CN201753445U - Uplift-resistant pile structure - Google Patents
Uplift-resistant pile structure Download PDFInfo
- Publication number
- CN201753445U CN201753445U CN 201020210569 CN201020210569U CN201753445U CN 201753445 U CN201753445 U CN 201753445U CN 201020210569 CN201020210569 CN 201020210569 CN 201020210569 U CN201020210569 U CN 201020210569U CN 201753445 U CN201753445 U CN 201753445U
- Authority
- CN
- China
- Prior art keywords
- uplift
- pile
- resistance
- pile body
- resistant
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
An uplift-resistant pile structure consists of a jet grouting mixed pile body, uplift-resistant ribs and connecting parts. The jet grouting mixed pile body is formed by aid of a jet grouting mixing drill, the uplift-resistant ribs connected with a rib hanger are connected to a guide bit via special guide pipes after the reducing cement pile body is formed, and then are inserted into the pile body along the center of the jet grouting mixed pile; and after the uplift-resistant ribs are inserted in place, the guide pipes are retracted while the grout is jetted into the pile body. The uplift-resistant pile structure can be formed in a harder soil layer, and can also be formed in a softer soil layer, and has fine uplift-resistant resistance, lower cost and fast construction.
Description
Technical field
The utility model relates to technical field of civil engineering, particularly relates to the anti-floating of a kind of underground structure and structure, the resistance to plucking of above ground structure and the uplift pile structure of anti-inclination.
Background technology
The resistance to plucking of underground structure commonly used at present and structure anti-floating, above ground structure and the uplift pile structure of anti-inclination mainly are cast-in-place steel concrete pilework, precast reinforced concrete pile structure, precast prestressed concrete pilework and soil bolt structures.Because the cast-in-situ concrete pilework, the external surface of pile body is wrapped up by one deck slurry coat method, and the frictional resistance between pile body and the foundation soil is lowered, and the waste mud that construction produces has contamination to environment, and cost is higher.Usually because the existence of pile joint easily produces the possibility that uplift resistance lost efficacy, and the disturbance to the stratum is bigger in the work progress in addition, often building and the structure that close on is had a negative impact, cost is higher relatively for the precast reinforced concrete pile structure.Soil bolt makes the durability of anchor bar body be difficult to meet the demands because the topping quality of its body of rod and thickness are difficult to guarantee, the crack of topping is wayward.In order to improve the durability of resistance to plucking muscle body, in the steel concrete pilework,,, to cause material cost very high just often need reinforcement ratio is improved more can meeting the demands for the control crack.
In order to improve the frictional resistance between the soil body and the pile body, the post grouting process of employing or expanded bore pile structure are also arranged, but these all increase more construction cost, and construction technology complexity, long in time limit.
The utility model content
Technical problem to be solved in the utility model is, overcome technical problem and fault of construction that existing uplift pile structure exists, a kind of large diameter rotary jet stirring pile body is provided, insert no bonding steel strand and connector in the stake, apply pre-stretching force, make the rotary jet stirring pile body be in compressive state, can improve the uplift resistance of uplift pile, the crack of control pile body greatly, reduce cost.
In order to address the above problem the technical solution of the utility model is such:
A kind of uplift pile structure comprises a rotary jet stirring pile body, it is characterized in that, is embedded with resistance to plucking muscle body in the rotary jet stirring pile body, and resistance to plucking muscle front end is provided with one and hangs gusset, and the resistance to plucking muscle connects the extension gusset by connecting dop, hangs the gusset front end and also is provided with starter.Described resistance to plucking muscle body middle part is provided with locating support.
The rotary jet stirring pile body utilizes jet grouting and stirring drill tool to apply, after forming this pile body, many steel strand hanging gusset will be connected with, adopt special conduit, starter in the connection is sent in the pile body along the center of rotating spraying mixture pile and goes, insert put in place after, pumpback conduit on one side, on one side in pile body rotary jet grouting.
Described rotary jet stirring pile body is the cement soil body, and diameter is 150-1500mm;
Described resistance to plucking muscle body is the wherein a kind of of the many steel strand that do not have a bonding, reinforcing bar, steel pipe, section bar, is made up of the plastic cement pipe of common steel strand, reinforcing bar, steel pipe or section bar and isolation usefulness, is full of anticorrosion grease in the sebific duct;
Described connector, comprise resistance to plucking muscle body locating support, hang gusset, connect dop and starter.
Beneficial effect, a kind of novel uplift pile structure described in the utility model, substep applies and finishes, and both can form in comparatively hard soil layer, also can form in the soil layer of weakness such as mucky soil, quicksand and slity soil, and resistance to plucking is effective.
Description of drawings
Describe the utility model in detail below in conjunction with the drawings and specific embodiments;
Fig. 1 is a kind of novel anti pile pulling structural representation described in the utility model;
The specific embodiment
For technological means, creation characteristic that the utility model is realized, reach purpose and effect is easy to understand, below in conjunction with concrete diagram, further set forth the utility model.
Referring to Fig. 1
Rotary jet stirring pile body 1 is a kind of cement soil pile, is formed by cement grout, Admixture and soil body mix, and diameter can change, and general pile body diameter is 150-1500mm, and he is the cylinder that forms by rotary jet stirring, and same pile is variable-diameter also;
Described resistance to plucking muscle body 2 is the wherein a kind of of the many steel strand that do not have a bonding, reinforcing bar, steel pipe, section bar, and not having bonding steel strand reinforcing bar, steel pipe or section bar is to be made of steel strand reinforcing bar, steel pipe or section bar and plastic cement pipe.
Connector, comprise resistance to plucking muscle body locating support 3, hang gusset 4, connect dop 5 and starter 6.By locating support 3 resistance to plucking muscle body 2 is supported the location at a certain distance, dop 5 will be hung gusset 4 and resistance to plucking muscle body 2 links together with connecting, and starter 6 welds together with extension gusset 4.
In work progress, form rotary jet stirring pile body 1 earlier, in the rotary jet stirring pile body, resistance to plucking muscle body 2 and connector are inserted in wherein then by specialist tools, treat that slurries solidify the back and form uplift pile.Connector comprises locating support 3, hangs gusset 4, connects dop 5 and starter 6.
More than show and described basic principle of the present utility model, principal character and advantage of the present utility model.The technician of the industry should understand; the utility model is not restricted to the described embodiments; that describes in the foregoing description and the manual just illustrates principle of the present utility model; the utility model also has various changes and modifications under the prerequisite that does not break away from the utility model spirit and scope, and these changes and improvements all fall in claimed the utility model scope.The claimed scope of the utility model is defined by appending claims and equivalent thereof.
Claims (4)
1. a uplift pile structure comprises a rotary jet stirring pile body, it is characterized in that, is embedded with resistance to plucking muscle body in the rotary jet stirring pile body, and resistance to plucking muscle front end is provided with one and hangs gusset, and the resistance to plucking muscle connects the extension gusset by connecting dop.
2. a kind of uplift pile structure according to claim 1 is characterized in that, described resistance to plucking muscle body is the wherein a kind of of the many steel strand that do not have a bonding, reinforcing bar, steel pipe, section bar.
3. a kind of uplift pile structure according to claim 1 is characterized in that, described resistance to plucking muscle body middle part is provided with locating support.
4. a kind of uplift pile structure according to claim 1 is characterized in that, hangs the gusset front end and is provided with starter.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201020210569 CN201753445U (en) | 2010-05-28 | 2010-05-28 | Uplift-resistant pile structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201020210569 CN201753445U (en) | 2010-05-28 | 2010-05-28 | Uplift-resistant pile structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201753445U true CN201753445U (en) | 2011-03-02 |
Family
ID=43621177
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201020210569 Expired - Lifetime CN201753445U (en) | 2010-05-28 | 2010-05-28 | Uplift-resistant pile structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201753445U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102359107A (en) * | 2011-07-23 | 2012-02-22 | 上海强劲地基工程股份有限公司 | Stiffening pile for reclaiming reinforcing body |
CN102359106A (en) * | 2011-10-31 | 2012-02-22 | 上海强劲地基工程股份有限公司 | Construction method for energy-saving pressure scattered cement soil anti-floating pile |
CN102363959A (en) * | 2011-11-23 | 2012-02-29 | 上海强劲地基工程股份有限公司 | Energy-saving pressure dispersed anti-floating pile and anti-pulling rib connecting structure |
CN102418339A (en) * | 2011-09-28 | 2012-04-18 | 上海强劲地基工程股份有限公司 | Novel energy-saving anti-floating pile |
CN108179743A (en) * | 2018-02-09 | 2018-06-19 | 浙江大学城市学院 | A kind of synchronous grouting pile for prestressed pipe and construction method |
-
2010
- 2010-05-28 CN CN 201020210569 patent/CN201753445U/en not_active Expired - Lifetime
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102359107A (en) * | 2011-07-23 | 2012-02-22 | 上海强劲地基工程股份有限公司 | Stiffening pile for reclaiming reinforcing body |
CN102418339A (en) * | 2011-09-28 | 2012-04-18 | 上海强劲地基工程股份有限公司 | Novel energy-saving anti-floating pile |
CN102418339B (en) * | 2011-09-28 | 2012-12-26 | 上海强劲地基工程股份有限公司 | Novel energy-saving anti-floating pile |
CN102359106A (en) * | 2011-10-31 | 2012-02-22 | 上海强劲地基工程股份有限公司 | Construction method for energy-saving pressure scattered cement soil anti-floating pile |
CN102363959A (en) * | 2011-11-23 | 2012-02-29 | 上海强劲地基工程股份有限公司 | Energy-saving pressure dispersed anti-floating pile and anti-pulling rib connecting structure |
CN102363959B (en) * | 2011-11-23 | 2014-06-04 | 上海强劲地基工程股份有限公司 | Energy-saving pressure dispersed anti-floating pile and anti-pulling rib connecting structure |
CN108179743A (en) * | 2018-02-09 | 2018-06-19 | 浙江大学城市学院 | A kind of synchronous grouting pile for prestressed pipe and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100501011C (en) | Hole drilling mudjack pile construction method | |
CN101748728B (en) | Soil cement expanding uplift pile | |
CN201753445U (en) | Uplift-resistant pile structure | |
CN104612134A (en) | Cast-in place pile post-grouting construction method for pouring construction | |
CN105239561A (en) | Long spiral mix spray pre-grouting press concrete post-inserted steel reinforcement cage cast-in-place pile construction process | |
CN101570970A (en) | Construction method of cement soil anchor and anchor plate combined member thereof | |
CN102418339B (en) | Novel energy-saving anti-floating pile | |
CN102011399A (en) | PHC pile-based multiple high jet pedestal pile construction method | |
CN105155550A (en) | Construction method for digging deep foundation pit in large-thickness highly weathered sandstone stratum in combined supporting mode | |
CN201395793Y (en) | Long spiral high-pressure spraying mud injecting stirring pile-forming device | |
CN105040695A (en) | Anchor rod structure capable of integrally working and construction method | |
CN102535458A (en) | Reinforced cement-soil anchor bolt and construction method thereof | |
CN103603379A (en) | Anti-floating system combining anti-floating cement soil pile and anti-floating anchor rod and construction process of anti-floating system | |
CN102877470A (en) | Combined soil nailing construction method | |
CN108547337A (en) | Tear down and build the foundation construction technology of house foundation | |
CN110468828A (en) | A kind of construction method of pattern foundation pit supporting structure water-stop continuous wall | |
CN101649614A (en) | Variable-diameter multi-direction anchor pile | |
CN203613568U (en) | Anti-floating cement soil pile and anti-floating anchor rod combined anti-floating system | |
CN105064352A (en) | Building expanding head anchor rod pile construction technology and anchor rod pile adopting technology | |
CN205576957U (en) | Stake end pilework | |
CN1051349C (en) | Pile head grouting and supersonic detecting combined process for filling long pile in saturated soil | |
CN102660948A (en) | Steel tube locked anchor rod construction method | |
CN202247866U (en) | Novel energy-saving anti-floating pile | |
CN202164599U (en) | Reinforcing pile enabling reinforcing rib body to be recycled | |
CN202626979U (en) | High-pressure rotary jet grouting stiffening pile construction equipment with rib drilling method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20110302 |
|
CX01 | Expiry of patent term |