CN204570482U - Separate type steel reinforced concrete synthetic rope tower anchorage zone structure - Google Patents

Separate type steel reinforced concrete synthetic rope tower anchorage zone structure Download PDF

Info

Publication number
CN204570482U
CN204570482U CN201520203964.6U CN201520203964U CN204570482U CN 204570482 U CN204570482 U CN 204570482U CN 201520203964 U CN201520203964 U CN 201520203964U CN 204570482 U CN204570482 U CN 204570482U
Authority
CN
China
Prior art keywords
steel anchor
anchorage zone
steel
separate type
anchor box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520203964.6U
Other languages
Chinese (zh)
Inventor
赖亚平
刘帮俊
乔云强
史建朋
李锦�
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Woods Is With Im International Construction Consulting (china) Co Ltd
Original Assignee
Woods Is With Im International Construction Consulting (china) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Woods Is With Im International Construction Consulting (china) Co Ltd filed Critical Woods Is With Im International Construction Consulting (china) Co Ltd
Priority to CN201520203964.6U priority Critical patent/CN204570482U/en
Application granted granted Critical
Publication of CN204570482U publication Critical patent/CN204570482U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of steel reinforced concrete combination Sarasota anchorage zone structure of separate type, comprise the Sarasota post of staying cable anchorage zone, the staying cable anchorage zone of described Sarasota by along bridge to two steel anchor boxes be oppositely arranged be arranged at and steel anchor box connected into overall longitude strut between two steel anchor boxes and form; Anchor-hold section concrete king-post is made the form of separation, connect into steel-concrete combined structure by WELDING STUDS and steel anchor box, then connect into entirety by longitude strut.Longitude strut bears the horizontal pull that steel anchor box transmission comes, and 4 concrete towers limbs of separation bear the vertical pressure of steel anchor box transmission.Form of structure in the middle of two steel anchor boxes can need change according to bridge tower view, different length can be done and hollow out process, solve a difficult problem for special-shaped bridge tower structure design, there is stressed clear and definite, handsome in appearance, the advantage such as cost economic, simple structure, expanded the design space of concrete bridge tower moulding.

Description

Separate type steel reinforced concrete synthetic rope tower anchorage zone structure
Technical field
The utility model relates to bridge engineering field, particularly a kind of separate type steel reinforced concrete synthetic rope tower anchorage zone structure.
Background technology
Sarasota is the pyramidal structure of cable stayed bridge anchoring drag-line, namely as main load-carrying members, is again the significant component embodying the overall view of cable stayed bridge.Sarasota structure need meet the requirement such as intensity, rigidity, stability of bridge construction.The anchor-hold position of Sarasota, is one and the locally concentrated forces of drag-line is distributed to total cross-section, and safely, be delivered evenly to anchorage zone with the important stress structure of lower king-post strut, be the key position of cable stayed bridge.At present, most of Sarasota all adopts concrete structure, and cable-pylon anchorage zone adopts combination anchor structure, namely bears drag-line horizontal pull with steel work, bears vertical pressure with Concrete-filled steel tube, plays material advantage separately.Ordinary construction is that king-post adopts closed box-type section, inside establishes steel anchor box or steel anchor beam as suspension cable anchor system on tower.Its appearance and modeling of this type of bridge tower anchoring structure is single, is only column structure.King-post cross section is box-type section, designs and constructs more complicated.Continuous print Concrete-filled steel tube and steel anchor box are connected as a single entity, and need bear steel anchor box transmission and the horizontal pull come, need configure a large amount of prestressing force and offset tensile stress in concrete.Connect between upper and lower two steel anchor box sections and adopt welding or bolt connection, steel anchor box can bear part compressive stress, stressed unfavorable to steel work.For the bridge tower moulding of complexity, generally adopt full steel structure, but cost is high, fabrication and installation difficulty large, maintenance cost is high, poor durability.
Utility model content
In view of this, the purpose of this utility model is to provide a kind of separate type steel reinforced concrete synthetic rope tower anchorage zone structure, the concrete solid pagoda limb of separate type and steel anchor box is adopted to form combination anchor structure, structural stability is good, bridge tower integral rigidity is high, can give full play to the characteristic of steel-concrete bi-material, and design and construction are simple, not only solve a difficult problem for special-shaped bridge tower structure design, and bridge tower is handsome in appearance.
Separate type steel reinforced concrete synthetic rope tower anchorage zone structure of the present utility model, comprise the Sarasota post of staying cable anchorage zone, described staying cable anchorage zone by along bridge to two steel anchor boxes be oppositely arranged be arranged at and between two steel anchor boxes, steel anchor box connected into overall longitude strut and form;
Further, described steel anchor box builds the concrete towers limb forming compound section with steel anchor box along direction across bridge two side, adopts shear connector connecting elements to be connected between described steel anchor box with concrete towers limb;
Further, described steel anchor box layback plate being provided with described shear connector connecting elements is one or both combination in PBL shear connector, WELDING STUDS;
Further, described shear connector connecting elements is WELDING STUDS, and described WELDING STUDS is fixedly installed on steel anchor box layback plate;
Further, described compound section is also distributed with for the prestressed strand of elimination of level to tensile stress;
Further, described prestressed strand comprises horizontal direction across bridge prestressed strand concrete towers limb being anchored on steel anchor box both sides and the horizontal longitudinal prestressing steel bundle being used for eliminating longitudinal tension stress distributed near steel anchor box sidewall concrete section, and described horizontal direction across bridge prestressed strand and level indulge bridge adopts mode crisscross distribution along compound section from one-end tension anchoring to prestressed strand;
Further, described king-post is along bridge to being y-type structure, and horizontal bridge is inverted Y-shaped structure;
Further, be bolted to connection between vertical two steel anchor boxes of described king-post;
Further, be provided with for bolted flange connecting plate between described vertical two steel anchor boxes;
Further, described longitude strut with between steel anchor box for high-strength bolt is fixedly connected with.
The beneficial effects of the utility model: separate type steel reinforced concrete synthetic rope tower anchorage zone structure of the present utility model, anchor-hold section concrete king-post is made the form of separation, connect into steel-concrete combined structure by WELDING STUDS and steel anchor box, then connect into entirety by longitude strut.Longitude strut bears the horizontal pull that steel anchor box transmission comes, and 4 concrete towers limbs of separation bear the vertical pressure of steel anchor box transmission.Form of structure in the middle of two steel anchor boxes can need change according to bridge tower view, different length can be done and hollow out process, solve a difficult problem for special-shaped bridge tower structure design, there is stressed clear and definite, handsome in appearance, the advantage such as cost economic, simple structure, expanded the design space of concrete bridge tower moulding.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the utility model is further described:
Fig. 1 is plane structure schematic diagram of the present utility model;
Fig. 2 is elevation of the present utility model;
Fig. 3 is Sarasota using state figure.
Detailed description of the invention
Fig. 1 is plane structure schematic diagram of the present utility model, and Fig. 2 is elevation of the present utility model, and Fig. 3 is Sarasota using state figure.As shown in the figure: separate type steel reinforced concrete synthetic rope tower anchorage zone structure of the present utility model, comprise the Sarasota post 7 of staying cable anchorage zone, steel anchor box 1 level connection joint longitude strut 2 integrally forms to two steel anchor boxes 1 be oppositely arranged and being arranged between two steel anchor boxes 1 by along bridge by the staying cable anchorage zone on described king-post 7; Anchor-hold section concrete king-post 7 is made the form of separation, connect into entirety by the longitude strut 2 between steel anchor box 1, the form of structure in the middle of two steel anchor boxes 1 needs to do to change according to bridge tower view; " longitudinal direction " refer to along bridge to.
In the present embodiment, described steel anchor box 1 builds the concrete towers limb 3 forming compound section with steel anchor box 1 along direction across bridge two side, and described steel anchor box 1 is connected with adopting shear connector connecting elements between concrete towers limb 3; Steel anchor box 1 is placed in the middle of two concrete towers limbs 3, by the power transmission of shear connector connecting elements to concrete towers limb 3, concrete towers limb 3 adopts the solid rectangular cross-section of 4 separate types, compound section is combined to form with steel anchor box 1, solid concrete towers limb 3 provides enough pressurized sectional dimensions, and design, construction are simply.
In the present embodiment, described steel anchor box 1 layback plate being provided with described shear connector connecting elements is one or both combination in PBL shear connector, WELDING STUDS.
In the present embodiment, described shear connector connecting elements is WELDING STUDS 4, and described WELDING STUDS 4 is fixedly installed on steel anchor box 1 layback plate; By WELDING STUDS 4 power transmission on layback plate to concrete towers limb 3, steel anchor box 1 is made up of components such as layback plate, end bearing plate, web, anchor slab, anchor plate, diaphragm, junction plate, stiffening ribs, by making concrete side walls and steel anchor box layback plate compatible deformation, the fraction tensile stress of generation.
In the present embodiment, described compound section is also distributed with for the prestressed strand of elimination of level to tensile stress; For balancing the level of drag-line generation to component, the distortion of confined concrete tower limb.
In the present embodiment, described prestressed strand comprises horizontal direction across bridge prestressed strand concrete towers limb being anchored on steel anchor box both sides and the horizontal longitudinal prestressing steel bundle being used for eliminating longitudinal tension stress distributed near steel anchor box sidewall concrete section, and described horizontal direction across bridge prestressed strand and level indulge bridge adopts mode crisscross distribution along compound section from one-end tension anchoring to prestressed strand; By fitting tightly of both sides concrete towers limb 3 and steel anchor box 1, ensure that concrete towers limb 3 and steel anchor box 1 are jointly stressed; In compound section, level is to the vertical, horizontal prestressed strand 5 arranging " well " font.If run through the horizontal direction across bridge prestressed strand of concrete towers limb 3 and steel anchor box 1, concrete towers limb 3 establishes a small amount of level to indulge bridge to prestressed strand near anchor case side, eliminates the fraction tensile stress that this side concrete and steel anchor box 1 layback plate produce due to compatible deformation; Prestressed strand 5 length is shorter, and adopting can the low retraction steel strand anchoring system of two times tensioning, and adopts staggered one-end tension anchorage style, ensure that effective prestress acts on concrete towers limb 3.
Described compound section is also distributed with concrete towers limb 3 is anchored on steel anchor box 1 both sides level to prestressed strand 5;
In the present embodiment, described level adopts the crisscross distribution along compound section of the mode of one-end tension anchoring to prestressed strand 5; In order to confined concrete distortion, the horizontal component of balance drag-line,
In the present embodiment, along described staying cable anchorage zone vertical two steel anchor boxes 1 of Sarasota post 7 between be bolted to connection; " vertical two steel anchor boxes 1 of Sarasota post 7 of staying cable anchorage zone " refer to the steel anchor box up and down of the Sarasota post 7 of facade staying cable anchorage zone, adopt plain bolt to connect, not power transmission, only meet location and installation needs between upper and lower steel anchor box.
In the present embodiment, be provided with for bolted flange connecting plate between described vertical two steel anchor boxes 1; Between steel anchor box 1 sections, flange connecting plate is set, with bolts to reach the object be located by connecting during connection.
In the present embodiment, described longitude strut 2 is fixedly connected with for high-strength bolt 6 with between steel anchor box 1, and installation rate is fast, avoids overhead welding operation, ensure that and connects precision and quality.
What finally illustrate is, above embodiment is only in order to illustrate the technical solution of the utility model and unrestricted, although be described in detail the utility model with reference to preferred embodiment, those of ordinary skill in the art is to be understood that, can modify to the technical solution of the utility model or equivalent replacement, and not departing from aim and the scope of technical solutions of the utility model, it all should be encompassed in the middle of right of the present utility model.

Claims (10)

1. a separate type steel reinforced concrete synthetic rope tower anchorage zone structure, it is characterized in that: the Sarasota post comprising staying cable anchorage zone, described staying cable anchorage zone by along bridge to two steel anchor boxes be oppositely arranged be arranged at and between two steel anchor boxes, steel anchor box connected into overall longitude strut and form.
2. separate type steel reinforced concrete synthetic rope tower anchorage zone structure according to claim 1, it is characterized in that: described steel anchor box builds the concrete towers limb forming compound section with steel anchor box along direction across bridge two side, between described steel anchor box with concrete towers limb, adopt shear connector connecting elements to be connected.
3. separate type steel reinforced concrete synthetic rope tower anchorage zone structure according to claim 2, is characterized in that: described steel anchor box layback plate being provided with described shear connector connecting elements is one or both combination in PBL shear connector, WELDING STUDS.
4. separate type steel reinforced concrete synthetic rope tower anchorage zone structure according to claim 3, it is characterized in that: described shear connector connecting elements is WELDING STUDS, described WELDING STUDS is fixedly installed on steel anchor box layback plate.
5. separate type steel reinforced concrete synthetic rope tower anchorage zone structure according to claim 2, is characterized in that: described compound section is also distributed with for the prestressed strand of elimination of level to tensile stress.
6. separate type steel reinforced concrete synthetic rope tower anchorage zone structure according to claim 5, it is characterized in that: described prestressed strand comprises horizontal direction across bridge prestressed strand concrete towers limb being anchored on steel anchor box both sides and the horizontal longitudinal prestressing steel bundle being used for eliminating longitudinal tension stress distributed near steel anchor box sidewall concrete section, described horizontal direction across bridge prestressed strand and level indulge bridge adopts mode crisscross distribution along compound section from one-end tension anchoring to prestressed strand.
7. separate type steel reinforced concrete synthetic rope tower anchorage zone structure according to claim 1, is characterized in that: described king-post is along bridge to being y-type structure, and direction across bridge is inverted Y-shaped structure.
8. separate type steel reinforced concrete synthetic rope tower anchorage zone structure according to claim 1, is characterized in that: be bolted to connection between vertical two steel anchor boxes of described king-post.
9. separate type steel reinforced concrete synthetic rope tower anchorage zone structure according to claim 8, is characterized in that: be provided with for bolted flange connecting plate between described vertical two steel anchor boxes.
10. separate type steel reinforced concrete synthetic rope tower anchorage zone structure according to claim 1, is characterized in that: described longitude strut with between steel anchor box for high-strength bolt is fixedly connected with.
CN201520203964.6U 2015-04-07 2015-04-07 Separate type steel reinforced concrete synthetic rope tower anchorage zone structure Active CN204570482U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520203964.6U CN204570482U (en) 2015-04-07 2015-04-07 Separate type steel reinforced concrete synthetic rope tower anchorage zone structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520203964.6U CN204570482U (en) 2015-04-07 2015-04-07 Separate type steel reinforced concrete synthetic rope tower anchorage zone structure

Publications (1)

Publication Number Publication Date
CN204570482U true CN204570482U (en) 2015-08-19

Family

ID=53863146

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520203964.6U Active CN204570482U (en) 2015-04-07 2015-04-07 Separate type steel reinforced concrete synthetic rope tower anchorage zone structure

Country Status (1)

Country Link
CN (1) CN204570482U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104727222A (en) * 2015-04-07 2015-06-24 林同棪国际工程咨询(中国)有限公司 Separated steel and concrete combined cable tower anchorage zone structure
CN106400675A (en) * 2016-08-31 2017-02-15 中交公局第三工程有限公司 Steel anchor box and mounting method thereof
CN110863432A (en) * 2019-11-26 2020-03-06 上海市基础工程集团有限公司 Rapid and accurate positioning method for steel structure tower column installation construction
CN111005302A (en) * 2019-12-30 2020-04-14 中交路桥华南工程有限公司 Steel anchor beam mounting method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104727222A (en) * 2015-04-07 2015-06-24 林同棪国际工程咨询(中国)有限公司 Separated steel and concrete combined cable tower anchorage zone structure
CN104727222B (en) * 2015-04-07 2017-01-18 林同棪国际工程咨询(中国)有限公司 Separated steel and concrete combined cable tower anchorage zone structure
CN106400675A (en) * 2016-08-31 2017-02-15 中交公局第三工程有限公司 Steel anchor box and mounting method thereof
CN106400675B (en) * 2016-08-31 2018-08-03 中交一公局第三工程有限公司 A kind of steel anchor box and its installation method
CN110863432A (en) * 2019-11-26 2020-03-06 上海市基础工程集团有限公司 Rapid and accurate positioning method for steel structure tower column installation construction
CN111005302A (en) * 2019-12-30 2020-04-14 中交路桥华南工程有限公司 Steel anchor beam mounting method

Similar Documents

Publication Publication Date Title
CN104727222A (en) Separated steel and concrete combined cable tower anchorage zone structure
CN102220739B (en) Corrugated steel web prestressed concrete continuous box girder and construction method thereof
CN204570482U (en) Separate type steel reinforced concrete synthetic rope tower anchorage zone structure
CN108194116B (en) Whole prefabricated rail top wind channel assembly structure of subway station
CN202131559U (en) Corrugated steel web plate prestressed concrete continuous box girder
CN203729193U (en) Low tower stay cable reinforced T-type rigid framework system with suspension beams
CN110820545B (en) Assembled concrete pier
CN101446065B (en) Combined cable support tower
CN102021889A (en) Bridge erection method
CN105780989B (en) A kind of twin beams building cover structure
CN101858053A (en) Stayed-cable anchor plate type anchoring structure of stayed-cable bridge cable tower
CN102277904A (en) Beam column connecting member and forming method thereof, building frame structure and installing method thereof
CN201794214U (en) Prefabricated beam with cavity
CN209493826U (en) The interim splicing structure of concrete segment precast bridge
CN105369736A (en) Outer anchoring structure of cable-stayed bridge tower body
CN103898834A (en) Concrete-filled steel tube composite beam and trussed cable tower cable-stayed bridge and construction method thereof
CN101057038B (en) Hollow prestressed concrete (HPC) girder and spliced hollow prestressed concrete girder (S-HPC) bridge construction method
KR101335382B1 (en) Constrution method of Prestressed Composite Truss girder with internal hinge structure
KR101200563B1 (en) A Steel Composite Bridge Having Steel Plates Connected by Using Concrete Cross Beams and Its Constructing Method
KR101396440B1 (en) Hybrid beam with reinforced end portions
KR100832100B1 (en) Temporal structure and temporal setting method for stress control of the pylon base
CN201738238U (en) Cable stayed anchor plate type anchor of cable stayed bridge cable tower
CN112982787A (en) Large-span beam with reinforced concrete and prestressed inhaul cable coupled
CN209227824U (en) The special-shaped I-shaped steel connection structure of shear wall and coupling beam
CN109137757B (en) Large-span corrugated steel web box girder buckling restrained structure and construction method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant