CN106602727A - Power plant insulation supervision management system - Google Patents

Power plant insulation supervision management system Download PDF

Info

Publication number
CN106602727A
CN106602727A CN201611192008.8A CN201611192008A CN106602727A CN 106602727 A CN106602727 A CN 106602727A CN 201611192008 A CN201611192008 A CN 201611192008A CN 106602727 A CN106602727 A CN 106602727A
Authority
CN
China
Prior art keywords
insulation
control management
electrical equipment
power plant
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611192008.8A
Other languages
Chinese (zh)
Inventor
黄宏伟
王鹏
于凯
牛志华
高尚聪
鲁菲菲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Technology Information Center Spic Henan Electric Power Co Ltd
Original Assignee
Technology Information Center Spic Henan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Technology Information Center Spic Henan Electric Power Co Ltd filed Critical Technology Information Center Spic Henan Electric Power Co Ltd
Priority to CN201611192008.8A priority Critical patent/CN106602727A/en
Publication of CN106602727A publication Critical patent/CN106602727A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00001Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by the display of information or by user interaction, e.g. supervisory control and data acquisition systems [SCADA] or graphical user interfaces [GUI]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/242Home appliances

Landscapes

  • Engineering & Computer Science (AREA)
  • Human Computer Interaction (AREA)
  • Power Engineering (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention discloses a power plant insulation supervision management system. The system comprises an intelligent terminal used for reading an electrical equipment graphic code and an insulation supervision management platform used for storing insulation data corresponding to electrical equipment. When the intelligent terminal reads the graphic code of the electrical equipment, the insulation data corresponding to the electrical equipment, stored by the intelligent terminal is displayed, or the insulation data corresponding to the electrical equipment, sent by the insulation supervision management platform is displayed. It can be seen that an insulation database is established for each piece of electrical equipment, a unique graphic code is generated for each piece of electrical equipment, insulation supervision personnel schedules the insulation data of the equipment in a field by reading the equipment graphic code, insulation supervision management is realized through an information means, and the insulation supervision management efficiency of the electrical equipment of a power plant is improved.

Description

A kind of power plant insulation control management system
Technical field
The present invention relates to insulation control management technique field, more particularly to a kind of power plant insulation control management system.
Background technology
Insulation control be technical monitoring in power plants work an important ring, be directly connected to electrical equipment safety and can By property.The groundwork of insulation control is exactly periodically to carry out preventive trial to electrical equipment, and when time result of the test and with Calculating is compared toward result of the test, the degradation trend of analytical equipment insulation prevents the generation of electrical equipment accident.Always with Come, conventional result of the test is preserved with the test report of papery, each pilot project and by testing equipment phase not to the utmost again Together.That is, insulation control is the comparative analysiss that test data will be carried out to every electrical equipment, and as working foundation Preventive trial is the part test project of a collection of electrical equipment for power plant, and preventive trial and insulation control work lack Rare effect linking.In addition, power plant electricity number of devices is more, and position dispersion.
In sum, the efficiency for how improving the insulation control management of power plant electricity equipment is those skilled in the art's mesh The front technical issues that need to address.
The content of the invention
In view of this, it is an object of the invention to provide a kind of power plant insulation control management system, can significantly improve The efficiency of the insulation control management of power plant electricity equipment.Its concrete scheme is as follows:
A kind of power plant insulation control management system, including for reading the intelligent terminal of electrical equipment graphic code and be used for Store the electrical equipment to insulate accordingly the insulation control management platform of data, described electrically set when the intelligent terminal reads Standby graphic code, then show the insulation data of the respective electric equipment of intelligent terminal's storage, or show by the insulation prison Superintend and direct the insulation data of the respective electric equipment of management platform transmission.
Preferably, the electrical equipment only exists unique corresponding graphic code.
Preferably, the insulation data include device parameter, insulation resistance historical variations rate, winding D.C. resistance, direct current The alternate deviation ratio of leakage current, historical variations rate, winding dielectric loss and historical variations rate, insulating element partial discharge quantity, turn Dynamic equipment shaft voltage, electromotor, the unloaded short-circuit curve data of transformator, transformer oil chromatographic result and historical variations rate, set Pipe dielectric loss, capacitance of bushing value and historical variations rate, SF6 choppers, moisture and high voltage lightning-protection in SF6 current transformers Device is with or several in electric leakage current historical variations rate.
Preferably, the power plant insulation control management system also includes:
When electrical equipment within arbitrary default test period without corresponding insulation data, then the intelligent terminal send into The alarm of row preventive trial.
Preferably, the intelligent terminal is can be additionally used in the newest insulation number obtained in preventive trial of electrical equipment According to being uploaded to the insulation control management platform.
Preferably, the power plant insulation control management system also includes:
When the insulation data that electrical equipment is obtained in preventive trial are above standard value, then shown intelligent terminal sends police Report.
Preferably, the intelligent terminal can be additionally used in the insulation data of stored electricity equipment.
Preferably, the intelligent terminal is intelligent PDA.
Preferably, the graphic code is Quick Response Code.
A kind of power plant insulation control management system disclosed by the invention, including for reading the intelligence of electrical equipment graphic code Terminal and can insulate accordingly the insulation control management platform of data for storing the electrical equipment, when the intelligent terminal reads The graphic code of the electrical equipment is taken, is then shown the insulation data of the respective electric equipment of intelligent terminal's storage, or is shown The insulation data of the respective electric equipment sent by the insulation control management platform.It can be seen that, each is electrically set by the present invention Standby to set up insulation data base and generate unique patterns code, insulation control personnel transfer equipment by reading equipment graphic code at the scene Insulation data, with informationalized means realize insulation control manage, so as to improve the insulation control pipe of power plant electricity equipment The efficiency of reason.
Description of the drawings
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing Accompanying drawing to be used needed for having technology description is briefly described, it should be apparent that, drawings in the following description are only this Inventive embodiment, for those of ordinary skill in the art, on the premise of not paying creative work, can be with basis The accompanying drawing of offer obtains other accompanying drawings.
Fig. 1 is a kind of structural representation of power plant insulation control management system disclosed in the embodiment of the present invention;
Fig. 2 is the handling process in a kind of specific power plant insulation control management system disclosed in the embodiment of the present invention Figure.
Specific embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than the embodiment of whole.It is based on Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of creative work is not made Embodiment, belongs to the scope of protection of the invention.
The embodiment of the invention discloses a kind of power plant insulation control management system, including for reading electrical equipment figure The intelligent terminal 11 of code and insulate accordingly the insulation control management platform 12 of data for storing above-mentioned electrical equipment, when above-mentioned Intelligent terminal reads the graphic code of above-mentioned electrical equipment, then show the insulation number of the respective electric equipment of above-mentioned intelligent terminal's storage According to, or the insulation data for showing the respective electric equipment sent by above-mentioned insulation control management platform.
It should be understood that be intelligent terminal include intelligent PDA, may also comprise with photographic head be capable of scanning figure shape code its His smart machine, such as panel computer, smart mobile phone.Corresponding program is installed, by photographic head scanning electricity on intelligent terminal The graphic code of gas equipment, obtains corresponding insulation data from insulation control management platform.Certainly, smart machine itself can be stored Insulation data, the insulation data and smart machine memory space of itself being stored on smart machine are directly proportional.
In a kind of specific embodiment, after smart machine scanning figure shape code, if smart machine inherently stores this The insulation data of electrical equipment, then it is preferential to show;If smart machine itself does not store the insulation data of the electrical equipment, from exhausted Edge supervision and management platform obtains corresponding insulation data.Certainly, intelligent terminal preferentially can also be obtained from insulation control management platform Take insulation data.
In another kind of specific embodiment, the electrical equipment that staff checks as needed, beforehand through intelligence Equipment is downloaded the electrical equipment from insulation control management platform and is insulated accordingly data, and is examined according to the insulation data downloaded Look into.This embodiment is more suitable for the unstable region of network connection, data communication.
It is understood that insulation control management platform specifically can be realized by Cloud Server, when intelligent terminal is reading The graphic code of electrical equipment, intelligent terminal can show the insulation data and analytical conclusions of the equipment;In addition, using wired or wireless The network access insulation control management platform, can also obtain the insulation data and analytical conclusions of respective electric equipment.Therefore, manage Personnel adopt system disclosed by the invention, both can check the insulation of respective electric equipment at electrical equipment scene by intelligent terminal Data, can connect insulation control management platform in other places, such as ground such as office, meeting room by computer again, inquire about phase The insulation data answered.
The insulation data include device parameter, insulation resistance historical variations rate, winding D.C. resistance, DC leakage-current Alternate deviation ratio, historical variations rate, winding dielectric loss and historical variations rate, insulating element partial discharge quantity, rotating machinery axle Voltage, electromotor, the unloaded short-circuit curve data of transformator, transformer oil chromatographic result and historical variations rate, sleeve pipe medium are damaged Moisture and high-voltage arrester is powered lets out in consumption, capacitance of bushing value and historical variations rate, SF6 choppers, SF6 current transformers One or several in leakage current historical variations rate.
In order to preferably be managed to electrical equipment, each electrical equipment only exists unique corresponding graphic code.Certainly, Multiple graphic codes can also be set for different electrical equipments, but different electrical equipments can not possess identical graphic code.Additionally, When multiple graphic codes are arranged for same electrical equipment, when can utilize intelligent terminal's scanning to different graphic code, show Different insulation data, for example, certain electrical equipment is provided with 2 graphic codes, and smart machine scans first graphic code, then shows It is current insulation data, scans second graphic code, then shows the statistical data of insulation data.
It can be seen that, each electrical equipment is set up insulation data base and generates unique patterns code by the embodiment of the present invention, insulate Supervisor transfers the insulation data of equipment at the scene by reading equipment graphic code, realizes insulation control with informationalized means Management, so as to the efficiency that the insulation control for improving power plant electricity equipment is managed.
The insulation data of all electrical equipments are stored in insulation control management platform, and according to stored insulation data Data maintenance is carried out to electrical equipment, if electrical equipment was insulated data accordingly without the cycle within arbitrary test period, is led to Cross intelligent terminal and send alarm, preventive trial is carried out to remind.Additionally, in office spaces such as office, meeting room, Control Rooms The computer for being connected to insulation control management platform can also receive corresponding alarm.Equally, when insulation data occur more than standard value Situation, can also pass through intelligent terminal and accordingly be connected to the computer of insulation control management platform to send alarm.
After preventive trial is carried out to electrical equipment, by the insulation data input intelligent terminal for obtaining, so as to by electrically The newest insulation data of equipment are uploaded to above-mentioned insulation control management platform, to carry out data syn-chronization.Certainly, actually used In, there is the situation that network connection does not go up, therefore insulation data periodically can be uploaded to insulation control management platform by intelligent terminal, Insulation control management platform is according to collection date of the insulation data come to original insulation data in insulation control management platform It is updated, renewal described herein refers to that insulation control management platform carries out data extending on the basis of original insulation data, Increase the new insulation data for obtaining in original insulation data basis.Additionally, intelligent terminal is also supported periodically from insulation control Management platform downloads insulation data.
It should be noted that graphic code includes Quick Response Code and one-dimension code (bar code).
It is shown in Figure 2, it is a kind of place of concrete power plant insulation control management system disclosed in embodiment of the present invention Reason flow chart, including being that every electrical equipment generates a unique Quick Response Code in advance, PDA (intelligent terminal) is by scanning two dimension Code obtains the insulation data of electrical equipment corresponding with the Quick Response Code, to judge whether the electric equipment test project is above standard In the cycle of regulation, if the electrical equipment is above standard the cycle of regulation, intelligent terminal sends alarm automatically, if otherwise wait for by Call, if then remind carrying out preventive trial, test data is entered into into PDA (intelligent terminal) or software platform, with synchronization To insulation control management platform.When insulation data are above standard setting, PDA (intelligent terminal) sends alarm automatically, in addition, absolutely Whether edge supervision and management platform also can have pilot project within the cycle that standard specifies by electrical equipment in automatic decision compass of competency Do not carry out, if so, then insulation control management platform also can send test alarm automatically, if there is electric equipment test result exceeding Standard setting, then insulation control management platform also can send automatically exceeded alarm.
The present invention carries out information-based arrangement by PDA and achieves to the Insulation Test data account of every electrical equipment, with two Dimension code is easy to insulation control personnel and expert to check to the insulation status of electrical equipment at the scene as equipment unique mark And diagnosis.
Finally, in addition it is also necessary to explanation, herein, such as first and second or the like relational terms be used merely to by One entity or operation are made a distinction with another entity or operation, and are not necessarily required or implied these entities or operation Between there is any this actual relation or order.And, term " including ", "comprising" or its any other variant are anticipated Covering including for nonexcludability, so that a series of process, method, article or equipment including key elements not only includes that A little key elements, but also including other key elements being not expressly set out, or also include for this process, method, article or The intrinsic key element of equipment.In the absence of more restrictions, the key element for being limited by sentence " including ... ", not Exclude and also there is other identical element in the process including the key element, method, article or equipment.
Above a kind of power plant insulation control management system provided by the present invention is described in detail, herein should The principle and embodiment of the present invention are set forth with specific case, the explanation of above example is only intended to help and manages The solution method of the present invention and its core concept;Simultaneously for one of ordinary skill in the art, according to the thought of the present invention, Will change in specific embodiment and range of application, in sum, this specification content is should not be construed as to this Bright restriction.

Claims (9)

1. a kind of power plant insulation control management system, including for reading the intelligent terminal of electrical equipment graphic code and for depositing Store up the electrical equipment to insulate accordingly the insulation control management platform of data, it is characterised in that when the intelligent terminal reads The graphic code of the electrical equipment, then show the insulation data of the respective electric equipment of intelligent terminal storage, or show by The insulation data of the respective electric equipment that the insulation control management platform sends.
2. insulation control management system in power plant according to claim 1, it is characterised in that the electrical equipment is only existed Unique corresponding graphic code.
3. insulation control management system in power plant according to claim 2, it is characterised in that the insulation data include setting Standby parameter, insulation resistance historical variations rate, winding D.C. resistance, the alternate deviation ratio of DC leakage-current, historical variations rate, winding Dielectric loss and historical variations rate, insulating element partial discharge quantity, rotating machinery shaft voltage, electromotor, transformator it is unloaded short Road curve data, transformer oil chromatographic result and historical variations rate, sleeve pipe dielectric loss, capacitance of bushing value and historical variations rate, In SF6 choppers, SF6 current transformers moisture and high-voltage arrester with electric leakage current historical variations rate or Several.
4. insulation control management system in power plant according to claim 3, it is characterised in that also include:
When electrical equipment within arbitrary default test period without corresponding insulation data, then the intelligent terminal send carry out it is pre- The alarm of anti-property test.
5. insulation control management system in power plant according to claim 4, it is characterised in that the intelligent terminal also can use In the newest insulation data obtained in preventive trial of electrical equipment are uploaded to the insulation control management platform.
6. insulation control management system in power plant according to claim 5, it is characterised in that also include:
When the insulation data that electrical equipment is obtained in preventive trial are above standard value, then shown intelligent terminal sends alarm.
7. insulation control management system in power plant according to claim 6, it is characterised in that the intelligent terminal also can use In the insulation data of stored electricity equipment.
8. insulation control management system in power plant according to claim 7, it is characterised in that the intelligent terminal is intelligence PDA。
9. the power plant insulation control management system according to any one of claim 1-8, it is characterised in that the graphic code For Quick Response Code.
CN201611192008.8A 2016-12-21 2016-12-21 Power plant insulation supervision management system Pending CN106602727A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611192008.8A CN106602727A (en) 2016-12-21 2016-12-21 Power plant insulation supervision management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611192008.8A CN106602727A (en) 2016-12-21 2016-12-21 Power plant insulation supervision management system

Publications (1)

Publication Number Publication Date
CN106602727A true CN106602727A (en) 2017-04-26

Family

ID=58600283

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611192008.8A Pending CN106602727A (en) 2016-12-21 2016-12-21 Power plant insulation supervision management system

Country Status (1)

Country Link
CN (1) CN106602727A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110176768A (en) * 2018-07-17 2019-08-27 吴怀诚 A kind of electric power data analysis method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014176077A (en) * 2013-03-07 2014-09-22 Nippon Electronics Service Kk Rfid data carrier suitable for automobile individual management
CN106022719A (en) * 2016-05-16 2016-10-12 华北电力科学研究院有限责任公司 Large-scale generator insulation data management system
CN106202401A (en) * 2016-07-11 2016-12-07 刘辉 A kind of insulator Life cycle information management platform and method thereof

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014176077A (en) * 2013-03-07 2014-09-22 Nippon Electronics Service Kk Rfid data carrier suitable for automobile individual management
CN106022719A (en) * 2016-05-16 2016-10-12 华北电力科学研究院有限责任公司 Large-scale generator insulation data management system
CN106202401A (en) * 2016-07-11 2016-12-07 刘辉 A kind of insulator Life cycle information management platform and method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110176768A (en) * 2018-07-17 2019-08-27 吴怀诚 A kind of electric power data analysis method

Similar Documents

Publication Publication Date Title
CN103972981B (en) A kind of intelligent monitor system of the low-tension switch cabinet based on cloud
CN108519127A (en) A kind of cable tunnel intelligent monitor system
CN105678651A (en) Power grid big data quality standardization-based power grid information management system and method
CN104410169A (en) Intelligent and online area monitoring system and implementation method thereof
DE202008009128U1 (en) Consumption and state meter
CN203678537U (en) Monitoring system of electric precipitator
CN103715767A (en) Smart power grid information integration and display platform
CN101895149A (en) The method and apparatus of web-enabled Engine-Generator system
CN103166311A (en) Intelligent distribution box
CN206431183U (en) Monitoring alarm temporarily drops in line voltage
CN106655523A (en) Smart electric service system
CN105807111A (en) Electricity stealing load control method of electricity facility, intelligent electricity management device and system
CN108449217A (en) Energy equipment management system based on Internet of Things
CN108711941A (en) Repair apparatus electriferous state detection method in a kind of power distribution network
US20190090145A1 (en) Commercial power restore indicator for sites, such as for cellular telecommunications sites
CN106502131A (en) New arc suppression coil control system based on internet platform
CN106249039A (en) A kind of on-line overvoltage monitor for power distribution network
CN104951884A (en) Visual display method of accident emergency repair and inversion based on distribution network
CN102209231B (en) Equipment information output method and system
CN106602727A (en) Power plant insulation supervision management system
CN211018398U (en) Power distribution room monitoring system
CN208691262U (en) Energy device management system based on Internet of Things
CN103178511A (en) Intelligent fault line selection and fault management system for power distribution network
CN102611198B (en) Protecting device for automatic remote wireless transmission of data
CN205159839U (en) Modular flame -proof type high pressure vacuum distribution device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170426