CN106493313A - 一种铜合金浮动浇注方法 - Google Patents
一种铜合金浮动浇注方法 Download PDFInfo
- Publication number
- CN106493313A CN106493313A CN201611126796.0A CN201611126796A CN106493313A CN 106493313 A CN106493313 A CN 106493313A CN 201611126796 A CN201611126796 A CN 201611126796A CN 106493313 A CN106493313 A CN 106493313A
- Authority
- CN
- China
- Prior art keywords
- running channel
- copper alloy
- ingot mould
- ingot
- floating
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D7/00—Casting ingots, e.g. from ferrous metals
- B22D7/005—Casting ingots, e.g. from ferrous metals from non-ferrous metals
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Continuous Casting (AREA)
Abstract
本发明公开了一种铜合金浮动浇注方法,属于铜合金的制备技术领域。该方法是采用浮动浇注设备进行铜合金的浇注,所述浮动浇注设备包括升降调速机构、浇道和锭模,所述浇道顶端焊接漏斗,浇道的底部伸入锭模内;所述升降调速机构连接浇道上的漏斗,并用于控制浇道底部在锭模中的位置;浇注时,浇道出液处保持在液面之下,随着液面的不断上升,浇道的位置也随之上移,直到浇注完成。本发明所制备的铜合金锭,无夹杂(或夹杂明显减少),纯度高,且制备工艺简单,成本低。
Description
技术领域
本发明涉及铜合金的制备技术领域,具体涉及一种铜合金浮动浇注方法。
背景技术
现有铜合金铸锭生产过程中,在浇铸包向锭模倾注铜水时,因铜水与锭模温差过大,以及铜水落下时产生的高度冲击力,而产生铜水落入锭模后四溅情况,挂壁凝固形成铜杂后,随着铜水液面上升,铜杂又重新融入铜水中。因为铜水在浇注时因锭模温度影响迅速降温,已近固态,当铜杂重返铜水时,就出现夹杂等现象,造成铜锭报废,不能满足工艺的要求。
发明内容
为了克服现有技术存在的不足之处,本发明目的在于提供一种铜合金浮动浇注方法,该方法采用特定结构的设备和工艺进行铜水浇注,所制备的铜锭无夹杂、纯度高,且降低生产成本。
为实现上述目的,本发明所采用的技术方案如下:
一种铜合金浮动浇注方法,该方法是采用浮动浇注设备进行铜合金的浇注,所述浮动浇注设备包括升降调速机构、浇道和锭模,所述浇道顶端焊接漏斗,浇道的底部伸入锭模内;所述升降调速机构连接浇道上的漏斗,并用于控制浇道底部在锭模中的位置;该浇注方法包括如下步骤:
(1)通过升降调整机构调整浇道位置,使浇道底部到锭模底部的距离为0.5‐1.5cm;
(2)将浇注包内铜合金液倾入漏斗,并通过浇道浇注到锭模内;
(3)当锭模内的铜合金液的液面没过浇道底部后,保持浇道底部与液面之间的距离为5‐10cm;
(4)铜合金液凝固后获得铜合金锭。
所述升降调速机构包括升降调速电机和滑轮,升降调速电机通过绳索吊装所述浇道上的漏斗,滑轮设于绳索之上用于改变绳索方向。浇注包内的铜合金液从漏斗上方倾注入浇道中,并进一步浇入锭模内,凝固后形成铜合金锭。
浇注过程中,锭模温度100‐120℃,浇铸速度为80‐100kg/min。
浇注过程中,随着铜合金液液面的上升,通过升降调整机构调整浇道位置。
上述浇注过程中,铜合金液的温度根据合金种类设定所需温度。
本发明的设计原理及有益效果如下:
1、本发明浇注方法中,将浇道伸入锭模底部,浇道上端安装存储铜水的漏斗,这样减少了铜合金液浇注时的溅射情况,浇道出液处保持在液面之下,随着液面的不断上升,浇道的位置也随之上移,直到浇注完成。
2、本发明所制备的铜合金锭(包括铜锭),无夹杂(或夹杂明显减少),纯度高,且制备工艺简单,成本低。
附图说明
图1为本发明浮动浇注设备结构示意图。
图2为实施例1制备的铜锭微观形貌图。
图3为对比例1制备的铜锭微观形貌图。
其中:1-锭模;2-浇道;3-漏斗;4-铜水包;5-升降调速电机;6-滑轮。
具体实施方式
下面结合附图及实施例对本发明做进一步描述。
图1所示为本发明浮动浇注装置结构示意图,该装置包括升降调速机构、浇道和锭模,所述浇道顶端焊接漏斗,浇道的底部伸入锭模内;所述升降调速机构包括升降调速电机和滑轮,升降调速电机通过绳索吊装所述浇道上的漏斗,滑轮设于绳索之上用于改变绳索方向。通过升降调速机构控制浇道底部在锭模中的位置。
浇注包内的铜合金液从漏斗上方倾注入浇道中,并进一步浇入锭模内,凝固后形成铜合金锭。
实施例1
本实施例所用浇注装置的规格为:锭模高度950cm,锭模侧壁厚度130cm,锭模宽度(或直径)500cn;漏斗高度300cm,浇道内径50cm。
本实施例为380kg铜水的浇注,浇注过程如下:
(1)锭模加热到110℃后,通过升降调整机构调整浇道位置,使浇道底部到锭模底部的距离为1.0cm;
(2)将浇注包内铜水倾入漏斗,并通过浇道浇注到锭模内;浇铸速度为90kg/min;
(3)随着铜水液面的上升,通过升降调整机构调整浇道位置,当锭模内的铜水的液面没过浇道底部后,保持浇道底部与液面之间的距离为5‐10cm;
(4)铜水凝固后获得铜锭。
所制备铜锭的微观形貌SEM如图2所示,可以看出,铜锭组织结构均匀,无夹杂。
对比例1
本例所用浇注装置为常规浇注装置,与实施例1相比,无升降调速机构,浇注包到锭模底部的距离保持850cm不变。
本例为380kg铜水的浇注,浇注过程如下:
(1)锭模加热到110℃后,将浇注包内铜水倾入漏斗,并通过浇道浇注到锭模内;浇铸速度为90kg/min;
(2)铜水凝固后获得铜锭。
所制备铜锭的微观形貌SEM如图3所示,可以看出,铜锭微观组织中含明显夹杂物。
Claims (5)
1.一种铜合金浮动浇注方法,其特征在于:该方法是采用浮动浇注设备进行铜合金的浇注,所述浮动浇注设备包括升降调速机构、浇道和锭模,所述浇道顶端焊接漏斗,浇道的底部伸入锭模内;所述升降调速机构连接浇道上的漏斗,并用于控制浇道底部在锭模中的位置;该浇注方法包括如下步骤:
(1)通过升降调整机构调整浇道位置,使浇道底部到锭模底部的距离为0.5‐1.5cm;
(2)将浇注包内铜合金液倾入漏斗,并通过浇道浇注到锭模内;
(3)当锭模内的铜合金液的液面没过浇道底部后,保持浇道底部与液面之间的距离为5‐10cm;
(4)铜合金液凝固后获得铜合金锭。
2.根据权利要求1所述的铜合金浮动浇注方法,其特征在于:所述升降调速机构包括升降调速电机和滑轮,升降调速电机通过绳索吊装所述浇道上的漏斗,滑轮设于绳索之上用于改变绳索方向。
3.根据权利要求1所述的铜合金浮动浇注方法,其特征在于:浇注包内的铜合金液从漏斗上方倾注入浇道中,并进一步浇入锭模内,凝固后形成铜合金锭。
4.根据权利要求1所述的铜合金浮动浇注方法,其特征在于:浇注过程中,锭模温度100‐120℃,浇铸速度为80‐100kg/min。
5.根据权利要求1所述的铜合金浮动浇注方法,其特征在于:浇注过程中,随着铜合金液液面的上升,通过升降调整机构调整浇道位置。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611126796.0A CN106493313A (zh) | 2016-12-07 | 2016-12-07 | 一种铜合金浮动浇注方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611126796.0A CN106493313A (zh) | 2016-12-07 | 2016-12-07 | 一种铜合金浮动浇注方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106493313A true CN106493313A (zh) | 2017-03-15 |
Family
ID=58330731
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611126796.0A Pending CN106493313A (zh) | 2016-12-07 | 2016-12-07 | 一种铜合金浮动浇注方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106493313A (zh) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1306982A (en) * | 1969-06-02 | 1973-02-14 | Daussan & Co | Process for the treatment of metal ingots |
JP2004167591A (ja) * | 2002-11-22 | 2004-06-17 | Sumitomo Metal Ind Ltd | マグネシウムまたはマグネシウム合金の溶解および鋳造方法 |
CN101099998A (zh) * | 2007-08-03 | 2008-01-09 | 天瑞集团铸造有限公司 | 铸造火车车轮的退行式浇注系统 |
CN102133628A (zh) * | 2010-01-22 | 2011-07-27 | 浙江恒通机械有限公司 | 一种铝合金棒类零件的铸造方法和实现该方法的设备 |
CN103341621A (zh) * | 2013-07-03 | 2013-10-09 | 大连理工大学 | 潜流铸造方法 |
-
2016
- 2016-12-07 CN CN201611126796.0A patent/CN106493313A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1306982A (en) * | 1969-06-02 | 1973-02-14 | Daussan & Co | Process for the treatment of metal ingots |
JP2004167591A (ja) * | 2002-11-22 | 2004-06-17 | Sumitomo Metal Ind Ltd | マグネシウムまたはマグネシウム合金の溶解および鋳造方法 |
CN101099998A (zh) * | 2007-08-03 | 2008-01-09 | 天瑞集团铸造有限公司 | 铸造火车车轮的退行式浇注系统 |
CN102133628A (zh) * | 2010-01-22 | 2011-07-27 | 浙江恒通机械有限公司 | 一种铝合金棒类零件的铸造方法和实现该方法的设备 |
CN103341621A (zh) * | 2013-07-03 | 2013-10-09 | 大连理工大学 | 潜流铸造方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102941323B (zh) | 中薄板坯连铸机结晶器低液位快速变更换中间包的方法 | |
KR101965038B1 (ko) | 큰 단면을 갖는 긴 주괴의 생산을 위한 방법 및 플랜트 | |
CN102303102B (zh) | 一种特厚板坯连铸工艺和连铸机 | |
CN104259415A (zh) | 一种连铸圆坯的连铸方法 | |
CN102248136B (zh) | 一种连铸坯开浇防漏钢工艺方法 | |
CN107321949A (zh) | 薄板坯连铸机变渣线方法 | |
CN105364042A (zh) | 一种大断面重轨钢铸坯结晶组织均匀性控制的方法 | |
CN109663892B (zh) | 一种大型铸锭或铸坯的渐进凝固成型装置 | |
CN102211166A (zh) | 铸铝件砂模低压铸造成型工艺 | |
CN102380588A (zh) | 中频感应定向凝固铸锭方法及其装置 | |
CN103464699B (zh) | 一种提高连铸机中间包热交换成功率的方法 | |
CN102274955A (zh) | 阳极板氮气保护隔氧全程快速冷却浇铸工艺及系统 | |
CN112658242A (zh) | 一种更换浸入式水口减少粘结的方法 | |
CN105215311B (zh) | 一种方坯连铸开浇操作方法 | |
CN102266920A (zh) | 在线调整连铸结晶器宽度减小过程受阻时锥度变更的方法 | |
CN102211154A (zh) | 提高连铸坯内部质量的方法及实施该方法的浸入式水口 | |
CN105251954B (zh) | 一种钢锭浇注模具及浇注方法 | |
CN106493313A (zh) | 一种铜合金浮动浇注方法 | |
CN106493312A (zh) | 一种铜合金浮动浇注装置和方法 | |
CN101966571A (zh) | 控制流量的浇注方法 | |
CN104439147A (zh) | 一种铸件缩孔的处理方法 | |
CN112548055A (zh) | 用于超宽幅铝合金扁锭的半连续铸造的装置和方法 | |
CN202316935U (zh) | 连铸结晶器 | |
CN210188431U (zh) | 一种大型铸锭或铸坯的渐进凝固成型装置 | |
CN105033209A (zh) | 一种连铸环节改善高碳钢质量的方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170315 |
|
RJ01 | Rejection of invention patent application after publication |