting mass is too large due to the fact that the prefabricated water collection pit board bottom reinforcing mesh and the water collection pit board surface reinforcing mesh are integrally prefabricated is avoided.

Description

Basement bottom board catch pit bar-mat reinforcement is layered precast construction and method of construction
Technical field
The invention belongs to building industry construction field, more particularly to basement bottom board catch pit technical field of construction.
Background technology
With continuing to bring out for current executive information systems, the waterproof problem of basement is also increasingly projected.Underground A kind of method of the common waterproof in room is exactly that catch pit is arranged on base plate, and water is concentrated in the dell i.e. catch pit of base plate, Then unification water pump discharges in water.
Existing basement bottom board catch pit construction, its reinforcing bar includes plate bottom and plate face two large divisions.Traditional construction technology For:1) good hole is first dug, and carries out the bed course or brick loose tool of catch pit;2) reinforcing bar will be processed to move into hole by root, by root positioning And connect reinforcing bar, form catch pit bar-mat reinforcement;3) casting concrete.
This construction technology is suffered from the drawback that:1) construction period is long, for Super High or high level, base is formed as early as possible Base plate is for deep pit monitor and stablizes particularly important in hole;2) position by root reinforcing bar and dock, the amount of labour is big, low construction efficiency;3) Reinforcing bar binding work condition is poor in catch pit, and reinforcing bar positioning is difficult, it is loaded down with trivial details to construct.
Therefore, how providing one kind can avoid assembling reinforcement, efficiency of construction height, short time limit, guarantee reinforcing bar in hole from connecting Connect the basement bottom board catch pit bar-mat reinforcement layering precast construction and method of construction of quality, it has also become construction circle needs further The technical problem of improvement and optimization.
The content of the invention
In view of the foregoing defects the prior art has, it is an object of the invention to provide a kind of basement bottom board catch pit steel Muscle net is layered precast construction and method of construction, solve existing basement bottom board catch pit reinforcing bar by root colligation hardly possible, low construction efficiency, Long in time limit, quality of connection is difficult to the technical problem for ensureing.
To solve above-mentioned technical problem, the present invention provides following technical scheme:
A kind of basement bottom board catch pit bar-mat reinforcement is layered precast construction, for the catch pit on base plate of constructing, including: Job site or processing factory shift to an earlier date prefabricated catch pit reinforcement net and bottom is fixed with the catch pit plate of Steel bar rack Face bar-mat reinforcement, the catch pit reinforcement net is in peviform structure, and the catch pit reinforcement net laying is located at and plans to build catch pit Bed course or brick loose tool on, the catch pit plate face bar-mat reinforcement is set up in catch pit reinforcement net by the Steel bar rack Top, the catch pit reinforcement net connects with catch pit peripheral floor reinforcement by root is corresponding, the catch pit plate face Bar-mat reinforcement connects with catch pit peripheral floor plate face reinforcing bar by root is corresponding.
Preferably, in above-mentioned basement bottom board catch pit bar-mat reinforcement layering precast construction, the catch pit plate bottom steel Muscle net includes horizontal bottom bar-mat reinforcement and the sidepiece bar-mat reinforcement positioned at horizontal bottom bar-mat reinforcement surrounding, and the sidepiece bar-mat reinforcement is oblique Upper setting, the reinforcing bar in the sidepiece bar-mat reinforcement obliquely is corresponding with catch pit peripheral floor reinforcement to intersect anchor connection.
Preferably, in above-mentioned basement bottom board catch pit bar-mat reinforcement layering precast construction, the catch pit plate face steel Muscle net includes hole bottom horizontal mesh reinforcement, crater wall vertical reinforcement net and hole top horizontal mesh reinforcement, and the crater wall vertical reinforcement net sets The surrounding of hole bottom horizontal mesh reinforcement is placed in, hole top horizontal mesh reinforcement is in " three-back-shaped ", and the interior of horizontal mesh reinforcement is pushed up in hole Circle matches and is fixedly connected with the upper port of the crater wall vertical reinforcement net, reinforcing bar at the outer ring of hole top horizontal mesh reinforcement Connect by root is corresponding with catch pit peripheral floor plate face reinforcing bar.
Preferably, in above-mentioned basement bottom board catch pit bar-mat reinforcement layering precast construction, the horizontal bottom reinforcing bar Net is rectangular, and the Steel bar rack includes rectangular top shaped steel steel ring and four vertical corner shaped steel, the rectangular top shaped steel The shapes and sizes of steel ring are corresponding with the horizontal bottom bar-mat reinforcement of the catch pit reinforcement net, and described four vertical Corner shaped steel is fixedly installed on four angles lower section of the rectangular top shaped steel steel ring, the lower end of described four vertical corner shaped steel It is arranged at four Angle Positions of the horizontal bottom bar-mat reinforcement of the catch pit reinforcement net, the rectangular top shaped steel steel Circle is supported in the lower surface of the hole top horizontal mesh reinforcement of the catch pit plate face bar-mat reinforcement.
Preferably, in above-mentioned basement bottom board catch pit bar-mat reinforcement layering precast construction, the Steel bar rack is also wrapped Four vertical middle part shaped steel are included, the vertical middle part shaped steel is respectively arranged in the four edges of the rectangular top shaped steel steel ring Portion lower section.
Preferably, in above-mentioned basement bottom board catch pit bar-mat reinforcement layering precast construction, the vertical middle part shaped steel per root Lower end be connected on the rectangular top shaped steel steel ring with the two ends of side by two diagonal braces.
Preferably, in above-mentioned basement bottom board catch pit bar-mat reinforcement layering precast construction, also hang including some top of the plate Circle, the top of the plate is hung circle and is fixed on the vertical corner shaped steel by connecting rod, or is fixed on by connecting rod described perpendicular To on the shaped steel of middle part.
Preferably, in above-mentioned basement bottom board catch pit bar-mat reinforcement layering precast construction, the sidepiece bar-mat reinforcement A plate bottom is equipped with four angles and hangs circle.
Preferably, in above-mentioned basement bottom board catch pit bar-mat reinforcement layering precast construction, the catch pit plate bottom steel Muscle net is enclosed by four groups of bracing frames and constituted by reinforcing bar moulding bed processing and fabricating, the reinforcing bar moulding bed, and every group of bracing frame is included at least Three pairs of vertical spaced right angle trigonometry shaped steel frames and a pair of parallel bar steel, each right angle trigonometry shaped steel frame is by hypotenuse Shaped steel, level right angle side shaped steel and vertical right-angle side shaped steel are surrounded, and the hypotenuse shaped steel of the right angled triangle frame is inner Arrange, each level right angle side shaped steel in every group of bracing frame is connected by a pair of parallel bar steel.
The invention also discloses a kind of basement bottom board catch pit bar-mat reinforcement is layered prefabricated method of construction, using as described above Basement bottom board catch pit bar-mat reinforcement layering precast construction, comprise the steps:
Step one, the design of catch pit bar-mat reinforcement;
Step 2, the catch pit prefabricated processing of precast reinforced net, the catch pit bar-mat reinforcement include catch pit reinforcement net, And bottom is fixed with the catch pit plate face bar-mat reinforcement of Steel bar rack;
Step 3, the precast reinforced net layering lifting of catch pit and assembly:Catch pit reinforcement net is first lifted, then is lifted down Portion is fixed with the catch pit plate face bar-mat reinforcement of Steel bar rack so that catch pit reinforcement net is with catch pit plate face bar-mat reinforcement by under It is supreme to be set in turn in catch pit;
Step 4, catch pit reinforcement net is connected with catch pit peripheral floor reinforcement by root is corresponding, will be catchmented Hole plate face bar-mat reinforcement connects with catch pit peripheral floor plate face reinforcing bar by root is corresponding;
Step 5;Pour the underplate concrete with catch pit.
Preferably, be layered in prefabricated method of construction in above-mentioned basement bottom board catch pit bar-mat reinforcement, the step 3 it Before, control line is drawn in four corners of the bed course or brick loose tool for planning to build catch pit, catch pit plate bottom is utilized in hoisting process The angular alignment bed course upper control line of bottom four of bar-mat reinforcement, completes catch pit reinforcement net and accurately enters hole positioning work.
From techniques disclosed above scheme, compared with prior art, beneficial effects of the present invention are as follows:
The present invention provides basement bottom board catch pit bar-mat reinforcement layering precast construction and its method of construction, is divided by layering Open prefabricated catch pit reinforcement net and bottom is fixed with the catch pit plate face bar-mat reinforcement of Steel bar rack, can effectively reduce collection A large amount of live reinforcing bar binding work amount in puddle, improves efficiency of construction, shortens the construction period, and is prefabricated with advance beneficial to carrying Reinforcing bar positioning and connection precision in basement bottom board catch pit bar-mat reinforcement and catch pit plate face bar-mat reinforcement are risen, catch pit is solved Interior reinforcing bar binding work condition is poor, and reinforcing bar positioning is difficult, loaded down with trivial details problem of constructing.For Super High or high level, can be as early as possible Form base plate of foundation pit to may insure deep pit monitor and stablize.Additionally, by layering i.e. separate prefabricated catch pit reinforcement net with And bottom is fixed with the catch pit plate face bar-mat reinforcement of Steel bar rack, it is to avoid prefabricated catch pit reinforcement net and catch pit plate The excessive problem of the integral prefabricated together caused lifting quality of face bar-mat reinforcement.
Description of the drawings
Fig. 1 is layered the structural representation of precast construction for the basement bottom board catch pit bar-mat reinforcement of one embodiment of the invention.
Fig. 2 is the structural representation of catch pit reinforcement net and reinforcing bar moulding bed in one embodiment of the invention.
Fig. 3 is the structural representation (not shown top of the plate hangs circle) of catch pit plate face bar-mat reinforcement in one embodiment of the invention.
Fig. 4 is schematic perspective view when catch pit reinforcement net is lifted in one embodiment of the invention.
Fig. 5 is structural representation when catch pit reinforcement net is lifted in one embodiment of the invention.
Fig. 6 is schematic perspective view when catch pit plate face bar-mat reinforcement is lifted in one embodiment of the invention.
Fig. 7 is structural representation when catch pit plate face bar-mat reinforcement is lifted in one embodiment of the invention.
Fig. 8 is that catch pit reinforcement net is corresponding by root with catch pit peripheral floor reinforcement in one embodiment of the invention Connection and catch pit plate face bar-mat reinforcement and catch pit peripheral floor plate face reinforcing bar by root is corresponding connect after structural representation.
In figure:The precast reinforced net of 100- catch pits, 1- catch pit reinforcement nets, 11- horizontal bottom bar-mat reinforcements, 12- sides Portion's bar-mat reinforcement, 13- plates bottom hang circle, 2- Steel bar racks, 21- rectangular top shaped steel steel rings, the vertical corner shaped steel of 22-, 23- it is vertical in Portion's shaped steel, 24- diagonal braces, 3- catch pit plate face bar-mat reinforcements, 31- holes bottom horizontal mesh reinforcement, 32- crater wall vertical reinforcement nets, 33- holes top Horizontal mesh reinforcement, 35- top of the plate hang circle, 4- bed courses or brick loose tool, 5- catch pit peripheral floor reinforcements, 6- catch pit peripheries Base plate plate face reinforcing bar, 71- right angle trigonometry shaped steel frames, 72- bar steels, 8- hoist cables.
Specific embodiment
The present invention is described in further detail below in conjunction with the drawings and specific embodiments.According to description below and right Claim, advantages and features of the invention will become apparent from.Hereinafter accompanying drawing will be combined by cited embodiment, describe this in detail Bright technology contents and feature.Need to illustrate in addition, accompanying drawing is compared in the form of simplifying very much and accurately using non- Example, only to purpose that is convenient, lucidly aiding in illustrating the embodiment of the present invention.For sake of convenience, described below " on ", The upper and lower direction of D score and accompanying drawing is consistent, but this can not become the restriction of technical solution of the present invention.
Embodiment one
Fig. 1 to Fig. 8 is referred to, present embodiment discloses a kind of basement bottom board catch pit bar-mat reinforcement layering precast construction, For the catch pit on base plate of constructing, including:At the construction field (site) or processing factory shift to an earlier date prefabricated catch pit reinforcement net 1 with And bottom is fixed with the catch pit plate face bar-mat reinforcement 3 of Steel bar rack 2, catch pit reinforcement net 1 and bottom are fixed with reinforcing bar The catch pit plate face bar-mat reinforcement 3 of support 2 is collectively referred to as the precast reinforced net 100 of catch pit.The catch pit reinforcement net 1 is in peviform Structure, the catch pit reinforcement net 1 is layed on the bed course or brick loose tool 4 for planning to build catch pit, the catch pit plate face Bar-mat reinforcement 3 is set up in the top of catch pit reinforcement net 1, the catch pit reinforcement net 1 and collection by the Steel bar rack 2 Puddle peripheral floor reinforcement 5 is by root correspondence connection, the catch pit plate face bar-mat reinforcement 3 and catch pit peripheral floor plate face steel Muscle 6 connects by root correspondence.
The present invention provides basement bottom board catch pit bar-mat reinforcement layering precast construction and its method of construction, is divided by layering Open prefabricated catch pit reinforcement net 1 and bottom is fixed with the catch pit plate face bar-mat reinforcement 3 of Steel bar rack 2, can effectively subtract A large amount of live reinforcing bar binding work in few catch pit, improves efficiency of construction, shortens the construction period, can as early as possible form foundation ditch bottom Plate, it can be ensured that deep pit monitor and stable, for Super High or high level show important especially, and is prefabricated with advance beneficial to lifting underground Reinforcing bar positioning and connection precision in room base plate catch pit bar-mat reinforcement and catch pit plate face bar-mat reinforcement 3, so as to solve catch pit Interior reinforcing bar binding work condition is poor, and reinforcing bar positioning is difficult, loaded down with trivial details problem of constructing.Additionally, separating prefabricated catch pit by layering Reinforcement net 1 and bottom are fixed with the catch pit plate face bar-mat reinforcement 3 of Steel bar rack 2, it is to avoid prefabricated catch pit plate bottom steel The excessive problem of muscle net 1 and the integral prefabricated together caused lifting quality of catch pit plate face bar-mat reinforcement 3, improves construction Security.
Preferably, in the basement bottom board catch pit bar-mat reinforcement layering precast construction of the present embodiment, the catch pit plate Bottom bar-mat reinforcement 1 includes horizontal bottom bar-mat reinforcement 11 and the sidepiece bar-mat reinforcement 12 positioned at the surrounding of horizontal bottom bar-mat reinforcement 11, That is, the catch pit reinforcement net 1 is obliquely bent to form its surrounding by one piece of horizontal mesh reinforcement, the sidepiece steel Muscle net 12 is arranged obliquely, and the reinforcing bar in the sidepiece bar-mat reinforcement 12 obliquely passes through with catch pit peripheral floor reinforcement 5 Artificial correspondence intersects anchor connection.For the ease of lifting catch pit reinforcement net 1, on four angles of the sidepiece bar-mat reinforcement 12 It is equipped with a plate bottom and hangs circle 13.
Preferably, in the basement bottom board catch pit bar-mat reinforcement layering precast construction of the present embodiment, the catch pit plate Face bar-mat reinforcement 3 includes hole bottom horizontal mesh reinforcement 31, crater wall vertical reinforcement net 32 and hole top horizontal mesh reinforcement 33, and the crater wall is erected The surrounding of hole bottom horizontal mesh reinforcement 31 is arranged to bar-mat reinforcement 32, hole top horizontal mesh reinforcement 33 is in " three-back-shaped ", is cheated The inner ring of top horizontal mesh reinforcement 33 matches and is fixedly connected with the upper port of the crater wall vertical reinforcement net 32, hole top water Reinforcing bar connects with catch pit peripheral floor plate face reinforcing bar 6 by root is corresponding at the outer ring of flat bar-mat reinforcement 33.When connecting by root correspondence, can With by welding procedure or in the form of straight screw connection.For the reinforcing bar more than 16mm can directly adopt straight thread set Cylinder mode connects, and in the case where bonding strength is guaranteed, improves joint efficiency.
Preferably, in catch pit plate face bar-mat reinforcement 3, hole bottom horizontal mesh reinforcement 31 and the horizontal bottom bar-mat reinforcement 11 is rectangular, and the Steel bar rack 2 includes rectangular top shaped steel steel ring 21 and four vertical corner shaped steel 22, the rectangular top The shapes and sizes of portion shaped steel steel ring 21 are corresponding with the horizontal bottom bar-mat reinforcement 11 of the catch pit reinforcement net 1, Described four vertical corner shaped steel 22 are fixedly installed on four angles lower section of the rectangular top shaped steel steel ring 21, and described four are erected Four angles position of the horizontal bottom bar-mat reinforcement 11 of the catch pit reinforcement net 1 is arranged to the lower end of corner shaped steel 22 Put, the rectangular top shaped steel steel ring 21 is supported in the following table of the hole top horizontal mesh reinforcement 33 of the catch pit plate face bar-mat reinforcement 3 Face.
Preferably, the intensity in order to improve Steel bar rack 2, realizes the support more stable to catch pit plate face bar-mat reinforcement 3, The Steel bar rack 2 also includes four vertical middle part shaped steel 23, and the vertical middle part shaped steel 23 is respectively arranged at the rectangular top The middle part lower section of the four edges of portion shaped steel steel ring 21.Per root, the lower end of vertical middle part shaped steel 23 is connected respectively by two diagonal braces 24 With the two ends of side on the rectangular top shaped steel steel ring 21.
Preferably, for the ease of lifting catch pit plate face bar-mat reinforcement 3, in the present embodiment, also hanging including some top of the plate Circle 35, the top of the plate is hung circle 35 and is fixed on the vertical corner shaped steel 22 by connecting rod, or is fixed on by connecting rod On the vertical middle part shaped steel 23.
Preferably, the making precision and make efficiency in order to improve catch pit reinforcement net 1, in the underground of the present embodiment In the base plate catch pit bar-mat reinforcement layering precast construction of room, the catch pit reinforcement net 1 is by reinforcing bar moulding bed processing and fabricating, institute State reinforcing bar moulding bed and enclosed by four groups of bracing frames and constitute, every group of bracing frame includes at least three pairs vertical spaced right angled triangles Steelframe 71 and a pair of parallel bar steel 72, each right angle trigonometry shaped steel frame 71 by hypotenuse shaped steel, level right angle side shaped steel with And vertical right-angle side shaped steel is surrounded, the inner setting of the hypotenuse shaped steel of the right angled triangle frame is each in every group of bracing frame Individual level right angle side shaped steel is connected by a pair of parallel bar steel 72.Wherein hypotenuse shaped steel and catch pit reinforcement net 1 Sidepiece bar-mat reinforcement 12 slope it is identical, for the sidepiece bar-mat reinforcement 12 of gentle support catch pit reinforcement net 1, realize catchmenting Hole reinforcement net 1 is accurately positioned with horizontal bottom bar-mat reinforcement 11, and catch pit reinforcement net 1 is quick prefabricated.
Embodiment two
Please continue to refer to Fig. 1 to Fig. 8, it is prefabricated that the present embodiment also discloses a kind of basement bottom board catch pit bar-mat reinforcement layering Method of construction, using the basement bottom board catch pit bar-mat reinforcement layering precast construction as described in embodiment one, comprises the steps:
Step one, the design of catch pit bar-mat reinforcement.Catch pit bar-mat reinforcement is designed, including determines that catch pit and hole side reinforcing bar are prefabricated Scope, (i.e. catch pit bar-mat reinforcement, including catch pit reinforcement net 1 and bottom are fixed with Steel bar rack 2 to precast reinforced net Catch pit plate face bar-mat reinforcement 3) blanking with arrangement, Steel bar rack 2 design with arrangement, bar-mat reinforcement suspension hook design with checking computations, reinforcing bar Net lifting checking computations etc..Wherein need to consider reinforcing bar colligation difficulty in tower crane Lifting Capacity, catch pit, entirety bar-mat reinforcement is pre- in hole System, precast reinforced net and periphery bar connecting, bar-mat reinforcement moulding bed make the aspects such as complexity and consider precast reinforced net Scope;Precast reinforced material off the net includes precast reinforced Cutting calculation, reinforcing bar spatial arrangement etc. with arrangement, and sets up precast reinforced net Threedimensional model etc.;Meet stablizing and force request for precast reinforced net itself, carry out the design of Steel bar rack 2 and arrangement;Additionally, To meet bar-mat reinforcement integral hoisting demand, need to shift to an earlier date and additionally arrange suspension hook in the Deepen Design stage, carry out bar-mat reinforcement lifting checking computations, To meet bar-mat reinforcement lifting rigidity and strength demand, additional bar etc. need to be additionally arranged.
Step 2, the catch pit prefabricated processing of precast reinforced net 100, the catch pit bar-mat reinforcement includes catch pit reinforcement Net 1 and bottom are fixed with the catch pit plate face bar-mat reinforcement 3 of Steel bar rack 2.Bar-mat reinforcement processing include bar-mat reinforcement moulding bed design and Make, bar-mat reinforcement moulding process, bar-mat reinforcement precision controlling etc..Wherein to meet the prefabricated demand of catch pit bar-mat reinforcement, need to be in project Scene or processing factory design and make a bar-mat reinforcement high accuracy and make moulding bed, and moulding bed profile and size need to be according to precast reinforced nets Profile and size determine.First carry out setting up bar-mat reinforcement moulding bed at project scene or processing factory, carry out the prefabricated of reinforcement net Processing, such as Fig. 2;Steel bar rack 2 is set up, the prefabricated processing of catch pit plate face bar-mat reinforcement 3 is carried out, as shown in Figure 3.Additionally, in steel In muscle net process, the machining accuracy of moulding bed, the blanking of single steel bar and installation accuracy etc. need to be strictly controlled.
Step 3, the precast reinforced layering of net 100 lifting of catch pit and assembly:Catch pit reinforcement net 1 is first lifted, then is hung The portion of loading is fixed with the catch pit plate face bar-mat reinforcement 3 of Steel bar rack 2 so that catch pit reinforcement net 1 and catch pit plate face steel Muscle net 3 is set in turn in from the bottom to top in catch pit.Specifically, the precast reinforced layering of net 100 lifting of catch pit and assembly, including Bar-mat reinforcement Hoisting Program determine, catch pit reinforcement net 1 be accurately positioned in catch pit, catch pit reinforcement net 1 with collection Puddle plate face bar-mat reinforcement 3 is assembled.Wherein need to determine the size and weight of catch pit baseplate reinforcing bar net 1 according to tower crane Lifting Capacity in advance Amount, is carried out with taking into account Lifting Capacity and as far as possible prefabricated principle;Precast reinforced net layering lifting special scheme is formulated, and formulates phase Emergency measure answered etc., first lifts reinforcement net, as shown in Figure 4,5, catch pit plate face bar-mat reinforcement 3 and lower rebar is lifted afterwards Support 2, as shown in Figure 6,7.
Preferably, be layered in prefabricated method of construction in above-mentioned basement bottom board catch pit bar-mat reinforcement, the step 3 it Before, control line is drawn in four corners of the bed course or brick loose tool 4 for planning to build catch pit, catch pit plate bottom is utilized in hoisting process The angular alignment bed course upper control line of bottom four of bar-mat reinforcement 1, completes catch pit reinforcement net 1 and accurately enters hole positioning work. That is, the line drawing control line in the corner of catch pit inner cushion layer four or four sides, the corner steel of reinforcement net four in hoisting process Muscle is directed at bed course upper control line, completes reinforcement net and accurately enters hole positioning work.Using tower crane by catch pit plate face bar-mat reinforcement 3 Enter hole with the integral hoisting of its underpart Steel bar rack 2, be accurately positioned using lower rebar support 2.
Step 4, catch pit reinforcement net 1 is connected with catch pit peripheral floor reinforcement 5 by root is corresponding, will be collected Puddle plate face bar-mat reinforcement 3 and catch pit peripheral floor plate face reinforcing bar 6 are by the corresponding connection of root.Precast reinforced net and peripheral floor reinforcing bar Connection includes being attached the side of precast reinforced net four with peripheral floor reinforcing bar by root using welding or sleeve connection mode, can profit Bar connecting is carried out with welding procedure or the reinforcing bar more than 16mm is directly connected using straight screw sleeve, as shown in Figure 8.
Step 5;Pour the underplate concrete with catch pit.
The basement bottom board catch pit bar-mat reinforcement of the present invention is layered prefabricated method of construction, by project scene or processing factory Prefabricated catch pit plate bottom and plate face bar-mat reinforcement are layered in advance, using tower crane by catch pit reinforcement net 1 and catch pit plate face steel Muscle net is lifted respectively into hole, assembled integral in hole, is positioned on the bed course of catch pit or brick loose tool, artificial connection pre-manufactured steel Muscle net and peripheral floor reinforcing bar, the construction technology of final casting concrete, because layering separates prefabricated catch pit reinforcement Net 1 and bottom are fixed with the catch pit plate face bar-mat reinforcement 3 of Steel bar rack 2, can effectively reduce a large amount of scenes in catch pit Reinforcing bar binding work, improves efficiency of construction, shortens the construction period, can as early as possible form base plate of foundation pit, it can be ensured that deep pit monitor And it is stable, and be prefabricated with advance beneficial to reinforcing bar positioning in lifting catch pit reinforcement net 1 and catch pit plate face bar-mat reinforcement 3 And connection precision, poor so as to solve reinforcing bar binding work condition in catch pit, reinforcing bar positioning is difficult, loaded down with trivial details problem of constructing.This Outward, prefabricated catch pit reinforcement net 1 is separated by layering and bottom is fixed with the catch pit plate face reinforcing bar of Steel bar rack 2 Net 3, it is to avoid prefabricated catch pit reinforcement net 1 and catch pit plate face bar-mat reinforcement 3 is integral prefabricated together caused hangs The excessive problem of packing quality, improves the security of construction.
Foregoing description is only the description to present pre-ferred embodiments, not to any restriction of the scope of the invention, this Any change, modification that the those of ordinary skill in bright field does according to the disclosure above content, belong to the protection of claims Scope.

Claims (10)

1. a kind of basement bottom board catch pit bar-mat reinforcement is layered precast construction, and for the catch pit on base plate of constructing, its feature exists In, including:At the construction field (site) or processing factory shifts to an earlier date prefabricated catch pit reinforcement net and bottom is fixed with Steel bar rack Catch pit plate face bar-mat reinforcement, the catch pit reinforcement net is in peviform structure, and the catch pit reinforcement net laying is located at Plan to build on the bed course or brick loose tool of catch pit, the catch pit plate face bar-mat reinforcement is set up in catch pit by the Steel bar rack Reinforcement is square on the net, and the catch pit reinforcement net connects with catch pit peripheral floor reinforcement by root is corresponding, described Catch pit plate face bar-mat reinforcement connects with catch pit peripheral floor plate face reinforcing bar by root is corresponding.
2. basement bottom board catch pit bar-mat reinforcement as claimed in claim 1 is layered precast construction, it is characterised in that described to catchment Hole reinforcement net includes horizontal bottom bar-mat reinforcement and is located at the sidepiece bar-mat reinforcement of horizontal bottom bar-mat reinforcement surrounding, the sidepiece steel Muscle net is arranged obliquely, the crossed anchor corresponding with catch pit peripheral floor reinforcement of the reinforcing bar in the sidepiece bar-mat reinforcement obliquely It is solidly connected.
3. basement bottom board catch pit bar-mat reinforcement as claimed in claim 2 is layered precast construction, it is characterised in that described to catchment Hole plate face bar-mat reinforcement includes hole bottom horizontal mesh reinforcement, crater wall vertical reinforcement net and hole top horizontal mesh reinforcement, and the crater wall is vertical Bar-mat reinforcement is arranged at the surrounding of hole bottom horizontal mesh reinforcement, and hole top horizontal mesh reinforcement is in " three-back-shaped ", and horizontal steel is pushed up in hole The inner ring of muscle net matches and is fixedly connected with the upper port of the crater wall vertical reinforcement net, outside the horizontal mesh reinforcement of the hole top Reinforcing bar connects with catch pit peripheral floor plate face reinforcing bar by root is corresponding at circle.
4. basement bottom board catch pit bar-mat reinforcement as claimed in claim 3 is layered precast construction, it is characterised in that the level Bottom reinforcement bars net is rectangular, and the Steel bar rack includes rectangular top shaped steel steel ring and four vertical corner shaped steel, the rectangle The shapes and sizes of top shaped steel steel ring are corresponding with the horizontal bottom bar-mat reinforcement of the catch pit reinforcement net, described Four vertical corner shaped steel are fixedly installed on four angles lower section of the rectangular top shaped steel steel ring, described four vertical corner types The lower end of steel is arranged at four Angle Positions of the horizontal bottom bar-mat reinforcement of the catch pit reinforcement net, the rectangular top Portion's shaped steel steel ring is supported in the lower surface of the hole top horizontal mesh reinforcement of the catch pit plate face bar-mat reinforcement.
5. basement bottom board catch pit bar-mat reinforcement as claimed in claim 4 is layered precast construction, it is characterised in that the reinforcing bar Support also includes four vertical middle part shaped steel, and the vertical middle part shaped steel is respectively arranged at the four of the rectangular top shaped steel steel ring The middle part lower section on bar side, per root, the lower end of vertical middle part shaped steel is connected to the rectangular top shaped steel steel by two diagonal braces With the two ends of side on circle.
6. basement bottom board catch pit bar-mat reinforcement as claimed in claim 5 is layered precast construction, it is characterised in that if also including Circle is hung on dry plate top, and the top of the plate is hung circle and is fixed on the vertical corner shaped steel by connecting rod, or is fixed by connecting rod On the vertical middle part shaped steel.
7. basement bottom board catch pit bar-mat reinforcement as claimed in claim 2 is layered precast construction, it is characterised in that the sidepiece A plate bottom is equipped with four angles of bar-mat reinforcement hang circle.
8. basement bottom board catch pit bar-mat reinforcement as claimed in claim 1 is layered precast construction, it is characterised in that described to catchment By reinforcing bar moulding bed processing and fabricating, the reinforcing bar moulding bed is enclosed and constituted hole reinforcement net by four groups of bracing frames, every group of bracing frame Including at least three pairs vertical spaced right angle trigonometry shaped steel frames and a pair of parallel bar steel, each right angled triangle steel Frame is surrounded by hypotenuse shaped steel, level right angle side shaped steel and vertical right-angle side shaped steel, the hypotenuse of the right angled triangle frame The inner setting of shaped steel, each level right angle side shaped steel in every group of bracing frame is connected by a pair of parallel bar steel.
9. a kind of basement bottom board catch pit bar-mat reinforcement is layered prefabricated method of construction, it is characterised in that using such as claim 1-8 Basement bottom board catch pit bar-mat reinforcement layering precast construction described in middle any one, comprises the steps:
Step one, the design of catch pit bar-mat reinforcement;
Step 2, the catch pit prefabricated processing of precast reinforced net, the catch pit bar-mat reinforcement include catch pit reinforcement net and Bottom is fixed with the catch pit plate face bar-mat reinforcement of Steel bar rack;
Step 3, the precast reinforced net layering lifting of catch pit and assembly:Catch pit reinforcement net is first lifted, then lifts bottom and consolidated Surely there is the catch pit plate face bar-mat reinforcement of Steel bar rack so that catch pit reinforcement net is with catch pit plate face bar-mat reinforcement from the bottom to top It is set in turn in catch pit;
Step 4, catch pit reinforcement net is connected with catch pit peripheral floor reinforcement by root is corresponding, by catch pit plate Face bar-mat reinforcement connects with catch pit peripheral floor plate face reinforcing bar by root is corresponding;
Step 5;Pour the underplate concrete with catch pit.
10. basement bottom board catch pit bar-mat reinforcement as claimed in claim 9 is layered prefabricated method of construction, it is characterised in that institute Before stating step 3, control line is drawn in four corners of the bed course or brick loose tool for planning to build catch pit, utilized in hoisting process The angular alignment bed course upper control line of bottom four of catch pit reinforcement net, completes catch pit reinforcement net and accurately enters hole positioning Work.
CN201611246113.5A 2016-12-29 2016-12-29 Basement bottom board catch pit steel mesh is layered precast construction and method of construction Active CN106638645B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611246113.5A CN106638645B (en) 2016-12-29 2016-12-29 Basement bottom board catch pit steel mesh is layered precast construction and method of construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611246113.5A CN106638645B (en) 2016-12-29 2016-12-29 Basement bottom board catch pit steel mesh is layered precast construction and method of construction

Publications (2)

Publication Number Publication Date
CN106638645A true CN106638645A (en) 2017-05-10
CN106638645B CN106638645B (en) 2018-12-18

Family

ID=58837114

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611246113.5A Active CN106638645B (en) 2016-12-29 2016-12-29 Basement bottom board catch pit steel mesh is layered precast construction and method of construction

Country Status (1)

Country Link
CN (1) CN106638645B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107891510A (en) * 2017-12-11 2018-04-10 安徽海龙建筑工业有限公司 A kind of split type prefabricated components toilet mould and its into mold technique
CN111021361A (en) * 2019-12-20 2020-04-17 中国建筑第八工程局有限公司 Installation construction method of foundation pit bottom plate reinforcing steel bars
CN112359874A (en) * 2020-11-18 2021-02-12 中建八局第三建设有限公司 Construction method of basement sump structure
CN115030205A (en) * 2022-06-07 2022-09-09 上海城建市政工程(集团)有限公司 Deep foundation pit raft, sump well and elevator shaft integrated rapid construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201176598Y (en) * 2007-12-28 2009-01-07 浙江环宇建设集团有限公司 Foundation slab reinforced bar caging over subway tunnel
CN104712146A (en) * 2013-12-12 2015-06-17 中国核工业第五建设有限公司 Steel bar binding construction method in wall body construction
CN105952061A (en) * 2016-06-24 2016-09-21 东南大学 Prefabricated shear wall reinforcement cage member and column reinforcement cage member as well as manufacturing and assembling methods thereof
CN206418512U (en) * 2016-12-29 2017-08-18 上海建工四建集团有限公司 Basement bottom board catch pit bar-mat reinforcement is layered precast construction

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201176598Y (en) * 2007-12-28 2009-01-07 浙江环宇建设集团有限公司 Foundation slab reinforced bar caging over subway tunnel
CN104712146A (en) * 2013-12-12 2015-06-17 中国核工业第五建设有限公司 Steel bar binding construction method in wall body construction
CN105952061A (en) * 2016-06-24 2016-09-21 东南大学 Prefabricated shear wall reinforcement cage member and column reinforcement cage member as well as manufacturing and assembling methods thereof
CN206418512U (en) * 2016-12-29 2017-08-18 上海建工四建集团有限公司 Basement bottom board catch pit bar-mat reinforcement is layered precast construction

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107891510A (en) * 2017-12-11 2018-04-10 安徽海龙建筑工业有限公司 A kind of split type prefabricated components toilet mould and its into mold technique
CN111021361A (en) * 2019-12-20 2020-04-17 中国建筑第八工程局有限公司 Installation construction method of foundation pit bottom plate reinforcing steel bars
CN112359874A (en) * 2020-11-18 2021-02-12 中建八局第三建设有限公司 Construction method of basement sump structure
CN115030205A (en) * 2022-06-07 2022-09-09 上海城建市政工程(集团)有限公司 Deep foundation pit raft, sump well and elevator shaft integrated rapid construction method

Also Published As

Publication number Publication date
CN106638645B (en) 2018-12-18

Similar Documents

Publication Publication Date Title
CN106638645A (en) Layering prefabricated structure and building method of basement bottom board water collection pit reinforcing mesh
CN105239725A (en) Construction method and construction template for ultrahigh oblique concrete column
CN105625568B (en) Assembly concrete orthogonal spatial space lattice boxlike tube-in-tube structure
CN209482679U (en) Tub brace type integral steel platform suitable for sloping core construction
CN105625566B (en) Assembly concrete orthogonal-diagonal lattice space lattice box structure tube-in-tube structure
CN113833020B (en) Construction method of large fish belly type inclined column structure in underground space
CN107419802A (en) A kind of Precast Concrete Frame and construction method
CN108726348B (en) Horizontal prefabrication, overturning and hoisting method for pipe gallery segments
CN106906841A (en) One kind is used for lateral wall form bracing system construction
CN106836255B (en) The integral prefabricated structure of basement bottom board catch pit steel mesh and method of construction
CN102767282B (en) Assembly-type high-formwork construction method for cantilever of oversized special-shaped conversion layer
CN208363271U (en) A kind of basement steel pipe congruent band of column girder connection using reverse construction
CN104213728B (en) Oblique beam for grandstand of stadium and construction process for oblique beam
CN206418512U (en) Basement bottom board catch pit bar-mat reinforcement is layered precast construction
CN105438965B (en) The hanging method of glomeration pattern masonry wall 2 centering hanging apparatus of piece
JP2001254516A (en) Erection method of src steel column in which pc concrete is poured on ground
CN206418513U (en) The integral prefabricated structure of basement bottom board catch pit bar-mat reinforcement
CN106522094B (en) A kind of Sarasota crosses segment structure and construction method
CN206873459U (en) A kind of large-span steel-reinforced concrete foundation ditch support system
CN207110035U (en) Assembled steel tendon concrete frame structure based on steel plate connection joint
CN108569629A (en) A kind of jack up high level modular architectural hanging device and construction method
CN208802765U (en) A kind of jack up high level modular architectural hanging device
CN107178149A (en) Fork-shaped steel reinforced concrete combining structure and its construction method
CN106223465A (en) Assembly concrete orthogonal-diagonal lattice space lattice boxlike bundled tube structure and manufacture method
CN207700206U (en) A kind of concrete self-balancing side mould of building construction cushion cap

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant