CN201176598Y - Foundation slab reinforced bar caging over subway tunnel - Google Patents

Foundation slab reinforced bar caging over subway tunnel Download PDF

Info

Publication number
CN201176598Y
CN201176598Y CNU2007200776592U CN200720077659U CN201176598Y CN 201176598 Y CN201176598 Y CN 201176598Y CN U2007200776592 U CNU2007200776592 U CN U2007200776592U CN 200720077659 U CN200720077659 U CN 200720077659U CN 201176598 Y CN201176598 Y CN 201176598Y
Authority
CN
China
Prior art keywords
cage
reinforcing
reinforcement
reinforced bars
bracket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007200776592U
Other languages
Chinese (zh)
Inventor
周国勇
金伟光
丁海港
丁铁华
傅先华
王华江
何国建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG HUANYU CONSTRUCTION GROUP
Original Assignee
ZHEJIANG HUANYU CONSTRUCTION GROUP
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG HUANYU CONSTRUCTION GROUP filed Critical ZHEJIANG HUANYU CONSTRUCTION GROUP
Priority to CNU2007200776592U priority Critical patent/CN201176598Y/en
Application granted granted Critical
Publication of CN201176598Y publication Critical patent/CN201176598Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model relates to a foundation mat reinforcing cage on the right upper portion of a metro tunnel, which is formed by a bottom reinforcing cage, an assembling bracket and top reinforcing steel bars, wherein the bottom reinforcing cage is formed by horizontal main reinforced bars, longitudinal main reinforced bars, bracket vertical reinforced bars, bracket horizontal reinforced bars, bracket diagonal reinforced bars, a water-tight steel plate, a metal mesh template and a hanger, and the assembling bracket is formed by frame reinforced bars and locating reinforced bars, wherein the longitudinal main reinforced bars and horizontal main reinforced bars are arrayed in matrix grid form by the bottom reinforcing cage under the assembling bracket, and each joint point is fixed through being tied by thin metal wires, and each joint point of the longitudinal main reinforced bars and horizontal main reinforced bars are welded, the bracket vertical reinforced bars, the water-tight steel plate, the bracket horizontal reinforced bars and the metal mesh template are welded or tied to fix into an integrated reinforcing cage. The foundation mat reinforcing cage of the utility model can be preset in batch, and is hoisted into a construction foundation pit by a hoister when in assemblage, can rapidly tie bottom board reinforced bar of the foundation pit, can erect a steel reinforcing bracket, and install water-tight steel plate and a side template.

Description

Sole plate reinforcing cage directly over the subway tunnel
Technical field
The utility model relates to a kind of sole plate reinforcing cage of concreting, especially a kind of prefabricated panel reinforcing cage that is used for directly over the subway tunnel.
Background technology
Entered since 21st century, urban construction has welcome another climax of taking turns, track traffic since its have fast, advantage such as environmental protection, capacity are huge and become the public transit facility of many big and medium-sized cities first-selection gradually.The development of the synchronous high-speed of underground construction and track traffic is being faced the engineering interface of the international metropolis as Shanghai and increasing is carried out the activity of large-scale foundation pit construction at the tunnel upper of building track traffic.
When the foundation ditch below was the track traffic facility of just runing, because the track traffic facility in the operation is high to the Deformation control requirement, this class construction activities was a forbidden zone of engineering circle always.If can break through this technology " forbidden zone " of engineering circle, will produce tangible society, environment and economic benefit.
According to Shanghai subway operation Co., Ltd to track traffic safeguard protection zone operation scheme technological audit suggestion: be positioned at the foundation ditch block construction directly over the subway, single width (each piecemeal) the whole construction time is controlled in seven hours and finishes.The single width whole contents comprises shoveling, soffit formwork (bed course), reinforcing bar binding, upright side template, concreting.
The reinforcing bar of general base arrangement is at the construction field (site) with vertical main reinforcement and horizontal main reinforcement, and layering is closely arranged with the lattice word shape that forms matrix pattern, imposes false fixingly at last with lametta, promptly is commonly called as reinforcing bar binding; The top reinforcement support is set up at the scene, and steel plate for sealing water, side template are installed; And base arrangement block construction or piecemeal are not bigger.
The single width whole construction time will be controlled in seven hours and finish, and obviously adopting traditional reinforcing cage to organize cube formula at the scene can't be effectively, finish on time.Thereby the method for prefabricated panel reinforcing cage is arisen at the historic moment.
Summary of the invention
The purpose of this utility model is that sole plate reinforcing cage directly over a kind of subway tunnel of can be in batches prefabricated, finishing fast will be provided.
For achieving the above object, the technical solution of the utility model is: sole plate reinforcing cage directly over a kind of subway tunnel, by the bottom layer of the reinforcing steel cage, the group staking, top reinforcement is formed, and is characterized in: the bottom layer of the reinforcing steel cage is made of horizontal main reinforcement, vertical main reinforcement, support vertical reinforcement, support level reinforcing bar, support oblique rollering steel muscle, steel plate for sealing water, wire lath sheet template and suspension hook; Group staking structure is made of framework reinforcing bar and spacer bars.
Below the group staking, the bottom layer of the reinforcing steel cage discharges its vertical, horizontal main reinforcement with the matrix pattern clathrate, and on each intersection point, fix with the fine wire colligation successively, welding is fixed on each intersection point of vertical, horizontal main reinforcement, the fixing one reinforcing cage that forms of support vertical reinforcement, steel plate for sealing water, support level reinforcing bar and the welding of wire lath sheet template or colligation.
Base plate top reinforcement cage is made of main reinforcement, suspension hook, and wherein, main reinforcement is with the discharging of matrix pattern clathrate, and welding is fixed on the intersection point, and is fixed in above the group staking.Bottom layer of the reinforcing steel cage and base plate top reinforcement cage are all reserved overlap joint section or anchoring section at the termination and the two ends of main reinforcement, are connected with avris piecemeal overlap joint; Suspension hook is welded on respectively on bottom layer of the reinforcing steel cage and the base plate top reinforcement cage downside vertical reinforcement.
The beneficial effects of the utility model are: sole plate reinforcing cage of the present utility model can be prefabricated in batches, when being used in combination, by crane reinforcing cage is hung in construction foundation pit, can finish the base plate of foundation pit reinforcing bar binding fast, set up Steel bar rack, steel plate for sealing water and side template are installed, thereby reach the purpose of this utility model.
Description of drawings
Fig. 1 is the utility model base plate bottom layer of the reinforcing steel cage schematic perspective view;
Fig. 2 is the utility model base plate top reinforcement cage schematic perspective view;
Fig. 3 is the utility model base plate reinforcing cage group staking structural upright schematic diagram;
Fig. 4 to Fig. 9 is the utility model base plate bottom layer of the reinforcing steel cage manufacturing process schematic diagram.
The specific embodiment
Below in conjunction with accompanying drawing the utility model is further elaborated.
Sole plate reinforcing cage directly over the subway tunnel of the present utility model, by the bottom layer of the reinforcing steel cage, the group staking, top reinforcement is formed.
As shown in Figure 1, the utility model base plate bottom layer of the reinforcing steel cage is made of horizontal main reinforcement 1, vertical main reinforcement 2, support vertical reinforcement 5, support level reinforcing bar 8, support oblique rollering steel muscle 6, steel plate for sealing water 9, wire lath sheet template 7 and suspension hook 10.It includes the termination and overlap joint section or anchoring section 3,4 are reserved in two ends.During enforcement, steel plate for sealing water 9 and wire lath sheet template 7 need be done corresponding adjustment according to each piecemeal, and for example first piecemeal will be provided with around then.If be provided with steel plate for sealing water 9 and 7 relative set supports of wire lath sheet template oblique rollering steel muscle 6, otherwise support vertical reinforcement 5, support level reinforcing bar 8 can correspondingly reduce.Overlap joint section or anchoring section 3,4 are reserved in termination and two ends, and when meeting the termination of whole base plate of foundation pit, reinforcing cage will not be provided with in whole base plate termination side and reserve overlap joint section 3,4, then reserve anchoring section by corresponding code requirement, and other all is to reserve overlap joint section 3,4.Suspension hook 10 is welded on the reinforcing cage downside reinforcing bar.
As shown in Figure 2, the utility model base plate top reinforcement cage is made of horizontal main reinforcement 11, vertical main reinforcement 12 and suspension hook 10.It includes the termination and overlap joint section or anchoring section 13,14 are reserved in two ends.During enforcement, overlap joint section or anchoring section 3,4 are reserved in termination and two ends, and when meeting the termination of whole base plate of foundation pit, reinforcing cage will not be provided with in whole base plate termination side and reserve overlap joint section 13,14, then reserve anchoring section by corresponding code requirement, other all is to reserve overlap joint section 13,14.Suspension hook 10 is welded on the reinforcing cage downside reinforcing bar.
As shown in Figure 3, the utility model base plate reinforcing cage group staking structure is made of framework reinforcing bar 15 and spacer bars 16.Spacer bars 16 is used to guarantee horizontal main reinforcement 1,11 and vertical main reinforcement 2,12 spacing each other, be convenient to reinforcing cage lifting and and piecemeal between the overlap joint of main reinforcement.
As shown in Figure 4, to be combined into the matrix pattern trellis false fixing with fine wire 19 colligations with vertical main reinforcement 2,12 respectively with the horizontal main reinforcement 1,11 of reinforcing cage on support as shown in Figure 3, and welding 18 is fixing on each intersection point then.
Below the group staking, the bottom layer of the reinforcing steel cage is with its vertical, horizontal main reinforcement 2,1 discharges with the matrix pattern clathrate, and it is false fixing with fine wire successively on each intersection point, longitudinal and transverse 2,1 on main reinforcement 1 each intersection point welding fixing, support vertical reinforcement 5, steel plate for sealing water 6, support level reinforcing bar 8 and 71 welding of wire lath sheet template or the fixing one reinforcing cage that forms of colligation;
The main reinforcement of base plate top reinforcement cage is with the discharging of matrix pattern clathrate, and welding is fixed on the intersection point, and is fixed in above the group staking.
As shown in Figure 5, support vertical reinforcement 5 is with laterally main reinforcement 1 welding 18 is fixing.
As shown in Figure 6, steel plate for sealing water 9 is cutting hole 17 with support vertical reinforcement 5 place of colliding.
As shown in Figure 7, steel plate for sealing water 9 is fixing with 5 welding 18 of support vertical reinforcement.
As shown in Figure 8, support level reinforcing bar 8 is fixing with 5 welding 18 of support vertical reinforcement, support oblique rollering steel muscle 6 is with support vertical reinforcement 5 and laterally main reinforcement 1 welding 18 is fixing, and wire lath sheet template 7 is fixed with support level reinforcing bar 8 and 19 colligations of support vertical reinforcement 5 usefulness fine wires.
As shown in Figure 9, suspension hook 10 is with laterally main reinforcement 1 and 12 welding 18 of vertical main reinforcement are fixing.

Claims (3)

1. sole plate reinforcing cage directly over the subway tunnel, by the bottom layer of the reinforcing steel cage, the group staking, top reinforcement is formed, it is characterized in that described bottom layer of the reinforcing steel cage is made of horizontal main reinforcement (1), vertical main reinforcement (2), support vertical reinforcement (5), support level reinforcing bar (8), support oblique rollering steel muscle (6), steel plate for sealing water (9), wire lath sheet template (7) and suspension hook (10); Group staking structure is by framework reinforcing bar (15), and spacer bars (16) constitutes;
Below described group of staking, the bottom layer of the reinforcing steel cage is with its vertical, horizontal main reinforcement (2,1) discharges with the matrix pattern clathrate, and on each intersection point, use fine wire (19) colligation to fix successively, vertical, horizontal main reinforcement (2,1) welding is fixing on each intersection point, the fixing one reinforcing cage that forms of support vertical reinforcement (5), steel plate for sealing water (6), support level reinforcing bar (8) and wire lath sheet template (7) welding or colligation;
Described base plate top reinforcement cage is made of main reinforcement (11), suspension hook (10), and wherein, main reinforcement (11) is with the discharging of matrix pattern clathrate, and welding is fixed on the intersection point, and is fixed in above the group staking.
2. sole plate reinforcing cage directly over the subway tunnel according to claim 1 is characterized in that, described bottom layer of the reinforcing steel cage and base plate top reinforcement cage are reserved overlap joint section (3,4) or anchoring section (13,14) at the termination and the two ends of main reinforcement respectively.
3. sole plate reinforcing cage directly over the subway tunnel according to claim 1 is characterized in that, described suspension hook (10) is welded on respectively on bottom layer of the reinforcing steel cage and the base plate top reinforcement cage downside reinforcing bar.
CNU2007200776592U 2007-12-28 2007-12-28 Foundation slab reinforced bar caging over subway tunnel Expired - Fee Related CN201176598Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007200776592U CN201176598Y (en) 2007-12-28 2007-12-28 Foundation slab reinforced bar caging over subway tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007200776592U CN201176598Y (en) 2007-12-28 2007-12-28 Foundation slab reinforced bar caging over subway tunnel

Publications (1)

Publication Number Publication Date
CN201176598Y true CN201176598Y (en) 2009-01-07

Family

ID=40216616

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007200776592U Expired - Fee Related CN201176598Y (en) 2007-12-28 2007-12-28 Foundation slab reinforced bar caging over subway tunnel

Country Status (1)

Country Link
CN (1) CN201176598Y (en)

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102121250A (en) * 2011-03-21 2011-07-13 中广核工程有限公司 Construction method of raft foundation reinforcing cage for containment vessel of nuclear power plant
CN102364011A (en) * 2011-11-23 2012-02-29 国核工程有限公司 Method for binding reinforcing steel bars of nuclear island bottom plate
CN102587404A (en) * 2012-02-09 2012-07-18 中国十九冶集团有限公司 Construction method for large-sized blast furnace foundation
CN102852224A (en) * 2012-09-28 2013-01-02 朱宏宇 Distributed steel tool set, combination framework, cast-in-situ concrete structure and construction method of cast-in-situ concrete structure
CN103410148A (en) * 2013-05-29 2013-11-27 中建保华建筑有限责任公司 Intercept netting applied to concrete pouring of foundation base plate and construction method thereof
CN104368915A (en) * 2014-09-26 2015-02-25 甘肃万泰建设工程有限公司 Method for manufacturing steel bar mesh die for first lining of tunnel
CN104600601A (en) * 2014-12-25 2015-05-06 贵州长通电气有限公司 Square splice plate-based easily positioned power distribution cabinet component
CN104600598A (en) * 2014-12-25 2015-05-06 贵州长通电气有限公司 Square and fan-shaped splice plate-based easily positioned power distribution cabinet component
CN104600602A (en) * 2014-12-25 2015-05-06 贵州长通电气有限公司 Fan-shaped and annular splice plate-based easily positioned power distribution cabinet component
CN104638543A (en) * 2014-12-25 2015-05-20 贵州长通电气有限公司 Power distribution cabinet assembly easy to position and based on fan-shaped splice plates
CN104638542A (en) * 2014-12-25 2015-05-20 贵州长通电气有限公司 Power distribution cabinet assembly easy to position and based on square and arch splice plates
CN105484268A (en) * 2015-11-24 2016-04-13 上海建工一建集团有限公司 Construction method of bottom plate of foundation pit
CN105790095A (en) * 2014-12-25 2016-07-20 贵州长通电气有限公司 Square splice plates-based power distribution cabinet assembly
CN105790122A (en) * 2014-12-25 2016-07-20 贵州长通电气有限公司 Triangular and arched splice plates-based power distribution cabinet assembly
CN105790124A (en) * 2014-12-25 2016-07-20 贵州长通电气有限公司 Fan-shaped splice plates-based power distribution cabinet assembly
CN106592821A (en) * 2016-12-30 2017-04-26 上海建工四建集团有限公司 Side-standing integral forming structure and method of shear steel plates and lateral reinforcement fabric
CN106638645A (en) * 2016-12-29 2017-05-10 上海建工四建集团有限公司 Layering prefabricated structure and building method of basement bottom board water collection pit reinforcing mesh
CN106836255A (en) * 2016-12-29 2017-06-13 上海建工四建集团有限公司 The integral prefabricated structure of basement bottom board catch pit bar-mat reinforcement and method of construction
CN111779194A (en) * 2020-07-21 2020-10-16 湖北三江航天建筑工程有限公司 Method for installing glass fiber reinforcement in constructional engineering

Cited By (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102121250A (en) * 2011-03-21 2011-07-13 中广核工程有限公司 Construction method of raft foundation reinforcing cage for containment vessel of nuclear power plant
CN102364011A (en) * 2011-11-23 2012-02-29 国核工程有限公司 Method for binding reinforcing steel bars of nuclear island bottom plate
CN102587404A (en) * 2012-02-09 2012-07-18 中国十九冶集团有限公司 Construction method for large-sized blast furnace foundation
CN102587404B (en) * 2012-02-09 2014-11-05 中国十九冶集团有限公司 Construction method for large-sized blast furnace foundation
CN102852224A (en) * 2012-09-28 2013-01-02 朱宏宇 Distributed steel tool set, combination framework, cast-in-situ concrete structure and construction method of cast-in-situ concrete structure
CN103410148B (en) * 2013-05-29 2015-11-25 中建保华建筑有限责任公司 A kind of catch net and construction method thereof being applied to sole plate concreting
CN103410148A (en) * 2013-05-29 2013-11-27 中建保华建筑有限责任公司 Intercept netting applied to concrete pouring of foundation base plate and construction method thereof
CN104368915A (en) * 2014-09-26 2015-02-25 甘肃万泰建设工程有限公司 Method for manufacturing steel bar mesh die for first lining of tunnel
CN104368915B (en) * 2014-09-26 2016-09-21 甘肃万泰建设工程有限公司 Reinforced mesh mould making method is served as a contrast at the beginning of tunnel
CN105790124A (en) * 2014-12-25 2016-07-20 贵州长通电气有限公司 Fan-shaped splice plates-based power distribution cabinet assembly
CN105790122A (en) * 2014-12-25 2016-07-20 贵州长通电气有限公司 Triangular and arched splice plates-based power distribution cabinet assembly
CN104638542A (en) * 2014-12-25 2015-05-20 贵州长通电气有限公司 Power distribution cabinet assembly easy to position and based on square and arch splice plates
CN104600601A (en) * 2014-12-25 2015-05-06 贵州长通电气有限公司 Square splice plate-based easily positioned power distribution cabinet component
CN104600598A (en) * 2014-12-25 2015-05-06 贵州长通电气有限公司 Square and fan-shaped splice plate-based easily positioned power distribution cabinet component
CN105790095A (en) * 2014-12-25 2016-07-20 贵州长通电气有限公司 Square splice plates-based power distribution cabinet assembly
CN104638543A (en) * 2014-12-25 2015-05-20 贵州长通电气有限公司 Power distribution cabinet assembly easy to position and based on fan-shaped splice plates
CN104600602A (en) * 2014-12-25 2015-05-06 贵州长通电气有限公司 Fan-shaped and annular splice plate-based easily positioned power distribution cabinet component
CN105484268A (en) * 2015-11-24 2016-04-13 上海建工一建集团有限公司 Construction method of bottom plate of foundation pit
CN106638645A (en) * 2016-12-29 2017-05-10 上海建工四建集团有限公司 Layering prefabricated structure and building method of basement bottom board water collection pit reinforcing mesh
CN106836255A (en) * 2016-12-29 2017-06-13 上海建工四建集团有限公司 The integral prefabricated structure of basement bottom board catch pit bar-mat reinforcement and method of construction
CN106638645B (en) * 2016-12-29 2018-12-18 上海建工四建集团有限公司 Basement bottom board catch pit steel mesh is layered precast construction and method of construction
CN106836255B (en) * 2016-12-29 2019-09-20 上海建工四建集团有限公司 The integral prefabricated structure of basement bottom board catch pit steel mesh and method of construction
CN106592821A (en) * 2016-12-30 2017-04-26 上海建工四建集团有限公司 Side-standing integral forming structure and method of shear steel plates and lateral reinforcement fabric
CN111779194A (en) * 2020-07-21 2020-10-16 湖北三江航天建筑工程有限公司 Method for installing glass fiber reinforcement in constructional engineering

Similar Documents

Publication Publication Date Title
CN201176598Y (en) Foundation slab reinforced bar caging over subway tunnel
CN101575911B (en) Top-down decreasing-formwork formwork system and construction method
CN107090925A (en) Reinforced precast reinforced concrete shear wall, structural system and its construction method
CN102251667B (en) Construction method for reinforced concrete arched roof of grain store
CN101343948B (en) Prefabricated casket beam reinforced bar binding stand and reinforced bar binding method using the same
CN102031785A (en) Foundation pit supporting technique for replacing temporary enclosing purlin by using plate belt of permanent structure
CN103046645A (en) Large span prefabricated monolithic casting structure and construction method
CN111794254A (en) Railway slope prefabricated assembled post-cast framework slope protection structure and construction method thereof
CN108222062B (en) A kind of underground pipe gallery framework of steel reinforcement temporary fixing rack and longitude and latitude binding method
CN102116051A (en) Layer-by-layer overhanging structure lifting method
CN207017483U (en) The full precast shear wall structural system of regenerative steel skeleton
CN207017484U (en) Reinforced precast reinforced concrete shear wall and structural system
CN102605717A (en) Pier-top longitudinal support scaffolding method
CN109162437B (en) Integral steel platform for multi-cylinder steel plate shear wall and construction method thereof
CN105064711A (en) Method for constructing underground garage between residential buildings
CN101761187B (en) Construction separating device for concrete of vertical structure in same wall body with different labels as well as pouring and tamping method thereof
CN206128077U (en) Dark excavation supporting's interior bearing structure
CN105649259B (en) A kind of wallboard structural system of the dark framework of band of precast concrete wall panel and its structure
CN204311457U (en) A kind of Metro station excavation excavation construction composite retaining structure system
CN207376945U (en) A kind of concrete prefabricated wallboard of steel bar girder and structural system
CN105625573A (en) Beam-bottom medium-strength prestressed steel bar and ordinary steel bar sleeve connecting beam-column joint
CN102936953B (en) Construction method of a bridging-arm stiffened steel structure template
CN202831219U (en) Large-span precast monolithic concrete structure
CN107165038A (en) The complete prefabricated substructure and construction method of a kind of bridge
CN108360685A (en) Monoblock type jack-up construction method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090107

Termination date: 20111228