CN105735464B - A kind of assembled composite structure and its installation method - Google Patents

A kind of assembled composite structure and its installation method Download PDF

Info

Publication number
CN105735464B
CN105735464B CN201610278344.8A CN201610278344A CN105735464B CN 105735464 B CN105735464 B CN 105735464B CN 201610278344 A CN201610278344 A CN 201610278344A CN 105735464 B CN105735464 B CN 105735464B
Authority
CN
China
Prior art keywords
steel
steel pipe
concrete slab
coupled column
girder steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610278344.8A
Other languages
Chinese (zh)
Other versions
CN105735464A (en
Inventor
庄舟
庄一舟
钱海敏
李增锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fuzhou University
Original Assignee
Fuzhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fuzhou University filed Critical Fuzhou University
Priority to CN201610278344.8A priority Critical patent/CN105735464B/en
Publication of CN105735464A publication Critical patent/CN105735464A/en
Application granted granted Critical
Publication of CN105735464B publication Critical patent/CN105735464B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/58Connections for building structures in general of bar-shaped building elements
    • E04B1/5806Connections for building structures in general of bar-shaped building elements with a cross-section having an open profile
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Mechanical Engineering (AREA)
  • Rod-Shaped Construction Members (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The present invention relates to a kind of assembled composite structure and its installation methods, including concrete filled steel tube coupled column, the coupled column is made of steel pipe and the concrete being filled in steel pipe, the side wall of the coupled column is provided with i section steel beam, armoured concrete slab is provided on the girder steel, the through-hole that coupled column is allowed to pass through is provided on the armoured concrete slab, the armoured concrete slab is fixedly connected on by several bolt shear connectors on the top flange of girder steel.The present apparatus is simple in structure, stabilized structure, and installation and transportation are convenient.

Description

A kind of assembled composite structure and its installation method
Technical field
The present invention relates to a kind of assembled composite structure and its installation methods.
Background technology
At present, concrete structure assembled architecture is the mainstream of assembled architecture, however concrete structure assembled architecture Since the weight of concrete itself is larger, precast beam need to make composite beam, to reduce transportation cost and hoisting difficulty, bean column node The reinforcing bar at place is still relatively spent human and material resources there is still a need for binding at the scene, and carry out a large amount of concrete wet construction.
Steel construction assembled architecture speed of application is very fast, however the characteristics of because of its cost height and poor residence comfort at home It develops slowly.Concrete filled steel tube is a kind of a kind of new structure for the advantages of combining concrete and steel, and cost is compared with steel Structure is low, and stress performance is good, is to select well as the force column in assembled architecture.Steel core concrete column is formed with girder steel Beam column construction system stiffness it is big, beam column easily forms rigid connection, and node construction is simple, can prefabricated completion in the factory, apply Work speed is also very fast, therefore is a kind of optimal selection of assembled architecture beam-column system.
The beam slab of conventional concrete assembled building is to realize that beam slab is rigidly connected by concrete cast-in-site, girder steel Good effect can also be obtained by being connected with concrete slab by bolt shear connector, and speed of application is fast.
Invention content
The present invention has made improvements in view of the above-mentioned problems of the prior art, i.e., the technical problems to be solved by the invention are A kind of assembled composite structure and its installation method are provided, simple in structure, stabilized structure, installation and transportation are conveniently.
In order to solve the above-mentioned technical problem, a kind of technical solution of the invention is:A kind of assembled composite structure, including steel Pipe concrete coupled column, the coupled column are made of steel pipe and the concrete being filled in steel pipe, and the side wall of the coupled column is set I section steel beam is equipped with, armoured concrete slab is provided on the girder steel, is provided on the armoured concrete slab and allows coupled column The through-hole passed through, the armoured concrete slab are fixedly connected on by several bolt shear connectors on the top flange of girder steel.
Further, the steel pipe cross section is rectangle.
Further, concordant end plate has been bolted on the steel pipe side wall, it is flat that the girder steel end is welded on this On neat end plate.
Further, the armoured concrete slab is not contacted with coupled column, between the through-hole madial wall and through-hole there are 1cm gaps.
Further, it is evenly equipped with several ribbed stiffeners along its length between two edges of a wing up and down of the girder steel, it is adjacent The spacing of ribbed stiffener is 1m.
Further, the bolt shear connector includes bolt, nut and two improved mats.
In order to solve the above-mentioned technical problem, another technical solution of the invention is:A kind of assembled combination as described above The installation method of structure carries out according to the following steps:
(1)Prefabricated steel pipe, i section steel beam and armoured concrete slab;
(2)Concordant end plate is pre-welded to the end of i section steel beam;
(3)Steel pipe, girder steel and armoured concrete slab are transported to construction site, it is at the scene that steel pipe, beam location and installation is complete Bi Hou to pouring into a mould concrete in steel pipe, forms concrete filled steel tube coupled column and girder steel system;
(4)Finally armoured concrete slab is lifted to girder steel top flange, is fixedly connected with bolt shear connector.
Compared with prior art, the invention has the advantages that:The assembled composite structure, utilizes concrete filled steel tube Column and girder steel composition post and lintel system, steel core concrete column resistance to compression anti-bending strength is good, is easy to reduce column section area, girder steel weight Gently, conducive to lifting and transportation cost, and this assembled composite structure bean column node construction is simple is reduced, manpower, concrete are saved Prefabricated board is connect with girder steel by bolt shear connector can form the beam slab system without sliding, and component can make in precast plant It completes, has the characteristics that easy for construction, cost-effective.
The present invention will be further described in detail with reference to the accompanying drawings and detailed description.
Description of the drawings
Fig. 1 is the organigram of the embodiment of the present invention.
Fig. 2 is the connection figure of beam slab in the embodiment of the present invention.
In figure:1- coupled columns, 2- girder steels, the concordant end plates of 3-, 4- bolts, 5- ribbed stiffeners, 6- armoured concrete slabs, 7- bolts Shear connector.
Specific embodiment
Embodiment one:As shown in Figure 1 and 2, a kind of assembled composite structure, including concrete filled steel tube coupled column 1, described group Zygostyle 1 is made of steel pipe and the concrete being filled in steel pipe, and the side wall of the coupled column is provided with i section steel beam 2, described Armoured concrete slab 6 is provided on girder steel 2, the through-hole that coupled column 1 is allowed to pass through is provided on the armoured concrete slab 6, it is described Armoured concrete slab 6 is fixedly connected on by several bolt shear connectors 7 on the top flange of girder steel 2.
In the present embodiment, the steel pipe cross section is rectangle.
In the present embodiment, concordant end plate 3 is connected with by bolt 4 on the steel pipe side wall, the girder steel end is welded on On the concordant end plate.
In the present embodiment, the armoured concrete slab is not contacted with coupled column, is stayed between the through-hole madial wall and through-hole There are 1cm gaps.
In the present embodiment, it is evenly equipped with several ribbed stiffeners 5, phase along its length between two edges of a wing up and down of the girder steel The spacing of adjacent ribbed stiffener is 1m.
In the present embodiment, the bolt shear connector includes bolt, nut and two improved mats.
The installation method of above-mentioned assembled composite structure, carries out according to the following steps:
(1)Prefabricated steel pipe, i section steel beam and armoured concrete slab;
(2)Concordant end plate is pre-welded to the end of i section steel beam;
(3)Steel pipe, girder steel and armoured concrete slab are transported to construction site, it is at the scene that steel pipe, beam location and installation is complete Bi Hou to pouring into a mould concrete in steel pipe, forms concrete filled steel tube coupled column and girder steel system;
(4)Finally armoured concrete slab is lifted to girder steel top flange, is fixedly connected with bolt shear connector.
The foregoing is merely presently preferred embodiments of the present invention, all equivalent changes done according to scope of the present invention patent with Modification should all belong to the covering scope of the present invention.

Claims (3)

1. a kind of assembled composite structure, it is characterised in that:Including concrete filled steel tube coupled column, the coupled column is by steel pipe and fills out It fills and is formed in the concrete in steel pipe, the side wall of the coupled column is provided with i section steel beam, reinforcing bar is provided on the girder steel Concrete slab is provided with the through-hole that coupled column is allowed to pass through on the armoured concrete slab, and the armoured concrete slab passes through several A bolt shear connector is fixedly connected on the top flange of girder steel, and concordant end has been bolted on the steel pipe side wall Plate, the girder steel end are welded on the concordant end plate, and the armoured concrete slab is not contacted with coupled column, on the inside of the through-hole Several are evenly equipped with along its length there are 1cm gaps between wall and through-hole, between two edges of a wing up and down of the girder steel to put more energy into Rib, the spacing of adjacent ribbed stiffener is 1m, and the bolt shear connector includes bolt, nut and two improved mats.
2. assembled composite structure according to claim 1, it is characterised in that:The steel pipe cross section is rectangle.
3. a kind of installation method of assembled composite structure as claimed in claim 2, which is characterized in that according to the following steps into Row:
(1)Prefabricated steel pipe, i section steel beam and armoured concrete slab;
(2)Concordant end plate is pre-welded to the end of i section steel beam;
(3)Steel pipe, girder steel and armoured concrete slab are transported to construction site, at the scene by steel pipe, beam location and installation after, To pouring into a mould concrete in steel pipe, concrete filled steel tube coupled column and girder steel system are formed;
(4)Finally armoured concrete slab is lifted to girder steel top flange, is fixedly connected with bolt shear connector.
CN201610278344.8A 2016-05-03 2016-05-03 A kind of assembled composite structure and its installation method Expired - Fee Related CN105735464B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610278344.8A CN105735464B (en) 2016-05-03 2016-05-03 A kind of assembled composite structure and its installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610278344.8A CN105735464B (en) 2016-05-03 2016-05-03 A kind of assembled composite structure and its installation method

Publications (2)

Publication Number Publication Date
CN105735464A CN105735464A (en) 2016-07-06
CN105735464B true CN105735464B (en) 2018-06-15

Family

ID=56288472

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610278344.8A Expired - Fee Related CN105735464B (en) 2016-05-03 2016-05-03 A kind of assembled composite structure and its installation method

Country Status (1)

Country Link
CN (1) CN105735464B (en)

Families Citing this family (30)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107989178A (en) * 2017-10-13 2018-05-04 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107975142A (en) * 2017-10-13 2018-05-01 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107859166A (en) * 2017-10-13 2018-03-30 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107989175A (en) * 2017-10-13 2018-05-04 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107905422A (en) * 2017-10-13 2018-04-13 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107989174A (en) * 2017-10-13 2018-05-04 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107975141A (en) * 2017-10-13 2018-05-01 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107905361A (en) * 2017-10-13 2018-04-13 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107975140A (en) * 2017-10-13 2018-05-01 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107989177A (en) * 2017-10-13 2018-05-04 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107905419A (en) * 2017-10-13 2018-04-13 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107956252A (en) * 2017-10-13 2018-04-24 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107975143A (en) * 2017-10-13 2018-05-01 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107989176A (en) * 2017-10-13 2018-05-04 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107882172A (en) * 2017-10-13 2018-04-06 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107989179A (en) * 2017-10-13 2018-05-04 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107905359A (en) * 2017-10-13 2018-04-13 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107905364A (en) * 2017-10-13 2018-04-13 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107905362A (en) * 2017-10-13 2018-04-13 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107882173A (en) * 2017-10-13 2018-04-06 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107905366A (en) * 2017-10-13 2018-04-13 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107956251A (en) * 2017-10-13 2018-04-24 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107905367A (en) * 2017-10-13 2018-04-13 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107905365A (en) * 2017-10-13 2018-04-13 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107893495A (en) * 2017-10-13 2018-04-10 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN107905360A (en) * 2017-10-13 2018-04-13 四川动和工程咨询有限公司 A kind of assembled three-dimensional beam-column unit prefabricated components
CN108468387A (en) * 2018-03-22 2018-08-31 河海大学 The assembled connecting node of combination beam and prefabricated board
CN110284656A (en) * 2019-08-05 2019-09-27 郑州大学 A kind of full assembled steel concrete combination beam
CN112376798B (en) * 2020-11-09 2023-07-28 广州大学 Assembled steel-UHPC beam plate structure based on bolt connection and manufacturing method thereof
LU503246B1 (en) 2022-12-23 2024-06-24 Univ Luxembourg Fastening between timber slab and beam with shear load bearing and assembly/disassembly capacities

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007113302A (en) * 2005-10-21 2007-05-10 Kajima Corp Composite beam structure
CN103410227A (en) * 2013-08-09 2013-11-27 河北合创建筑节能科技有限责任公司 Reinforced concrete cast-in-situ frame structure
CN204112504U (en) * 2014-10-23 2015-01-21 广州大学 A kind of new steel structure bean column node adopting top-seat-angle steel to be connected with extended end plate
CN105297978A (en) * 2015-11-18 2016-02-03 湖南大学 Prefabricated assembled type steel-concrete combined beam connected through bolt nails
CN205617552U (en) * 2016-05-03 2016-10-05 福州大学 Assembled integrated configuration

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007113302A (en) * 2005-10-21 2007-05-10 Kajima Corp Composite beam structure
CN103410227A (en) * 2013-08-09 2013-11-27 河北合创建筑节能科技有限责任公司 Reinforced concrete cast-in-situ frame structure
CN204112504U (en) * 2014-10-23 2015-01-21 广州大学 A kind of new steel structure bean column node adopting top-seat-angle steel to be connected with extended end plate
CN105297978A (en) * 2015-11-18 2016-02-03 湖南大学 Prefabricated assembled type steel-concrete combined beam connected through bolt nails
CN205617552U (en) * 2016-05-03 2016-10-05 福州大学 Assembled integrated configuration

Also Published As

Publication number Publication date
CN105735464A (en) 2016-07-06

Similar Documents

Publication Publication Date Title
CN105735464B (en) A kind of assembled composite structure and its installation method
CN105544733B (en) For supporting the structural framing system of building and assembling its method
CN203320738U (en) Assembled concrete frame-shear wall structure
CN202925762U (en) Novel reinforced concrete superposed beam
CN108755963A (en) A kind of partial precast assembled steel reinforced concrete giant frame structure and construction method
CN105040829A (en) Prefabricated concrete main beam and secondary beam connecting structure and construction method thereof
CN103132708B (en) Beam-column joint reinforcing method and beam-column joint reinforcing device
CN108756061A (en) A kind of partial precast assembly prestress steel reinforced concrete hybrid beam and construction method
CN108086488B (en) Assembled frame shear structure wall staggered connection structure and assembling method
CN107130715A (en) Teeth groove is poured after a kind of to be linked and packed the construction method of formula building roof system
CN105064529A (en) Prefabricated and assembled large-board shear wall structure with concealed bracings
CN205617552U (en) Assembled integrated configuration
CN107237398A (en) A kind of new multi and tall steel building assembled combined structure system
CN107130716A (en) After pour teeth groove and be linked and packed formula building roof system
CN105064195B (en) The fish belly Wavelike steel webplate prestressing with bond steel reinforced concrete combination simply supported girder bridge and its construction method of precast assembly
CN104294920A (en) Joint assembly of U-shaped steel reinforced concrete combined beam and special-shaped concrete-filled steel tube column and manufacturing method of joint assembly
CN106760036B (en) A kind of prefabricated steel-combined concrete shear wall
CN108104310B (en) Assembled frame shear structure column staggered connection structure and assembling method
CN107447873B (en) Device for connecting prefabricated laminated connecting beam and prefabricated shear wall and installation method
CN206769150U (en) After pour teeth groove and be linked and packed formula building roof system
CN104153463B (en) Assembled integrated frame system and construction method thereof
CN105735529B (en) A kind of stull formula steel frame steel plate shear wall structure being easily assembled
CN109680833B (en) Self-supporting prefabricated steel reinforced concrete wall plate component, wall, structural system and manufacturing method
CN208502067U (en) A kind of partial precast assembly prestress steel reinforced concrete hybrid beam
CN115467446A (en) Assembled steel structure frame and concrete combined structure residential wall construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180615

Termination date: 20210503