CN106499054A - Prefabricated assembled frame beam column structure and its construction method - Google Patents

Prefabricated assembled frame beam column structure and its construction method Download PDF

Info

Publication number
CN106499054A
CN106499054A CN201611085430.3A CN201611085430A CN106499054A CN 106499054 A CN106499054 A CN 106499054A CN 201611085430 A CN201611085430 A CN 201611085430A CN 106499054 A CN106499054 A CN 106499054A
Authority
CN
China
Prior art keywords
prefabricated
prefabricated post
section
post
beam column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611085430.3A
Other languages
Chinese (zh)
Inventor
龙莉波
郑七振
马跃强
戚建文
罗恒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction No 2 Group Co Ltd
University of Shanghai for Science and Technology
Original Assignee
Shanghai Construction No 2 Group Co Ltd
University of Shanghai for Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction No 2 Group Co Ltd, University of Shanghai for Science and Technology filed Critical Shanghai Construction No 2 Group Co Ltd
Priority to CN201611085430.3A priority Critical patent/CN106499054A/en
Publication of CN106499054A publication Critical patent/CN106499054A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/20Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/16Structures made from masses, e.g. of concrete, cast or similarly formed in situ with or without making use of additional elements, such as permanent forms, substructures to be coated with load-bearing material
    • E04B1/165Structures made from masses, e.g. of concrete, cast or similarly formed in situ with or without making use of additional elements, such as permanent forms, substructures to be coated with load-bearing material with elongated load-supporting parts, cast in situ

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention provides a kind of prefabricated assembled frame beam column structure and its construction method, the present invention passes through linkage section, the linkage section is vertical with the prefabricated post, and it is prefabricated with the prefabricated post integral, precast beam, the precast beam are poured section after the beam column and are connected with the linkage section, increased the flexibility of prefabricated components, section is poured after avoiding beam column positioned at beam column node core area, produces potential safety hazard.Further, upper strata prefabricated post of the present invention and lower floor's prefabricated post pour section connection after intercolumniation, the about central region that section is located between the precast beam and the precast beam of lower floor's prefabricated post that connect upper strata prefabricated post respectively is poured after the intercolumniation, section is poured after further avoid intercolumniation positioned at beam column node core area, produces potential safety hazard.

Description

Prefabricated assembled frame beam column structure and its construction method
Technical field
The present invention relates to a kind of prefabricated assembled frame beam column structure and its construction method.
Background technology
Prefabrication refers to the building with prefabricated component in assemble in site.Traditional frame structure is prefabricated In assembled architecture construction system, its principle is typically with precast reinforced concrete beam, post, pours portion after armored concrete Divide and beam, Column border node are linked to be entirety, form frame structure system.Compared to traditional construction way, prefabricated assembled system is carried High efficiency of construction, but due to pouring concrete after at node by the way of, it can only be whole beam or post to limit prefabricated components, Construction flexibility is not enough, simultaneously because after to pour section be exactly beam column node core area, it is understood that there may be safety caused by construction quality Hidden danger.
Content of the invention
It is an object of the invention to provide a kind of prefabricated assembled frame beam column structure and its construction method, can avoid by The potential safety hazard of the beam column node core area produced in rear pouring concrete.
For solving the above problems, the present invention provides a kind of prefabricated assembled frame beam column structure, including:
Prefabricated post;
Linkage section, the linkage section are vertical with the prefabricated post, and prefabricated with the prefabricated post integral;
Section is poured after beam column;
Precast beam, the precast beam are poured section after the beam column and are connected with the linkage section.
Further, in said structure, with the prefabricated all-in-one-piece linkage section of same prefabricated post be one multiple.
Further, in said structure, section is poured after also including intercolumniation, the prefabricated post includes upper strata prefabricated post and lower floor Prefabricated post, the upper strata prefabricated post and lower floor's prefabricated post pour section connection after the intercolumniation, pour section and are located at and divide after the intercolumniation About central region that Lian Jie be between the precast beam of upper strata prefabricated post and the precast beam of lower floor's prefabricated post.
Further, in said structure, lower floor's prefabricated post includes the bottom prefabricated post for connecting bottom floor, described The prefabricated post of connection bottom floor is connected with the section of being poured after intercolumniation of upper strata prefabricated post, the prefabricated post of the connection bottom floor Section is poured with after the intercolumniation of upper strata prefabricated post, prefabricated with connection bottom prefabricated post positioned at the precast beam of connection upper strata prefabricated post respectively About central region between beam.
Further, in said structure, pour Duan Jun after section and intercolumniation is poured after the beam column and adopt ultra-high performance concrete.
According to the another side of the present invention, there is provided a kind of prefabricated assembled frame beam column construction method,
Using the prefabricated assembled frame beam column structure as described in any one of claim 1 to 5, methods described includes:
Carry out to precast beam and with the prefabricated all-in-one-piece prefabricated post of linkage section according to topology requirement prefabricated;
Basement construction is completed, as desired reserved steel bar;
The prefabricated post of lifting connection bottom floor, sets up template and simultaneously pours, by the reserved steel bar be connected ground floor The bottom connection of the prefabricated post of plate;
Lifting bottom precast beam, sets up template at the linkage section of bottom prefabricated post and pours, with by being formed after beam column Pour section to be attached bottom prefabricated post with bottom precast beam;
Repeat this step, until each layer of prefabricated post and precast beam all connect finishing:After lifting last layer prefabricated post, will Last layer prefabricated post and next layer of prefabricated post are poured after section is attached after intercolumniation, and the prefabricated post of last layer and precast beam are led to Section is poured after crossing beam column to be attached;
Carry out construction of binding.
Further, in the above-mentioned methods, with the prefabricated all-in-one-piece linkage section of same prefabricated post be one multiple.
Further, in the above-mentioned methods, pour after the intercolumniation section be located at respectively connection upper strata prefabricated post precast beam and About central region between the precast beam of lower floor's prefabricated post.
Further, in the above-mentioned methods, pour after the prefabricated post of the connection bottom floor and the intercolumniation of upper strata prefabricated post Section, positioned at about central region respectively between the precast beam of the precast beam of connection upper strata prefabricated post and connection bottom prefabricated post.
Further, in the above-mentioned methods, pour Duan Jun after section and intercolumniation being poured after the beam column adopt ultra-high performance concrete.
Compared with prior art, by linkage section, the linkage section is vertical with the prefabricated post and pre- with described for the present invention Post processed is prefabricated integral, precast beam, and the precast beam is poured section after the beam column and is connected with the linkage section, be increased prefabricated The flexibility of component, it is to avoid pour section after beam column positioned at beam column node core area, produce potential safety hazard.Further, the present invention The upper strata prefabricated post and lower floor's prefabricated post pour section connection after intercolumniation, pour section pre- positioned at connection upper strata respectively after the intercolumniation About central region between the precast beam of the precast beam of post processed and lower floor's prefabricated post, pours section positioned at beam after further avoid intercolumniation Column border node core space, produces potential safety hazard.
Description of the drawings
Fig. 1 is the overall diagram of the prefabricated assembled frame beam column structure of one embodiment of the invention;
Fig. 2 is that the beam column local of one embodiment of the invention is linked and packed figure;
Fig. 3 is that the post post local of one embodiment of the invention is linked and packed figure.
Specific embodiment
Understandable for enabling the above objects, features and advantages of the present invention to become apparent from, below in conjunction with the accompanying drawings and concrete real The present invention is further detailed explanation to apply mode.
As illustrated in fig. 1 and 2, the present invention provides a kind of prefabricated assembled frame beam column structure, including:
Prefabricated post 1;
Linkage section 2, the linkage section 2 are vertical with the prefabricated post 1, and prefabricated with the prefabricated post 1 integral;
Section 3 is poured after beam column;
Precast beam 4, the precast beam 4 are poured section 3 after the beam column and are connected with the linkage section 2.Here, in order to increase Construction flexibility, and also to avoid the potential safety hazard of the beam column node core area due to the generation of rear pouring concrete, raising from applying Work efficiency rate and security, the present invention will be used as linkage section by prefabricated post in the overhanging one section of beam of node region, linkage section one end with The prefabricated post is prefabricated integral, the linkage section other end pours section after connecting prefabricated beam column, it is to avoid prefabricated post and precast beam in Joint cores are directly connected to, and only need prefabricated beam column, easy construction.In addition, after pour the length of section and position can be according to actually applying Work needs flexibly to choose.
In one embodiment of the invention, with the prefabricated all-in-one-piece linkage section of same prefabricated post be one multiple, so as to realize A piece prefabricated post pours the connection of Duan Yuyi roots precast beam with after by a linkage section, or same prefabricated post is respectively by difference Linkage section and after pour section and be connected with many precast beams, i.e., the linkage section of prefabricated post can make " one beam of a post " or " a post two Beam ", improves construction flexibility.
In one embodiment of the invention, as shown in figs. 1 and 3, after the prefabricated assembled frame beam column structure also includes intercolumniation Section 5 is poured, the prefabricated post includes that upper strata prefabricated post and lower floor's prefabricated post, the upper strata prefabricated post and lower floor's prefabricated post pass through intercolumniation After pour section connection, pour after the intercolumniation section be located at respectively connection upper strata prefabricated post precast beam and lower floor's prefabricated post precast beam it Between about central region, that is, pour after connecting prefabricated intercolumniation section positioned at two-layer floor centre, the linkage section in every prefabricated post The central region of prefabricated post is approximately at, so as to avoid pouring section after intercolumniation positioned at joint cores, and then avoids producing beam column section The potential safety hazard of point core space destruction.
In one embodiment of the invention, lower floor's prefabricated post includes the bottom prefabricated post for connecting bottom floor, the connection The prefabricated post of bottom floor is connected with the section of being poured after intercolumniation of upper strata prefabricated post, described connection bottom floor prefabricated post with upper Layer prefabricated post intercolumniation after pour section, positioned at respectively connection upper strata prefabricated post precast beam and connection bottom prefabricated post precast beam it Between about central region, so as to avoid pouring section after intercolumniation positioned at joint cores, and then avoid producing beam column node core area and break Bad potential safety hazard.
In one embodiment of the invention, pour Duan Jun after section and intercolumniation is poured after the beam column and adopt ultra-high performance concrete (UHPC), here, pouring section using ultra-high performance concrete after doing pours material, structure connection safety is also greatly improved.
The present invention also provides a kind of construction method of above-mentioned prefabricated assembled frame beam column structure, specific as follows:
Carry out to precast beam and with the prefabricated all-in-one-piece prefabricated post of linkage section according to topology requirement prefabricated;
Basement construction is completed, as desired reserved steel bar;
The prefabricated post of lifting connection bottom floor, sets up template and simultaneously pours, by the reserved steel bar be connected ground floor The bottom connection of the prefabricated post of plate;
Lifting bottom precast beam, sets up template at the linkage section of bottom prefabricated post and pours, with by being formed after beam column Pour section to be attached bottom prefabricated post with bottom precast beam;
Repeat this step, until each layer of prefabricated post and precast beam all connect finishing:After lifting last layer prefabricated post, will Last layer prefabricated post and next layer of prefabricated post are poured after section is attached after intercolumniation, and the prefabricated post of last layer and precast beam are led to Section is poured after crossing beam column to be attached;
Carry out construction of binding.
In one embodiment of the invention, with the prefabricated all-in-one-piece linkage section of same prefabricated post be one multiple, so as to realize A piece prefabricated post pours the connection of Duan Yuyi roots precast beam with after by a linkage section, or same prefabricated post is respectively by difference Linkage section and after pour section and be connected with many precast beams, i.e., the linkage section of prefabricated post can make " one beam of a post " or " a post two Beam ", improves construction flexibility.
In one embodiment of the invention, section is poured after the intercolumniation pre- positioned at the precast beam of connection upper strata prefabricated post and lower floor respectively About central region between the precast beam of post processed, that is, pour section positioned at the centre of two-layer floor after connecting prefabricated intercolumniation, pre- per root Linkage section on post processed is approximately at the central region of prefabricated post, so as to avoid pouring section after intercolumniation positioned at joint cores, and then Avoid the potential safety hazard for producing beam column node core area destruction.
In one embodiment of the invention, after the prefabricated post of the connection bottom floor and the intercolumniation of upper strata prefabricated post, section, position is poured In about central region respectively between the precast beam of the precast beam of connection upper strata prefabricated post and connection bottom prefabricated post.So as to avoid Section is poured after intercolumniation positioned at joint cores, and then the potential safety hazard for avoiding producing beam column node core area destruction.
In one embodiment of the invention, pour Duan Jun after section and intercolumniation is poured after the beam column and adopt ultra-high performance concrete (UHPC), here, pouring section using ultra-high performance concrete after doing pours material, structure connection safety is also greatly improved.
In sum, by linkage section, the linkage section is vertical with the prefabricated post and pre- with the prefabricated post for the present invention It is formed integrally, precast beam, the precast beam is poured section after the beam column and is connected with the linkage section, increased prefabricated components Flexibility, it is to avoid pour section after beam column positioned at beam column node core area, produce potential safety hazard.Further, on of the present invention Layer prefabricated post and lower floor's prefabricated post pour section connection after intercolumniation, pour section positioned at connection upper strata prefabricated post respectively after the intercolumniation About central region between the precast beam of precast beam and lower floor's prefabricated post, pours section positioned at bean column node after further avoid intercolumniation Core space, produces potential safety hazard.
In this specification, each embodiment is described by the way of going forward one by one, and what each embodiment was stressed is and other The difference of embodiment, between each embodiment identical similar portion mutually referring to.
Obviously, those skilled in the art can carry out the spirit of various changes and modification without deviating from the present invention to invention And scope.So, if these modifications of the present invention and modification belong to the claims in the present invention and its equivalent technologies scope it Interior, then the present invention is also intended to including including these changes and modification.

Claims (10)

1. a kind of prefabricated assembled frame beam column structure, it is characterised in that include:
Prefabricated post;
Linkage section, the linkage section are vertical with the prefabricated post, and prefabricated with the prefabricated post integral;
Section is poured after beam column;
Precast beam, the precast beam are poured section after the beam column and are connected with the linkage section.
2. prefabricated assembled frame beam column structure as claimed in claim 1, it is characterised in that be prefabricated into same prefabricated post The linkage section of one is multiple for one.
3. prefabricated assembled frame beam column structure as claimed in claim 1, it is characterised in that pour section, institute after also including intercolumniation Stating prefabricated post includes that upper strata prefabricated post and lower floor's prefabricated post, the upper strata prefabricated post and lower floor's prefabricated post are poured after the intercolumniation Section connection, pours section and is located between the precast beam and the precast beam of lower floor's prefabricated post for connecting upper strata prefabricated post respectively after the intercolumniation About central region.
4. prefabricated assembled frame beam column structure as claimed in claim 3, it is characterised in that lower floor's prefabricated post includes connecting The bottom prefabricated post of bottom floor is connect, the prefabricated post of the connection bottom floor pours Duan Lian after intercolumniation with upper strata prefabricated post Connect, after the prefabricated post of the connection bottom floor and the intercolumniation of upper strata prefabricated post, pour section, positioned at connection upper strata prefabricated post respectively About central region between the precast beam of precast beam and connection bottom prefabricated post.
5. prefabricated assembled frame beam column structure as claimed in claim 1, it is characterised in that pour section and intercolumniation after the beam column After pour Duan Jun and adopt ultra-high performance concrete.
6. a kind of prefabricated assembled frame beam column construction method, it is characterised in that using as described in any one of claim 1 to 5 Prefabricated assembled frame beam column structure, methods described includes:
Carry out to precast beam and with the prefabricated all-in-one-piece prefabricated post of linkage section according to topology requirement prefabricated;
Basement construction is completed, as desired reserved steel bar;
The prefabricated post of lifting connection bottom floor, sets up template and simultaneously pours, by the reserved steel bar be connected bottom floor The bottom connection of prefabricated post;
Lifting bottom precast beam, sets up template at the linkage section of bottom prefabricated post and pours, pour after beam column section by being formed Bottom prefabricated post is attached with bottom precast beam;
Repeat this step, until each layer of prefabricated post and precast beam all connect finishing:After lifting last layer prefabricated post, by upper one Layer prefabricated post and next layer of prefabricated post are poured after section is attached by intercolumniation after, by the prefabricated post of last layer with precast beam by beam Pour section to be attached after post;
Carry out construction of binding.
7. prefabricated assembled frame beam column construction method as claimed in claim 6, it is characterised in that prefabricated with same prefabricated post All-in-one-piece linkage section is multiple for one.
8. prefabricated assembled frame beam column construction method as claimed in claim 6, it is characterised in that pour section after the intercolumniation and be located at Connect the about central region between the precast beam and the precast beam of lower floor's prefabricated post of upper strata prefabricated post respectively.
9. prefabricated assembled frame beam column construction method as claimed in claim 8, it is characterised in that the connection bottom floor Section is poured after prefabricated post and the intercolumniation of upper strata prefabricated post, positioned at the precast beam of connection upper strata prefabricated post respectively and connection bottom prefabricated post Precast beam between about central region.
10. prefabricated assembled frame beam column construction method as claimed in claim 6, it is characterised in that pour after the beam column section and Duan Jun is poured after intercolumniation adopts ultra-high performance concrete.
CN201611085430.3A 2016-11-30 2016-11-30 Prefabricated assembled frame beam column structure and its construction method Pending CN106499054A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611085430.3A CN106499054A (en) 2016-11-30 2016-11-30 Prefabricated assembled frame beam column structure and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611085430.3A CN106499054A (en) 2016-11-30 2016-11-30 Prefabricated assembled frame beam column structure and its construction method

Publications (1)

Publication Number Publication Date
CN106499054A true CN106499054A (en) 2017-03-15

Family

ID=58328945

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611085430.3A Pending CN106499054A (en) 2016-11-30 2016-11-30 Prefabricated assembled frame beam column structure and its construction method

Country Status (1)

Country Link
CN (1) CN106499054A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115163115A (en) * 2022-09-06 2022-10-11 湖南省交通规划勘察设计院有限公司 Intersection structure of large-diameter shield tunnel contact passage and construction method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103104040A (en) * 2013-03-08 2013-05-15 郑州大学 Assembled framework beam-column joint adopting vertical connection and construction method thereof
CN103104041A (en) * 2013-03-08 2013-05-15 郑州大学 Assembled framework beam-column joint adopting transverse connection and construction method thereof
CN103195170A (en) * 2013-04-03 2013-07-10 中铁建设集团有限公司 Prefabricated reinforced concrete frame structure system
KR101292395B1 (en) * 2011-09-22 2013-08-01 대림산업 주식회사 A compenstation struture for high strength polygonal centrifugal precast columns
CN104532952A (en) * 2014-12-19 2015-04-22 东南大学 Short angle iron connection type reinforced concrete assembling integrated frame and construction method thereof
CN204435564U (en) * 2015-01-16 2015-07-01 青岛建安建设集团有限公司 Prefabricated assembled frame construction New Types of Beam column Connections
CN105756191A (en) * 2016-04-22 2016-07-13 河北省建筑科学研究院 Assembling-type beam-column joint connection structure for concrete special-shaped column frame
CN206328863U (en) * 2016-11-30 2017-07-14 上海建工二建集团有限公司 Prefabricated assembled frame beam column structure

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101292395B1 (en) * 2011-09-22 2013-08-01 대림산업 주식회사 A compenstation struture for high strength polygonal centrifugal precast columns
CN103104040A (en) * 2013-03-08 2013-05-15 郑州大学 Assembled framework beam-column joint adopting vertical connection and construction method thereof
CN103104041A (en) * 2013-03-08 2013-05-15 郑州大学 Assembled framework beam-column joint adopting transverse connection and construction method thereof
CN103195170A (en) * 2013-04-03 2013-07-10 中铁建设集团有限公司 Prefabricated reinforced concrete frame structure system
CN104532952A (en) * 2014-12-19 2015-04-22 东南大学 Short angle iron connection type reinforced concrete assembling integrated frame and construction method thereof
CN204435564U (en) * 2015-01-16 2015-07-01 青岛建安建设集团有限公司 Prefabricated assembled frame construction New Types of Beam column Connections
CN105756191A (en) * 2016-04-22 2016-07-13 河北省建筑科学研究院 Assembling-type beam-column joint connection structure for concrete special-shaped column frame
CN206328863U (en) * 2016-11-30 2017-07-14 上海建工二建集团有限公司 Prefabricated assembled frame beam column structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115163115A (en) * 2022-09-06 2022-10-11 湖南省交通规划勘察设计院有限公司 Intersection structure of large-diameter shield tunnel contact passage and construction method
CN115163115B (en) * 2022-09-06 2023-01-20 湖南省交通规划勘察设计院有限公司 Intersection structure of large-diameter shield tunnel connection channel and construction method

Similar Documents

Publication Publication Date Title
CN105735464B (en) A kind of assembled composite structure and its installation method
CN104018582B (en) Top is with pedestal at the restressed beam slab and frame structure of restraining moment flexual reinforcement
CN103882798B (en) The reinforced concrete arch bridge of the powerful skeleton of a kind of concrete filled steel tube and construction method thereof
CN103422434B (en) Corrugated sheet steel combinative structure bridge floor system
CN105908977B (en) Joint bar constructing structure and method
CN106088326B (en) Assembling frame rod structure based on 3D printing
CN103541305B (en) A kind of construction method of the hollow slab bridge structure with integration pave-load layer
CN105040829A (en) Prefabricated concrete main beam and secondary beam connecting structure and construction method thereof
CN207419803U (en) A kind of high-strength connection structure of laminated floor slab and girder steel
CN206328863U (en) Prefabricated assembled frame beam column structure
CN106284656A (en) A kind of prefabricated primary and secondary beam connecting node being connected with angle steel and manufacture method
CN110359597A (en) A kind of steel bar template integrated component shear wall cross-layer coupling beam construction and installation method
CN106760050A (en) The attachment structure and through processing method of shear wall and after-pouring concrete frame beam
CN107130715A (en) Teeth groove is poured after a kind of to be linked and packed the construction method of formula building roof system
CN106906736A (en) A kind of clad steel case performance of concrete column confined and girder steel are rigidly connected structural form and construction method
CN105201204B (en) A kind of method and structure of rotten when preventing pouring reinforcement concrete column suspension column
CN105275013B (en) Core tube inverse superimposed underground diaphragm wall and construction method thereof
CN106499054A (en) Prefabricated assembled frame beam column structure and its construction method
KR101668295B1 (en) Steel-concrete composite box girder
CN103726613A (en) Novel fabricated concrete column
CN103924741B (en) Band cross constraint batten plate box-shaped reinforcing bar confined concrete models and the practice
CN205934722U (en) Seam bolted connection precast concrete decking
CN104947804B (en) A kind of steel bracket and the construction method that beam-column node structure is built using it
CN209261310U (en) The concrete prefabricated assembly combined storehouse of Contiuum type
CN208815673U (en) The connecting joint structure of square steel tube concrete column and reinforced beam

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170315