CN106545027A - 一种超深冲刷基桩围裙钢管桩加固法 - Google Patents

一种超深冲刷基桩围裙钢管桩加固法 Download PDF

Info

Publication number
CN106545027A
CN106545027A CN201610905457.6A CN201610905457A CN106545027A CN 106545027 A CN106545027 A CN 106545027A CN 201610905457 A CN201610905457 A CN 201610905457A CN 106545027 A CN106545027 A CN 106545027A
Authority
CN
China
Prior art keywords
pile
foundation pile
steel
pipe pile
bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610905457.6A
Other languages
English (en)
Inventor
高荣雄
刘少伦
张华伟
肖茜
袁卫军
孙玲
李凤阳
周文玮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Highway Administration Of Zhumadian City
Huazhong University of Science and Technology
Original Assignee
Highway Administration Of Zhumadian City
Huazhong University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Highway Administration Of Zhumadian City, Huazhong University of Science and Technology filed Critical Highway Administration Of Zhumadian City
Priority to CN201610905457.6A priority Critical patent/CN106545027A/zh
Publication of CN106545027A publication Critical patent/CN106545027A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • E02D27/14Pile framings, i.e. piles assembled to form the substructure

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

本发明属于桥路建造施工技术领域,并公开了一种超深冲刷基桩围裙钢管桩加固法,包括以下步骤:(a)在基桩的周围周向均匀布置钢管桩;(b)在基桩的上部钻孔并植入多条植筋,在所述植筋外露于所述基桩的部分绑扎承台钢筋,从而形成钢筋网;(c)搭设支架以支撑所述钢筋网,在钢筋网上浇注混凝土,从而形成一环形承台;(d)待环形承台的混凝土达到设计强度后,移除支架,使钢管桩、承台和被冲刷的基桩连成一体,即形成基桩围裙钢管桩加固系统。本方法有效地解决了超深冲刷基桩加固困难以及加固效果差等问题,同时具有施工简单,造价低的优点。

Description

一种超深冲刷基桩围裙钢管桩加固法
技术领域
本发明属于桥路建造施工技术领域,更具体地,涉及一种超深冲刷基桩围裙钢管桩加固法。
背景技术
基桩承担上部结构作用的载荷,通过桩身周围与土体的摩擦力以及桩底的支撑力最终将载荷传递至土层中,基桩是包括桥梁结构在内的所用结构物的重要组成部分。尤其是摩擦桩,基桩的承载力主要通过桩身与土的摩擦来提供,因此,桩身入土深度越长,其承载力响应越高,稳定性也越好。然而,处于河床中的桩基础,难免受到河水长期冲刷,加上屡禁不止地挖沙,实际工程中,大量桥梁基桩冲刷程度远远超出预期。人为挖沙活动改变了河道水流状态,部分基桩受冲刷的程度非常严重,不仅很大程度上降低了基桩承载力,而且使下部结构稳定性恶化,严重威胁桥梁安全。对于这种超深冲刷基桩,由于河道或河道的主河槽部分整体向下侵切,导致加固难度非常大。
针对以上问题,目前普遍采用的加固方法是在基桩周围外包混凝土或是在基桩周围堆砌砂石等方法。但实际使用效果表明,这些方法大多未能有效加强基桩的承载力和稳定性。
发明内容
针对现有技术的以上缺陷或改进需求,本发明提供了一种超深冲刷基桩围裙钢管桩加固法,该方法充分考虑了超深冲刷河床的地质条件和需要提高的承载力幅度及稳定性,通过在基桩周围均匀打入钢管桩以及对基桩桩身进行钻孔植筋,形成钢管桩与原基桩连成整体的加固方法,有效地解决了超深冲刷基桩加固困难以及加固效果差等问题,同时具有施工简单,造价低的优点。
为实现上述目的,按照本发明,提供了一种超深冲刷基桩围裙钢管桩加固法,其特征在于,包括以下步骤:
(a)在冲刷严重的基桩的周围周向均匀布置钢管桩,每根所述钢管桩均打入河床内,并确保每根钢管的上端均露出河床;
(b)在基桩的上部钻孔并植入多条植筋,在所述植筋外露于所述基桩的部分绑扎承台钢筋,从而形成钢筋网,在此过程中确保钢管桩的顶部伸入到所述钢筋网的内部;
(c)搭设支架以支撑所述钢筋网,在钢筋网上浇注混凝土,从而形成一环形承台,该环形承台的圆心在所述基桩处,并且确保每根所述钢管桩的顶端伸入所述环形承台内;
(d)待环形承台的混凝土达到设计强度后,移除支架,使钢管桩、承台和被冲刷的基桩连成一体,即形成基桩围裙钢管桩加固系统。
优选地,所述基桩周围的钢管桩的根数、桩长和分布半径根据被冲刷的基桩需要提高的承载力幅度以及基桩与钢管桩之间的间距规定确定。
优选地,每根所述钢管桩露出河床的高度根据墩高和加固后的稳定性确定。
优选地,从俯视图上看,在所述基桩上植入的植筋呈星形分布。
总体而言,通过本发明所构思的以上技术方案与现有技术相比,能够取得下列有益效果:
1)、通过在超深冲刷基桩周围均匀打入钢管桩,在增强基桩承载力和稳定的同时保证了加固后基桩的美观性和整体性;
2)、通过对基桩桩身进行钻孔植筋并对外露钢筋进行绑扎,以及将钢管桩伸入承台一定深度,加强了桩柱与承台的联系,从而加强了基桩的承载力和稳定性,提高了加固后基础的整体性;
3)、使用本方法对超深冲刷基桩进行加固,操作简单,容易实现,造价低,同时又能有效地达到预期所需的承载力提高幅度,因此具有极高的使用价值和广泛的利用前景。
附图说明
图1是本发明的基桩围裙钢管桩加固系统的立面示意图;
图2是本发明的基桩围裙钢管桩加固系统的剖面示意图。
具体实施方式
为了使本发明的目的、技术方案及优点更加清楚明白,以下结合附图及实施例,对本发明进行进一步详细说明。应当理解,此处所描述的具体实施例仅仅用以解释本发明,并不用于限定本发明。此外,下面所描述的本发明各个实施方式中所涉及到的技术特征只要彼此之间未构成冲突就可以相互组合。
参照图1、图2,一种超深冲刷基桩2围裙钢管桩3加固法,包括以下步骤:
(a)在冲刷严重的基桩2的周围周向均匀布置钢管桩3,每根所述钢管桩3均打入河床1内,并确保每根钢管的上端均露出河床1;
(b)在基桩2的上部钻孔并植入多条植筋5,在所述植筋5外露于所述基桩2的部分绑扎承台钢筋,从而形成钢筋网,在此过程中确保钢管桩3的顶部伸入到所述钢筋网的内部;通过对钢管桩3顶一定高度范围对应的基桩2桩身上进行钻孔植筋5及对植筋5的外露部分绑扎承台钢筋,同时确保钢管顶部伸入到承台钢筋网内部一定深度,以提高钢管桩3与桩基连接性;
(c)搭设支架以支撑所述钢筋网,在钢筋网上浇注混凝土,从而形成一环形承台4,该环形承台4的圆心在所述基桩2处,并且确保每根所述钢管桩3的顶端伸入所述环形承台4内;通过搭设少量支架,在植筋5范围浇筑承台混凝土,形成一与基桩2同心的环形承台4,并确保钢管桩3顶伸入到新浇筑的承台内部一定深度,以形成基桩2围裙钢管桩3加固系统。不仅对基桩2进行了有效的加固,而且大大提高了被冲刷基桩2的承载力和稳定性,同时具有施工简单,造价低的优点;
(d)待环形承台4的混凝土达到设计强度后,移除支架,使钢管桩3、承台和被冲刷的基桩2连成一体,即形成基桩2围裙钢管桩3加固系统。
进一步,所述基桩2周围的钢管桩3的根数、桩长和分布半径根据被冲刷的基桩2需要提高的承载力幅度以及基桩2与钢管桩3之间的间距规定确定。
进一步,每根所述钢管桩3露出河床1的高度根据墩高和加固后的稳定性确定。
进一步,从俯视图上看,在所述基桩2上植入的植筋5呈星形分布。
本发明充分考虑了超深冲刷河床1的地质条件和需要提高的承载力幅度及稳定性,通过在基桩2周围均匀打入钢管桩3以及对基桩2桩身进行钻孔植筋5的方法,解决了超深冲刷基桩2加固困难以及加固效果差等问题,同时具有施工简单,造价低的优点。
本领域的技术人员容易理解,以上所述仅为本发明的较佳实施例而已,并不用以限制本发明,凡在本发明的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本发明的保护范围之内。

Claims (4)

1.一种超深冲刷基桩围裙钢管桩加固法,其特征在于,包括以下步骤:
(a)在冲刷严重的基桩(2)的周围周向均匀布置钢管桩(3),每根所述钢管桩(3)均打入河床(1)内,并确保每根钢管(3)的上端均露出河床(1);
(b)在基桩(2)的上部钻孔并植入多条植筋(5),在所述植筋(5)外露于所述基桩(2)的部分绑扎承台钢筋,从而形成钢筋网,在此过程中确保钢管桩(3)的顶部伸入到所述钢筋网的内部;
(c)搭设支架以支撑所述钢筋网,在钢筋网上浇注混凝土,从而形成一环形承台(4),该环形承台(4)的圆心在所述基桩(2)处,并且确保每根所述钢管桩(3)的顶端伸入所述环形承台(4)内;
(d)待环形承台(4)的混凝土达到设计强度后,移除支架,使钢管桩(3)、承台(4)和被冲刷的基桩(2)连成一体,即形成基桩围裙钢管桩加固系统。
2.根据权利要求1所述的一种超深冲刷基桩围裙钢管桩加固法,其特征在于,所述基桩(2)周围的钢管桩(3)的根数、桩长和分布半径根据被冲刷的基桩(2)需要提高的承载力幅度以及基桩(2)与钢管桩(3)之间的间距规定确定。
3.根据权利要求1所述的一种超深冲刷基桩围裙钢管桩加固法,其特征在于,每根所述钢管桩(3)露出河床的高度根据墩高和加固后的稳定性确定。
4.根据权利要求1所述的一种超深冲刷基桩围裙钢管桩加固法,其特征在于,从俯视图上看,在所述基桩(2)上植入的植筋(5)呈星形分布。
CN201610905457.6A 2016-10-16 2016-10-16 一种超深冲刷基桩围裙钢管桩加固法 Pending CN106545027A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610905457.6A CN106545027A (zh) 2016-10-16 2016-10-16 一种超深冲刷基桩围裙钢管桩加固法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610905457.6A CN106545027A (zh) 2016-10-16 2016-10-16 一种超深冲刷基桩围裙钢管桩加固法

Publications (1)

Publication Number Publication Date
CN106545027A true CN106545027A (zh) 2017-03-29

Family

ID=58369249

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610905457.6A Pending CN106545027A (zh) 2016-10-16 2016-10-16 一种超深冲刷基桩围裙钢管桩加固法

Country Status (1)

Country Link
CN (1) CN106545027A (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108611995A (zh) * 2018-06-08 2018-10-02 厦门理工学院 一种对受损的单桩独柱墩进行快速加固补强的方法及装置
CN110453716A (zh) * 2019-08-08 2019-11-15 广东天联电力设计有限公司 基础桩加固方法及输电线路桩
CN111236289A (zh) * 2020-01-20 2020-06-05 重庆大学 桥梁群桩桩基防冲刷承台及其施工方法
CN113463518A (zh) * 2021-06-21 2021-10-01 中铁十九局集团第五工程有限公司 既有桥梁桩基桩间土的防泄流施工方法
CN114875976A (zh) * 2022-06-13 2022-08-09 中国华能集团清洁能源技术研究院有限公司 适用于海上风电单桩基础冲刷治理方法和装置
CN115125942A (zh) * 2022-07-22 2022-09-30 广东省源天工程有限公司 一种钢管桩地基基础加固机构

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6722821B1 (en) * 2002-01-04 2004-04-20 Howard A. Perko Helice pier post and method of installation
WO2008111032A1 (en) * 2007-03-15 2008-09-18 Lilianto Ong Poi Nguan Method of preparing a hole for a post pile cast in place using hydraulic pressure and apparatus therefor
US7533505B2 (en) * 2003-01-06 2009-05-19 Henderson Allan P Pile anchor foundation
CN201538971U (zh) * 2009-10-23 2010-08-04 中国水电顾问集团华东勘测设计研究院 高桩承台式海上风力发电机基础结构
CN202865715U (zh) * 2012-09-09 2013-04-10 中铁二院工程集团有限责任公司 既有路基桩板结构修复加固构造
CN103132513A (zh) * 2013-02-25 2013-06-05 中交武汉港湾工程设计研究院有限公司 高桩码头受损基桩的修复方法
CN103835304A (zh) * 2014-02-25 2014-06-04 湘电风能(福建)有限公司 一种高桩承台基础结构
CN104631221A (zh) * 2015-02-17 2015-05-20 铁道第三勘察设计院集团有限公司 一种高速铁路帮宽路基结构
CN204753615U (zh) * 2015-06-26 2015-11-11 山东省交通规划设计院 一种桥梁桩基加固结构
CN205399508U (zh) * 2016-03-02 2016-07-27 江西省交通桥梁检测加固有限公司 加固水下沉井基础的结构

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6722821B1 (en) * 2002-01-04 2004-04-20 Howard A. Perko Helice pier post and method of installation
US7533505B2 (en) * 2003-01-06 2009-05-19 Henderson Allan P Pile anchor foundation
WO2008111032A1 (en) * 2007-03-15 2008-09-18 Lilianto Ong Poi Nguan Method of preparing a hole for a post pile cast in place using hydraulic pressure and apparatus therefor
CN201538971U (zh) * 2009-10-23 2010-08-04 中国水电顾问集团华东勘测设计研究院 高桩承台式海上风力发电机基础结构
CN202865715U (zh) * 2012-09-09 2013-04-10 中铁二院工程集团有限责任公司 既有路基桩板结构修复加固构造
CN103132513A (zh) * 2013-02-25 2013-06-05 中交武汉港湾工程设计研究院有限公司 高桩码头受损基桩的修复方法
CN103835304A (zh) * 2014-02-25 2014-06-04 湘电风能(福建)有限公司 一种高桩承台基础结构
CN104631221A (zh) * 2015-02-17 2015-05-20 铁道第三勘察设计院集团有限公司 一种高速铁路帮宽路基结构
CN204753615U (zh) * 2015-06-26 2015-11-11 山东省交通规划设计院 一种桥梁桩基加固结构
CN205399508U (zh) * 2016-03-02 2016-07-27 江西省交通桥梁检测加固有限公司 加固水下沉井基础的结构

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108611995A (zh) * 2018-06-08 2018-10-02 厦门理工学院 一种对受损的单桩独柱墩进行快速加固补强的方法及装置
CN110453716A (zh) * 2019-08-08 2019-11-15 广东天联电力设计有限公司 基础桩加固方法及输电线路桩
CN111236289A (zh) * 2020-01-20 2020-06-05 重庆大学 桥梁群桩桩基防冲刷承台及其施工方法
CN113463518A (zh) * 2021-06-21 2021-10-01 中铁十九局集团第五工程有限公司 既有桥梁桩基桩间土的防泄流施工方法
CN113463518B (zh) * 2021-06-21 2022-12-09 中铁十九局集团第五工程有限公司 既有桥梁桩基桩间土的防泄流施工方法
CN114875976A (zh) * 2022-06-13 2022-08-09 中国华能集团清洁能源技术研究院有限公司 适用于海上风电单桩基础冲刷治理方法和装置
CN115125942A (zh) * 2022-07-22 2022-09-30 广东省源天工程有限公司 一种钢管桩地基基础加固机构

Similar Documents

Publication Publication Date Title
CN106545027A (zh) 一种超深冲刷基桩围裙钢管桩加固法
CN107060840B (zh) 一种大断面隧道v级围岩开挖支护的施工方法
CN206986900U (zh) 一种带有利于排水结构的基坑支护
CN209457028U (zh) 一种软土地基的加固结构
CN202530486U (zh) 一种既有建筑下的桩基础加固装置
CN101838996A (zh) 一种海上重力式桩基组合风机基础
CN105113514B (zh) 以地下连续墙作为竖向悬臂支点的基坑围护体系及施工方法
CN208934006U (zh) 双层挡墙结构
CN111236278A (zh) 一种斜坡软土地基桩-索加固结构、加固系统及构造方法
CN203238642U (zh) 基坑支护挡墙
CN212926126U (zh) 山地大体积拱座基础
CN207079492U (zh) 一种桥梁桩基加固结构
CN201746812U (zh) 一种湿地岸边树木生态驳岸加固结构
CN203188201U (zh) 一种变径扩底桩基础
CN204715223U (zh) 一种桥台预应力加固构造
CN204456182U (zh) 竖向锚拉桩挡土墙
CN106759424A (zh) 一种桩间土连续加固群桩体系及其施工方法
CN110029635A (zh) 一种基于混凝土桩支撑的堆石坝溢洪道
CN205276289U (zh) 预应力混凝土梁式双排桩支护体系
CN205000340U (zh) 一种以地下连续墙作为竖向悬臂支点的基坑围护体系
CN210066532U (zh) 用于对陡峭崖壁处拱桥拱座加固施工的悬吊平台
CN205012177U (zh) 加桩路基支挡结构
CN105525618B (zh) 呈拱形的基坑支护结构及其施工方法
CN105442615A (zh) 一种用于基坑工程的人字形支护结构及其施工方法
CN205954668U (zh) 一种光伏基础专用桩

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170329