CN102660948A - Steel tube locked anchor rod construction method - Google Patents

Steel tube locked anchor rod construction method Download PDF

Info

Publication number
CN102660948A
CN102660948A CN2012101709162A CN201210170916A CN102660948A CN 102660948 A CN102660948 A CN 102660948A CN 2012101709162 A CN2012101709162 A CN 2012101709162A CN 201210170916 A CN201210170916 A CN 201210170916A CN 102660948 A CN102660948 A CN 102660948A
Authority
CN
China
Prior art keywords
steel pipe
anchor rod
soil
anchor
steel tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012101709162A
Other languages
Chinese (zh)
Inventor
黎粤桥
王红
何霁耀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gansu Jiangong Engineering Contracting Co., Ltd.
Original Assignee
GANSU CONSTRUCTION INVESTEMENT (HOLDING) GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GANSU CONSTRUCTION INVESTEMENT (HOLDING) GROUP CO Ltd filed Critical GANSU CONSTRUCTION INVESTEMENT (HOLDING) GROUP CO Ltd
Priority to CN2012101709162A priority Critical patent/CN102660948A/en
Publication of CN102660948A publication Critical patent/CN102660948A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention relates to a steel tube locked anchor rod construction method. The method comprises the following steps of: (1) deploying points by using a conventional method; (2) putting an anchor shank in place; (3) driving a guide steel tube in a steel tube locked prestressing anchor rod and a deformed steel bar anchor rod into soil at the deployed points to designed length by using the anchor shank; (4) mixing cement slurry; (5) injecting the cement slurry into the guide steel tube by an injection pump under the pressure of 0.5-3MPa, and stopping injecting the slurry when cement slurry flows out of a hole formed in the soil by the guide steel tube locked pretressing anchor rod; and (6) after the soil is solidified for seven days and the strength is above 75%, carrying out pull-push detection on the guide steel tube locked pretressing anchor rod, wherein the detection quantity is no less than 3% and the pull-push force is greater than a preset value. The method provided by the invention is simple in process and low in construction cost, and solves the problems admitted in the building industry that anchor rods and soil nails difficultly form holes in a soft ground, saturated soil, sand soil and silty clay in deep foundation pit support.

Description

Steel pipe locking anchor rod construction method
Technical field
The present invention relates to the prestressed anchor technical field of construction, relate in particular to steel pipe locking anchor rod construction method.
Background technology
[0002] along with development and national economy, highrise building is more and more, and deep foundation ditch is also more and more.The national regulation regulation, all deep foundation ditchs all must be done pattern foundation pit supporting structure.The conventionally form of pattern foundation pit supporting structure has: various ways such as soldier pile, soil nailing wall.The horizontal thrust on the foundation ditch limit that soil nailing wall, soldier pile receive will be resisted by the horizontal pull of prestressed anchor, so support systems such as soldier pile, soil nailing wall all will be established prestressed anchor, makes anchor pole become as a whole drawknot body with the soil body, accomplishes economical rationality.
But having following difficult point: ⑴ pore-forming on soft foundation, saturated soil, grains of sand soil, silty clay in the prestressed anchor construction is a difficult problem, and this is the key in the construction technology; ⑵ in the construction work, because construction is basic earlier, so in case commencement of works requires foundation pit dewatering fast, excavation is fast, so the duration is short; ⑶ though adopted dewatering measure, near more in the precipitation from the foundation ditch limit, easy more the oozing down of water in the soil body, water is difficult to ooze down in the soil body on more than 10 meter on foundation ditch limit, because excavation speed is fast, the time does not allow, so water can't be penetrated in the gutter fully; ⑷ general soil body upper strata major part is miscellaneous fill, grains of sand soil, silty clay; So a little less than the permeability of water; Just as sponge, can keep the moisture causes water here and can not in time be penetrated into the gutter, so the soil body that exists is saturated soil mostly; And saturated soil often can't pore-forming, manual pore-forming and the machine drilling hole that is prone to collapse; ⑸ prestressed anchor design generally all more than 10m, penetrates the soil body slipping face, anchors in the stable soil layer, could produce the effective prestress pulling force like this.Ill-conditioned, the hole depth of the soil body when therefore, having brought up the pore-forming of prestressed anchor, be prone to cave in, easy-formation not.Do not have qualified hole, carry out next procedure with regard to it doesn't matter---insert bolt grouting.
Hole forming method commonly used at present is luoyang spade manual pore-forming method and machine drilling sleeve pipe follow-up hole forming method.The shortcoming of luoyang spade manual pore-forming method is that efficient is extremely low, the grains of sand are native shapeless, at all can't pore-forming; Machine drilling sleeve pipe follow-up hole forming method is that the termination of drilling rod and sleeve pipe is equiped with alloy tool steel bit, has revolution and impacts the double-acting function of creeping into, and sleeve pipe and drilling rod creep into simultaneously, realize sleeve pipe follow-up retaining wall, needn't adopt mud off; Water under high pressure pumps in drilling rod, flows out from cavity between drilling rod and sleeve pipe, and drilling cuttings earth is taken out of, forms bolthole, and being suitable for the pore-forming aperture is foundation ditch hole wall prestress anchorage cable or the prestressed anchor supporting construction of 150 mm.This hole forming method complex process, require high, long in time limit and noise is big, cost is high to work plane, only the 1m cost of holing is just between 280 ~ 300 yuan.
Summary of the invention
Technical problem to be solved by this invention provides the steel pipe locking anchor rod construction method that a kind of technology is simple, cost is low.
For addressing the above problem, steel pipe locking anchor rod construction method of the present invention may further comprise the steps:
⑴ adopt conventional method to layout;
⑵ roof-bolter is in place;
⑶ guiding steel pipe, twisted steel anchor rod that said roof-bolter will lead in the steel pipe locking prestressed anchor are squeezed into the said soil body to the design length of layouting;
⑷ mix the system cement grout: in 425 grades of Portland cements, mix the accelerating admixture of its weight 5%, and to make the water/binder ratio of cement grout be 0.45 ~ 0.5, proportion is 1.7 ~ 1.8;
⑸ be under the condition of 0.5 ~ 3MPa at pressure, injects said cement grout through grouting pump to said guiding steel pipe, in the hole that said guiding steel pipe locking prestressed anchor forms in the said soil body, has cement grout to flow out and can stop slip casting;
⑹ behind the soil solidifying 7 days, and intensity reaches 75% and draws the power of dialling to detect to said guiding steel pipe locking prestressed anchor when above, and amount detection is no less than 3%, draws to dial the power value and get final product greater than design load.
Guiding steel pipe locking prestressed anchor among the said step ⑶ comprises two butt welding guiding steel pipe, twisted steel anchor rod and reaming reinforcing bar together; Said each guiding steel pipe is equipped with the said reaming reinforcing bar that is the tip of falling the Eight characters, and the front end of said two guiding in the steel pipes is provided with three and arranges and equidistantly be quincuncial several injected holes; Said twisted steel anchor rod and said two guiding steel pipes weld together at forward terminal.
The weld of said two butt welding guiding steel pipe together is evenly equipped with three said reaming reinforcing bars along the pipe outer wall of said guiding steel pipe.
The bore dia of said injected hole is 6mm ~ 9mm.
Said twisted steel anchor rod is formed by 2 isodiametric screw-thread steel single-selded lap joints, and fusion length equals 10 times of said screw-thread steel diameter.
The present invention compared with prior art has the following advantages:
1, owing to is provided with guiding steel pipe and the twisted steel anchor rod that welds together among the present invention; And be provided with the reaming reinforcing bar that is the tip of falling the Eight characters; Therefore; Surrounding soil strengthens its anchor pole rub cross section so that can make anchor pole fixed with the loosening soil body and slurry when injecting slurries on every side in the loosening anchor pole 150mm diameter when guiding steel pipe and twisted steel anchor rod are hammering into the soil body.
2, be quincunx injected hole owing to being provided with among the present invention, therefore, through the anchoring section of slip casting formation anchor pole, grouting reinforcement produces frictional resistance, generates pulling force in saturated soil and grains of sand soil, reaches pore-forming, prestressed reinforcement placement, the one-time formed purpose of slip casting.
3, the present invention is with in anchor pole, the soil nailing construction technology; Two independent working procedures: pore-forming → insert anchor pole to be integrated; Therefore; Not only technology is simple, and has solved this difficult problem of building anchor pole in the generally acknowledged deep foundation pit support of industry, soil nailing pore-forming difficulty in subgrade soil, saturated soil, grains of sand soil, silty clay.
4, simple, light, the required work plane of present device is little; Noise, pollute little, with low cost; Be applicable to miscellaneous fill (refuse soil), powder fine sand, saturated soil, subgrade soil layer, be specially adapted to the geology (the Northwest's geology generally all is grains of sand soil, silty clay) of the Northwest.
Even 5 groundwater table are high, construction period is tight, and the foundation ditch excavation of will seeking quickness in well digging dewatering, although shipwreck to leak out to deep-well, adopts technology of the present invention also can directly throw into, carries out anchor bolt construction.
6, the present invention builds the auspicious scape 1# of worker building base pit engineering, " Gansu Tumour Hospital's outpatient service " complex building base pit engineering, builds the practical application in the old building transforming base pit engineering of endangering for high-storey business, the cooperation South Road worker of Gansu Province the 8th construction engineering corporation man-hour in solid 116# high-rise residential building deep foundation pit support soldier pile prestressed anchor engineering, Gansu through the orchidization west; Effect is remarkable, has obtained owner's favorable comment.
Description of drawings
Do further detailed explanation below in conjunction with the accompanying drawing specific embodiments of the invention.
Fig. 1 is a structural representation of the present invention.
Among the figure: 1-guiding steel pipe, 2-twisted steel anchor rod, 3-reaming reinforcing bar, 4-injected hole.
The specific embodiment
Steel pipe locking anchor rod construction method may further comprise the steps:
⑴ adopt conventional method to layout.
⑵ roof-bolter is in place.
⑶ guiding steel pipe 1, twisted steel anchor rod 2 that roof-bolter will lead in the steel pipe locking prestressed anchor are squeezed into the soil body to the design length of layouting.
Wherein: guiding steel pipe locking prestressed anchor comprises two butt welding guiding steel pipe 1, twisted steel anchor rod 2 and reaming reinforcing bar 3 (referring to Fig. 1) together.Each guiding steel pipe 1 is equipped with the reaming reinforcing bar 3 that is the tip of falling the Eight characters, and the front end of two guiding in the steel pipe 1 is provided with three and arranges the injected hole 4 that equidistantly to be quincuncial several bore dias be 6mm ~ 9mm; Twisted steel anchor rod 2 and two guiding steel pipe 1 welds together at forward terminal.
The weld of two butt welding guiding steel pipe 1 together is evenly equipped with three reaming reinforcing bars 3 along the pipe outer wall of guiding steel pipe 1.Twisted steel anchor rod 2 is formed by 2 isodiametric screw-thread steel single-selded lap joints, and fusion length equals 10 times of the screw-thread steel diameter.
⑷ mix the system cement grout: in 425 grades of Portland cements, mix the accelerating admixture of its weight 5%, and to make the water/binder ratio of cement grout be 0.45 ~ 0.5, proportion is 1.7 ~ 1.8.
Wherein: the requirement that accelerating admixture satisfies " sprayed mortar is used accelerating admixture " JC477-92 gets final product.
⑸ be under the condition of 0.5 ~ 3MPa at pressure, injects cement grout through grouting pump to guiding steel pipe 1, in the hole that guiding steel pipe locking prestressed anchor forms in the said soil body, has cement grout to flow out and can stop slip casting.
⑹ behind the soil solidifying 7 days, and intensity reaches 75% and draws the power of dialling to detect to guiding steel pipe locking prestressed anchor when above, and amount detection is no less than 3%, draws to dial the power value and get final product greater than design load.

Claims (5)

1. steel pipe locks anchor rod construction method, may further comprise the steps:
⑴ adopt conventional method to layout;
⑵ roof-bolter is in place;
⑶ guiding steel pipe (1), twisted steel anchor rod (2) that said roof-bolter will lead in the steel pipe locking prestressed anchor are squeezed into the said soil body to the design length of layouting;
⑷ mix the system cement grout: in 425 grades of Portland cements, mix the accelerating admixture of its weight 5%, and to make the water/binder ratio of cement grout be 0.45 ~ 0.5, proportion is 1.7 ~ 1.8;
⑸ be under the condition of 0.5 ~ 3MPa at pressure, injects said cement grout through grouting pump to said guiding steel pipe (1), in the hole that said guiding steel pipe locking prestressed anchor forms in the said soil body, has cement grout to flow out and can stop slip casting;
⑹ behind the soil solidifying 7 days, and intensity reaches 75% and draws the power of dialling to detect to said guiding steel pipe locking prestressed anchor when above, and amount detection is no less than 3%, draws to dial the power value and get final product greater than design load.
2. steel pipe locking anchor rod construction method as claimed in claim 1 is characterized in that: the guiding steel pipe locking prestressed anchor among the said step ⑶ comprises two butt welding guiding steel pipe (1), twisted steel anchor rod (2) and reaming reinforcing bar (3) together; Said each guiding steel pipe (1) is equipped with the said reaming reinforcing bar (3) that is the tip of falling the Eight characters, and a front end in said two guiding steel pipes (1) is provided with three and arranges and equidistantly be quincuncial several injected holes (4); Said twisted steel anchor rod (2) welds together at forward terminal with said two guiding steel pipes (1).
3. steel pipe locking anchor rod construction method as claimed in claim 2, it is characterized in that: the weld of said two butt welding guiding steel pipe (1) together is evenly equipped with three said reaming reinforcing bars (3) along the pipe outer wall of said guiding steel pipe (1).
4. steel pipe locking anchor rod construction method as claimed in claim 2, it is characterized in that: the bore dia of said injected hole (4) is 6mm ~ 9mm.
5. steel pipe locking anchor rod construction method as claimed in claim 2, it is characterized in that: said twisted steel anchor rod (2) is formed by 2 isodiametric screw-thread steel single-selded lap joints, and fusion length equals 10 times of said screw-thread steel diameter.
CN2012101709162A 2012-05-30 2012-05-30 Steel tube locked anchor rod construction method Pending CN102660948A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012101709162A CN102660948A (en) 2012-05-30 2012-05-30 Steel tube locked anchor rod construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012101709162A CN102660948A (en) 2012-05-30 2012-05-30 Steel tube locked anchor rod construction method

Publications (1)

Publication Number Publication Date
CN102660948A true CN102660948A (en) 2012-09-12

Family

ID=46770516

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012101709162A Pending CN102660948A (en) 2012-05-30 2012-05-30 Steel tube locked anchor rod construction method

Country Status (1)

Country Link
CN (1) CN102660948A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106555399A (en) * 2017-01-23 2017-04-05 贵州正业工程技术投资有限公司 A kind of carbonate rock area Pulling-Resistant Anchor Rod slip casting drainage arrangement and its construction method
CN106567393A (en) * 2016-11-04 2017-04-19 中建六局土木工程有限公司 Collapsible loess deep foundation pit support construction method
CN106638592A (en) * 2016-12-29 2017-05-10 青建集团股份公司 Drive anchor rod in complicated geological condition and construction method thereof
CN110206042A (en) * 2019-06-18 2019-09-06 深圳市中天基础勘测设计有限公司 A kind of foundation pit of network column supporting

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2006074145A1 (en) * 2005-01-03 2006-07-13 Geoject, Inc. Grout injecting/structure anchoring system
CN201050062Y (en) * 2007-06-26 2008-04-23 北京建工一建工程建设有限公司 Sand bed soil reinforcing piece
CN201132957Y (en) * 2007-12-05 2008-10-15 中国水电顾问集团中南勘测设计研究院 Roof bolt
CN201943071U (en) * 2011-03-01 2011-08-24 中国有色金属工业昆明勘察设计研究院 Implantable steel tube anchor rod with stabs
CN102322273A (en) * 2011-05-20 2012-01-18 中国矿业大学 A kind of roadway floor anchor is annotated integrated reinforcement means

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2006074145A1 (en) * 2005-01-03 2006-07-13 Geoject, Inc. Grout injecting/structure anchoring system
CN201050062Y (en) * 2007-06-26 2008-04-23 北京建工一建工程建设有限公司 Sand bed soil reinforcing piece
CN201132957Y (en) * 2007-12-05 2008-10-15 中国水电顾问集团中南勘测设计研究院 Roof bolt
CN201943071U (en) * 2011-03-01 2011-08-24 中国有色金属工业昆明勘察设计研究院 Implantable steel tube anchor rod with stabs
CN102322273A (en) * 2011-05-20 2012-01-18 中国矿业大学 A kind of roadway floor anchor is annotated integrated reinforcement means

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106567393A (en) * 2016-11-04 2017-04-19 中建六局土木工程有限公司 Collapsible loess deep foundation pit support construction method
CN106638592A (en) * 2016-12-29 2017-05-10 青建集团股份公司 Drive anchor rod in complicated geological condition and construction method thereof
CN106555399A (en) * 2017-01-23 2017-04-05 贵州正业工程技术投资有限公司 A kind of carbonate rock area Pulling-Resistant Anchor Rod slip casting drainage arrangement and its construction method
CN110206042A (en) * 2019-06-18 2019-09-06 深圳市中天基础勘测设计有限公司 A kind of foundation pit of network column supporting

Similar Documents

Publication Publication Date Title
CN110230309B (en) Karst area bridge karst cave pile foundation construction method
CN102518135B (en) Horizontal jet grouting soil anchor and castinplace pile Composite Foundation Pit supporting construction engineering method
CN101748741B (en) Construction method of concrete supporting structure
CN107513996A (en) A kind of anchorage and its construction method of recoverable prestressed anchor cable
CN101736760A (en) Prestressed anti-floating anchor rod and construction method thereof
CN101570970A (en) Construction method of cement soil anchor and anchor plate combined member thereof
CN104131560A (en) Anti-floating anchor and construction method thereof
CN101058980B (en) Construction method for self-feeding anchor pile
CN101775814A (en) Anti-slip cement soil pile soil blocking structure and construction method thereof
CN103321235A (en) Composite soil nailing wall slope support method
CN102660948A (en) Steel tube locked anchor rod construction method
CN102535458A (en) Reinforced cement-soil anchor bolt and construction method thereof
CN102877470A (en) Combined soil nailing construction method
CN105064335A (en) Ultrahigh pressure rotary jet grouting method suitable for sandy cobble stratum shield end well reinforcement
CN103573280B (en) Method for supporting porous ooze invasion compound roof roadway
CN201809768U (en) Recyclable pre-stressing anchor rope with U-shaped anchoring head
CN102817361B (en) Double bushing top cover for broken rock curtain grouting and construction method of double bushing top cover
CN203530974U (en) Anti-floating anchor rod
CN201753445U (en) Uplift-resistant pile structure
CN203613568U (en) Anti-floating cement soil pile and anti-floating anchor rod combined anti-floating system
CN202482860U (en) Self-drilling helical anchor rod
CN203716145U (en) Orientation steel pipe locking prestress multiple anchor rope
CN201183950Y (en) Self-propelling type anchor rod of seamless steel pipe
CN202989919U (en) Pressure-bearing water-sand-layer anchor rod mounting structure
CN102493436A (en) Novel manual tunneling construction method of rectangular anti-slide pile

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: GANSU CONSTRUCTION ENGINEERING CONTRACTING CO., LT

Free format text: FORMER OWNER: GANSU CONSTRUCTION INVESTMENT (HOLDINGS) GROUP CORPORATION

Effective date: 20130401

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20130401

Address after: 730050 No. 17 construction street, Qilihe District, Gansu, Lanzhou

Applicant after: Gansu Jiangong Engineering Contracting Co., Ltd.

Address before: Qilihe District of Gansu city in Lanzhou Province, 730050 West East Road No. 575

Applicant before: Gansu Construction Investement (Holding) Group Co.,Ltd.

C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120912