CN106592658B CN201611089336.5A CN201611089336A CN106592658B CN 106592658 B CN106592658 B CN 106592658B CN 201611089336 A CN201611089336 A CN 201611089336A CN 106592658 B CN106592658 B CN 106592658B
Authority
CN
China
Prior art keywords
pile
concrete
minor diameter
foundation
cushion cap
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611089336.5A
Other languages
Chinese (zh)
Other versions
CN106592658A (en
Inventor
叶香菲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
DAHAO MUNICIPAL CONSTRUCTION Co.,Ltd.
Original Assignee
叶香菲
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 叶香菲 filed Critical 叶香菲
Priority to CN201611089336.5A priority Critical patent/CN106592658B/en
Priority to CN201810325126.4A priority patent/CN108425387B/en
Priority to CN201710436016.0A priority patent/CN107191001B/en
Priority to CN201810323695.5A priority patent/CN108547337B/en
Publication of CN106592658A publication Critical patent/CN106592658A/en
Application granted granted Critical
Publication of CN106592658B publication Critical patent/CN106592658B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0218Increasing or restoring the load-bearing capacity of building construction elements
    • E04G23/0229Increasing or restoring the load-bearing capacity of building construction elements of foundations or foundation walls
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D37/00Repair of damaged foundations or foundation structures

Abstract

The invention discloses a kind of foundation construction methods for tearing down and building house foundation, it is characterized in that the basis in house uses raft foundation after transformation, raft foundation thickness is 600~800mm, raft foundation is constituted by cutting low rear cushion cap and new casting foundation, cushion cap and new casting foundation are linked to be entirety by dowel, back pouring hole is set in cushion cap, and back pouring hole diameter is identical as concrete-pile.Minor diameter concrete-pile, a diameter of 150~300mm of minor diameter concrete-pile are arranged except cushion cap, top concrete stake eliminates 100~150mm, and rubber block is arranged in stake top, and rubber block thickness is 100~150mm;Precast concrete pipe collar is arranged in minor diameter concrete-pile pile crown, and minor diameter concrete-pile stake top is laid with rubble sand bedding course.

Description

Tear down and build the foundation construction method of house foundation
Technical field
The present invention relates to a kind of building strengthening structure, more particularly to a kind of foundation construction method for tearing down and building house foundation.
Background technology
With the development of urban construction, some dilapidated houses need to be transformed, and original usual number of plies of dilapidated house is relatively low, pass The load for passing ground is smaller, so the bearing capacity after basement process is relatively low.And the number of plies in house may compare after being transformed Original dilapidated house wants much higher, and the load for passing to ground also can be larger, and ground must be handled again could meet bearing capacity It is required that.Since the pile foundation in house after the pile foundation of original dilapidated house and transformation has larger difference, if dealt with improperly when appearance It is uneven to easily cause local foundation deformation, causes differential settlement.
Invention content
For the deficiencies in the prior art, the purpose of the present invention is to provide a kind of bases for tearing down and building house foundation to apply Work method ensures that building settlement and load-carrying properties reach requirement.
There are two types of forms for the basement process of dilapidated house:First, being reinforced using rigid pile such as concrete-pile, basic type Formula is usually cushion cap foundation;Second is that being reinforced using flexible pile such as cement mixing pile, foundation pattern is usually raft foundation.This Invention uses different technical solutions for different pile foundation forms.
For the basis reinforced using rigid pile such as concrete-pile, using following technical scheme:
In order to promote economic benefit, existing pile foundation and concrete foundation are utilized as far as possible.Since cushion cap height is relatively high, After foundation structure form is transformed into raft foundation, if raft foundation height is identical as cushion cap height, it will seem more wasteful, Cushion cap can suitably be cut low.It is 600~800mm, raft plate that the basis in house, which uses raft foundation, raft foundation thickness, after transformation Basis is constituted by cutting low rear cushion cap and new casting foundation, and new casting foundation lower rebar uses the reinforcing bar of a diameter of 20~25mm, reinforcing bar Spacing is that 150~200mm, cushion cap and new casting foundation are linked to be entirety by dowel, and dowel spacing is 200~250mm, connection A diameter of 22~the 25mm of muscle, dowel stretch into the pre-buried hole length of cushion cap be 250~300mm, cushion cap embedded hole a diameter of 24~ 27mm, between dowel and cushion cap embedded hole gap using epoxy resin clog, dowel expose to cushion cap length be 400~ 450mm.Back pouring hole is set in cushion cap, and back pouring hole diameter is identical as concrete-pile.
Original concrete-pile is usually arranged in the form of cushion cap, and minor diameter concrete-pile is arranged except cushion cap, small Rubber block is arranged in concrete-pile stake top in a diameter of 150~300mm of diameter concrete-pile, and rubber block thickness is 100~150mm. Precast concrete pipe collar is arranged in minor diameter concrete-pile pile crown, and precast concrete pipe collar is embedded in minor diameter concrete-pile pile crown height For 100mm, precast concrete pipe collar top is higher by 120~150mm than minor diameter concrete-pile stake top.Minor diameter concrete-pile stake Top is laid with rubble sand bedding course, and stone sand cushion thickness is 120~150mm, and minor diameter concrete-pile stake is long can be with concrete-pile Stake is long identical, if Geological condition has a hard formation in superficial part, minor diameter concrete-pile can stretch into superficial part hard formation 500~ 800mm forms length pilework with concrete-pile, and superficial part hard formation is generally 10~20m here, and the deep that concrete-pile stretches into is hard Layer is generally the soil layer of 20m or more.
It is to enable minor diameter concrete-pile and soil preferably to cooperate with that rubble sand bedding course, which is arranged in minor diameter concrete-pile, Effect, since the rigidity of minor diameter concrete-pile is very big, and native relatively small, the minor diameter concrete-pile stress under same strain Can be larger, and soil stress can be smaller, minor diameter can effectively be reduced by being laid with rubble sand bedding course in minor diameter concrete-pile stake top The rigidity of concrete-pile and surrounding soil ratio.There is horizontal comparison under upper load effect in rubble sand bedding course in order to prevent, overflows Enter surrounding soil disequilibrium stress, in minor diameter concrete-pile stake top nesting precast concrete pipe collar.
Minor diameter concrete-pile quantity is according to requirement for bearing capacity and requirement of settlement control double control, minor diameter concrete-pile Quantity first primarily determines that minor diameter concrete-pile quantity S is determined according to the following formula, S=m according to bearing capacity2Az/Ap2, AzFor raft plate base Plinth bottom area, m2For minor diameter concrete-pile replacement rate, the i.e. ratio of stake total sectional area and raft foundation bottom area, Ap2For Minor diameter concrete-pile sectional area, minor diameter concrete-pile replacement rate m2It determines according to the following formula, f=m1R1/Ap1+(Ec2/Ec1) m2R2/Ap2+θ(Es/Ec1)fs, m in formula1For concrete-pile replacement rate, i.e. concrete-pile total sectional area and raft foundation bottom area Ratio, R1For concrete-pile bearing capacity, Ap1For concrete-pile sectional area, Ec1For concrete-pile elasticity modulus, Ec2For minor diameter Concrete-pile elasticity modulus, m2For minor diameter concrete-pile replacement rate, R2For minor diameter concrete-pile bearing capacity, Ap2For minor diameter Concrete-pile sectional area, θ are reduction coefficient, take 0.5~0.6, EsFor native elasticity modulus, fsFor native foundation bearing capacity.
Sedimentation review is carried out after primarily determining minor diameter concrete-pile quantity according to requirement for bearing capacity.Settlement formula is adopted With as follows:
P is the stress that top passes to ground, E in formulasiIt is composite modulus, ZiAnd Zi-1For The bottom of foundation respectively to the depth within the scope of i-th layer and (i-1)-th layer of bottom surface,WithFor basic bottom surface respectively to i-th layer and Average additional stress coefficient within the scope of i-1 layers of bottom surface, according to《Building foundation treatment technical specification》(JGJ-79-91) come true Fixed, the composite modulus of entire ground can be divided into three parts along depth direction, and first part is concrete-pile, minor diameter concrete-pile The ground formed with soil, second part are the ground that concrete-pile and soil are formed, and Part III is the ground that subjacent bed soil is formed.
First part composite modulus Es1Calculation formula is using as follows:Es1=m1Ec1+m2Ec2+(1-m1-m2)Es, second part Composite modulus Es2Calculation formula is using as follows:Es2=m1Ec1+(1-m1)Es
If sedimentation more than 100mm, increases minor diameter concrete-pile length and quantity carries out sedimentation review again, until Until sedimentation reaches requirement.
Construction procedure includes:
(1) former cushion cap is cut higher than new casting foundation top mark high-order bit concrete, is cut to new casting foundation top mark height 150mm below position, and the extra reinforcing bar in top is cut off, lower part stirrup welds small stirrup, and small stirrup height is 100mm, small hoop Bar diameter used by muscle is 8mm, and spacing is 50~100mm, and steel bar stress is set up above small stirrup and carries out banding fixed;
(2) former cushion cap concrete-pile position concrete chisel removal is gone out into back pouring hole, concrete-pile stake top carries out cutting low, concrete Stake top absolute altitude is lower 100~150mm than former cushion cap bottom absolute altitude;Concrete-pile stake top reinforcing bar would generally stretch into former cushion cap 50cm, mix Solidifying soil stake top is cut and is flushed as low as concrete-pile stake top behind position with cutting as low as wiping out concrete-pile stake top exposed steel bar behind position;
(3) the minor diameter concrete-pile between construction bearing platform, minor diameter concrete-pile stake top absolute altitude is than former cushion cap bottom absolute altitude Low 50~100mm;
(4) it is inserted in precast concrete pipe collar in minor diameter concrete-pile stake top;
(5) it is laid with rubble sand bedding course in minor diameter concrete-pile stake top;
(6) it is drilled with preformed hole with electric drill, dowel is inserted into preformed hole, epoxy resin sealing preformed hole is used in combination and connect Gap between muscle;
(7) new casting foundation reinforcing bar is bound, new casting foundation template is installed, pours new casting foundation concrete, it is then that cushion cap is low In new casting foundation top mark high-order bit, concrete is poured;
(8) concrete-pile stake top is laid with rubber block after cutting as low as position;
(9) back pouring hole is closed with expansive concrete again after house reaches three layers;Since concrete-pile is in upper load Effect is lower to be easy first to carry, and the especially native bearing capacity of minor diameter concrete-pile bearing capacity is difficult to be played, and back pouring hole waits for Re-closed purpose is that minor diameter concrete-pile and soil is allowed first to participate in carrying after house reaches three layers, waits for that the number of plies increases concrete The ability of stake, minor diameter concrete-pile and earth cooperation carrying can further enhance.
For the basis reinforced using flexible pile such as cement mixing pile, using following technical scheme:
It is 600~800mm that the basis in house, which uses raft foundation, raft foundation thickness, after transformation.It is held to promote ground Power and non-deformability are carried, I-steel is inserted into part of cement mixing pile, I-steel length is the 1.8 of cement mixing pile length ~2.5 times.I-steel is arranged position and back pouring hole is arranged, and back pouring hole diameter is identical as cement mixing pile diameter.In order to avoid by Stress concentration during power is laid with rubber block in I-steel, and rubber block thickness is 150~200mm.Back pouring hole after I-steel carrying Punching resistance suffered by position can be larger, therefore reinforcing rib is arranged at back pouring hole position, and reinforcing rib is the steel of 4 a diameter of 25mm Muscle, while the stirrup that spacing is 200mm, stirrup diameter 8mm are set.
I-steel quantity is according to requirement for bearing capacity and requirement of settlement control double control, and I-steel quantity is first according to bearing capacity It primarily determines, I-steel quantity G is determined according to the following formula, G=m2gAz/Ap2g, AzFor raft foundation bottom area, m2gFor I-steel Replacement rate, the i.e. ratio of stake total sectional area and raft foundation bottom area, Ap2gFor I-steel sectional area, I-steel replacement rate m2g It determines according to the following formula,
F=m1sR1s/Ap1s+(Ec2g/Ec1s)m2gR2g/Ap2g+β(Es/Ec1s)fs, m in formula1sTo be not inserted into the cement of I-steel Mixing pile replacement rate is not inserted into the ratio of the cement mixing pile total sectional area and raft foundation bottom area of I-steel, R1sFor Bearing Capacity of Cement Deep Mixing Piles, Ap1sFor cement mixing dowel section area, Ec1sFor cement mixing pile elasticity modulus, Ec2gFor I-shaped steel bomb Property modulus, m2gFor I-steel replacement rate, R2gFor I-steel bearing capacity, Ap2gFor I-steel sectional area, β is reduction coefficient, takes 0.7 ~0.8, EsFor native elasticity modulus, fsFor native foundation bearing capacity.
Sedimentation review is carried out after primarily determining I-steel quantity according to requirement for bearing capacity.Settlement formula is using as follows:P is the stress that top passes to ground, E in formulasiIt is composite modulus, ZiAnd Zi-1For basic bottom surface Respectively to the depth within the scope of i-th layer and (i-1)-th layer of bottom surface,WithIt is basic bottom surface respectively to i-th layer and (i-1)-th layer of bottom surface Average additional stress coefficient in range, according to《Building foundation treatment technical specification》(JGJ-79-91) it determines, entire ground Composite modulus can be divided into three parts along depth direction, first part is the ground that cement mixing pile, I-steel and soil are formed, the Two parts are the ground that I-steel and soil are formed, and Part III is the ground that subjacent bed soil is formed.
First part composite modulus Es1sCalculation formula is using as follows:Es1s=m1sEc1s+m2gEc2g+(1-m1s-m2g)Es, the Two part composite modulus Es2sCalculation formula is using as follows:Es2s=m2gEc2g+(1-m2g)Es
If sedimentation more than 100mm, increases I-steel length and quantity carries out sedimentation review again, until sedimentation reaches Until it is required that.
Construction procedure includes:
(1) the raft board concrete for installing I-steel position is cut into out back pouring hole, and cuts off the extra reinforcing bar in top;
(2) drilling machine drilling tool passes through back pouring hole to be drilled with I-shaped slot in cement mixing stake body, and drill tip installs I-shaped cutter Cut soil cement, I-steel sling using loop wheel machine, I-steel be inserted into during I-shaped slot ensured by fixing steel plate it is vertical Degree;
(3) gap of waterglass closing I-steel and I-shaped slot, waterglass injection pressure are injected after I-steel is inserted into For 1~1.2MPa, to ensure slip casting effect.
(4) rubber block is laid at the top of I-steel;
(5) steel reinforcement cage being made of reinforcing rib and stirrup is put into back pouring hole again after house reaches three layers;Due to work Word steel rigidity is obviously more much greater than cement mixing pile rigidity or native rigidity, is easy first to carry under upper load effect, water The especially native bearing capacity of mud stirring pile bearing capacity is difficult to be played, back pouring hole re-closed mesh after house reaches three layers Be allow cement mixing pile and soil first participate in carrying, wait for the number of plies increase cement mixing pile, I-steel and earth cooperation carrying ability It can further enhance.
(6) back pouring hole is poured, back pouring hole uses expansive concrete;Back pouring hole pours sequence to be intermediate behind first periphery, and to the greatest extent Amount is relatively uniform when I-steel being made to carry using symmetrical closed mode.
Constructing operation of the present invention is convenient, securely and reliably.
Description of the drawings
Fig. 1 is cushion cap schematic diagram, and Fig. 2 is the raft foundation elevational schematic view with rigid pile foundation form, and Fig. 3 is band rigidity The raft foundation floor map of pile foundation form, Fig. 4 are the raft foundation floor map with flexible pile base form.
1, cushion cap, 2, concrete-pile, 3, rubber block, 4, back pouring hole, 5, dowel, 6, minor diameter concrete-pile, 7, prefabricated Concrete pipe collar, 8, rubble sand bedding course, 9, new casting foundation, 10, cement mixing pile, 11, I-steel.
Specific implementation mode
Embodiment one
It is 700mm that the basis in house, which uses raft foundation, raft foundation thickness, after transformation, and raft foundation is by cutting low rear cushion cap 1 and new casting foundation 9 constitute, 9 lower rebar of new casting foundation use a diameter of 22mm reinforcing bar, bar spacing 150mm, cushion cap 1 Entirety is linked to be by dowel 5 with new casting foundation 9,5 spacing of dowel is 200mm, 5 a diameter of 22mm of dowel, and dowel 5 is stretched Enter 1 pre-buried hole length of cushion cap for 250mm, a diameter of 24mm of 1 embedded hole of cushion cap, gap is adopted between 1 embedded hole of dowel 5 and cushion cap It is clogged with epoxy resin, it is 400mm that dowel 5, which exposes to 1 length of cushion cap,.Back pouring hole 4 is set in cushion cap 1,4 diameter of back pouring hole with Concrete-pile 2 is identical.
Minor diameter concrete-pile 6,6 a diameter of 200mm of minor diameter concrete-pile, in concrete-pile 2 are arranged except cushion cap 1 Rubber block 3 is arranged in stake top, and 3 thickness of rubber block is 120mm.Precast concrete pipe collar 7 is arranged in 6 pile crown of minor diameter concrete-pile, in advance It is 100mm that concrete pipe collar 7 processed, which is embedded in 6 pile crown height of minor diameter concrete-pile, and 7 top of precast concrete pipe collar is more mixed than minor diameter Solidifying soil 6 stake top of stake is higher by 120mm.6 stake top of minor diameter concrete-pile is laid with rubble sand bedding course 8, and 8 thickness of rubble sand bedding course is 120mm, Geological condition have hard formation in 15m superficial parts, and minor diameter concrete-pile 6 stretches into superficial part hard formation 600mm, with concrete-pile 2 form length pilework.
6 quantity of minor diameter concrete-pile is according to requirement for bearing capacity and requirement of settlement control double control, minor diameter concrete 6 quantity of stake first primarily determine that 6 quantity S of minor diameter concrete-pile is determined according to the following formula, S=m according to bearing capacity2Az/Ap2, AzFor raft Plate foundation bottom area, m2For 6 replacement rate of minor diameter concrete-pile, the i.e. ratio of stake total sectional area and raft foundation bottom area Value, Ap2For 6 sectional area of minor diameter concrete-pile, 6 replacement rate m of minor diameter concrete-pile2It determines according to the following formula, f=m1R1/Ap1+ (Ec2/Ec1)m2R2/Ap2+θ(Es/Ec1)fs, m in formula1For 2 replacement rate of concrete-pile, i.e. 2 total sectional area of concrete-pile and raft plate base The ratio of plinth bottom area, R1For 2 bearing capacity of concrete-pile, Ap1For 2 sectional area of concrete-pile, Ec1For 2 springform of concrete-pile Amount, Ec2For 6 elasticity modulus of minor diameter concrete-pile, m2For 6 replacement rate of minor diameter concrete-pile, R2For minor diameter concrete-pile 6 Bearing capacity, Ap2For 6 sectional area of minor diameter concrete-pile, θ is reduction coefficient, takes 0.5~0.6, EsFor native elasticity modulus, fsFor soil Foundation bearing capacity.
Sedimentation review is carried out after primarily determining 6 quantity of minor diameter concrete-pile according to requirement for bearing capacity.Settlement formula Using as follows:
P is the stress that top passes to ground, E in formulasiIt is composite modulus, ZiAnd Zi-1For The bottom of foundation respectively to the depth within the scope of i-th layer and (i-1)-th layer of bottom surface,WithFor basic bottom surface respectively to i-th layer and Average additional stress coefficient within the scope of i-1 layers of bottom surface, according to《Building foundation treatment technical specification》(JGJ-79-91) come true Fixed, the composite modulus of entire ground can be divided into three parts along depth direction, and first part is concrete-pile 2, minor diameter concrete The ground that stake 6 and soil are formed, second part are the ground that concrete-pile 2 and soil are formed, and Part III is what subjacent bed soil was formed Ground.
First part composite modulus Es1Calculation formula is using as follows:Es1=m1Ec1+m2Ec2+(1-m1-m2)Es, second part Composite modulus Es2Calculation formula is using as follows:Es2=m1Ec1+(1-m1)Es
If sedimentation more than 100mm, increases by 6 length of minor diameter concrete-pile and quantity carries out sedimentation review again, directly Until sedimentation reaches requirement.According to above-mentioned steps, 11 quantity of I-steel is determined as 125.
Construction procedure includes:
(1) former cushion cap 1 is cut higher than 9 top mark high-order bit concrete of new casting foundation, is cut to 9 top mark of new casting foundation 150mm below high-order bit, and the extra reinforcing bar in top is cut off, lower part stirrup welds small stirrup, and small stirrup height is 100mm, small Bar diameter used by stirrup is 8mm, and spacing is 50~100mm, and steel bar stress is set up above small stirrup and bind solid It is fixed;
(2) 1 concrete-pile of former cushion cap, 2 position concrete chisel removal is gone out into back pouring hole 4,2 stake top of concrete-pile cut low, mixes Solidifying soil 2 stake top absolute altitude of stake is lower 100~150mm than 1 bottom absolute altitude of former cushion cap;2 stake top of concrete-pile cut as low as behind position by concrete-pile 2 Stake top exposed steel bar is wiped out and is flushed as low as 2 stake top of concrete-pile behind position with cutting;
(3) the minor diameter concrete-pile 6 between construction bearing platform 1,6 stake top absolute altitude of minor diameter concrete-pile is than 1 bottom of former cushion cap Low 50~the 100mm of absolute altitude;
(4) it is inserted in precast concrete pipe collar 7 in 6 stake top of minor diameter concrete-pile;
(5) it is laid with rubble sand bedding course 8 in 6 stake top of minor diameter concrete-pile;
(6) it is drilled with preformed hole with electric drill, dowel 5 is inserted into preformed hole, epoxy resin sealing preformed hole and company is used in combination Connect gap between muscle 5;
(7) new 9 reinforcing bar of casting foundation is bound, 9 template of new casting foundation is installed, 9 concrete of new casting foundation is poured, then by cushion cap 1 is poured less than 9 top mark high-order bit concrete of new casting foundation;
(8) 2 stake top of concrete-pile is laid with rubber block 3 after cutting as low as position;
(9) back pouring hole 4 is closed with expansive concrete again after house reaches three layers.
Embodiment two
For using the flexible pile basis that for example cement mixing pile 10 is reinforced in the present embodiment, using following technical side Case:
It is 700mm that the basis in house, which uses raft foundation, raft foundation thickness, after transformation, and 10 length of cement mixing pile is 15m, is inserted into I-steel 11 in part of cement mixing pile 10, and 11 length of I-steel is 30m.Position raft plate base is arranged in I-steel 11 Back pouring hole 4 is arranged in plinth, and 4 diameter of back pouring hole is identical as 10 diameter of cement mixing pile.It is laid with rubber block 3, rubber block 3 in I-steel 11 Thickness is 180mm.Reinforcing rib is set at 4 position of back pouring hole, reinforcing rib is the reinforcing bar of 4 a diameter of 25mm, while spacing is arranged For the stirrup of 200mm, stirrup diameter 8mm.
11 quantity of I-steel is according to requirement for bearing capacity and requirement of settlement control double control, and 11 quantity of I-steel first hold by basis It carries power and primarily determines that 11 quantity G of I-steel is determined according to the following formula, G=m2gAz/Ap2g, AzFor raft foundation bottom area, m2gFor 11 replacement rate of I-steel, the i.e. ratio of stake total sectional area and raft foundation bottom area, Ap2gFor 11 sectional area of I-steel, I-shaped 11 replacement rate m of steel2gIt determines according to the following formula,
F=m1sR1s/Ap1s+(Ec2g/Ec1s)m2gR2g/Ap2g+β(Es/Ec1s)fs, m in formula1sTo be not inserted into the water of I-steel 11 10 replacement rate of mud mixing pile is not inserted into 10 total sectional area of cement mixing pile of I-steel 11 and the ratio of raft foundation bottom area Value, R1sFor 10 bearing capacity of cement mixing pile, Ap1sFor 10 sectional area of cement mixing pile, Ec1sFor 10 elasticity modulus of cement mixing pile, Ec2gFor 11 elasticity modulus of I-steel, m2gFor 11 replacement rate of I-steel, R2gFor 11 bearing capacity of I-steel, Ap2gIt is cut for I-steel 11 Area, β are reduction coefficient, take 0.75, EsFor native elasticity modulus, fsFor native foundation bearing capacity;
Sedimentation review is carried out after primarily determining 11 quantity of I-steel according to requirement for bearing capacity.Settlement formula is using such as Under:P is the stress that top passes to ground, E in formulasiIt is composite modulus, ZiAnd Zi-1Based on Bottom surface respectively to the depth within the scope of i-th layer and (i-1)-th layer of bottom surface,WithIt is basic bottom surface respectively to i-th layer and (i-1)-th layer Average additional stress coefficient within the scope of bottom surface, according to《Building foundation treatment technical specification》(JGJ-79-91) it determines, entirely The composite modulus of ground can be divided into three parts along depth direction, and first part is that cement mixing pile 10, I-steel 11 and soil are formed Ground, second part be I-steel 11 and soil formed ground, Part III be subjacent bed soil formed ground.
First part composite modulus Es1sCalculation formula is using as follows:Es1s=m1sEc1s+m2gEc2g+(1-m1s-m2g)Es, the Two part composite modulus Es2sCalculation formula is using as follows:Es2s=m2gEc2g+(1-m2g)Es
If sedimentation more than 100mm, increases by 11 length of I-steel and quantity carries out sedimentation review again, until sedimentation reaches Until requirement.According to above-mentioned steps, 11 quantity of I-steel is determined as 76.
Construction procedure includes:
(1) the raft board concrete for installing 11 position of I-steel is cut into out back pouring hole 4, and cuts off the extra reinforcing bar in top;
(2) drilling machine drilling tool passes through back pouring hole 4 to be drilled with I-shaped slot in 10 pile body of cement mixing pile, and drill tip installs I-shaped knife Have to cut soil cement, I-steel 11 is sling using loop wheel machine, I-steel 11 is protected during being inserted into I-shaped slot by fixing steel plate Demonstrate,prove verticality;
(3) gap of waterglass closing I-steel 11 and I-shaped slot, waterglass injection are injected after I-steel 11 is inserted into Pressure is 1~1.2MPa, to ensure slip casting effect.
(4) it is laid with rubber block 3 at 11 top of I-steel;
(5) steel reinforcement cage being made of reinforcing rib and stirrup is put into back pouring hole 4 again after house reaches three layers;
(6) back pouring hole 4 is poured, back pouring hole 4 uses expansive concrete;Back pouring hole 4 pours sequence to be intermediate behind first periphery, and Symmetrical closed mode is used as possible.

Claims (1)

1. a kind of foundation construction method for tearing down and building house foundation, it is characterized in that the basis in house uses raft foundation, raft after transformation Plate base thickness is 600~800mm, and raft foundation is constituted by cutting low rear cushion cap and new casting foundation, and new casting foundation lower rebar is adopted With the reinforcing bar of a diameter of 20~25mm, bar spacing is 150~200mm, and cushion cap and new casting foundation are linked to be entirety by dowel, Dowel spacing be 200~250mm, a diameter of 22~25mm of dowel, dowel stretch into the pre-buried hole length of cushion cap be 250~ 300mm, a diameter of 24~27mm of cushion cap embedded hole, gap is clogged using epoxy resin between dowel and cushion cap embedded hole, even It is 400~450mm to connect muscle and expose to cushion cap length;Back pouring hole is set in cushion cap, and back pouring hole diameter is identical as concrete-pile;
Minor diameter concrete-pile, a diameter of 150~300mm of minor diameter concrete-pile, in concrete-pile stake are arranged except cushion cap Top setting rubber block, rubber block thickness are 100~150mm;Precast concrete pipe collar is arranged in minor diameter concrete-pile pile crown, prefabricated It is 100mm that concrete pipe collar, which is embedded in minor diameter concrete-pile pile crown height, and precast concrete pipe collar top is than minor diameter concrete Stake top is higher by 120~150mm;Minor diameter concrete-pile stake top be laid with rubble sand bedding course, stone sand cushion thickness be 120~ 150mm, minor diameter concrete-pile stake is long long identical as concrete-pile stake, small straight if Geological condition has hard formation in superficial part Diameter concrete-pile stretches into 500~800mm of superficial part hard formation;
Minor diameter concrete-pile quantity is according to requirement for bearing capacity and requirement of settlement control double control, minor diameter concrete-pile quantity It is first primarily determined according to bearing capacity, minor diameter concrete-pile quantity S is determined according to the following formula, S=m2Az/Ap2, AzFor raft foundation bottom Portion's area, m2For minor diameter concrete-pile replacement rate, the i.e. ratio of stake total sectional area and raft foundation bottom area, Ap2It is small straight Diameter concrete-pile sectional area, minor diameter concrete-pile replacement rate m2It determines according to the following formula, f=m1R1/Ap1+(Ec2/Ec1)m2R2/Ap2 +θ(Es/Ec1)fs, m in formula1For concrete-pile replacement rate, the i.e. ratio of concrete-pile total sectional area and raft foundation bottom area, R1For concrete-pile bearing capacity, Ap1For concrete-pile sectional area, Ec1For concrete-pile elasticity modulus, Ec2For minor diameter concrete Stake elasticity modulus, m2For minor diameter concrete-pile replacement rate, R2For minor diameter concrete-pile bearing capacity, Ap2For minor diameter concrete Dowel section area, θ are reduction coefficient, take 0.5~0.6, EsFor native elasticity modulus, fsFor native foundation bearing capacity;
Sedimentation review is carried out after primarily determining minor diameter concrete-pile quantity according to requirement for bearing capacity, settlement formula is using such as Under:
P is the stress that top passes to ground, E in formulasiIt is composite modulus, ZiAnd Zi-1Based on Bottom surface respectively to the depth within the scope of i-th layer and (i-1)-th layer of bottom surface,WithIt is basic bottom surface respectively to i-th layer and (i-1)-th layer Average additional stress coefficient within the scope of bottom surface, according to《Building foundation treatment technical specification》(JGJ-79-91) it determines, entirely The composite modulus of ground can be divided into three parts along depth direction, and first part is concrete-pile, minor diameter concrete-pile and native shape At ground, second part be concrete-pile and soil formed ground, Part III be subjacent bed soil formed ground;
First part composite modulus Es1Calculation formula is using as follows:Es1=m1Ec1+m2Ec2+(1-m1-m2)Es, second part is compound Modulus Es2Calculation formula is using as follows:Es2=m1Ec1+(1-m1)Es
If sedimentation more than 100mm, increases minor diameter concrete-pile length and quantity carries out sedimentation review again, until sedimentation Until reaching requirement.
CN201611089336.5A 2016-11-22 2016-11-22 Tear down and build the foundation construction method of house foundation Active CN106592658B (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
CN201611089336.5A CN106592658B (en) 2016-11-22 2016-11-22 Tear down and build the foundation construction method of house foundation
CN201810325126.4A CN108425387B (en) 2016-11-22 2016-11-22 Foundation reinforcing construction technology for building foundation
CN201710436016.0A CN107191001B (en) 2016-11-22 2016-11-22 Tear down and build the strengthening of foundation construction method of house foundation
CN201810323695.5A CN108547337B (en) 2016-11-22 2016-11-22 Foundation construction technology for building foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611089336.5A CN106592658B (en) 2016-11-22 2016-11-22 Tear down and build the foundation construction method of house foundation

Related Child Applications (3)

Application Number Title Priority Date Filing Date
CN201810323695.5A Division CN108547337B (en) 2016-11-22 2016-11-22 Foundation construction technology for building foundation
CN201810325126.4A Division CN108425387B (en) 2016-11-22 2016-11-22 Foundation reinforcing construction technology for building foundation
CN201710436016.0A Division CN107191001B (en) 2016-11-22 2016-11-22 Tear down and build the strengthening of foundation construction method of house foundation

Publications (2)

Publication Number Publication Date
CN106592658A CN106592658A (en) 2017-04-26
CN106592658B true CN106592658B (en) 2018-11-09

Family

ID=58594627

Family Applications (4)

Application Number Title Priority Date Filing Date
CN201810323695.5A Active CN108547337B (en) 2016-11-22 2016-11-22 Foundation construction technology for building foundation
CN201810325126.4A Active CN108425387B (en) 2016-11-22 2016-11-22 Foundation reinforcing construction technology for building foundation
CN201611089336.5A Active CN106592658B (en) 2016-11-22 2016-11-22 Tear down and build the foundation construction method of house foundation
CN201710436016.0A Active CN107191001B (en) 2016-11-22 2016-11-22 Tear down and build the strengthening of foundation construction method of house foundation

Family Applications Before (2)

Application Number Title Priority Date Filing Date
CN201810323695.5A Active CN108547337B (en) 2016-11-22 2016-11-22 Foundation construction technology for building foundation
CN201810325126.4A Active CN108425387B (en) 2016-11-22 2016-11-22 Foundation reinforcing construction technology for building foundation

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201710436016.0A Active CN107191001B (en) 2016-11-22 2016-11-22 Tear down and build the strengthening of foundation construction method of house foundation

Country Status (1)

Country Link
CN (4) CN108547337B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108532624B (en) * 2018-05-31 2020-05-19 广东工业大学 Chemical tank raft foundation reinforcing structure
CN111173052A (en) * 2019-04-04 2020-05-19 中建二局第三建筑工程有限公司 Raft plate structure and construction method for carrying out sinking repair on wood structure foundation by using same
CN110359475A (en) * 2019-07-25 2019-10-22 广东庆余堂建筑科技有限公司 The structure and its construction method of digging-free reinforcing raft foundation
CN111576920B (en) * 2020-06-03 2021-09-10 中天建设集团有限公司 Reinforced foundation for building foundation and construction method thereof
CN114215380A (en) * 2021-12-25 2022-03-22 金瀚建设有限公司 Lengthening construction method for existing building raft foundation

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102005027107A1 (en) * 2005-06-10 2006-12-14 Sedra Gmbh Running track for streetcar has rails embedded in elastic cushion on raft of ballast embedded in concrete
CN1970897A (en) * 2005-11-23 2007-05-30 张准胜 Method and device for building underground space structure for established building by using public land
CN101294396A (en) * 2008-06-13 2008-10-29 朱奎 Different-stiffness composite pile composite foundation and processing method
CN103321118A (en) * 2013-07-09 2013-09-25 中铁第四勘察设计院集团有限公司 Bridge road transition section roadbed structure of deep layer yielding ground regions
WO2014139252A1 (en) * 2013-03-15 2014-09-18 中国十七冶集团有限公司 Method for constructing large raft foundation in high-temperature environment

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201554047U (en) * 2009-11-20 2010-08-18 高振伟 Grouting pipe used for repairing defects of underground building curtain by grouting method
CN101935986B (en) * 2010-10-09 2011-12-28 中铁八局集团第一工程有限公司 Overwater large-span steel tube pile cast-in-situ trestle and building method thereof
CN103195114B (en) * 2013-03-29 2015-07-08 中国建筑第八工程局有限公司 High-rise building foundation strengthening construction method on weak geological conditions
CN203795451U (en) * 2014-02-19 2014-08-27 中铁第四勘察设计院集团有限公司 Strengthening and reinforcing structure for defect precast driven pile foundation
CN104912067A (en) * 2014-03-15 2015-09-16 温州荣强海洋科技有限公司 High-pressure rotary spraying threaded pile
US9290957B1 (en) * 2014-12-31 2016-03-22 Fortress Stabilization Systems Structure reinforcement system and method
US9903085B2 (en) * 2015-03-11 2018-02-27 4D Tech Solutions, Inc. Pile repair clamp

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102005027107A1 (en) * 2005-06-10 2006-12-14 Sedra Gmbh Running track for streetcar has rails embedded in elastic cushion on raft of ballast embedded in concrete
CN1970897A (en) * 2005-11-23 2007-05-30 张准胜 Method and device for building underground space structure for established building by using public land
CN101294396A (en) * 2008-06-13 2008-10-29 朱奎 Different-stiffness composite pile composite foundation and processing method
WO2014139252A1 (en) * 2013-03-15 2014-09-18 中国十七冶集团有限公司 Method for constructing large raft foundation in high-temperature environment
CN103321118A (en) * 2013-07-09 2013-09-25 中铁第四勘察设计院集团有限公司 Bridge road transition section roadbed structure of deep layer yielding ground regions

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
岩溶地区高层建筑刚性桩复合地基筏板基础体系的受理性能研究;李耀琨;《中国优秀硕士论文》;20151130;第1、50-55、73-76、182-184页 *

Also Published As

Publication number Publication date
CN108425387B (en) 2020-02-04
CN108547337B (en) 2020-02-28
CN106592658A (en) 2017-04-26
CN107191001B (en) 2019-05-03
CN107191001A (en) 2017-09-22
CN108547337A (en) 2018-09-18
CN108425387A (en) 2018-08-21

Similar Documents

Publication Publication Date Title
CN106592658B (en) Tear down and build the foundation construction method of house foundation
CN100572683C (en) The large-diameter ultra-deep rock borehole bottom-expanding filling pile job practices
CN102444142B (en) Pile group column replacement expanded basement and construction method of same
CN105133620B (en) Pit supporting construction and its construction method in local flow's modeling shape Muddy Bottoms soil body hole
CN101538833B (en) Vertical subsection double-wall steel cofferdam water stopping construction method
CN102966114A (en) Tower crane foundation structure and construction method thereof
CN108442395A (en) Latch steel pipe pile cofferdam construction method
CN110331992A (en) A kind of hole daguanpeng construction method
CN102121251A (en) Construction method for pouring main tower pier foundation of bridge on deep-water oblique river bed
CN108166771A (en) Steel reinforced concrete pool structural reform makes construction method
CN106337391A (en) Long piled wharf panel bottom large-area damage repairing construction method
CN106049563B (en) Earthquake is damaged pier footing reinforcing system
CN107740427A (en) A kind of construction method of interpolation concrete prefabricated square stake foundation pit enclosure structure
CN204385724U (en) A kind of polyurethane gravel pile
CN201753445U (en) Uplift-resistant pile structure
CN106400807B (en) Extra large work barge grouting method and its equipment
CN105178333B (en) Construction method for removing anchor rod obstacles in grooving process of underground diaphragm wall
CN207109804U (en) A kind of quick spreading structure configuration of soft soil foundation bored concrete pile
CN106545071A (en) Inspection shaft, roof drain and cement concrete pavement one-time cast-forming construction method
CN106400745B (en) A kind of sea work barge operational method and equipment
CN107476293A (en) A kind of quick spreading structure of soft soil foundation bored concrete pile configures and its spreading method
CN211171922U (en) Construction structure for improving stability of groove wall
CN210106749U (en) Counter-force structure of soft soil foundation super large section push pipe jacking operation
CN207659988U (en) Crane beam on rock wall for underground power house present situation foundation reinforcing structure
CN112575794A (en) Deep silt geological foundation pit support structure and construction method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder

Address after: 245400 building 3, Yaoshun Avenue, Haiyang Town, Xiuning County, Huangshan City, Anhui Province

Patentee after: Ye Xiangfei

Address before: 325000 Zhejiang city of Wenzhou Province Economic and Technological Development Zone Shacheng five a Street Street No. 30

Patentee before: Ye Xiangfei

CP02 Change in the address of a patent holder
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201230

Address after: 537100 Comprehensive Economic Development Zone of Three-invested Enterprises in Gangnan District, Guigang City, Guangxi Zhuang Autonomous Region (near the traffic lights of Jiangnan Industrial Zone)

Patentee after: Guangxi Xin Bin Cheng Machinery Co.,Ltd.

Address before: 245400 building 3, Yaoshun Avenue, Haiyang Town, Xiuning County, Huangshan City, Anhui Province

Patentee before: Ye Xiangfei

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210507

Address after: 102200 423, 4 / F, block a, Xinhua future city building, 175 Litang Road, Changping District, Beijing

Patentee after: Li Qiannan

Address before: 537100 Comprehensive Economic Development Zone of Three-invested Enterprises in Gangnan District, Guigang City, Guangxi Zhuang Autonomous Region (near the traffic lights of Jiangnan Industrial Zone)

Patentee before: Guangxi Xin Bin Cheng Machinery Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20211217

Address after: 515000 second floor of Chigang Hongqiao urban construction complex building, Haojiang District, Shantou City, Guangdong Province

Patentee after: DAHAO MUNICIPAL CONSTRUCTION Co.,Ltd.

Address before: 102200 423, 4 / F, block a, Xinhua future city building, 175 Litang Road, Changping District, Beijing

Patentee before: Li Qiannan