CN106516763A - T-shaped guide rail steel stack spacing device and method - Google Patents

T-shaped guide rail steel stack spacing device and method Download PDF

Info

Publication number
CN106516763A
CN106516763A CN201710010860.7A CN201710010860A CN106516763A CN 106516763 A CN106516763 A CN 106516763A CN 201710010860 A CN201710010860 A CN 201710010860A CN 106516763 A CN106516763 A CN 106516763A
Authority
CN
China
Prior art keywords
steel
spacing
chute
substrate
rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710010860.7A
Other languages
Chinese (zh)
Other versions
CN106516763B (en
Inventor
沐贤春
江伟
徐勇
何家宝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huatian Engineering and Technology Corp MCC
Original Assignee
Huatian Engineering and Technology Corp MCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huatian Engineering and Technology Corp MCC filed Critical Huatian Engineering and Technology Corp MCC
Priority to CN201710010860.7A priority Critical patent/CN106516763B/en
Publication of CN106516763A publication Critical patent/CN106516763A/en
Application granted granted Critical
Publication of CN106516763B publication Critical patent/CN106516763B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G57/00Stacking of articles

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Stacking Of Articles And Auxiliary Devices (AREA)
  • Chutes (AREA)

Abstract

The invention discloses a T-shaped guide rail steel stack spacing device and a method. The device comprises at least one pair of spacing units; the spacing units include a base, a driving cylinder, a substrate, multiple steel separation insertion heads and a baffle plate, wherein a chute and a fixed base are arranged on the base; the base is fixed on a bracket of a transportation chain through a bolt, and is positioned on a stop side of a fixed stopper; the driving cylinder is mounted on the fixed base; the center axis of the driving cylinder and the plane of the chute are positioned in the same one horizontal plane; the substrate is mounted in the chute, and is connected with an extension rod of the driving cylinder; the driving cylinder pushes the substrate to move in the chute; the steel separation insertion heads are respectively arranged on the substrate; the length of each steel separation insertion head is gradually increased; and the baffle plate is arranged on the substrate in parallel to the steel separation insertion heads, and is positioned on the outer side of the smaller steel separation insertion head. The device uses the steel separation insertion heads on the substrate for increasing and fixing the distances of rows of T-shaped guide rails in sequence, and increases the gaps of steel rail heads of the rows of T-shaped guide rail to create conditions for further forward and reverse stacking of the T-shaped guide rails.

Description

A kind of T-rail steel piling spacing device and method
Technical field
The present invention relates to the production T-rail steel automatic stacking technical field of metallurgy industry, more particularly to a kind of T-rail Steel piling spacing device and method.
Background technology
For a long time, either traditional hand stowage or new-type automatic stacking, positive left-hand thread after T-rail steel folded steel All it is a difficult problem.One row's shaped steel transports from upstream, and one is emitted on Palletizer by one, due to T-rail The T-rail steel of rail head gap very little, especially small dimension after steel folded steel, as long as the glacing flatness of T-rail steel is slightly not enough, just Can come difficult to positive and negative cingulum, or even cannot buckle into.
The content of the invention
In order to overcome the defect of prior art, it is an object of the invention to provide a kind of T-rail steel piling spacing device, solution Certainly in a row rail head gap is too little afterwards for T-rail steel folded steel, it is impossible to smoothly complete the problem of positive left-hand thread.
In order to realize above-mentioned purpose, technical scheme is as follows:
A kind of T-rail steel piling spacing device, is characterized in that the device includes at least one pair of spacing unit, and described determines Include away from unit:One base, is provided with chute and fixed seat, and base is bolted on the support of conveyer chain, and Positioned at the stopping side of fixed gear head;
One drive cylinder, in above-mentioned fixed seat, and the central axis of drive cylinder and chute place plane position In same level;
One substrate, is installed in above-mentioned chute, and is connected with the expansion link of above-mentioned drive cylinder, is pushed away by drive cylinder Dynamic substrate is moved in chute;
Some points of steel plugs, a point steel plug are each provided on above-mentioned substrate, and the length of point steel plug increases successively per root;
One baffle plate, is set in parallel on substrate and is located on the outside of less point of steel plug with above-mentioned point of steel plug.
In above-mentioned T-rail steel piling spacing device, optionally, the base is welded by steel plate, in base Top be symmetrically welded by angle steel and constitute chute;Fixed seat offers notch with chute with arranging in length direction in fixed seat.
In above-mentioned T-rail steel piling spacing device, optionally, the drive cylinder is hydraulic cylinder, is being driven Be provided with the outside of the cylinder body of cylinder installation clamp it is corresponding with above-mentioned notch, drive cylinder can be installed on base.
In above-mentioned T-rail steel piling spacing device, optionally, the substrate is rectangle, in its width On be symmetrically arranged with guide rail and coordinate with above-mentioned chute;At least six road spacing grooves, spacing groove are equipped with the front end plate face of substrate Screw is offered inside.
In above-mentioned T-rail steel piling spacing device, optionally, the head of described point of steel plug is pointed or inclined-plane Shape, is easy to rail head gap after plug insertion T-rail steel folded steel;Its postmedian offers through hole, fixes plug by bolt In spacing groove.
In above-mentioned T-rail steel piling spacing device, optionally, some points of steel plugs include at least six roots of sensation, Plug increases to larger length La from less length Lj, it is ensured that longer plug is firstly inserted into, afterwards by setting Put the plug for shortening successively to be sequentially inserted in the head clearance after T-rail steel is tentatively stacked, carry out expansion spacing;Compared with small plug Length Lj less than length Lb of baffle plate, further accurately can control overall wide after row's T-rail steel expansion spacing Degree.
In above-mentioned T-rail steel piling spacing device, optionally, the length of the plug is linearly increased or spill Circular arc expands.
In above-mentioned T-rail steel piling spacing device, optionally, the baffle plate two ends flush, wherein one end Through hole is offered, baffle plate is fixed in spacing groove by bolt.
It is a further object of the present invention to provide a kind of T-rail steel piling spacing method, the method comprising the steps of:Conveyer chain Preliminary stacked rear in a row T-rail steel is delivered to and stop at the fixed stopper of conveyer chain termination, be arranged in determining for conveyer chain both sides Start insertion simultaneously away from unit, point steel plug of different length is sequentially inserted in the head clearance after T-rail steel is tentatively stacked, Expansion spacing is carried out, is return after completing expansion spacing action, an action cycle completes.
Compared with prior art, advantage is:The present invention using the several points of steel plugs (according to radical in a row) on substrate according to It is secondary to be parked in the T-rail steel expansion spacing in a row between the spacing device of mirror-image arrangement, return after the completion of action, expansion spacing T-rail rail head gap increase in a row afterwards, is that the positive and negative piling of next step T-rail steel creates condition, that is, completes spacing Operation.
Description of the drawings
Technical scheme is described in further detail below with reference to drawings and Examples, but should Know, these accompanying drawings are only designed for task of explanation, therefore not as the restriction of the scope of the invention.Additionally, removing non-specifically Point out, these accompanying drawings are meant only to conceptually illustrate structure construction described herein, without being drawn to scale.
Fig. 1 is the spacing cellular construction schematic diagram of T-rail steel piling spacing device of the present invention;
Fig. 2 is the board structure schematic diagram of T-rail steel piling spacing device of the present invention;
Fig. 3 is cooperation sectional schematic diagram of the substrate with point steel plug for doing invention;
Fig. 4 is the T-rail steel piling schematic diagram before and after use of the present invention;
Fig. 5 is schematic diagram before and after the positive and negative piling of T-rail steel.
In figure:10- spacing units, 11- bases, 111- chutes, 112- fixed seats, 1121- notches, 12- drive cylinders, 121- installs clamp, 13- substrates, 131- guide rails, 132- spacing grooves, 14- point steel plug, 15- baffle plates, 20- conveyer chains, 30- Fixed gear head, 40-T shape guide rail steel.
Specific embodiment
Firstly, it is necessary to explanation, below by by way of example come illustrate shaped steel Palletizer of the present invention from flat Weighing apparatus puts concrete structure, feature and advantage of steel device etc., but all of description is intended merely to what is illustrated, and should not be by which It is interpreted as forming any restriction to the present invention.Additionally, any list in mentioned each embodiment being herein described by or implying Individual technical characteristic, or shown or implicit any single technical characteristic in the drawings, still can be in these technical characteristics Proceed to be combined or delete between (or its equivalent), so as to obtain may without directly refer to herein this Bright more other embodiments.
Incorporated by reference to referring to figs. 1 to Fig. 5, below the embodiment that is just given by this come to shaped steel Palletizer of the present invention It is illustrative that self-balancing puts steel device.
As shown in Fig. 1 to 5, T-rail steel piling spacing device includes at least one pair of spacing unit, and spacing unit is arranged on The both sides of conveyer chain, and near the stopping side of fixed gear head.
The spacing unit 10 of the present invention includes:One base 11, is provided with chute 111 and fixed seat 112, and base 11 leads to Cross and be bolted on the support of conveyer chain 20, and positioned at the stopping side of fixed gear 30;One drive cylinder 12, installed in above-mentioned Fixed seat 112 on, and the central axis of drive cylinder 12 is located in the same horizontal plane with chute place plane;One substrate 13, It is installed in above-mentioned chute 111, and is connected with the expansion link of above-mentioned drive cylinder 12, substrate 13 is promoted by drive cylinder 12 Move in chute 111;Some points of steel plugs 14, a point steel plug 14 are each provided on above-mentioned substrate 13, and point steel plug per root 14 length increases successively;One baffle plate 15, is be arranged in parallel on the substrate 13 with above-mentioned point of steel plug 14 and is located at less point of steel On the outside of plug 14.
Further, the base 11 is welded by steel plate, is symmetrically welded by angle steel in the top of base 11 and is constituted cunning Groove 111;Fixed seat 112 offers notch 1121 with chute 111 with arranging in length direction in fixed seat.
Further, the drive cylinder 12 is hydraulic cylinder, on the outside of the cylinder body of drive cylinder is provided with installation clamp 121 is corresponding with above-mentioned notch 1121, and drive cylinder can be with clamp on the pedestal 11.
Further, the substrate 13 is rectangle, and is symmetrically arranged with guide rail 131 in the width direction with above-mentioned cunning Groove 111 coordinates;At least six road spacing grooves 132 are equipped with the front end plate face of substrate 13, in spacing groove, screw is offered.
Further, the head of described point of steel plug 14 is pointed or inclined plane shape, is easy to a point steel plug insertion T-rail steel Rail head gap after folded steel;Its postmedian offers through hole, a point steel plug is fixed in spacing groove 132 by bolt.
Further, some points of steel plugs 14 include at least six roots of sensation, and point steel plug increases from less length Lj It is added to larger length La, it is ensured that longer plug is firstly inserted into, the plug for being shortened by setting successively afterwards is sequentially inserted into T In head clearance after shape guide rail steel is tentatively stacked, expansion spacing is carried out;The length of baffle plate 15 is less than compared with length Lj of small plug Degree Lb, further can accurately control the overall width after row's T-rail steel expansion spacing.
Further, the length of described point of steel plug 14 is linearly increased or concave circular arcs expand.
Further, 15 two ends of the baffle plate flush, and one end offers through hole wherein, by bolt by baffle plate 15 It is fixed in spacing groove.
It is a further object of the present invention to provide a kind of T-rail steel piling spacing method, the method comprising the steps of:Conveyer chain Preliminary stacked rear in a row T-rail steel is delivered to and stop at the fixed stopper of conveyer chain termination, be arranged in determining for conveyer chain both sides Start insertion simultaneously away from unit, point steel plug of different length is sequentially inserted in the head clearance after T-rail steel is tentatively stacked, Expansion spacing is carried out, is return after completing expansion spacing action, an action cycle completes.
By taking T89 guide rails as an example, during production, row T89 guide rails be 7, after preliminary folded steel overall width be 410mm, plug Seat top is provided with 7 grooves, and every groove center spacing is 58mm, and first near fixed stopper is most long, because will ensure Which is firstly inserted into, and the plug for being shortened by setting successively afterwards carries out expansion in being sequentially inserted into the head clearance after guide rail is tentatively stacked Spacing, the last item are also longer, in order to accurately control the overall width after row's steel expansion spacing, after expansion spacing In a row T89 guide rails overall width is 500mm, and every rail head gap increased 15mm, and 76 interspaces of steel increased 90mm altogether.

Claims (9)

1.T shape guide rail steel piling spacing devices, it is characterised in that including at least one pair of spacing unit (10), described spacing list Unit includes:One base (11), is provided with chute (111) and fixed seat (112), and base (11) is bolted on transport On the support of chain (20), and it is located at the stopping side of fixed gear head (30);One drive cylinder (12), installed in above-mentioned fixed seat (112) on, and the central axis of drive cylinder (12) is located in the same horizontal plane with chute (111) place plane;One substrate (13), it is installed in above-mentioned chute (111), and is connected with the expansion link of above-mentioned drive cylinder (111), by drive cylinder (12) substrate (13) is promoted to move in chute (111);Some points of steel plugs (14), a point steel plug (14) are each provided at above-mentioned base On plate (13), and the length of point steel plug (14) increases successively per root;One baffle plate (15), it is parallel with above-mentioned point of steel plug (14) It is arranged on substrate (13) and is located on the outside of less point of steel plug (14).
2. T-rail steel piling spacing device according to claim 1, it is characterised in that the base (11) is by steel plate It is welded, is symmetrically welded by angle steel in the top of base (11) and constitutes chute (111);Fixed seat (112) is same with chute (111) Arrange in length direction, in fixed seat (112), offer notch (1121).
3. T-rail steel piling spacing device according to claim 2, it is characterised in that the drive cylinder (12) is Hydraulic cylinder, be provided with the outside of the cylinder body of drive cylinder installation clamp (121) it is corresponding with above-mentioned notch (1121), drive gas Cylinder (12) is installed on base (11).
4. T-rail steel piling spacing device according to claim 2, it is characterised in that the substrate (13) is in rectangular Shape, is symmetrically arranged with guide rail (131) in the width direction and is coordinated with above-mentioned chute (111);The front end plate face of substrate (13) On be equipped with least six roads spacing groove (132), offers screw in spacing groove (132).
5. T-rail steel piling spacing device according to claim 4, it is characterised in that described point of steel plug (14) Head is pointed or inclined plane shape, and its postmedian offers through hole, and a point steel plug (14) is fixed on spacing groove (132) by bolt In.
6. T-rail steel piling spacing device according to claim 1, it is characterised in that some points of steel plugs (14) including at least six roots of sensation, a point steel plug (14) increases to larger length La from less length Lj;Less point Length Lb of length Lj of steel plug (14) less than baffle plate (15).
7. T-rail steel piling spacing device according to claim 6, it is characterised in that described point of steel plug (14) Length is linearly increased or concave circular arcs expand.
8. T-rail steel piling spacing device according to claim 4, it is characterised in that baffle plate (15) two ends Flush, one end offers through hole wherein, baffle plate (15) is fixed in spacing groove (132) by bolt.
9. a kind of spacing method of the T-rail steel piling spacing device according to any one of claim 1 to 8, its feature It is, including step:Conveyer chain (20) will tentatively be stacked the fixed stopper that rear in a row T-rail steel (40) delivers to conveyer chain termination (30) place stops, and is arranged in the spacing unit (10) of conveyer chain both sides while starting insertion, point steel plug (14) of different length It is sequentially inserted in the head clearance after T-rail steel is tentatively stacked, carries out expansion spacing, return after completing expansion spacing action, One action cycle completes.
CN201710010860.7A 2017-01-06 2017-01-06 A kind of T-rail steel stacking spacing device and method Active CN106516763B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710010860.7A CN106516763B (en) 2017-01-06 2017-01-06 A kind of T-rail steel stacking spacing device and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710010860.7A CN106516763B (en) 2017-01-06 2017-01-06 A kind of T-rail steel stacking spacing device and method

Publications (2)

Publication Number Publication Date
CN106516763A true CN106516763A (en) 2017-03-22
CN106516763B CN106516763B (en) 2019-04-30

Family

ID=58335197

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710010860.7A Active CN106516763B (en) 2017-01-06 2017-01-06 A kind of T-rail steel stacking spacing device and method

Country Status (1)

Country Link
CN (1) CN106516763B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106976731A (en) * 2017-03-29 2017-07-25 邯郸市友发钢管有限公司 The quick stacking machine of Large Diameter Pipeline steel pipe and palletizing method
CN110282440A (en) * 2019-06-20 2019-09-27 中冶东方工程技术有限公司 Fashioned iron Palletizer and fashioned iron palletizing method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6137614A (en) * 1984-07-30 1986-02-22 Nec Kansai Ltd Case aligning method
CN87103997A (en) * 1986-06-12 1988-02-10 费罗那机械厂有限公司 Buttress road entrance correction device
JPH0797054A (en) * 1993-09-27 1995-04-11 Kawasaki Steel Corp Steel pipe loading device
CN205034791U (en) * 2015-09-07 2016-02-17 绍兴县仕马特机械制造有限公司 Full -automatic hacking machine of pi shaped steel
CN105712065A (en) * 2016-02-29 2016-06-29 中冶华天工程技术有限公司 Full-automatic palletizing system and technology
CN206395477U (en) * 2017-01-06 2017-08-11 中冶华天南京工程技术有限公司 A kind of T-rail steel stacking spacing device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6137614A (en) * 1984-07-30 1986-02-22 Nec Kansai Ltd Case aligning method
CN87103997A (en) * 1986-06-12 1988-02-10 费罗那机械厂有限公司 Buttress road entrance correction device
JPH0797054A (en) * 1993-09-27 1995-04-11 Kawasaki Steel Corp Steel pipe loading device
CN205034791U (en) * 2015-09-07 2016-02-17 绍兴县仕马特机械制造有限公司 Full -automatic hacking machine of pi shaped steel
CN105712065A (en) * 2016-02-29 2016-06-29 中冶华天工程技术有限公司 Full-automatic palletizing system and technology
CN206395477U (en) * 2017-01-06 2017-08-11 中冶华天南京工程技术有限公司 A kind of T-rail steel stacking spacing device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106976731A (en) * 2017-03-29 2017-07-25 邯郸市友发钢管有限公司 The quick stacking machine of Large Diameter Pipeline steel pipe and palletizing method
CN106976731B (en) * 2017-03-29 2022-12-09 天津友发钢管集团股份有限公司 Rapid stacking machine and stacking method for large-diameter steel pipes
CN110282440A (en) * 2019-06-20 2019-09-27 中冶东方工程技术有限公司 Fashioned iron Palletizer and fashioned iron palletizing method
CN110282440B (en) * 2019-06-20 2021-07-20 中冶东方工程技术有限公司 Profile steel stacking equipment and profile steel stacking method

Also Published As

Publication number Publication date
CN106516763B (en) 2019-04-30

Similar Documents

Publication Publication Date Title
KR100862600B1 (en) Pull drawing device
CN104495395B (en) A kind of piling layout mechanism of preset clearance
US4103786A (en) Board piling-up apparatus
CN106516763A (en) T-shaped guide rail steel stack spacing device and method
CN104477640B (en) A kind of piling method of combination of preset clearance
CN104741441A (en) Automatic punching production line for hollow guide rail
CN105398810A (en) Release blocking mechanism for automobile brake caliper support
CN109175129B (en) Automatic feeding machine of pipe cutting machine
CN108569559A (en) A kind of battery crawl feeding distribution mechanism
CN107161415A (en) The automatic board plug device of valve element
CN106516686A (en) Tray lifting and conveying mechanism
US3823834A (en) Method and device for performing the insertion of piling strips in timber packages
CN210451492U (en) Longitudinal short rib feeding and distributing device used during welding of reinforcing mesh
CN206395477U (en) A kind of T-rail steel stacking spacing device
CN110420876B (en) Efficient parallel sorting machine for pipe materials and sorting method for pipe materials
CN102901480A (en) Welding detection device and automatic welding machine
CN109720635B (en) Article arranging method
CN108438777A (en) Package is for packet platform control method
CN208357659U (en) Condenser process units
CN104355121A (en) Sole timber conveying device in automatic stacking machine of elevator guide rails
CN209306493U (en) Pipe batch transfer preposed feeder for plug injection molding
CN106743446B (en) Magnetic material arranges conveying equipment
CN210417996U (en) Chain type conveying equipment for automobile steel pipe heat treatment production line
JP3540501B2 (en) Long material supply device
CN204737388U (en) Carton permutation device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant