CN206680860U - Pin-connected panel steel assembled pier - Google Patents

Pin-connected panel steel assembled pier Download PDF

Info

Publication number
CN206680860U
CN206680860U CN201720399682.7U CN201720399682U CN206680860U CN 206680860 U CN206680860 U CN 206680860U CN 201720399682 U CN201720399682 U CN 201720399682U CN 206680860 U CN206680860 U CN 206680860U
Authority
CN
China
Prior art keywords
steel
pin
spiral
pier
arch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720399682.7U
Other languages
Chinese (zh)
Inventor
马骅
苏立超
陈大伟
周印霄
李国志
王彦辉
王菲
冀晓晖
李东玉
李国群
成晓志
贾艳杰
周伟谦
苌现伟
赵炜
王凤志
孙立彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xingtai road and Bridge Construction Group Co.,Ltd.
Original Assignee
XINGTAI ROAD AND BRIDGE CONSTRUCTION GENERAL CO
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XINGTAI ROAD AND BRIDGE CONSTRUCTION GENERAL CO filed Critical XINGTAI ROAD AND BRIDGE CONSTRUCTION GENERAL CO
Priority to CN201720399682.7U priority Critical patent/CN206680860U/en
Application granted granted Critical
Publication of CN206680860U publication Critical patent/CN206680860U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of pin-connected panel steel assembled pier, belongs to bridge technology field, including steel pier stud and the bent cap for being fixed on steel pier stud top, key are:The structure of the steel pier stud includes the main pier of two steel and the steel lagging jack between two main piers of steel, and the both ends of the steel lagging jack are individually fixed in the top of two main piers of steel, and the steel lagging jack is H profile steel and is processed into the arch being bent upwards.The beneficial effects of the utility model are:Rational in infrastructure, bearing capacity is strong, can effectively solve the problems such as reinforced concrete bridge pier dead load is big, shock resistance is poor, span ability is small, bearing capacity is low;Whole bridge pier uses assembled structure, its each part is prefabricated in the factory, live quick-assembling and simple to install, effectively accelerate the speed of application of live bridge pier, while avoid the production of conventional steel bar concrete structural concrete, noise or dust pollution caused by construction using steel construction, bridge abutment moulding plate need not be made and carry out reinforcement engineering construction etc..

Description

Pin-connected panel steel assembled pier
Technical field
The utility model belongs to the construction fields such as urban interchange, highway bridge, box culvert structure thing, and in particular to Yi Zhongbian In Fast Installation, light-duty transport, the new spelling dressization that structure is attractive in appearance, across footpath is larger assembled pier.
Background technology
Domestic bridge surface in bridge project pier uses reinforced concrete bridge pier more, to meet bridge deck width requirement, using polystyle Reinforced concrete bridge pier.Reinforced concrete bridge pier exist Concrete contamination is big, substructure from it is great, sectional dimension is big, construction Efficiency is low, the construction period is long, poor seismic behavior, concrete cracking, structure type is single, span ability is small, extruding space under bridge The problems such as.
Therefore need to design a kind of structure it is slim and graceful, it is attractive in appearance, be readily transported, span ability is big and demountable corrugated steel group Close bridge pier.
The content of the invention
The technical problems to be solved in the utility model is to provide a kind of pin-connected panel steel assembled pier, passes through the conjunction to structure Reason design, each part can be prefabricated in the factory, be installed after transporting to scene, substantially increase efficiency of construction, slim and graceful attractive in appearance, antidetonation Performance is good.
In order to solve the above technical problems, the technical solution adopted in the utility model is:A kind of pin-connected panel steel assembled pier, Including steel pier stud and the bent cap on steel pier stud top is fixed on, key is:The structure of the steel pier stud includes two The main pier of steel and the steel lagging jack between two main piers of steel, the both ends of the steel lagging jack are individually fixed in the top of two main piers of steel, The steel lagging jack is H profile steel and is processed into the arch being bent upwards.
Advantageous effects of the present utility model are:1st, rational in infrastructure, bearing capacity is strong, can effectively solve armored concrete Bridge pier structure is from the great, problem such as shock resistance is poor, span ability is small, bearing capacity is low;2nd, whole bridge pier uses pin-connected panel knot Structure, its each part is prefabricated in the factory, live quick-assembling and simple to install, effectively accelerates the speed of application of live bridge pier, simultaneously The production of conventional steel bar concrete structural concrete, noise or dust pollution caused by construction are avoided, without system using steel construction Make bridge abutment moulding plate and carry out reinforcement engineering construction etc., it is notable for Environmental Role, the increase of span ability, main pier can be reduced Quantity, space under bridge also can obtain efficient utilization;3rd, the main pier combining structure of double steel meets the infrastructure requirement of wider bridge floor, section The space saved can do Light-duty vehicle Lane, at utmost solve the problems, such as urban congestion using space under bridge, auxiliary;4th, the company of design is passed through Arch springing lacing wire is connected by connection device with pressure-bearing steel arch pin, simple in construction, and connection is reliable, reusable.
The utility model is described in detail below in conjunction with the accompanying drawings.
Brief description of the drawings
Fig. 1 is the structural representation of the utility model pin-connected panel steel assembled pier;
Fig. 2 is the structural representation of bent cap in Fig. 1;
Fig. 3 is the structural representation of attachment means in the utility model pin-connected panel steel assembled pier;
Fig. 4 is Fig. 3 scheme of installation;
Fig. 5 is the structural representation of locking nut in Fig. 3.
In the accompanying drawings:1 is Antivibration block, and 2 be bent cap, and 2-1 is top flange plate, and 2-2 is bottom wing listrium, and 2-3 is setback plate, 3 be distribution column, and 4 be steel lagging jack, and 5 be arch springing lacing wire, and 6 be the main pier of steel, and 7 be pressure-bearing steel arch pin;
11 be conic pipe joint, and 11-1 is taper connection end, and 11-2 is spiral connecting groove, and 11-3 is external screw thread connection Portion, 12 be locking nut, and 12-1 is female threaded joint, and 12-2 is taper compressed part, and 12-3 is spiral self-locking groove, and 13 be lock Tight tapered sleeve, 13-1 are spiral locking grooves.
Embodiment
Referring to accompanying drawing 1, utility model provides a kind of pin-connected panel steel assembled pier, including steel pier stud and is fixed on steel The bent cap 2 on pier stud top processed, key is:The structure of above-mentioned steel pier stud includes the main pier 6 of two steel and positioned at two steel master Steel lagging jack 4 between pier 6, the both ends of above-mentioned steel lagging jack 4 are individually fixed in the top of the main pier 6 of two steel, and above-mentioned steel lagging jack 4 is H types Steel is simultaneously processed into the arch being bent upwards.
The web of H profile steel uses waveform in above-mentioned steel lagging jack 4.The web of H profile steel is located at vertical plane in above-mentioned steel lagging jack 4 It is interior.Steel lagging jack 4 is the arch of microbend, and arch can use parabola or large radius circular curve.
Pressure-bearing steel arch pin 7 is welded with the both ends of steel lagging jack 4, above-mentioned steel lagging jack 4 is by pressure-bearing steel arch pin 7 and steel master Pier 6 is fixed.
When across footpath is excessive, the supporting pressure-bearing steel of steel lagging jack 4 under bridge superstructure gravity load and Vehicle Load Horizontal thrust is outwards produced at arch springing 7 and is unfavorable for the main stress of pier 6 of steel, arch springing lacing wire 5, the both ends of arch springing lacing wire 5 are devised for this It is individually fixed on two pressure-bearing steel arch pin 7.Arch springing lacing wire 5 can be wire rod or type using the superior FRP material of tensile property Material.
Antivibration block 1 is respectively fixed with the top both sides of bent cap 2.Antivibration block 1 is to be formed by steel plate bending or group Weldering forms, and its section is trapezoidal.Steel Antivibration block 1 is welded and fixed with bent cap 2.
Referring to accompanying drawing 2, the structure of above-mentioned bent cap 2 includes top flange plate 2-1, the bottom wing listrium 2-2 that pier main with steel 6 is connected And it is arranged on one or more setback plate 2-3 between top flange plate 2-1 and bottom wing listrium 2-2.Its transverse direction can use single-beam H Shaped steel bent cap, can also twin beams be used to form box-type section steel lid beam.
Distribution column 3 is provided between bent cap 2 and steel lagging jack 4.Column 3 is distributed according to the design needs in bent cap 2 and steel arch It is provided between rib 4 multiple.Steel lagging jack 4 sets ribs with distribution column 3 junction, to increase bonding strength.Distribution column 3 uses Steel pipe or the formed steel construction such as square, groove profile, I-shaped transmit superstructure load to steel lagging jack 4, to distribute vertical pressure, increase The rigidity of steel lid beam 2, its span ability is improved, reduce depth of section etc..
The main pier 6 of steel can use the structures such as steel pipe, shaped steel, truss, mainly undertake axial compressive force.
Design principle of the present utility model is as follows:Using arch(Steel lagging jack 4)Beam(Steel lid beam 2)Post(The main pier 6 of steel)It is combined Form substructure can be made to meet wide bridge beam with slimmer and more graceful structure, bigger bearing capacity and span ability It is required that.Steel lagging jack 4 has larger span ability, and it improves the rigidity of steel lid beam 2 by distributing column 3, can effectively reduce steel The deck-molding of bent cap 2, material is saved, reduce deadweight, and structure is merrily and lightheartedly attractive in appearance, anti-seismic performance is good.Branch seat cushion is arranged on steel lid beam 2 Block, directly bears superstructure dead load and pressure that wheel mobile load passes over, and then pressure divides two parts to pass to the main pier of steel 6, a portion pressure passes to steel lagging jack 4 by distributing column 3, when transmitting pressure to steel lagging jack 4, is produced at arch springing perpendicular To component and horizontal component, horizontal component is resisted by arch springing lacing wire 5, and vertical force component passes to the main pier 6 of steel;Another part pressure is straight Connect and pass to the main pier 6 of steel, now vertical pressure is passed to pile foundation by the main pier 6 of steel again.
Step is as follows in the specific implementation for bridge pier of the present utility model:
(1), design according to demand and the Antivibration block 1 that is prefabricated in the factory, corrugated steel bent cap 2, distribution column 3, steel lagging jack 4, Arch springing lacing wire 5, the main pier 6 of steel and pressure-bearing steel arch pin 7;Such as relating to the component such as roomy, overlength segmented can make, wherein Antivibration block 1 is welded in factory's manufacturing process on steel lid beam 2, distribution column 3 and the section welding fabrication of steel lagging jack 4, in pressure-bearing steel arch pin 7 The attachment means of arch springing lacing wire 5 are set during making.
(2), prefabricated each part transported to erecting bed.
(3), scene passes through Site Welding by bridge pier assembled formation, between each part or bolt connection is molded.
In above-mentioned steps, distribution column 3, the main pier 6 of steel preferentially realize bolt with the junction of steel lid beam 2 using reserved splice plate Connection, processed with this and reduce Site Welding workload, it is ensured that steel combines the installation quality and efficiency of construction of pier.
When arch springing lacing wire 5 is FRP tubing, referring to accompanying drawing 3-5, above-mentioned attachment means include solid with pressure-bearing steel arch pin 7 Fixed and the conic pipe joint 11 matched with the flared end of FRP tubing and the locking nut 12 being threadedly coupled with conic pipe joint 11. Conic pipe joint 11 is bolted or welded to be connected with pressure-bearing steel arch pin 7.
The structure of conic pipe joint 11 includes the taper connection end 11-1 being engaged with the flared end of FRP tubing and lock The male threaded joint 11-3 of the tight cooperation of the nut 12 and spiral connecting groove 11-2 for being located at taper connection end 11-1 outer surfaces, After tubing is pressed on conic pipe joint 11 by locking nut 12, the inner wall deformation of tubing enters above-mentioned spiral connecting groove 11-2 It is interior, so as to play a part of connecting and prevent to loosen.Taper connection end 11-1 cone angle is 3-7 °, and less cone angle facilitates pipe The expansion of material termination, it is also convenient for installing.
The structure of locking nut 12 include inwall be provided be engaged with the male threaded joint 11-3 of conic pipe joint 11 Female threaded joint 12-1 and the taper of horn-like cavity is cooperatively formed with the taper connection end 11-1 of conic pipe joint 11 Compressed part 12-2.Taper compressed part 12-2 interior cone angle is less than or equal to taper connection end 11-1 outside cone angle, to adapt to tubing end Deformation at mouthful after enlarging(The thickness of pipe is thinner at port)Make the seal face of tubing larger, also make spiral connecting groove Tubing at 11-2 is by maximum thrust.
Spiral self-locking groove 12-3, the spiral self-locking groove 12-3 hand of spiral are provided with taper compressed part 12-2 inwall It is identical with the hand of spiral of female threaded joint 12-1 screw threads, opposite with the spiral connecting groove 11-2 hand of spiral.Tubing Inner wall deformation enters in above-mentioned spiral self-locking groove 12-3, and spiral self-locking groove 12-3 cooperatively forms with spiral connecting groove 11-2 The biconial self-locking structure of tubing, prevent tubing from unclamping, departing from conic pipe joint 11.More specifically, above-mentioned spiral self-locking is recessed Groove 12-3 pitch is consistent with the pitch of female threaded joint 12-1 screw threads, to prevent from destroying the outer surface of tubing.
To prevent locking nut 12 from loosening, locking tapered sleeve 13 is connected with taper compressed part 12-2 end thread, is being locked The conical inboard wall of tight tapered sleeve 13 is provided with spiral locking groove 13-1, the spiral locking groove 13-1 hand of spiral, locking tapered sleeve 13 It is consistent with the hand of spiral of screw thread at taper compressed part 12-2 screw threads and the spiral connecting groove 11-2 hand of spiral, tubing it is interior Wall deforms into spiral locking groove 13-1 so that spiral locking groove 13-1 and spiral self-locking groove 12-3 cooperatively forms lock The self-locking structure of tight nut.Spiral locks the self-locking knot that groove 13-1 and spiral self-locking groove 12-3 cooperatively forms locking nut 12 Structure, prevent the loosening being likely to occur after the long-time use of locking nut 12.Spiral locking groove 13-1 pitch and locking cone Set 13 is consistent with the pitch at taper compressed part 12-2 external screw threads, to prevent from destroying the outer surface of tubing.
Installed after locking nut 12 and conic pipe joint 11 install, then by locking tapered sleeve 13 with locking nut 12. The threaded connection part of locking tapered sleeve 13 and locking nut 12 should add screw threads for fastening agent.Locking nut 12 and locking tapered sleeve 13 are pacified After installing, the outer wall of tubing is deformed into locking tapered sleeve 13 and the groove of locking nut 12, the hand of spiral of two grooves on the contrary, Play the purpose for preventing that locking nut 12 from loosening.Attachment means of the present utility model are by tubing inside and outside wall in the different hands of spiral Helical groove at deformation prevent the loosening of tubing and locking nut so that apparatus structure is simple, connection is reliable, can repeatedly weigh Multiple effect, and will not also be loosened using rear tubing for a long time.
Pin-connected panel steel assembled pier of the present utility model, using steel construction, required for avoiding concrete structure construction Template construct, concrete mixing, the process such as transport, pour, vibrating, required for reducing noise pollution and production concrete The environmental pollution that building stones, sand etc. are brought, using steel construction dismounts facility, reusable edible value is high, CO2 emissions are low, Long lifespan, high, antidetonation is good etc. is carried, be a kind of superior bridge pier structure.
Finally it should be noted that:The above embodiments are merely illustrative of the technical scheme of the present invention and are not intended to be limiting thereof;To the greatest extent The present invention is described in detail with reference to preferred embodiments for pipe, those of ordinary skills in the art should understand that:Still The embodiment of the present invention can be modified or equivalent substitution is carried out to some technical characteristics;Without departing from this hair The spirit of bright technical scheme, it all should cover among the claimed technical scheme scope of the present invention.

Claims (10)

1. a kind of pin-connected panel steel assembled pier, including steel pier stud and the bent cap for being fixed on steel pier stud top(2), its feature It is:The structure of the steel pier stud includes two main piers of steel(6)And positioned at two main piers of steel(6)Between steel lagging jack(4), institute State steel lagging jack(4)Both ends be individually fixed in two main piers of steel(6)Top, the steel lagging jack(4)Be H profile steel and be processed into The arch of upper bending.
2. pin-connected panel steel assembled pier according to claim 1, it is characterised in that:The steel lagging jack(4)Middle H profile steel Web is waveform and is located in vertical plane.
3. pin-connected panel steel assembled pier according to claim 1, it is characterised in that:In steel lagging jack(4)Both ends welding It is fixed with pressure-bearing steel arch pin(7), the steel lagging jack(4)By pressure-bearing steel arch pin(7)With the main pier of steel(6)It is fixed.
4. pin-connected panel steel assembled pier according to claim 3, it is characterised in that:In two main piers of steel(6)Between set There is arch springing lacing wire(5), the arch springing lacing wire(5)Both ends be individually fixed in pressure-bearing steel arch pin(7)On.
5. pin-connected panel steel assembled pier according to claim 4, it is characterised in that:The arch springing lacing wire(5)It is FRP types Material, the arch springing lacing wire(5)Both ends are by attachment means and pressure-bearing steel arch pin(7)It is connected.
6. pin-connected panel steel assembled pier according to claim 5, it is characterised in that:The arch springing lacing wire(5)It is FRP pipes Material, the attachment means include and pressure-bearing steel arch pin(7)Conic pipe joint that is fixed and being matched with the flared end of FRP tubing(11) And and conic pipe joint(11)The locking nut of threaded connection(12);The conic pipe joint(11)Structure include and FRP The taper connection end that the flared end of tubing is engaged(11-1)With locking nut(12)The male threaded joint of cooperation(11-3)And It is located at taper connection end(11-1)The spiral connecting groove of outer surface(11-2);The locking nut(12)Structure include with Conic pipe joint(11)Male threaded joint(11-3)The female threaded joint being engaged(12-1)And and conic pipe joint (11)Taper connection end(11-1)Cooperatively form the taper compressed part of horn-like cavity(12-2).
7. pin-connected panel steel assembled pier according to claim 6, it is characterised in that:In taper compressed part(12-2)It is interior Wall is provided with spiral self-locking groove(12-3), the spiral self-locking groove(12-3)The hand of spiral and female threaded joint(12-1) The hand of spiral of screw thread is identical, with spiral connecting groove(11-2)The hand of spiral it is opposite.
8. pin-connected panel steel assembled pier according to claim 7, it is characterised in that:In taper compressed part(12-2)End End is threaded with locking tapered sleeve(13), in locking tapered sleeve(13)Conical inboard wall be provided with spiral locking groove(13-1), spiral Lock groove(13-1)The hand of spiral, locking tapered sleeve(13)With taper compressed part(12-2)At screw thread the hand of spiral of screw thread and Spiral connecting groove(11-2)The hand of spiral it is consistent, spiral locking groove(13-1)With spiral self-locking groove(12-3)Coordinate shape Into the self-locking structure of locking nut.
9. pin-connected panel steel assembled pier according to claim 1, it is characterised in that:In bent cap(2)Top both sides point Antivibration block is not fixed with it(1), the Antivibration block(1)It is into its section is trapezoidal by steel plate bending.
10. the pin-connected panel steel assembled pier according to claim any one of 1-9, it is characterised in that:In bent cap(2)With steel Arch rib(4)Between be provided with distribution column(3).
CN201720399682.7U 2017-04-17 2017-04-17 Pin-connected panel steel assembled pier Active CN206680860U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720399682.7U CN206680860U (en) 2017-04-17 2017-04-17 Pin-connected panel steel assembled pier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720399682.7U CN206680860U (en) 2017-04-17 2017-04-17 Pin-connected panel steel assembled pier

Publications (1)

Publication Number Publication Date
CN206680860U true CN206680860U (en) 2017-11-28

Family

ID=60400414

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720399682.7U Active CN206680860U (en) 2017-04-17 2017-04-17 Pin-connected panel steel assembled pier

Country Status (1)

Country Link
CN (1) CN206680860U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107059601A (en) * 2017-04-17 2017-08-18 邢台路桥建设总公司 Pin-connected panel steel assembled pier
CN110042745A (en) * 2019-05-16 2019-07-23 兰州交通大学 Antidetonation bridge pier component

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107059601A (en) * 2017-04-17 2017-08-18 邢台路桥建设总公司 Pin-connected panel steel assembled pier
CN110042745A (en) * 2019-05-16 2019-07-23 兰州交通大学 Antidetonation bridge pier component
CN110042745B (en) * 2019-05-16 2024-03-15 兰州交通大学 Anti-seismic bridge pier assembly

Similar Documents

Publication Publication Date Title
CN204753843U (en) PC primary and secondary roof beam bolted connection node
CN109914244B (en) Weak bracket system suitable for high-tower reinforced concrete combined beam steel structure installation and bottom and top plate concrete pouring and operation method thereof
CN211517947U (en) Bridge case roof beam is prefabricated with shaped steel pedestal
CN206680860U (en) Pin-connected panel steel assembled pier
CN102383498A (en) Equal-strength connection nodes of high-strength bolts for box-shaped steel tube frame columns and method for making same
CN107059601A (en) Pin-connected panel steel assembled pier
CN101225917B (en) Vertical locating connection construction for novel sill anchor
CN100485137C (en) Combined foundation of backstay type machinery apparatus
CN205062668U (en) Light -duty pier bent cap of highway construction segmental timbering
CN201554032U (en) Positioning structure and mold thereof for tower mast mechanical equipment under frame
CN204570482U (en) Separate type steel reinforced concrete synthetic rope tower anchorage zone structure
CN113445670A (en) Prefabricated and assembled composite steel pipe concrete lattice column and construction method
CN105821903A (en) Synthesized pipe rack with frame composite structure
CN101672040B (en) Positioning construction of tower mechanical equipment chassis and preparation method thereof
CN208830464U (en) A kind of girder steel and concrete small column rigid joint
CN110777679A (en) Method for reinforcing, lifting and transforming truss of deck type arch bridge
CN217098282U (en) Structure for preventing inner die of prefabricated box girder from floating upwards
CN106480906B (en) Feed intake storehouse and the connection structure of standard block tube coupling and the pipe gallery of changes of section
CN201801884U (en) Vertical positioning connection system structure of underframe and foundation of tower mast mechanical equipment
CN205975668U (en) Steel concrete hybrid structure underground box piping lane
CN101565951B (en) Vertical connection construction of tower mast type mechanical equipment underframe cross beam
CN204475150U (en) Assembly type steel bridge pier column
CN103046648A (en) Composite structure reinforcing steel bar connecting node
CN203008127U (en) Connecting node of steel bar of composite structure
CN203904983U (en) Mechanical connection prestress solid square pile

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 054001, 79 Qiao Road, Qiaodong District, Hebei, Xingtai

Patentee after: Xingtai road and Bridge Construction Group Co.,Ltd.

Address before: 054001, 79 Qiao Road, Qiaodong District, Hebei, Xingtai

Patentee before: XINGTAI ROAD & BRIDGE CONSTRUCTION GENERAL Co.,Ltd.