CN106592411B - A kind of erection method of packaged type bridges - Google Patents

A kind of erection method of packaged type bridges Download PDF

Info

Publication number
CN106592411B
CN106592411B CN201710088865.1A CN201710088865A CN106592411B CN 106592411 B CN106592411 B CN 106592411B CN 201710088865 A CN201710088865 A CN 201710088865A CN 106592411 B CN106592411 B CN 106592411B
Authority
CN
China
Prior art keywords
girder
preassembled unit
nose
nose girder
packaged type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710088865.1A
Other languages
Chinese (zh)
Other versions
CN106592411A (en
Inventor
苟明康
张颖
梁川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
63983 Troops of PLA
Original Assignee
63983 Troops of PLA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 63983 Troops of PLA filed Critical 63983 Troops of PLA
Priority to CN201710088865.1A priority Critical patent/CN106592411B/en
Publication of CN106592411A publication Critical patent/CN106592411A/en
Application granted granted Critical
Publication of CN106592411B publication Critical patent/CN106592411B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D15/00Movable or portable bridges; Floating bridges
    • E01D15/12Portable or sectional bridges
    • E01D15/133Portable or sectional bridges built-up from readily separable standardised sections or elements, e.g. Bailey bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • E01D21/06Methods or apparatus specially adapted for erecting or assembling bridges by translational movement of the bridge or bridge sections
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The present invention relates to a kind of erection methods of packaged type bridges, preassembled unit and bridge erection step including structure.Preassembled unit is made of spanning girder preassembled unit and nose girder preassembled unit, is a kind of stereochemical structure.Girder preassembled unit is larger, and nose girder preassembled unit is smaller, and the two nests together.Spanning girder and nose girder are respectively formed after several preassembled unit connections.The nose girder can slide back and forth in girder.The present invention can be achieved the quick of packaged type bridges and assemble and remove receipts, simplifies the assembly of traditional nose frame nose girder and removes work, can be widely used for rescue and relief work and military operation.

Description

A kind of erection method of packaged type bridges
Technical field
The present invention relates to the erections of a kind of packaged type bridges, especially packaged type bridges/remove receiving method.
Background technique
Packaged type bridges are also referred to as reassembling type bridge, are that the highly important bridge rush-repair in home and abroad robs frame equipment, representative Product is assembly type steel bridge on highway.Assembly type steel bridge on highway is widely used in the motor-driven guarantee of army, usually rescue and relief work and its people In economic construction.Since assembled highway bridge is readily transported, using flexible can set up into the bridge of different length as needed Beam, bridge passage is functional, and by the attention of army, national communication war preparedness department and road and bridge company, performance is obtained not It is disconnected to improve.
The assembled rigid unit of existing several assembly type steel bridge on highway is mainly plane girder and linear stick-type members composition, structure System is essentially identical, is base-supporting bridge, and basic erection mode is nose frame (being also nose girder) guidance mode.Patent announcement number Disclosed on patent announcement for " CN 201372404Y " a kind of " wide-span ", the truss of the bridge by Sheet triangular web member and H-type metal chord member are assembled.The patent announcement of patent announcement number " ZL201218003212.7 " " a kind of chord member of reassembling type bridge ".Girder involved in above-mentioned patent is made of plane girder or linear stick-type members.Its Main deficiency is that the number of components is more, and it is slower to set up speed for joint connection in site heavy workload." assembly type steel bridge on highway uses hand to data Volume ", " ZB-200 type assembly type steel bridge on highway service instruction ", " ZB-450 type assembly type steel bridge on highway working service is said The erection method that bright book " is introduced is nose frame guidance mode.Nose frame used in this method is assembled using girder truss element, sets up When spanning front end install nose frame, push spanning and nose frame to opposite bank together.After nose frame reaches opposite bank rock and roll, with spanning Continue to push, need to remove nose frame in time, the main deficiency of this method is the installation of nose frame and removes laborious time-consuming.Not only in frame If when need install and remove nose frame, remove receive bridge when be also required to reinstall and remove nose frame, larger workload is unfavorable for The fast erecting of bridge and remove receipts.Especially when bridge span is larger, that is adopted uses Nose rack structure form complicated, common constructor Member is not easy to grasp, and influences erection construction safety.
Bailey bridge used in Britain, the U.S. and MDB bridge (Mabey Delta Bridge) etc., with China's assembled highway Steel bridge is similar, and erection method also uses nose frame guidance to set up.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of packaged type bridges, by way of being assembled into preassembled unit, Synchronized links form the girder and nose girder of spanning, to reduce the consolidation service amount of spanning, simplify the assembling process of nose girder, need to be It sets up/removes time receiving installation, remove nose girder, to improve bridge erection speed.
In order to solve the above-mentioned technical problem, the present invention includes the structure of packaged type bridges, and sets up/remove accordingly receipts Step.The packaged type bridges constitute main structure by girder, nose girder and crossbeam etc..Girder is made of girder preassembled unit, is led Beam is made of nose girder preassembled unit, and girder preassembled unit and nose girder preassembled unit may respectively be segment pattern, nose girder preassembled unit It is nested in inside girder preassembled unit, forms preassembled unit, joined end to end, be respectively combined by pin joint, bolt or other modes At girder and nose girder.First by nose girder by releasing in girder when erection, cantilever extension arrives at opposite bank, and spanning relies on nose girder to slide to pair again Bank.After spanning reaches opposite bank, nose girder is aligned with spanning, is no longer removed.
The girder preassembled unit includes the connector between the load bearing beam and load bearing beam of the left and right sides, will by crossbeam Two preassembled units (being also possible to multiple) hold together, and constitute bridge span structure.Crossbeam can both be located at preassembled unit lower part Base-supporting bridge is formed, preassembled unit top can also be located at and form car for deck bridge.
The nose girder preassembled unit is nested in girder preassembled unit, can be slided in girder preassembled unit.Prepackage is single The length of member, Lifting Capacity when by transport or erection determine.When transport or erection, nose girder preassembled unit can be filled by locking It sets fixed in girder preassembled unit.
The erection/remove receipts step are as follows: when erection, nose girder is stretched out by drawing or pushing in girder, until being able to maintain bridge Predetermined position across balance, locking nose girder prevent the opposite sliding between nose girder and girder.Push spanning to opposite bank again, until leading Opposite bank rock and roll support is costed in beam front end, releases the locking system between nose girder and girder, and keeps nose girder and opposite bank rock and roll support solid It is fixed.It pushes girder to slide to opposite bank along nose girder, until making spanning take a seat after girder is aligned with nose girder, completes the erection of bridge.Remove receipts Operation procedure is in contrast.Spanning is first risen, props up on the rock and roll support of two sides, nose girder and opposite bank rock and roll support is fixed, led Draw girder and retracts my bank to predetermined position.Release the fixation of nose girder and opposite bank rock and roll support, locking nose girder and girder.By girder with Nose girder retracts my bank together, until structural focus returns to my bank rock and roll support rear, releases the locking between nose girder and girder, retracts Nose girder removes crossbeam, girder and nose girder is decomposed into preassembled unit to being aligned with girder, remove harvest it is complete.
Detailed description of the invention
To describe the technical solutions in the embodiments of the present invention more clearly, make required in being described below to embodiment Attached drawing is briefly described.It should be evident that drawings in the following description are only some embodiments of the invention, for For those of ordinary skill in the art, without creative efforts, it can also be obtained according to these attached drawings other Attached drawing, in which:
Fig. 1 is that two section preassembled units join end to end main view.According to the crane capacity of hoisting machine tool, three sections can also be used Or more section preassembled unit.
Fig. 2 is preassembled unit side view.
Fig. 3 is spanning cross-sectional view.
Fig. 4~Figure 10 is the implementation principle figure of erection method of the present invention.
Specific embodiment
The present invention includes girder 11, nose girder 12 and crossbeam 2, and girder 11 is made of girder preassembled unit 111, and nose girder 12 is by leading Beam preassembled unit 121 forms, and girder preassembled unit 111 and nose girder preassembled unit 121 may respectively be segment pattern, and nose girder prepackage is single Member 121 is nested in inside girder preassembled unit 111, is formed preassembled unit 1, is joined end to end by pin joint, bolt or other modes It is respectively combined into girder 11 and nose girder 12.
Girder preassembled unit 111 includes the load bearing beam 1111 and connector 1112 of the left and right sides, will by connector 1112 Two sides load bearing beam 1111 holds together.
Nose girder preassembled unit 121 is made of left and right sides load bearing beam 1211 and connector 1212, and it is single to be nested in girder prepackage In member 111, nose girder preassembled unit 121 can slide in girder preassembled unit 111, can also be fixed by locking system.
The preassembled unit 1 of the left and right sides is connected by crossbeam 2, constitutes bridge main body structure.
As shown in Fig. 4~Figure 10, erection of the invention/remove receiving method includes the following steps:
When erection, nose girder 12 is stretched out by drawing or pushing in girder 11, until it is able to maintain the predetermined position of spanning balance, lock Only nose girder 12 prevent the opposite sliding between nose girder 12 and girder 11.Push girder 11 and nose girder 12 to opposite bank together again, until leading Opposite bank rock and roll support 3 is costed in 12 front end of beam, releases the locking system between nose girder 12 and girder 11, and shake nose girder 12 with opposite bank It is fixed to roll support 3, girder 11 is pushed to slide to opposite bank along with nose girder 12, until so that spanning is taken a seat after girder 11 is aligned with nose girder 12, it is complete At the erection of bridge.It removes and receives operation procedure in contrast, first rise spanning, branch is on the support of two sides, by nose girder 12 and opposite bank Rock and roll support 3 is fixed, and traction girder 11 retracts my bank to predetermined position, releases the fixation of nose girder 12 and opposite bank rock and roll support 3, Make nose girder 12 and 11 locking of girder.Girder 11 and nose girder 12 are retracted into my bank together, until structural focus returns to my bank rock and roll support 4 Rear releases the locking between nose girder 12 and girder 11, retracts nose girder 12 and be aligned to girder 11, decompose each structure, remove and harvest Finish.

Claims (7)

1. a kind of erection method of packaged type bridges, including the end to end preassembled unit of several sections (1), the preassembled unit It (1) include girder preassembled unit (111) and nose girder preassembled unit (121), it is single that nose girder preassembled unit (121) is nested in girder prepackage First (111) are internal, and the girder preassembled unit (111), which joins end to end, to be combined into girder (11), the nose girder preassembled unit (121) It joins end to end and is combined into nose girder (12), which is characterized in that nose girder (12) is stretched out by traction in girder (11) or push, until can protect Maintain an equal level the predetermined position weighed, locking nose girder (12), then pushes girder (11) and nose girder (12) to opposite bank together, until before nose girder (12) Opposite bank rock and roll support (3) is costed at end, is released the locking system between nose girder (12) and girder (12), is shaken nose girder (12) with opposite bank It rolls support (3) to fix, pushes girder (11) to slide to opposite bank along nose girder (12), until making bridge after girder (11) is aligned with nose girder (12) Across taking a seat, the erection of bridge is completed.
2. the erection method of packaged type bridges according to claim 1, which is characterized in that the girder preassembled unit (111) include the left and right sides load bearing beam (1111) and connector (1112), by connector (1112) by two sides load bearing beam (1111) it holds together.
3. the erection method of packaged type bridges according to claim 1, which is characterized in that the nose girder preassembled unit (121) it is made of left and right sides load bearing beam (1211) and connector (1212), it is small compared with girder preassembled unit (111), it can be in master Sliding in beam preassembled unit (111), and can be fixed by locking system.
4. the erection method of packaged type bridges according to claim 2, which is characterized in that the load bearing beam (1111) is purlin Frame structure or plate-girder, box-beam structure.
5. the erection method of packaged type bridges according to claim 3, which is characterized in that the load bearing beam (1211) is purlin Frame structure or plate-girder, box-beam structure.
6. the erection method of packaged type bridges according to claim 1, which is characterized in that the bridge further includes crossbeam (2), crossbeam (2) is located at preassembled unit (1) lower part formation base-supporting bridge.
7. the erection method of packaged type bridges according to claim 1, which is characterized in that the bridge further includes crossbeam (2), crossbeam (2) is located at preassembled unit (1) top formation car for deck bridge.
CN201710088865.1A 2017-02-20 2017-02-20 A kind of erection method of packaged type bridges Active CN106592411B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710088865.1A CN106592411B (en) 2017-02-20 2017-02-20 A kind of erection method of packaged type bridges

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710088865.1A CN106592411B (en) 2017-02-20 2017-02-20 A kind of erection method of packaged type bridges

Publications (2)

Publication Number Publication Date
CN106592411A CN106592411A (en) 2017-04-26
CN106592411B true CN106592411B (en) 2018-12-21

Family

ID=58587745

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710088865.1A Active CN106592411B (en) 2017-02-20 2017-02-20 A kind of erection method of packaged type bridges

Country Status (1)

Country Link
CN (1) CN106592411B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107761543B (en) * 2017-07-12 2022-05-31 赵启林 Device and method for quickly constructing large-span lightweight emergency bridge
CN108179695B (en) * 2017-11-24 2019-08-16 中国船舶重工集团应急预警与救援装备股份有限公司 A kind of modular assembly formula emergency bridge and its erection method
CN109653076B (en) * 2018-12-24 2021-01-08 四川港航建设工程有限公司 Combined type flood control flood gate first bailey steel bridge and construction method
CN109853355B (en) * 2019-01-22 2021-05-28 中国船舶重工集团应急预警与救援装备股份有限公司 Vehicle-mounted emergency mechanized bridge with front guide beam and erection method thereof
CN112252196B (en) * 2019-09-20 2022-04-12 重庆工业职业技术学院 Bridge protection frame locking device
CN113463516B (en) * 2021-05-19 2023-03-28 赵启林 Large-span fiber reinforced composite material rush-repair beam erecting method
CN113957813A (en) * 2021-11-12 2022-01-21 石家庄铁道大学 Expandable truss member, expandable rush-repair beam truss and emergency rush-repair beam

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2801328B1 (en) * 1999-11-19 2002-02-01 Soc Civ D Brevets Matiere METAL BRIDGE APRON AND METHOD OF CONSTRUCTING A BRIDGE COMPRISING SUCH AN APRON
DE10242863A1 (en) * 2002-09-14 2004-04-08 Dornier Gmbh Kit for a dismantled bridge
SE535709C2 (en) * 2011-12-02 2012-11-20 Fmt Int Trade Ab Passenger jetty for airports and ships
CN202688900U (en) * 2012-08-22 2013-01-23 吴立新 Telescopic bridging machine
CN104652247B (en) * 2013-11-26 2016-08-31 湖北华舟重工应急装备股份有限公司 A kind of dismountable modularized emergency bridge

Also Published As

Publication number Publication date
CN106592411A (en) 2017-04-26

Similar Documents

Publication Publication Date Title
CN106592411B (en) A kind of erection method of packaged type bridges
CN106400701B (en) A kind of list girder low level balanced cantilever assembly Bridge Erector
CN100543235C (en) The method and system of erecting steel trusses by stay cable auxiliary complete cantilever
CN102242570B (en) Method for reinforcing transmission line iron tower
CN103233427B (en) Sling tensioning and system conversion method for double-tower three-span plane main cable self-anchorage type suspension bridge
CN103422441B (en) DJ180 Bridge Erector erection long-span highway box beam passing method
CN105421249A (en) Novel dragging- hoisting combined type hanging basket structure and construction method
CN105926464A (en) Inverted hanging type trapezoid inclined climbing form traveler
CN105586867A (en) Installation method for over-length over-weight steel reinforcement cage
CN205577444U (en) Track is organized - trailing component of bed -jig conveying instrument system in advance
CN106702909A (en) Integral swiveling structure for double-body steel box girder and construction method thereof
CN107761543A (en) A kind of apparatus and method of rapid build large span lightweight emergency bridge
CN203346798U (en) Reverse dragging device for large span steel truss girder dragging construction
CN110158486A (en) It is a kind of to set up the Bridge Erector and construction method for spelling wide beam
CN202170574U (en) String truss cable anchoring node
CN202280022U (en) Inversely-hung triangular aslant-climbing hanging basket
CN204151695U (en) Be applicable to the combination Hanging Basket system of continuous rigid frame bridge or the full beam section construction of continuous girder bridge
CN203361021U (en) Double-spliced type truss hanging basket
CN208250893U (en) A kind of device of rapid build large span lightweight emergency bridge
CN102134834A (en) Small pier construction diamond cradle
CN211036729U (en) Telescopic hanging basket overturning prevention device
CN211171648U (en) Traction rope hanging basket walking device
CN108203933B (en) Frame-transporting integrated bridge girder erection machine for rear vehicle three-row tires
CN203307732U (en) Stayed-cable type walking bridge erecting machine
CN206267037U (en) Reversely hung Yong is trapezoidal tiltedly to climb Hanging Basket

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant