CN106592411A - Assembly-type bridge and erecting method - Google Patents

Assembly-type bridge and erecting method Download PDF

Info

Publication number
CN106592411A
CN106592411A CN201710088865.1A CN201710088865A CN106592411A CN 106592411 A CN106592411 A CN 106592411A CN 201710088865 A CN201710088865 A CN 201710088865A CN 106592411 A CN106592411 A CN 106592411A
Authority
CN
China
Prior art keywords
girder
preassembled unit
bridge
nose
nose girder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710088865.1A
Other languages
Chinese (zh)
Other versions
CN106592411B (en
Inventor
苟明康
张颖
梁川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
63983 Troops of PLA
Original Assignee
63983 Troops of PLA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 63983 Troops of PLA filed Critical 63983 Troops of PLA
Priority to CN201710088865.1A priority Critical patent/CN106592411B/en
Publication of CN106592411A publication Critical patent/CN106592411A/en
Application granted granted Critical
Publication of CN106592411B publication Critical patent/CN106592411B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D15/00Movable or portable bridges; Floating bridges
    • E01D15/12Portable or sectional bridges
    • E01D15/133Portable or sectional bridges built-up from readily separable standardised sections or elements, e.g. Bailey bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • E01D21/06Methods or apparatus specially adapted for erecting or assembling bridges by translational movement of the bridge or bridge sections
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention relates to an assembly-type bridge and an erecting method, and the method comprises the step of erection of pre-assembly units and a bridge of the structure. The pre-assembly unit consists of a bridge-span main girder pre-assembly unit and a guide girder pre-assembly unit, and is of a three-dimensional structure. The bridge-span main girder pre-assembly unit is bigger, and the guide girder pre-assembly unit is smaller, and the bridge-span main girder pre-assembly unit and the guide girder pre-assembly unit are set together in a nested manner. A plurality of pre-assembly units are connected to form a bridge-span main girder and a guide girder. The guide girder can slide back and forth in the main girder. The method can achieve the quick assembly and disassembly of the bridge, simplifies the assembly and disassembly operation of a conventional nose girder, and can be widely used for rescue and relief and military action.

Description

A kind of packaged type bridges and erection method
Technical field
The present invention relates to the erection of a kind of packaged type bridges, especially packaged type bridges/remove receiving method.
Background technology
Packaged type bridges are also referred to as reassembling type bridge, are that the highly important bridge rush-repair in home and abroad robs frame equipment, and it is representative Product is assembly type steel bridge on highway.Assembly type steel bridge on highway is widely used in the motor-driven guarantee of army, at ordinary times rescue and relief work and its people In economic construction.Because assembled highway bridge is readily transported, using flexible, the bridge of different length can be as needed set up into Beam, bridge passes through functional, is paid attention to by army, national communication war preparedness department and road and bridge company, and its performance is obtained not It is disconnected to improve.
The assembled rigid unit of existing several assembly type steel bridge on highway is mainly plane girder and linear stick-type members composition, structure System is essentially identical, is base-supporting bridge, and basic erection mode is nose frame (being also nose girder) guidance mode.Patent announcement number Disclose on patent announcement for " CN 201372404Y " a kind of " wide-span ", the truss of the bridge by Lamellar triangular web member and H type metal chord members are assembled.The patent announcement of patent announcement number " ZL201218003212.7 " " a kind of chord member of reassembling type bridge ".Girder involved by above-mentioned patent is constituted by plane girder or linear stick-type members.Its Main deficiency is that the number of components is more, and joint connection in site workload is big, sets up speed slower." assembly type steel bridge on highway uses handss to data Volume ", " ZB-200 type assembly type steel bridge on highway service instructions ", " ZB-450 type assembly type steel bridge on highway working services are said The erection method that bright book " is introduced is nose frame guidance mode.Nose frame used by the method is assembled using girder truss element, sets up When spanning front end install nose frame, push spanning and nose frame to opposite bank together.After nose frame reaches opposite bank rock and roll, with spanning Continue to push, need to remove nose frame in time, the main deficiency of the method is the installation of nose frame and removes laborious time-consuming.Not only in frame If when need install and remove nose frame, remove receive bridge when be also required to reinstall and remove nose frame, workload is larger, is unfavorable for The fast erecting of bridge and remove receipts.Especially when bridge span is larger, the use Nose rack structure form adopted is complicated, common constructor Member is difficult to grasp, and affects erection construction safety.
Bailey bridge and MDB bridges (Mabey Delta Bridge) used by Britain, the U.S. etc., with China's assembled highway Steel bridge is similar, and erection method is also adopted by nose frame guiding and sets up.
The content of the invention
The technical problem to be solved in the present invention is to provide a kind of packaged type bridges, by the form for being assembled into preassembled unit, Synchronized links form the girder and nose girder of spanning, to reduce the consolidation service amount of spanning, simplify the assembling process of nose girder, need to be Set up/remove time receiving installation, nose girder removed, to improve bridge erection speed.
In order to solve above-mentioned technical problem, the present invention includes the structure of packaged type bridges, and sets up/remove receipts step accordingly Suddenly.The packaged type bridges constitute agent structure by girder, nose girder and crossbeam etc..Girder is made up of girder preassembled unit, nose girder It is made up of nose girder preassembled unit, girder preassembled unit and nose girder preassembled unit can be respectively sections pattern, and nose girder preassembled unit is embedding It is enclosed within inside girder preassembled unit, forms preassembled unit, joined end to end by pin joint, bolt or other modes, is respectively combined into Girder and nose girder.First by nose girder by release in girder during erection, cantilever extension arrives at opposite bank, and it is right that spanning relies on again nose girder to slide to Bank.Spanning is reached behind opposite bank, and nose girder aligns with spanning, no longer removes.
Described girder preassembled unit includes the connector between the carrier bar and carrier bar of the left and right sides, will by crossbeam Two preassembled units (can also be multiple) hold together, and constitute bridge span structure.Crossbeam both can be located at preassembled unit bottom Form base-supporting bridge, it is also possible to form car for deck bridge positioned at preassembled unit top.
Described nose girder preassembled unit is nested in girder preassembled unit, can be slided in girder preassembled unit.Prepackage is single The length of unit, is determined by Lifting Capacity when transport or erection.When transport or erection, nose girder preassembled unit can be filled by locking Put fixed in girder preassembled unit.
Described erection/remove receipts step is:During erection, nose girder is stretched out by traction in girder or push, can extremely keep bridge Across the precalculated position of balance, locking nose girder prevents the relative slip between nose girder and girder.Push spanning to opposite bank again, to leading Opposite bank rock and roll bearing is costed in beam front end, releases the locking system between nose girder and girder, and nose girder is consolidated with opposite bank rock and roll bearing It is fixed.Promote girder to slide to opposite bank along nose girder, after aliging with nose girder to girder, make spanning take a seat, complete the erection of bridge.Remove receipts Operation routine is in contrast.Spanning is first risen, is propped up on the rock and roll bearing of two sides, nose girder is fixed with opposite bank rock and roll bearing, led Draw girder and retract my bank to precalculated position.Release the fixation of nose girder and opposite bank rock and roll bearing, locking nose girder and girder.By girder with Nose girder retracts together my bank, and to structural focus my bank rock and roll bearing rear is returned to, and releases the locking between nose girder and girder, retracts Nose girder removes crossbeam to aliging with girder, and girder and nose girder are decomposed into into preassembled unit, remove harvest it is complete.
Description of the drawings
Technical scheme in order to be illustrated more clearly that the embodiment of the present invention, below will be to making needed for embodiment description Accompanying drawing is briefly described.It should be evident that drawings in the following description are only some embodiments of the present invention, for For those of ordinary skill in the art, on the premise of not paying creative work, can be obtaining other according to these accompanying drawings Accompanying drawing, wherein:
Fig. 1 is that two section preassembled units join end to end front view.According to the crane capacity of hoisting machine tool, it would however also be possible to employ three sections Or the preassembled unit of more more piece.
Fig. 2 is preassembled unit side view.
Fig. 3 is spanning cross-sectional view.
Fig. 4~Figure 10 is the implementation principle figure of erection method of the present invention.
Specific embodiment
The present invention includes girder 11, nose girder 12 and crossbeam 2, and girder 11 is made up of girder preassembled unit 111, and nose girder 12 is by leading Beam preassembled unit 121 is constituted, and girder preassembled unit 111 and nose girder preassembled unit 121 can be respectively sections pattern, and nose girder prepackage is single Unit 121 is nested in inside girder preassembled unit 111, forms preassembled unit 1, is joined end to end by pin joint, bolt or other modes It is respectively combined into girder 11 and nose girder 12.
Girder preassembled unit 111 includes the carrier bar 1111 and connector 1112 of the left and right sides, will by connector 1112 Both sides carrier bar 1111 holds together.
Nose girder preassembled unit 121 is made up of left and right sides carrier bar 1211 and connector 1212, is nested in girder prepackage single In unit 111, nose girder preassembled unit 121 can slide in girder preassembled unit 111, it is also possible to be fixed by locking system.
The preassembled unit 1 of the left and right sides is connected by crossbeam 2, constitutes bridge main body structure.
By shown in Fig. 4~Figure 10, the erection/remove receiving method of the present invention comprises the steps:
During erection, nose girder 12 is stretched out by traction in girder 11 or push, the precalculated position that can extremely keep spanning to balance, lock Only nose girder 12, prevent the relative slip between nose girder 12 and girder 11.Push girder 11 and nose girder 12 to opposite bank together again, to leading Opposite bank rock and roll bearing 3 is costed in the front end of beam 12, releases the locking system between nose girder 12 and girder 11, and nose girder 12 is shaken with opposite bank Rolling bearing 3 is fixed, and promotes girder 11 to slide to opposite bank along with nose girder 12, after aliging with nose girder 12 to girder 11, makes spanning take a seat, complete Into the erection of bridge.Remove receipts operation routine and rise spanning in contrast, first, prop up on the bearing of two sides, by nose girder 12 and opposite bank Rock and roll bearing 3 is fixed, and traction girder 11 retracts my bank to precalculated position, releases the fixation of nose girder 12 and opposite bank rock and roll bearing 3, is made Nose girder 12 and the locking of girder 11.Girder 11 is retracted into my bank together with nose girder 12, is returned to after my bank rock and roll bearing 4 to structural focus Side, releases the locking between nose girder 12 and girder 11, retracts nose girder 12 to aliging with girder 11, decomposes each structure, remove harvest it is complete.

Claims (10)

1. a kind of packaged type bridges, it is characterised in that the bridge includes the end to end preassembled unit (1) of some sections, described Preassembled unit (1) includes girder preassembled unit (111) and nose girder preassembled unit (121), and nose girder preassembled unit (121) is nested in master Beam preassembled unit (111) is internal.
2. packaged type bridges according to claim 1, it is characterised in that the girder preassembled unit (111) joins end to end Girder (11) is combined into, the nose girder preassembled unit (121) joins end to end and is combined into nose girder (12).
3. packaged type bridges according to claim 1, it is characterised in that the girder preassembled unit (111) includes left and right The carrier bar (1111) and connector (1112) of both sides, by connector (1112) by both sides carrier bar (1111) be linked as one it is whole Body.
4. packaged type bridges according to claim 1, it is characterised in that the nose girder preassembled unit (121) is by left and right two Side carrier bar (1211) and connector (1212) are constituted, little compared with girder preassembled unit (111), can be in girder preassembled unit (111) slide in, and can be fixed by locking system.
5. packaged type bridges according to claim 3, it is characterised in that the carrier bar (1111) is truss structure or plate Beam, box-beam structure.
6. packaged type bridges according to claim 4, it is characterised in that the carrier bar (1211) is truss structure or plate Beam, box-beam structure.
7. packaged type bridges according to claim 1, it is characterised in that the bridge also includes crossbeam (2), crossbeam (2) Base-supporting bridge is formed positioned at preassembled unit (1) bottom.
8. packaged type bridges according to claim 1, it is characterised in that the bridge also includes crossbeam (2), crossbeam (2) Car for deck bridge is formed positioned at preassembled unit (1) top.
9. a kind of unit construction bridge beam erection method, it is characterised in that nose girder (12) is stretched out by traction in girder (11) or push, extremely The precalculated position for balancing, locking nose girder (12) can be kept, then pushes girder (11) and nose girder (12) to opposite bank together, to nose girder (12) opposite bank rock and roll bearing (3) is costed in front end, releases the locking system between nose girder (12) and girder (12), make nose girder (12) and Opposite bank rock and roll bearing (3) is fixed, promotes girder (11) to slide to opposite bank along nose girder (12), aligns with nose girder (12) to girder (11) Afterwards, make spanning take a seat, complete the erection of bridge.
10. a kind of packaged type bridges remove receiving method, it is characterised in that rise spanning, prop up on the rock and roll bearing (3) of two sides, will Nose girder (12) and opposite bank rock and roll bearing (3) are fixed, and traction girder (11) retracts my bank to precalculated position.Release nose girder (12) with it is right The fixation of bank rock and roll bearing (3), nose girder (12) is fixed with girder (11).Girder (11) is retracted into my bank together with nose girder (12), My bank rock and roll bearing (3) rear is returned to structural focus, the locking between nose girder (12) and girder (11) is released, nose girder is retracted (12) to aliging with girder (11), crossbeam (2) is removed, girder (11) and nose girder (12) is decomposed into into preassembled unit, complete bridge Remove receipts.
CN201710088865.1A 2017-02-20 2017-02-20 A kind of erection method of packaged type bridges Active CN106592411B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710088865.1A CN106592411B (en) 2017-02-20 2017-02-20 A kind of erection method of packaged type bridges

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710088865.1A CN106592411B (en) 2017-02-20 2017-02-20 A kind of erection method of packaged type bridges

Publications (2)

Publication Number Publication Date
CN106592411A true CN106592411A (en) 2017-04-26
CN106592411B CN106592411B (en) 2018-12-21

Family

ID=58587745

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710088865.1A Active CN106592411B (en) 2017-02-20 2017-02-20 A kind of erection method of packaged type bridges

Country Status (1)

Country Link
CN (1) CN106592411B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107761543A (en) * 2017-07-12 2018-03-06 赵启林 A kind of apparatus and method of rapid build large span lightweight emergency bridge
CN108179695A (en) * 2017-11-24 2018-06-19 湖北华舟重工应急装备股份有限公司 A kind of modular assembly formula is met an urgent need bridge and its erection method
CN109653076A (en) * 2018-12-24 2019-04-19 四川港航建设工程有限公司 Combined type flood control is passed the flood period lock head shellfish Lei Gangqiao and construction method
CN109853355A (en) * 2019-01-22 2019-06-07 中国船舶重工集团应急预警与救援装备股份有限公司 A kind of nose girder preposition vehicle-mounted emergency machine bridge and its erection method
CN110468733A (en) * 2019-09-20 2019-11-19 重庆工业职业技术学院 A kind of bridge assembly fixture sets constructing device
CN113463516A (en) * 2021-05-19 2021-10-01 赵启林 Large-span fiber reinforced composite material rush-repair beam erecting method
CN113957813A (en) * 2021-11-12 2022-01-21 石家庄铁道大学 Expandable truss member, expandable rush-repair beam truss and emergency rush-repair beam

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6574818B1 (en) * 1999-11-19 2003-06-10 Societe Civile De Brevets Matiere Provisional bridge of prefabricated elements
WO2004027157A1 (en) * 2002-09-14 2004-04-01 Eurobridge Mobile Brücken GmbH Construction kit for a bridge that can be dismantled
SE1151151A1 (en) * 2011-12-02 2012-11-20 Fmt Int Trade Ab Passenger jetty for airports and ships
CN202688900U (en) * 2012-08-22 2013-01-23 吴立新 Telescopic bridging machine
CN104652247A (en) * 2013-11-26 2015-05-27 湖北华舟重工应急装备股份有限公司 Detachable type modularized emergency bridge

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6574818B1 (en) * 1999-11-19 2003-06-10 Societe Civile De Brevets Matiere Provisional bridge of prefabricated elements
WO2004027157A1 (en) * 2002-09-14 2004-04-01 Eurobridge Mobile Brücken GmbH Construction kit for a bridge that can be dismantled
SE1151151A1 (en) * 2011-12-02 2012-11-20 Fmt Int Trade Ab Passenger jetty for airports and ships
CN202688900U (en) * 2012-08-22 2013-01-23 吴立新 Telescopic bridging machine
CN104652247A (en) * 2013-11-26 2015-05-27 湖北华舟重工应急装备股份有限公司 Detachable type modularized emergency bridge

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107761543A (en) * 2017-07-12 2018-03-06 赵启林 A kind of apparatus and method of rapid build large span lightweight emergency bridge
CN108179695A (en) * 2017-11-24 2018-06-19 湖北华舟重工应急装备股份有限公司 A kind of modular assembly formula is met an urgent need bridge and its erection method
CN109653076A (en) * 2018-12-24 2019-04-19 四川港航建设工程有限公司 Combined type flood control is passed the flood period lock head shellfish Lei Gangqiao and construction method
CN109653076B (en) * 2018-12-24 2021-01-08 四川港航建设工程有限公司 Combined type flood control flood gate first bailey steel bridge and construction method
CN109853355A (en) * 2019-01-22 2019-06-07 中国船舶重工集团应急预警与救援装备股份有限公司 A kind of nose girder preposition vehicle-mounted emergency machine bridge and its erection method
CN110468733A (en) * 2019-09-20 2019-11-19 重庆工业职业技术学院 A kind of bridge assembly fixture sets constructing device
CN110468733B (en) * 2019-09-20 2020-10-30 重庆工业职业技术学院 Bridge assembling erection construction device
CN113463516A (en) * 2021-05-19 2021-10-01 赵启林 Large-span fiber reinforced composite material rush-repair beam erecting method
CN113957813A (en) * 2021-11-12 2022-01-21 石家庄铁道大学 Expandable truss member, expandable rush-repair beam truss and emergency rush-repair beam

Also Published As

Publication number Publication date
CN106592411B (en) 2018-12-21

Similar Documents

Publication Publication Date Title
CN106592411A (en) Assembly-type bridge and erecting method
CN106400701B (en) A kind of list girder low level balanced cantilever assembly Bridge Erector
CN202090286U (en) Traction system suitable for self-anchored type double cable plane suspension bridge
CN201169749Y (en) Simple-mounted pin connection triangle hanging basket
CN105421249A (en) Novel dragging- hoisting combined type hanging basket structure and construction method
CN103410093B (en) For the reverse towed equipment of longspan steel truss girder hauling construction
CN208814225U (en) A kind of hoisting mechanism and profile steel stacker of profile steel stacker
CN101481903B (en) Method for constructing hilly region rope-suspension bridge main beam by span cable supported crane assembling
CN205577444U (en) Track is organized - trailing component of bed -jig conveying instrument system in advance
CN203346798U (en) Reverse dragging device for large span steel truss girder dragging construction
EP3388576A1 (en) Beveled-end steel railroad
CN107761543A (en) A kind of apparatus and method of rapid build large span lightweight emergency bridge
CN103147398B (en) A kind of Bridge Erector realizes the method shifting between bridge or pass through tunnel
CN202170574U (en) String truss cable anchoring node
CN209891096U (en) Be used for reinforced concrete box girder static force cutting to demolish combination formula hoist
CN102009929A (en) Movably-assembled anti-collision bridge wall construction hanging basket
CN213417600U (en) Hanging basket protection device for bridge construction
CN219218682U (en) Ultra-wide bridge hanging basket structure
CN212423135U (en) Rail sliding type signal lamp car stopper
CN1061117C (en) Bridge span erecting machine
CN211171648U (en) Traction rope hanging basket walking device
CN211174141U (en) Tunnel reinforcing device
CN210127855U (en) Coal mine vertical shaft arrangement structure
CN208250893U (en) A kind of device of rapid build large span lightweight emergency bridge
CN102134834A (en) Small pier construction diamond cradle

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant