CN106480906A - Feed intake storehouse and the attachment structure of standard block tube coupling and the pipe gallery of changes of section - Google Patents

Feed intake storehouse and the attachment structure of standard block tube coupling and the pipe gallery of changes of section Download PDF

Info

Publication number
CN106480906A
CN106480906A CN201611142848.3A CN201611142848A CN106480906A CN 106480906 A CN106480906 A CN 106480906A CN 201611142848 A CN201611142848 A CN 201611142848A CN 106480906 A CN106480906 A CN 106480906A
Authority
CN
China
Prior art keywords
tube coupling
storehouse
standard block
block tube
pipe gallery
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611142848.3A
Other languages
Chinese (zh)
Other versions
CN106480906B (en
Inventor
战福军
盛富强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Lianzhong Engineering Technology Co ltd
Original Assignee
Nanjing Lianzhong Construction Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Lianzhong Construction Engineering Technology Co Ltd filed Critical Nanjing Lianzhong Construction Engineering Technology Co Ltd
Priority to CN201611142848.3A priority Critical patent/CN106480906B/en
Publication of CN106480906A publication Critical patent/CN106480906A/en
Application granted granted Critical
Publication of CN106480906B publication Critical patent/CN106480906B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/10Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Sewage (AREA)
  • Rigid Pipes And Flexible Pipes (AREA)

Abstract

The invention discloses a kind of feed intake storehouse and attachment structure of standard block tube coupling for steel construction pipe gallery, by unit sheet bar, circumferentially assembly forms standard block tube coupling to described pipe gallery, this unit tube coupling is assembled vertically to form piping lane, it is separated by vertically on this piping lane and is provided with the feed intake storehouse inconsistent with standard block tube coupling section, this is fed intake and is connected by the transition segment of changes of section between storehouse and standard block tube coupling.The present invention achieves standard block tube coupling and the connection feeding intake between storehouse by the transition segment of this variable cross-section, solves the technical barrier that steel construction pipe gallery variable cross-section is difficult to be connected.

Description

Feed intake storehouse and the attachment structure of standard block tube coupling and the pipe gallery of changes of section
Technical field
The invention discloses a kind of structure of pipe gallery, more particularly, to a kind of feed intake storehouse and the connection of standard block tube coupling Structure and the pipe gallery of changes of section.
Background technology
Applicant is devoted to research and the application of Pipe rack always, and has applied for substantial amounts of patent.In Practical Project, Laying for piping lane internal pipeline and the maintenance of later stage pipeline, very inconvenient inside staff's entrance piping lane, after Continuous maintenance piping lane and piping lane inner facility need when building to expend substantial amounts of manpower and materials it is therefore desirable to be equipped with phase in corridor body structure The dog-house answered, to realize entering inside piping lane by it, implements related operation.The storehouse section that feeds intake is directed not only to the string of pipeline OK, personnel's turnover space, the monitoring of its pipeline compartment, measurement and statistics equipment also can concentrate laying herein, so entirely Feed intake Cang Chu internal space ratio only lay pipeline standard tube coupling space big many, both sections are inconsistent, in order to ensure Entirely piping lane is continuous, there is a problem of that different cross section tube coupling docks.
It would therefore be highly desirable to solve above-mentioned technical barrier.
Content of the invention
Goal of the invention:The first object of the present invention is to provide a kind of steel construction pipe gallery variable cross-section that solves to be difficult to hold in the mouth Feed intake storehouse and the attachment structure of standard block tube coupling for steel construction pipe gallery of the technical barrier connecing.
The second object of the present invention is to provide a kind of pipe gallery of changes of section.
Technical scheme:Feed intake storehouse and the connection knot of standard block tube coupling for steel construction pipe gallery of the present invention Structure, pipe gallery forms standard block tube coupling by unit sheet bar assembly, and this unit tube coupling is assembled vertically to form piping lane, this piping lane On be separated by vertically and be provided with the feed intake storehouse inconsistent with standard block tube coupling section, this feeds intake logical between storehouse and standard block tube coupling The transition segment crossing changes of section is connected.The present invention achieves standard block tube coupling and the storehouse that feeds intake by the transition segment of this variable cross-section Between connection, solve steel construction pipe gallery variable cross-section be difficult to be connected technical barrier.
Wherein, the described storehouse that feeds intake forms box tube coupling by including top board, base plate and biside plate assembly, and this top board offers Meet pipeline, equipment, the aperture of personnel's turnover size.The present invention open up on the surface positioned at the plate of top surface meet pipeline, Equipment, personnel pass in and out the aperture of size, are easy to the laying of piping lane internal unit and keep in repair.
Further, the above and below in the described storehouse that feeds intake and standard block tube coupling flush.Internal space ratio because of the Cang Chu that feeds intake The inner space only laying the standard block tube coupling of pipeline is big, but is arranged on below ground the pipe gallery of the present invention more, setting Feed intake storehouse height consistent with unit tube coupling and flush so that pre-buried depth is constant, reduce installation cost.
Preferably, the width in the described storehouse that feeds intake is more than the width of standard block tube coupling, this feed intake storehouse one side and mark simultaneously The side of quasi- unit tube coupling is concordant;The cross-sectional area of wherein said transition segment is incremented by tail and is seamlessly transitted by first, and along width Cross sectional shape on direction is right-angled trapezium.
Furthermore, the width in the described storehouse that feeds intake is more than the width of standard block tube coupling, the longitudinal center plane in this storehouse that feeds intake simultaneously Coplanar with the longitudinal center plane of standard block tube coupling;The cross-sectional area of wherein said transition segment is incremented by and smoothed to tail by first Cross, and the cross sectional shape gone up in the width direction is isosceles trapezoid.This transition segment is seamlessly transitted using gradual change, slows down answering of transition position Power concentration phenomenon is so that overall structure is stable.
Preferably, described transition segment includes by the upper and lower and assembled nonstandard tube coupling of both sides plate, between adjacent plate It is spliced by circumferential shaped steel flange.This transition segment is formed by the transformation of the way of nonstandard plate, and assembled even by circumferential shaped steel flange Connect, the transition segment intensity of itself is ensured well.
Further, the two ends of described transition segment are connected with standard block tube coupling and the storehouse that feeds intake by axialmode steel flange respectively Connect.This transition segment adopts axialmode steel flange to realize being connected with adjacent cells tube coupling and the storehouse that feeds intake, and its installation procedure is simple, construction Hurry up, construction speed is secure.
A kind of pipe gallery of changes of section of the present invention, including by unit sheet bar, circumferentially assembly forms standard block Tube coupling, this standard block tube coupling is assembled vertically to form piping lane, and wherein, the end bore of described standard block tube coupling expands outwardly Or to one section of formation transition segment of contract, and it is connected with the storehouse that feeds intake by this transition segment.
Beneficial effect:Compared with prior art, the present invention has following remarkable advantage:The present invention passes through this variable cross-section first Transition segment achieve standard block tube coupling and the connection feeding intake between storehouse, solve steel construction pipe gallery variable cross-section and be difficult to reality The technical barrier being now connected;Next storehouse that feeds intake opens up on the surface positioned at the plate of top surface and meets pipeline, equipment, personnel's turnover The aperture of size, is easy to the laying of piping lane internal unit and keeps in repair;Furthermore the internal space ratio because of the Cang Chu that feeds intake only lays pipeline The inner space of standard block tube coupling is big, but is arranged on below ground the pipe gallery of the present invention more, arranges the height in the storehouse that feeds intake Consistent with standard block tube coupling and flush so that pre-buried depth is constant, reduce installation cost;Then this transition segment adopts gradual change Seamlessly transit, slow down the stress concentration phenomenon of transition position so that overall structure is stable;Finally, this attachment structure is rational in infrastructure, just In processing and manufacturing, workable, using precast splice type pattern, construction is fast and construction speed is secure, and fabrication and installation work Sequence is simple, low with respect to concrete component production, installation cost, has good economic benefit.
Brief description
Fig. 1 is the first structural representation of the present invention;
Fig. 2 is the second structural representation of the present invention.
Specific embodiment
Below in conjunction with the accompanying drawings technical scheme is described further.
As shown in figure 1, pipe gallery includes the standard block tube coupling 1 being formed by unit sheet bar assembly, this mark in the present invention Quasi- unit tube coupling 1 is assembled vertically to form piping lane.Whole piping lane corridor body at a certain distance, ultimate range no more than 400m, Concrete distance can determine according to apart from project design parameter, accordingly lay for be connected with ground structures and compartment inside Pipeline monitoring, measurement and the instrument of statistics and the storehouse that feeds intake of equipment.In view of the internal space ratio of the Cang Chu that feeds intake only lays pipeline Standard block tube coupling space is big many, and both sections are inconsistent, in order to ensure the continuous of whole piping lane, need to be to two different cross sections Linking be designed, the company being fed intake between storehouse 2 and standard block tube coupling 1 by the realization of the transition segment 3 of variable cross-section in the present invention Connect, the technical barrier being connected with solving steel construction pipe gallery variable cross-section to be difficult to.
As shown in figure 1, the storehouse 2 that feeds intake forms box tube coupling by including top board, base plate and biside plate assembly, this top board opens up Have and meet pipeline, equipment, the aperture 4 of personnel's turnover size, preferably can be reinforced using shaped steel in the one of aperture week, be easy to Be easy to the laying of piping lane internal unit and keep in repair, the connected mode of shaped steel and dog-house surrounding is welding, bolt, in riveting at least One kind, preferably bolts;The structure of shaped steel can be selected with shape according to aperture position, and shaped steel 3 can be I-steel, plain plate, arc Shape steel plate, channel-section steel, H profile steel, angle steel, square steel, deformed steel etc..The present invention opens up at the top board in storehouse that feeds intake and meets pipeline, sets Standby, personnel pass in and out the aperture of size, and a week in aperture is reinforced using shaped steel, and shaped steel is also as flange and dog-house Superstructure connect;Simultaneously facilitate the laying of piping lane internal unit and keep in repair.It is also associated with for setting with ground on above-mentioned shaped steel 3 Apply the connection shaped steel being connected, this connection shaped steel is located above dog-house surrounding respectively.The lower end of this connection shaped steel has and type The lower flange that steel 3 is connected, the specific shaped steel that connects is bolted with shaped steel 3 or welds;The upper end tool of this connection shaped steel There is the upper flange being connected with ground installation, this upper flange is face-flange structure.The connection shaped steel that this feeds intake in chamber structure is not Only play the effect reinforcing aperture further, the connection transition piece of the structures that also feed intake as dog-house and ground, realize underground Connection and surface infrastructure between.
As depicted in figs. 1 and 2, above-mentioned aperture 4 is offset to the side in the storehouse axial centre face that feeds intake, wherein near axial centre Face connect shaped steel be one axially through the storehouse that feeds intake carrying girder steel, near unit sheet bar side connection shaped steel be an edge The shape steel rolled stock of dog-house edge setting, two other is used for connecting carrying girder steel and shape steel rolled stock, arranges along dog-house edge Connection shaped steel be I-steel or plain plate.In the present invention, dog-house holds near the side throwing storage hopper center, i.e. this dog-house Pressure by top bears the thrust that side plate transmits again, sets up an edge again in dog-house on the side shaped steel in axial centre face Axially penetrate through the storehouse that feeds intake carries the weakness that girder steel can further enhance dog-house as connection shaped steel, improves overall structure Intensity;And the two ends of this carrying girder steel are respectively placed on the unit sheet bar of top surface, the load transmission that can be born is to unit On plate, reduce the compacting to dog-house.
Top board, base plate and the biside plate in the above-mentioned storehouse 2 that feeds intake respectively with cambered corrugated sheet steel, in the described storehouse 2 that feeds intake Inwall, be provided with the steel pipe consistent with corrugated sheet steel radian in the trough of corrugated sheet steel.Trough in adjacent plate corresponds And circumference connects the annular trough of formation, and the annular steel ring of the end to end formation of the steel pipe in this annular trough.For whole by ripple The assembled unit pipes nodule structure of shape steel plate, in order to increase integrally-built stable and intensity, can be spaced or all waveform steel Lay, in the trough of plate, the steel pipe fitted with corrugated sheet steel, and form one or multi-channel annular steel ring.When corrugated sheet steel is arc During plate, in its trough, the radian of steel pipe of setting is consistent with arc radian, and steel pipe is constituted similar to steel with corrugated sheet steel Arch frame structure, thus integrally-built strength and stability can be greatly improved.
Further for strengthen integrally-built stability, can in steel pipe fill concrete, or in steel pipe arrange steel Muscle fill concrete, armored concrete can be with steel pipe together stress.In addition the load that above-mentioned connection shaped steel is born can be transmitted To the steel pipe by the shaped steel being connected with it and the setting of unit sheet bar inwall, setting reinforcing bar or reinforced concrete wherein in steel pipe Soil, its using steel pipe be arranged circumferentially and the common stress of pipeclay is so that the bearing capacity of total is ensured well.
The height in the above-mentioned storehouse 2 that feeds intake is consistent with standard block tube coupling, and the above and below in this storehouse 2 that feeds intake and standard block pipe Save 1 flush.Because the internal space ratio of the Cang Chu that feeds intake only lay the standard block tube coupling of pipeline inner space big, but the present invention Pipe gallery more be arranged on below ground, setting feed intake storehouse 2 height is consistent with standard block tube coupling 1 and above and below and mark Quasi- unit tube coupling 1 flushes so that pre-buried depth is constant, reduces cost of installation and use.
As shown in figure 1, the first is used for feed intake storehouse and the attachment structure of standard block tube coupling of steel construction pipe gallery, its In the feed intake width in storehouse 2 be more than the width of standard block tube coupling 1, side of this feed intake storehouse 2 one side and standard block tube coupling 1 simultaneously Face is concordant;The cross-sectional area of wherein transition segment 3 is incremented by tail and is seamlessly transitted by first, and the cross sectional shape gone up in the width direction is Right-angled trapezium.One end that in the present invention, transition segment 3 is connected with standard block tube coupling 1 is head end, transition segment 3 and storehouse 2 phase that feeds intake The one end connecting is tail end.As shown in Fig. 2 second is used for feed intake storehouse and the company of standard block tube coupling of steel construction pipe gallery Access node structure, the width in the storehouse 2 that wherein feeds intake is more than the width of standard block tube coupling 1, the longitudinal center plane in this storehouse 2 that feeds intake and mark simultaneously The longitudinal center plane of quasi- unit tube coupling 1 is coplanar;The cross-sectional area of wherein said transition segment 3 is incremented by tail and is seamlessly transitted by first, And the cross sectional shape gone up is isosceles trapezoid in the width direction.This transition segment is seamlessly transitted using gradual change, slows down the stress of transition position Concentration phenomenon is so that overall structure is stable.
This transition segment 3 includes by the upper and lower and assembled nonstandard tube coupling of both sides plate, passes through circumference between adjacent plate Shaped steel flange is spliced.This transition segment is formed by the transformation of the way of nonstandard plate, and connects by circumferential shaped steel flange is assembled, itself Transition segment intensity ensured well.The two ends of described transition segment 3 pass through axialmode steel flange and standard block pipe respectively Section 1 is connected with the storehouse 2 that feeds intake.
A kind of pipe gallery of changes of section of the present invention, including by unit sheet bar, circumferentially assembly forms standard block tube coupling 1, this standard block tube coupling 1 is assembled vertically to form piping lane, and wherein, the end bore of described standard block tube coupling 1 expands outwardly Or to one section of formation transition segment of contract, and it is connected with the storehouse that feeds intake by this transition segment.
The version of attachment structure of the present invention rationally, is easy to processing and manufacturing, workable, using precast splice type type Formula, construction are soon and construction speed is secure, and fabrication and installation operation is simple, low with respect to concrete component production, installation cost, There is good economic benefit.

Claims (8)

1. a kind of attachment structure of feed intake storehouse and the standard block tube coupling for steel construction pipe gallery it is characterised in that:Described By unit sheet bar, circumferentially assembly forms standard block tube coupling (1) to pipe gallery, and this unit tube coupling is assembled vertically to form piping lane, Be separated by vertically on this piping lane and be provided with the feed intake storehouse (2) inconsistent with standard block tube coupling (1) section, this storehouse that feeds intake (2) with mark It is connected by the transition segment (3) of changes of section between quasi- unit tube coupling (1).
2. feed intake storehouse and the attachment structure of standard block tube coupling for steel construction pipe gallery according to claim 1, It is characterized in that:The described storehouse that feeds intake (2) forms box tube coupling by including top board, base plate and biside plate assembly, and this top board opens up Have and meet pipeline, equipment, the aperture (4) of personnel's turnover size.
3. feed intake storehouse and the attachment structure of standard block tube coupling for steel construction pipe gallery according to claim 2, It is characterized in that:The above and below of the described storehouse that feeds intake (2) and standard block tube coupling (1) flush.
4. feed intake storehouse and the attachment structure of standard block tube coupling for steel construction pipe gallery according to claim 3, It is characterized in that:The width of the described storehouse that feeds intake (2) is more than the width of standard block tube coupling (1), this storehouse that feeds intake (2) one side simultaneously Concordant with the side of unit tube coupling (1);The cross-sectional area of wherein said transition segment (3) is incremented by tail and is seamlessly transitted by first, and The cross sectional shape gone up in the width direction is right-angled trapezium.
5. feed intake storehouse and the attachment structure of standard block tube coupling for steel construction pipe gallery according to claim 3, It is characterized in that:The width of the described storehouse that feeds intake (2) is more than the width of standard block tube coupling (1), the longitudinal direction in this storehouse that feeds intake (2) simultaneously Median plane is coplanar with the longitudinal center plane of unit tube coupling (1);The cross-sectional area of wherein said transition segment (3) by first to tail incremental and Seamlessly transit, and the cross sectional shape gone up in the width direction is isosceles trapezoid.
6. feed intake storehouse and the attachment structure of standard block tube coupling for steel construction pipe gallery according to claim 1, It is characterized in that:Described transition segment (3) includes by the upper and lower and assembled non-standard tube coupling of both sides plate, adjacent plate it Between be spliced by circumferential shaped steel flange.
7. feed intake storehouse and the attachment structure of standard block tube coupling for steel construction pipe gallery according to claim 1, It is characterized in that:The two ends of described transition segment (3) pass through axialmode steel flange and standard block tube coupling (1) and the storehouse that feeds intake respectively (2) it is connected.
8. a kind of pipe gallery of changes of section it is characterised in that:Including by unit sheet bar, circumferentially assembly forms standard block Tube coupling (1), this standard block tube coupling (1) is assembled vertically to form piping lane, wherein, the end mouth of described standard block tube coupling (1) Footpath expands outwardly or to one section of formation transition segment of contract, and is connected with the storehouse that feeds intake by this transition segment.
CN201611142848.3A 2016-12-13 2016-12-13 Feed intake storehouse and the connection structure of standard block tube coupling and the pipe gallery of changes of section Active CN106480906B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611142848.3A CN106480906B (en) 2016-12-13 2016-12-13 Feed intake storehouse and the connection structure of standard block tube coupling and the pipe gallery of changes of section

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611142848.3A CN106480906B (en) 2016-12-13 2016-12-13 Feed intake storehouse and the connection structure of standard block tube coupling and the pipe gallery of changes of section

Publications (2)

Publication Number Publication Date
CN106480906A true CN106480906A (en) 2017-03-08
CN106480906B CN106480906B (en) 2019-03-26

Family

ID=58284820

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611142848.3A Active CN106480906B (en) 2016-12-13 2016-12-13 Feed intake storehouse and the connection structure of standard block tube coupling and the pipe gallery of changes of section

Country Status (1)

Country Link
CN (1) CN106480906B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107514010A (en) * 2017-09-08 2017-12-26 衡水益通管业股份有限公司 A kind of steel connecting joint structure of steel pipe gallery
CN108867698A (en) * 2018-09-03 2018-11-23 江苏金贸科技发展有限公司 A kind of double cabin piping lane import and export mixes in underground

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2034852A1 (en) * 1990-02-01 1991-08-02 Eric Federspiel Process and device for replacing an underground pipe
CN205503178U (en) * 2016-03-21 2016-08-24 中铁第一勘察设计院集团有限公司 Rail travel inclined shaft shaft bottom conveyor system
CN106090450A (en) * 2016-08-09 2016-11-09 南京联众建设工程技术有限公司 There is the box pipeline that circumferential obtuse angle connects
CN206289667U (en) * 2016-12-13 2017-06-30 南京联众建设工程技术有限公司 Feed intake storehouse and the attachment structure and the pipe gallery of changes of section of standard block tube coupling

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2034852A1 (en) * 1990-02-01 1991-08-02 Eric Federspiel Process and device for replacing an underground pipe
CN205503178U (en) * 2016-03-21 2016-08-24 中铁第一勘察设计院集团有限公司 Rail travel inclined shaft shaft bottom conveyor system
CN106090450A (en) * 2016-08-09 2016-11-09 南京联众建设工程技术有限公司 There is the box pipeline that circumferential obtuse angle connects
CN206289667U (en) * 2016-12-13 2017-06-30 南京联众建设工程技术有限公司 Feed intake storehouse and the attachment structure and the pipe gallery of changes of section of standard block tube coupling

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107514010A (en) * 2017-09-08 2017-12-26 衡水益通管业股份有限公司 A kind of steel connecting joint structure of steel pipe gallery
CN108867698A (en) * 2018-09-03 2018-11-23 江苏金贸科技发展有限公司 A kind of double cabin piping lane import and export mixes in underground

Also Published As

Publication number Publication date
CN106480906B (en) 2019-03-26

Similar Documents

Publication Publication Date Title
CN108104567B (en) Concrete tower drum longitudinal joint connecting structure and method, prefabricating method of sheet body and concrete tower drum
CN205894364U (en) Prefabricated formula wall body and prefabricated formula housing construction
WO2023280260A1 (en) Installation-type high-piled wharf structure and construction method
CN107780437A (en) Prefabricated assembled pipe joint of utility tunnel
CN106480906A (en) Feed intake storehouse and the attachment structure of standard block tube coupling and the pipe gallery of changes of section
RU2474694C2 (en) Device for connection of shafts of underground facilities of subway
CN206289667U (en) Feed intake storehouse and the attachment structure and the pipe gallery of changes of section of standard block tube coupling
CN208845183U (en) Assembled tube coupling
CN106481347A (en) A kind of anti-internal water pressure composite shield section of jurisdiction
CN211342028U (en) Adjustable assembled steel pipe tower
CN211368680U (en) Slurry anchor sleeve type precast pile connecting structure
CN205387716U (en) Communication tower pipe pile foundation
CN107237454A (en) A kind of connection method of precast concrete
CN106522267B (en) The steel of underground pipe gallery feeds intake chamber structure
CN207685864U (en) Combined type underground pipe gallery
CN106088142B (en) A kind of prefabricated assembled pipeline foundation and its assembly method
CN207959499U (en) A kind of steel construction
CN206338075U (en) A kind of anti-internal water pressure composite shield section of jurisdiction
CN206205012U (en) A kind of SMW engineering methods stake inclinometer pipe installation aiding device
CN206680860U (en) Pin-connected panel steel assembled pier
CN215487993U (en) Steel cylinder with hoop for horizontal spiral drilling jacking machine pipe jacking
CN213651626U (en) Gantry crane foundation
CN203701086U (en) PHC tubular pile and steel pipe butt-joint structure
CN206289656U (en) The steel of underground pipe gallery feeds intake chamber structure
CN203939508U (en) The steel grating bow member that size is adjustable

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 211215 Zhetang Town Industrial Park, Lishui District, Nanjing City, Jiangsu Province

Patentee after: NANJING LIANZHONG ENGINEERING TECHNOLOGY Co.,Ltd.

Address before: 211215 No. 331 Zhening East Road, Zhetang Industrial Concentration Zone, Lishui Economic Development Zone, Nanjing City, Jiangsu Province

Patentee before: NANJING LIANZHONG CONSTRUCTION ENGINEERING TECHNOLOGY Co.,Ltd.

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20170308

Assignee: Jiangsu Xinbao Financial Leasing Co.,Ltd.

Assignor: NANJING LIANZHONG ENGINEERING TECHNOLOGY Co.,Ltd.

Contract record no.: X2024980009485

Denomination of invention: Comprehensive pipe gallery for the connection structure and cross-sectional changes between the feeding bin and the standard unit pipe section

Granted publication date: 20190326

License type: Exclusive License

Record date: 20240711

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Comprehensive pipe gallery for the connection structure and cross-sectional changes between the feeding bin and the standard unit pipe section

Granted publication date: 20190326

Pledgee: Jiangsu Xinbao Financial Leasing Co.,Ltd.

Pledgor: NANJING LIANZHONG ENGINEERING TECHNOLOGY Co.,Ltd.

Registration number: Y2024980029577