CN106553665A - Zone controller compatibility handles/method of not handling route - Google Patents

Zone controller compatibility handles/method of not handling route Download PDF

Info

Publication number
CN106553665A
CN106553665A CN201611074871.3A CN201611074871A CN106553665A CN 106553665 A CN106553665 A CN 106553665A CN 201611074871 A CN201611074871 A CN 201611074871A CN 106553665 A CN106553665 A CN 106553665A
Authority
CN
China
Prior art keywords
route
zone controller
handled
handle
handles
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611074871.3A
Other languages
Chinese (zh)
Other versions
CN106553665B (en
Inventor
吴卫平
胡剑
刘喻声
李澎东
高原
雷达定
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CRRC Corp Ltd
Hunan CRRC Times Signal and Communication Co Ltd
Original Assignee
Hunan CRRC Times Signal and Communication Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan CRRC Times Signal and Communication Co Ltd filed Critical Hunan CRRC Times Signal and Communication Co Ltd
Priority to CN201611074871.3A priority Critical patent/CN106553665B/en
Publication of CN106553665A publication Critical patent/CN106553665A/en
Application granted granted Critical
Publication of CN106553665B publication Critical patent/CN106553665B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L27/00Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
    • B61L27/04Automatic systems, e.g. controlled by train; Change-over to manual control
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/12Protocols specially adapted for proprietary or special-purpose networking environments, e.g. medical networks, sensor networks, networks in vehicles or remote metering networks
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/2866Architectures; Arrangements
    • H04L67/30Profiles

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mechanical Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • Computing Systems (AREA)
  • General Health & Medical Sciences (AREA)
  • Medical Informatics (AREA)
  • Train Traffic Observation, Control, And Security (AREA)

Abstract

The invention discloses the implementation method of route is handled/do not handled to a kind of zone controller compatibility, possess more compatible more open function, adapt to current several different main flow frameworks, improve the applicability of product.Its technical scheme is:Zone controller can compatibility handle/do not handle route function, enhance the function of zone controller, can couple with the CI of many families and ATS, improve the adaptability of product.Zone controller compatibility handles/route function is not handled, reduce modification of the ATS and CI products in connection.The processing method of the zone controller of the present invention both adapts to handle the CI of route, also adapts to the CI for aiding in ZC to handle track switch and system gateway, and the function of zone controller is greatly increased, can more adaptation market demands.

Description

Zone controller compatibility handles/method of not handling route
Technical field
The present invention relates to the improvement to zone controller, more particularly to provide One function more compatible more open region control The processing method of device processed.
Background technology
As shown in figure 1, city rail traffic signal system is mainly by vehicle-mounted ATP (automatic trainprotection, Automatic Train Protection), ATO (driverless train operate, Automatic Train Operation), CI (interlocking, Computer Interlocking), ATS (driverless train monitor, Automatic Train Supervision) and ZC (regions Controller, Zone Controller) five subsystems complete.Wherein zone controller ZC is the maincenter of whole signal system, Under CBTC (communication-based train control, Communication Based Train Control) pattern, current ZC is to vehicle-mounted ATP calculates mobile authorization mainly two schemes.
The first string is as shown in Fig. 2 be that ATS sends out route request to interlocking (CI), CI systems are handled according to route request Route information is passed to into ZC after route.ZC, finally will be mobile according to the assessment that mandate is moved on the basis of the calculated routes of CI Mandate is issued vehicle-mounted ATP and carries out control car.
Second scheme is as shown in figure 3, be that ATS sends route request to ZC, ZC systems handle route according to route request. Different operations are carried out according to track switch or system gateway whether are included in route:By CI if comprising track switch or system gateway The route for carrying out track switch or system gateway is handled;Handled according to CI by ZC systems if not comprising track switch or system gateway Route carries out route and handles.Then, ZC moves mandate assessment according to calculated route.It is finally vehicle-mounted to receive the shifting passed by ZC Dynamic mandate carries out control car.
Maincenters of the ZC as CBTC, it is seen that CI does route from above-mentioned the first string, from second scheme It is seen that sponsor route by ZC, not only CI functions have a very big difference to both schemes, and ZC functions also difference is very big.This Two schemes mainly have the disadvantage that:
(1) ZC of current the first string can not be compatible with the CI of second scheme, otherwise also identical;
(2) scheme of ZC is different, affects very big on ATS and CI, and especially ATS and CI is more ripe product at home. Used as a subsystem, the ZC in the first string can not be coordinated ZC with the CI in second scheme, while in second scheme ZC can not be coordinated with the CI in the first string,, for ZC systems, being greatly limited property is also unfavorable for for this The development of CBTC systems.
The content of the invention
The brief overview of one or more aspects given below is providing to the basic comprehension in terms of these.This general introduction is not The extensive overview of all aspects for contemplating, and it is also non-to be both not intended to identify the key or decisive key element of all aspects Attempt to define the scope in terms of any or all.Its unique purpose is will to provide the one of one or more aspects in simplified form A little concepts think the sequence of more detailed description given later.
It is an object of the invention to solve the above problems, there is provided a kind of zone controller compatibility handles/do not handle route Implementation method, possess more compatible more open function, adapt to current several different main flow frameworks, improve the suitable of product The property used.
The technical scheme is that:Present invention is disclosed the side of route is handled/do not handled to a kind of zone controller compatibility Method, method include:
Step 1:Zone controller carries out system initialization;
Step 2:Judge whether zone controller is self-service and handle route, if then execution step 3 to 7, if otherwise entering step Rapid 8 to 10;
Step 3:Zone controller re-starts the initialization of corresponding function according to route mode is handled;
Step 4:Zone controller receives the route request of driverless train monitoring system;
Step 5:Zone controller handles route according to route request;
Step 6:Zone controller moves the calculating of mandate according to itself handled route;
Step 7:Zone controller sends the mobile authorization for being calculated to vehicle-mounted automatic trainprotection system, vehicle-mounted automatic Train protection system carries out control car according to mobile authorization;
Step 8:Zone controller carries out the initialization of corresponding function according to route mode is not handled;
Step 9:Driverless train monitoring system sends route request to interlocking, to interlock and handle route according to route request, and The route successfully handled is passed to into zone controller, zone controller receives the route of interlocking transmission, moves on route The assessment of mandate;
Step 10:Zone controller sends the mobile authorization for being calculated to vehicle-mounted automatic trainprotection system, it is vehicle-mounted from Dynamic train protection system carries out control car according to mobile authorization.
An embodiment of the method for route is handled/do not handled to zone controller compatibility of the invention, in step 1, Zone controller first reads CONFIG.SYS, carries out systematic parameter initialization further according to CONFIG.SYS.
An embodiment of the method for route is handled/do not handled to zone controller compatibility of the invention, in steps of 5, If route includes track switch or system gateway, zone controller is carried out after receiving route request to interlocking request route, interlocking The route of track switch or system gateway is handled, and will be handled result and be passed to zone controller, and zone controller is receiving interlocking institute Route is carried out on the basis of handling route to handle;If without track switch or system gateway in route, zone controller directly handle into Road.
Present invention contrast prior art has following beneficial effect:The present invention zone controller can compatibility handle/no Route function is handled, the function of zone controller is enhanced, can be coupled with the CI of many families and ATS, be improve the adaptability of product. Zone controller compatibility handles/route function is not handled, reduce modification of the ATS and CI products in connection.The area of the present invention The processing method of domain controller both adapts to the CI for handling route, also adapts to aid in ZC to handle track switch and system gateway CI, the function of zone controller are greatly increased, can more adaptation market demands.
Description of the drawings
Fig. 1 shows the system architecture diagram of city rail traffic signal system.
Fig. 2 shows the schematic diagram of the one of which scheme of existing zone controller.
Fig. 3 shows the schematic diagram of another kind of scheme of existing zone controller.
Fig. 4 shows the flow chart that the embodiment of the method for route was handled/do not handled to the zone controller compatibility of the present invention.
Specific embodiment
After the detailed description of embodiment of the disclosure is read in conjunction with the following drawings, better understood when the present invention's Features described above and advantage.In the accompanying drawings, each component is not necessarily drawn to scale, and with similar correlation properties or feature Component may have same or like reference.
Fig. 4 shows that the flow process of the embodiment of the method for route is handled/do not handled to the zone controller compatibility of the present invention.Please Referring to Fig. 4, details are as follows for the implementation steps of the method for the present embodiment.
Step S1:Zone controller reads CONFIG.SYS and carries out systematization configuration.
Step S2:Zone controller carries out function initialization by CONFIG.SYS.
Step S3:Judge whether zone controller is self-service and handle route, if then execution step S4 is extremely, if otherwise entering step Rapid 8 to 10.
Step S4:Zone controller re-starts the initialization of corresponding function according to route mode is handled.
Step S5:Zone controller receives the route request of driverless train monitoring system.
Step S6:Zone controller handles route according to route request.
Step S7:Whether track switch or system gateway are included in judging route.If then entering step S8, step is otherwise entered Rapid S9.
Step S8:Interlocking carries out track switch or the route of system gateway is handled.
Step S9:Zone controller carries out route according to handled route of interlocking and handles.
Step S10:Zone controller moves mandate assessment according to calculated route.
Step S11:Zone controller sends the mobile authorization for being calculated to vehicle-mounted automatic trainprotection system, it is vehicle-mounted from Dynamic train protection system carries out control car according to mobile authorization, and flow process terminates.
Step S12:Zone controller carries out the initialization of corresponding function according to route mode is not handled.
Step S13:Driverless train monitoring system sends route request to interlocking, to interlock and handle route according to route request, And the route successfully handled is passed to into zone controller.
Step S14:Zone controller receives the route of interlocking transmission, and the assessment of mobile authorization is carried out on route.
Step S15:Zone controller sends the mobile authorization for being calculated to vehicle-mounted automatic trainprotection system, it is vehicle-mounted from Dynamic train protection system carries out control car according to mobile authorization, and flow process terminates.
Although for make explanation simplify said method is illustrated and is described as a series of actions, it should be understood that and understand, These methods are not limited by the order of action, because according to one or more embodiments, some actions can occur in different order And/or with from it is depicted and described herein or not shown herein and describe but it will be appreciated by those skilled in the art that other Action concomitantly occurs.
Those skilled in the art will further appreciate that, the various illustratives described with reference to the embodiments described herein Logic plate, module, circuit and algorithm steps are capable of achieving as electronic hardware, computer software or combination of the two.For clear Chu ground explains this interchangeability of hardware and software, various illustrative components, frame, module, circuit and step be above with Its functional form makees vague generalization description.Such feature be implemented as hardware or software depend on concrete application and Put on the design constraint of total system.Technical staff for every kind of application-specific can be realized with different modes it is described Feature, but such realize that decision-making should not be interpreted to cause departing from the scope of the present invention.
Various illustrative logic plates, module and circuit with reference to presently disclosed embodiment description can use general place Reason device, digital signal processor (DSP), special IC (ASIC), field programmable gate array (FPGA) or other can compile Journey logical device, discrete door or transistor logic, discrete nextport hardware component NextPort or its be designed to carry out function described herein Any combinations are realizing or perform.General processor can be microprocessor, but in alternative, the processor can be appointed What conventional processor, controller, microcontroller or state machine.Processor is also implemented as the combination of computing device, example The one or more microprocessors that cooperate with DSP core with the combination of microprocessor, multi-microprocessor such as DSP or it is any its His such configuration.
The step of method described with reference to embodiment disclosed herein or algorithm, can be embodied directly in hardware, in by processor In the software module of execution, or in combination of the two embody.Software module can reside in RAM memory, flash memory, ROM and deposit Reservoir, eprom memory, eeprom memory, register, hard disk, removable disk, CD-ROM or known in the art appoint In the storage medium of what other forms.Exemplary storage medium is coupled to processor so that the processor can be from/to the storage Medium reads and writes information.In alternative, storage medium can be integrated into processor.Processor and storage medium can Reside in ASIC.ASIC is can reside in user terminal.In alternative, processor and storage medium can be used as discrete sets Part is resident in the user terminal.
In one or more exemplary embodiments, described function can be in hardware, software, firmware or its any combinations Middle realization.If being embodied as computer program in software, each function can be instructed as one or more bars or generation Code storage on a computer-readable medium or mat its transmitted.Computer-readable medium includes computer-readable storage medium and communication Both media, which includes any medium for facilitating computer program to shift from one place to another.Storage medium can be can quilt Any usable medium that computer is accessed.It is non-limiting as an example, such computer-readable medium may include RAM, ROM, EEPROM, CD-ROM or other optical disc storages, disk storage or other magnetic storage apparatus can be used to carry or store instruction Or the desirable program code and any other medium that can be accessed by a computer of data structure form.Any connection is also by by rights Referred to as computer-readable medium.For example, if software is using coaxial cable, fiber optic cables, twisted-pair feeder, digital subscriber line , or the wireless technology of such as infrared, radio and microwave etc is passed from web site, server or other remote sources (DSL) Send, then the coaxial cable, fiber optic cables, twisted-pair feeder, DSL or such as infrared, radio and microwave etc is wireless Among technology is just included in the definition of medium.Disk (disk) as used herein and dish (disc) are including compact disc (CD), laser disc, laser disc, digital versatile disc (DVD), floppy disk and blu-ray disc, which disk (disk) are often reproduced in the way of magnetic Data, and dish (disc) laser reproduce data optically.Combinations of the above should also be included in computer-readable medium In the range of.
It is for so that any person skilled in the art can all make or use this public affairs to provide of this disclosure being previously described Open.Various modifications of this disclosure all will be apparent for a person skilled in the art, and as defined herein general Suitable principle can be applied to spirit or scope of other variants without departing from the disclosure.Thus, the disclosure is not intended to be limited Due to example described herein and design, but should be awarded and principle disclosed herein and novel features phase one The widest scope of cause.

Claims (3)

1. a kind of zone controller compatibility handles the/method of not handling route, it is characterised in that method includes:
Step 1:Zone controller carries out system initialization;
Step 2:Judge whether zone controller self-service and handle route, if then execution step 3 to 7, if otherwise enter step 8 to 10;
Step 3:Zone controller re-starts the initialization of corresponding function according to route mode is handled;
Step 4:Zone controller receives the route request of driverless train monitoring system;
Step 5:Zone controller handles route according to route request;
Step 6:Zone controller moves the calculating of mandate according to itself handled route;
Step 7:Zone controller sends the mobile authorization for being calculated to vehicle-mounted automatic trainprotection system, vehicle-mounted driverless train Guard system carries out control car according to mobile authorization;
Step 8:Zone controller carries out the initialization of corresponding function according to route mode is not handled;
Step 9:Driverless train monitoring system sends route request to interlocking, to interlock and handle route according to route request, and will be into The route that work(is handled passes to zone controller, and zone controller receives the route of interlocking transmission, mobile authorization is carried out on route Assessment;
Step 10:Zone controller sends the mobile authorization for being calculated to vehicle-mounted automatic trainprotection system, vehicle-mounted automatic row Car guard system carries out control car according to mobile authorization.
2. zone controller compatibility according to claim 1 handles the/method of not handling route, it is characterised in that in step In rapid 1, zone controller first reads CONFIG.SYS, carries out systematic parameter initialization further according to CONFIG.SYS.
3. zone controller compatibility according to claim 1 handles the/method of not handling route, it is characterised in that in step In rapid 5, if route includes track switch or system gateway, zone controller receives route request to interlocking request route, interlocking The route of laggard trade trouble or system gateway is handled, and will be handled result and be passed to zone controller, and zone controller is being received Route is carried out on the basis of the handled route of interlocking to handle;If without track switch or system gateway in route, zone controller is direct Handle route.
CN201611074871.3A 2016-11-29 2016-11-29 Zone controller is compatible to be handled/method of not handling route Active CN106553665B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611074871.3A CN106553665B (en) 2016-11-29 2016-11-29 Zone controller is compatible to be handled/method of not handling route

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611074871.3A CN106553665B (en) 2016-11-29 2016-11-29 Zone controller is compatible to be handled/method of not handling route

Publications (2)

Publication Number Publication Date
CN106553665A true CN106553665A (en) 2017-04-05
CN106553665B CN106553665B (en) 2019-03-22

Family

ID=58445982

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611074871.3A Active CN106553665B (en) 2016-11-29 2016-11-29 Zone controller is compatible to be handled/method of not handling route

Country Status (1)

Country Link
CN (1) CN106553665B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109017881A (en) * 2018-06-08 2018-12-18 卡斯柯信号有限公司 Train identity management method based on train tracker
CN112878849A (en) * 2019-11-29 2021-06-01 比亚迪股份有限公司 Control method, control device and control system of garage door

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101009679A (en) * 2007-01-29 2007-08-01 北京交通大学 Communication-based interconnected and intercommunicated I-CBIT train operation control system
EP2216230A1 (en) * 2009-02-04 2010-08-11 Thales Deutschland Holding GmbH Method for releasing a route after cancellation of the route by an interlocking
EP2572955A1 (en) * 2011-09-23 2013-03-27 Siemens SAS Method and system for managing an interlocking
CN103984271A (en) * 2014-05-30 2014-08-13 常州联力自动化科技有限公司 Mine intrinsic safety type controller based on modular technology and control method
CN105059329A (en) * 2015-08-03 2015-11-18 北京全路通信信号研究设计院有限公司 Route control method under communication based train control system and relevant equipment thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101009679A (en) * 2007-01-29 2007-08-01 北京交通大学 Communication-based interconnected and intercommunicated I-CBIT train operation control system
EP2216230A1 (en) * 2009-02-04 2010-08-11 Thales Deutschland Holding GmbH Method for releasing a route after cancellation of the route by an interlocking
EP2572955A1 (en) * 2011-09-23 2013-03-27 Siemens SAS Method and system for managing an interlocking
CN103984271A (en) * 2014-05-30 2014-08-13 常州联力自动化科技有限公司 Mine intrinsic safety type controller based on modular technology and control method
CN105059329A (en) * 2015-08-03 2015-11-18 北京全路通信信号研究设计院有限公司 Route control method under communication based train control system and relevant equipment thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
赵晓峰: "计算机联锁在CBTC系统中的两种集成方式", 《铁道通信信号》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109017881A (en) * 2018-06-08 2018-12-18 卡斯柯信号有限公司 Train identity management method based on train tracker
CN112878849A (en) * 2019-11-29 2021-06-01 比亚迪股份有限公司 Control method, control device and control system of garage door

Also Published As

Publication number Publication date
CN106553665B (en) 2019-03-22

Similar Documents

Publication Publication Date Title
CN107336727A (en) A kind of interlock access handles method
CN106080674B (en) The calibration method and system of a kind of train positioning
CN106896751B (en) The universal transform method and device of ATS and interlocking code bit table based on data configuration
WO2018037708A1 (en) Vehicle-mounted device and log collection system
CN107985351B (en) Mobile authorization processing method based on interconnection CBTC
CN113247053A (en) Multi-station integrated code sending control method, electronic equipment and medium
CN107215361A (en) Time-table display methods and device based on Locomotive Running Monitor System
CN109299404B (en) LKJ line data-based train operation path searching method, device and system
CN106553665A (en) Zone controller compatibility handles/method of not handling route
CN112124362A (en) Method for controlling turnout resource lock based on OC, OC and VBTC
CN109213762A (en) The automatic Pilot track data generation method and device of Locomotive Running Monitor System
CN104512440A (en) Signal safety guarantee system
CN107380211A (en) The method and apparatus that a kind of station track number automatically enters
JP6310868B2 (en) Course control system, course control method, and ground device
BR102015006010B1 (en) Method to reset a piece of lane detection equipment
CN106428125B (en) Navigation-type operation pathway data organization method based on GIS map and system
CN105425785A (en) Method and system for platform fault recording
CN108082220B (en) TCC field-linked zone control method, device and storage medium
CN105022839A (en) Running route retrieval method and device
CN112307135A (en) Analysis method for station yard graph playback file route
CN114954584A (en) Virtual section-based train safety path resource locking method
CN115366954B (en) TACS and CBTC compatible operation system and method
CN111661112B (en) Opposite dispersion type train running direction adapting method and system
CN107336726B (en) A kind of locomotive temporary speed-limiting method and system
JP2020032801A (en) Linkage table data generating device and linkage table data generation method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20171227

Address after: No. 16, West Fourth Ring Road, Haidian District, Beijing, Beijing

Applicant after: CRRC Corporation Limited

Applicant after: Hunan CRRC Times Communications Signal Co., Ltd.

Address before: 410100 Hunan economic and Technological Development Zone, Changsha Province, the people of the East Road, No. 7, building 21, floor

Applicant before: Hunan CRRC Times Communications Signal Co., Ltd.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant