CN106603790A - Start-up and shutdown test method for mobile terminal - Google Patents

Start-up and shutdown test method for mobile terminal Download PDF

Info

Publication number
CN106603790A
CN106603790A CN201611246024.0A CN201611246024A CN106603790A CN 106603790 A CN106603790 A CN 106603790A CN 201611246024 A CN201611246024 A CN 201611246024A CN 106603790 A CN106603790 A CN 106603790A
Authority
CN
China
Prior art keywords
mobile terminal
preset time
controlling switch
power supply
close machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611246024.0A
Other languages
Chinese (zh)
Inventor
王迅
刘卫洋
杨玉龙
杨沛
潘维维
吴旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Green Orange Industry Co Ltd
Original Assignee
Shanghai Green Orange Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Green Orange Industry Co Ltd filed Critical Shanghai Green Orange Industry Co Ltd
Priority to CN201611246024.0A priority Critical patent/CN106603790A/en
Publication of CN106603790A publication Critical patent/CN106603790A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04MTELEPHONIC COMMUNICATION
    • H04M1/00Substation equipment, e.g. for use by subscribers
    • H04M1/24Arrangements for testing

Landscapes

  • Engineering & Computer Science (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

Provided is a start-up and shutdown test method for a mobile terminal. An automation test system is utilized to control the mobile terminal to carry out start-up and shutdown operations, the automation test system includes an automatic switch device and a first power supply, and the automatic switch device includes a first control switch and a second control switch. The start-up and shutdown test method comprises the following steps: turning on the first control switch to control the mobile terminal to carry out a start-up process, wherein the turning-on time of the first control switch is first preset time; after the first preset time, turning off the first control switch and turning on the second control switch to control the first power supply to provide power to the mobile terminal, wherein the turning-on time of the second control switch is second preset time; after the second preset time, turning off the second control switch; and implementing the above three steps circularly till the needed number of times of start-up and shutdown tests is realized. According to the technical scheme, the start-up and shutdown test method for a mobile terminal greatly cuts the cost of manpower, and is convenient for counting the number of times of start-up and shutdown tests.

Description

The method for testing open/close machine of mobile terminal
Technical field
The present invention relates to mobile terminal test technical field, more particularly to a kind of method for testing open/close machine of mobile terminal.
Background technology
In the multinomial test of mobile phone, have one to be tested with regard to mobile phone multiple switching machine, for example, mobile phone is switched Whether 5000 tests of machine, the function of then observing mobile phone are normal.
In existing measuring technology, it is typically with manually being tested by switch switch, but such method of testing Cause testing efficiency low, waste of manpower resources costss, and also manual record switching on and shutting down number of times is likely to cause testing time not Accurately the problems such as.
The content of the invention
The problem that the present invention is solved is that existing handset switch machine test labor cost is higher, and the switching on and shutting down number of times for recording It is inaccurate.
To solve the above problems, a kind of method for testing open/close machine of mobile terminal is embodiments provided, using certainly Dynamicization test system controls the mobile terminal and performs startup and shutdown operation, and the automatization test system includes automatic switch Device and the first power supply, wherein, the automatic switch device includes the first controlling switch and the second controlling switch;It is described to open Shutdown method of testing includes:
Step 1:Close first controlling switch starting procedure is performed to control the mobile terminal;Wherein, described The closing time of one controlling switch is the first Preset Time;
Step 2:After first Preset Time, disconnect first controlling switch and close second controlling switch Powered to the mobile terminal with controlling first power supply;Wherein, the closing time of second controlling switch is the Two Preset Times;
Step 3:After second Preset Time, second controlling switch is disconnected;
Circulation performs above-mentioned steps 1 to step 3, until the switching on and shutting down testing time needed for completing.
Optionally, method for testing open/close machine also comprises the steps:Disconnection second control in the step 3 is opened After pass, closure first controlling switch in the step 1 after waiting the 3rd Preset Time, is performed again.
Optionally, the 3rd Preset Time is equal to first Preset Time.
Optionally, first Preset Time be 5 seconds, second Preset Time be 55 seconds.
Optionally, the automatic switch device is relay.
Optionally, first power supply is+4V DC sources.
Optionally, the automatization test system also includes the second power supply, and second power supply is used for as institute State automatic switch device and electric energy is provided.
Optionally, second power supply is 220V alternating current power supplys.
Optionally, ground connection position, and the mobile terminal are additionally provided with the mobile terminal and the automatic switch device Battery port and the ground connection position between also connect a 10K resistance.
Compared with prior art, technical solution of the present invention has advantages below:
In automatization test system, controlled using the first controlling switch and the second controlling switch in automatic switch device Mobile terminal processed carries out switching on and shutting down, and the first controlling switch of closure performs starting procedure to control the mobile terminal, through first After Preset Time, disconnect the first controlling switch and close the second controlling switch and powered to mobile terminal with controlling the first power supply (keeping open state), then again after the second Preset Time, disconnects second controlling switch (shutting down).According to upper State the switching on and shutting down testing time needed for control method loop control mobile terminal is completed.As a result of the test side of automatization Formula, can greatly reduce human cost.
Further, the first Preset Time for arranging in the embodiment of the present invention is 5 seconds, the second Preset Time is 55 seconds, this One test loop cycle of sample is 1 minute, so facilitates statistic switch machine testing time, i.e. switching on and shutting down testing time to be equal to automatic Change working time the number of minutes of test system.
Description of the drawings
Fig. 1 is a kind of schematic flow sheet of the method for testing open/close machine of mobile terminal of the embodiment of the present invention;
Fig. 2 is the test company that a kind of automatization test system of the embodiment of the present invention carries out switching on and shutting down test to mobile terminal Connect schematic diagram;
Fig. 3 is the electrifying timing sequence figure of automatization test system in the embodiment of the present invention.
Specific embodiment
It is understandable to enable the above objects, features and advantages of the present invention to become apparent from, below in conjunction with the accompanying drawings to the present invention Specific embodiment be described in detail.
As shown in Fig. 1 the schematic flow sheet of the method for testing open/close machine of a kind of mobile terminal of the embodiment of the present invention. With reference to Fig. 1, the method for testing open/close machine includes:
Step S1:Close first controlling switch starting procedure is performed to control the mobile terminal;Wherein, described The closing time of one controlling switch is the first Preset Time;
Step S2:After first Preset Time, disconnect first controlling switch and close second control and open Pass is powered to the mobile terminal with controlling first power supply;Wherein, the closing time of second controlling switch is Second Preset Time;
Step S3:After second Preset Time, second controlling switch is disconnected;
Step S4:Circulation performs above-mentioned steps S1 to step S3, until the switching on and shutting down testing time needed for completing.
In embodiments of the present invention, inventor provide a kind of automatization test system start is performed controlling mobile terminal And power-off operation.As shown in Fig. 2 a kind of automatization test system of the embodiment of the present invention carries out switching on and shutting down to mobile terminal The test connection diagram of test.
With reference to Fig. 2, the automatization test system includes:Automatic switch device 1 and the first power supply 3, wherein described Automatic switch device 1 includes the first controlling switch S4 and the second controlling switch S5.Wherein, the first controlling switch S4 connection is moved The POWER keys of dynamic terminal 2, control the POWER of mobile terminal 2 by the opened/closed of control first controlling switch S4 Key;Connect between second controlling switch S5 and the V-BAT (battery port) of the mobile terminal first power supply 3, power off is supplied for mobile terminal 2 by the closed/open of control second controlling switch S5.Wherein described first supplies Power supply 3 is+4V DC sources.In the present embodiment, the automatic switch device 1 be relay (such as GHPG-140-B after Electrical equipment), it would however also be possible to employ other have the device of auto-switch function, will not be described here.
The mobile terminal 2 and the automatic switch device 1 are also each provided with ground connection position, due to moving in Automated condtrol Uneasy packed battery in mobile terminal during dynamic limit switch machine, therefore need between the V-BAT and GND of the mobile terminal 2 One 10K resistance of connection (not shown in Fig. 2).
The automatization test system also includes the second power supply 4, and second power supply 4 is used to be described automatic Switching device 1 provides electric energy.For example, second power supply is mains-supplied power supply (i.e. 220V alternating current power supplys).
Can be to the start of mobile terminal described in Automated condtrol 2 and pass using automatization test system as shown in Figure 2 Machine is operated.
Specifically, as described in step S1, first controlling switch S4 is closed first and is held with controlling the mobile terminal 2 Row starting procedure, after completing starting procedure, mobile terminal 2 enters holding state.In the present embodiment, first controlling switch S4 Closing time be 5 seconds (i.e. the first Preset Time be 5 seconds).
As described in step S2,5 seconds are closed afterwards in first controlling switch S4, disconnects first controlling switch S4 simultaneously Close second controlling switch S5 and powered to the mobile terminal 2 with controlling first power supply 3, due in automatization In test process, uneasy packed battery in mobile terminal 2, so being supplied to the mobile terminal 2 by first power supply 3 Electricity.In the present embodiment, the closing time of second controlling switch S5 is 55 seconds (i.e. the second Preset Time is 55 seconds).
As described in step S3, after second Preset Time, second controlling switch S5 is disconnected, now mobile terminal 2 enter off-mode.
Automatization test system execution above-mentioned steps S1 control the mobile terminal 2 to step S3, that is, and complete one Secondary switching on and shutting down operation.
According to actual test demand, automatization test system performs above-mentioned steps S1 to step S3 to control by circulating State mobile terminal 2 and complete the operation of multiple switching machine.
It should be noted that in actual applications, after second controlling switch S5 disconnects, need to wait 5 seconds (i.e. the Three Preset Times are 5 seconds) after start working (wait 5 seconds then be closed again first controlling switch S4) again.
As shown in Fig. 3 in the embodiment of the present invention automatization test system electrifying timing sequence figure.
With reference to Fig. 3, the transverse axis T in electrifying timing sequence figure is time shafts, and longitudinal axis Y is first controlling switch S4 and the second control The state of system switch S5.
Wherein, T1=t1+t2, T2=t3+t4;T1=t3=5 seconds, t2=t4=55 seconds;I.e. described first controlling switch S4 is disconnected 55 seconds and being circulated to close 5 seconds;Second controlling switch S5 is disconnected 5 seconds and being circulated to close 55 seconds, and described first Controlling switch S4 need to be disconnected in second controlling switch S5 starts working for 5 seconds afterwards.
As can be seen that the first Preset Time for arranging in embodiments of the present invention be 5 seconds, the second Preset Time be 55 seconds, Such a test loop cycle is 1 minute, so facilitates statistic switch machine testing time, i.e. switching on and shutting down testing time to be equal to certainly Working time the number of minutes of dynamicization test system.
In actual applications, can be realized by carrying out parameter setting and set of time to the automatization test system The function of above-mentioned Automated condtrol.
For automatization test system provided in an embodiment of the present invention, can be arranged by following concrete set-up mode.
Specifically, the parameter setting of first controlling switch S4 and the second controlling switch S5 is as follows:
S4:" setting " key is pressed more than 3S, then by " setting ", is selected " LP2 ", then by " setting ", selected " 1nd52 ", then press " setting ", selects " 1T22 ".
S5:On the basis of the operation for arranging S4, by " setting ", select " 2nd42 ", then by " setting ", select " 2T22 ", then By " setting ", select " 2st1R ", then automatically exit from and automatically save after pressing " setting " key, centre is exited and can not be automatically saved.
The set of time of first controlling switch S4 and the second controlling switch S5 is as follows:
S4:Under relay normal operating condition, point clicks " setting " key, then presses " SET " key, then presses " displacement " key, " modification " key is pressed again, and t3 is set to into " 0005 ";" SET " key being pressed again, then presses " displacement " key, then press " modification " key, t4 is set to “0055”。
S5:On the basis of the operation that S4 is set, " SET " key is pressed, then presses " displacement " key, then press " modification " key t1 is set to “0005”;" SET " key is pressed again, then presses " displacement " key, then press " modification " key and t2 is set to " 0055 ", then put and click " setting " Automatically exit from after key and automatically save, centre is exited and can not be automatically saved.
In sum, the method for testing open/close machine of the mobile terminal for being provided using the technical program can greatly reduce people Power cost, and facilitate statistic switch machine testing time.
Although the present invention is disclosed as above with preferred embodiment, which is not for limiting the present invention, any this area Technical staff without departing from the spirit and scope of the present invention, may be by the methods and techniques content of the disclosure above to this Bright technical scheme makes possible variation and modification, therefore, every content without departing from technical solution of the present invention, according to the present invention Technical spirit any simple modification, equivalent variations and modification that above example is made, belong to technical solution of the present invention Protection domain.

Claims (9)

1. a kind of method for testing open/close machine of mobile terminal, it is characterised in that control the movement using automatization test system Terminal performs startup and shutdown operation, and the automatization test system includes automatic switch device and the first power supply, wherein, The automatic switch device includes the first controlling switch and the second controlling switch;The method for testing open/close machine includes:
Step 1:Close first controlling switch starting procedure is performed to control the mobile terminal;Wherein, first control The closing time of system switch is the first Preset Time;
Step 2:After first Preset Time, disconnect first controlling switch and second controlling switch is closed to control Make first power supply to power to the mobile terminal;Wherein, the closing time of second controlling switch is second pre- If the time;
Step 3:After second Preset Time, second controlling switch is disconnected;
Circulation performs above-mentioned steps 1 to step 3, until the switching on and shutting down testing time needed for completing.
2. the method for testing open/close machine of mobile terminal as claimed in claim 1, it is characterised in that also comprise the steps: After disconnection second controlling switch in the step 3, after waiting the 3rd Preset Time, closing in the step 1 is performed again Close first controlling switch.
3. the method for testing open/close machine of mobile terminal as claimed in claim 2, it is characterised in that described 3rd Preset Time etc. In first Preset Time.
4. the method for testing open/close machine of mobile terminal as claimed in claim 1, it is characterised in that first Preset Time is 5 seconds, second Preset Time be 55 seconds.
5. the method for testing open/close machine of mobile terminal as claimed in claim 1, it is characterised in that the automatic switch device is Relay.
6. the method for testing open/close machine of mobile terminal as claimed in claim 1, it is characterised in that first power supply is + 4V DC sources.
7. the method for testing open/close machine of mobile terminal as claimed in claim 1, it is characterised in that the automatization test system Also include the second power supply, second power supply is used to electric energy is provided for the automatic switch device.
8. the method for testing open/close machine of mobile terminal as claimed in claim 7, it is characterised in that second power supply is 220V alternating current power supplys.
9. the method for testing open/close machine of mobile terminal as claimed in claim 1, it is characterised in that the mobile terminal and described Ground connection is additionally provided with automatic switch device and between position, and the battery port of the mobile terminal and the ground connection position, also connects one Individual 10K resistance.
CN201611246024.0A 2016-12-29 2016-12-29 Start-up and shutdown test method for mobile terminal Pending CN106603790A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611246024.0A CN106603790A (en) 2016-12-29 2016-12-29 Start-up and shutdown test method for mobile terminal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611246024.0A CN106603790A (en) 2016-12-29 2016-12-29 Start-up and shutdown test method for mobile terminal

Publications (1)

Publication Number Publication Date
CN106603790A true CN106603790A (en) 2017-04-26

Family

ID=58605069

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611246024.0A Pending CN106603790A (en) 2016-12-29 2016-12-29 Start-up and shutdown test method for mobile terminal

Country Status (1)

Country Link
CN (1) CN106603790A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108874601A (en) * 2018-06-13 2018-11-23 四川斐讯信息技术有限公司 A kind of method for testing open/close machine and system of mobile terminal
CN113434347A (en) * 2021-06-25 2021-09-24 上海商米科技集团股份有限公司 Power-off automatic test system and method for mobile terminal
CN117082170A (en) * 2023-10-16 2023-11-17 荣耀终端有限公司 On-off test method, test system and shared host

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201571166U (en) * 2009-11-27 2010-09-01 深圳市同洲电子股份有限公司 Switch machine test system
CN103347194A (en) * 2013-01-22 2013-10-09 深圳创维数字技术股份有限公司 Method, apparatus and system for starting-up and shut-down testing

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201571166U (en) * 2009-11-27 2010-09-01 深圳市同洲电子股份有限公司 Switch machine test system
CN103347194A (en) * 2013-01-22 2013-10-09 深圳创维数字技术股份有限公司 Method, apparatus and system for starting-up and shut-down testing

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108874601A (en) * 2018-06-13 2018-11-23 四川斐讯信息技术有限公司 A kind of method for testing open/close machine and system of mobile terminal
CN113434347A (en) * 2021-06-25 2021-09-24 上海商米科技集团股份有限公司 Power-off automatic test system and method for mobile terminal
CN113434347B (en) * 2021-06-25 2023-02-07 上海商米科技集团股份有限公司 Power-off automatic test system and method for mobile terminal
CN117082170A (en) * 2023-10-16 2023-11-17 荣耀终端有限公司 On-off test method, test system and shared host
CN117082170B (en) * 2023-10-16 2024-03-08 荣耀终端有限公司 On-off test method, test system and shared host

Similar Documents

Publication Publication Date Title
CN103607798B (en) The detection method of pan type and electromagnetic heater
CN106603790A (en) Start-up and shutdown test method for mobile terminal
CN102255774A (en) Test system and test method for switch-on and switch-off of communication device as well as fault location method
CN105301381A (en) Automatic surge testing system and testing method
CN104410549B (en) The test system and method for router
CN206618845U (en) Power supply module for communication test system
CN105807155A (en) Testing device and method for power cut and starting of electric devices
CN203396869U (en) Integrated test equipment
CN107169388A (en) Realize the automatization test system and method for testing of SIM card hot plug function
CN110320463A (en) A kind of device and method for realizing Devices to test intelligence Aging control
CN201110878Y (en) Aging test system
CN105302680A (en) Automatic testing method for AC stability of RACK cabinet
CN103245869A (en) Detecting method for integrated circuit power supply base pin short circuit judging
CN105391833B (en) A kind of internal storage data loss test system and method based on mobile terminal
CN117112403A (en) Product automatic testing method, device, system and photovoltaic equipment
CN219533302U (en) Inverter testing device and system
CN104319427A (en) Acquiring apparatus of cell temperature, mobile terminal and debugging method
CN204855728U (en) Ageing and test state device of fast switch over semiconductor device
CN203084104U (en) OTP burning and upper/lower-limit voltage detecting system of liquid crystal display module
CN207096620U (en) liquid crystal display performance test system
CN105376379B (en) A kind of automatic test realization method and system of converse power consumption and stand-by power consumption
CN101661065A (en) System and method for automatically testing electronic product
CN102411318B (en) Device for automatically testing and controlling electromagnetic fan clutch for vehicle
CN106291173B (en) A kind of mobile phone radio frequency Reliability for Power Amplifiers Auto-Test System and method
CN206945856U (en) Solar energy bypass diode temperature rise test automation device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170426

WD01 Invention patent application deemed withdrawn after publication