CN101858053A - Stayed-cable anchor plate type anchoring structure of stayed-cable bridge cable tower - Google Patents
Stayed-cable anchor plate type anchoring structure of stayed-cable bridge cable tower Download PDFInfo
- Publication number
- CN101858053A CN101858053A CN 201010205534 CN201010205534A CN101858053A CN 101858053 A CN101858053 A CN 101858053A CN 201010205534 CN201010205534 CN 201010205534 CN 201010205534 A CN201010205534 A CN 201010205534A CN 101858053 A CN101858053 A CN 101858053A
- Authority
- CN
- China
- Prior art keywords
- cable
- stayed
- steel anchor
- plate
- anchor slab
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The invention relates to a stayed-cable anchor plate type anchoring structure of a stayed-cable bridge cable tower, which comprises a steel anchor plate embedded inside a concrete tower post, transverse separation plates are symmetrically and transversely arranged at two side surfaces of the steel anchor plate, vertical separation plates are vertically and symmetrically arranged in the middle position of both side surfaces, a bottom plate is arranged at the bottom of the steel anchor plate, reinforcing ribs are vertically and symmetrically arranged on two side surfaces of the steel anchor plate and the upper surface of the bottom plate, a plurality of PBL shear connectors vertical to the steel anchor plate are symmetrically arranged on the steel anchor plate at both sides of the vertical separation plates, both ends of the steel anchor plate are respectively and fixedly connected with an anchor ear plate extending out of the outer side of the tower post, pin holes are arranged on the anchor ear plate, a side plate parallel to the vertical separation plates is respectively arranged at the connecting parts of both ends of the steel anchor plate and the anchor ear plate, and transverse reinforcing plates with one end corresponding to the positions of the transverse separation plates are fixedly connected on the anchor ear plate. The invention has the advantages of simple structure, definite force transmission, small size, convenient construction, low manufacture cost, safe and reliable structure and simple and artistic appearance, and is suitable for being used by the stayed-cable bridge cable tower with small tower post cross section.
Description
Technical field:
The present invention relates to a kind of suspension cable anchor device, especially a kind of cable stayed bridge that is used for adopts parallel rope face, the less stayed-cable anchor plate type anchoring structure of stayed-cable bridge cable tower in king-post cross section.
Background technology:
The hollow variable cross-section king-post of the general employing of the king-post of large span stayed-cable bridge at present, anchoring has anchoring systems such as ring orientation prestress, steel anchor box and steel anchor beam on the oblique tensile tower of technology comparative maturity.The ring orientation prestress anchoring structure is the annular prestressed bundle of plane of arrangement in the tower wall, the internal force that the external force that produces with prestressing tendon comes the balance suspension cable to produce in the tower wall.Steel anchor box and steel anchor beam anchoring structure mainly are to resist the horizontal component that suspension cable produces by steel anchor box or steel anchor beam are set in tower, and king-post mainly bears vertical force component, and the steel anchor box anchor structure that has also needs to resist horizontal force by horizontal prestressing force is set.But these anchor types all require the Tower Column of A Cable Stayed Bridge column section bigger, can't realize in less king-post cross section.And, on the reliable basis of structural safety, consider convenient construction, the reduction cost and handsome in appearance of cable stayed bridge some medium and small striding in the cable stayed bridge design of footpath, the king-post design tends to select less sectional dimension.At present, still there is not a kind of anchoring that can satisfy above-mentioned Sarasota instructions for use.
Summary of the invention:
The invention provides a kind of stayed-cable anchor plate type anchoring structure of stayed-cable bridge cable tower, it is simple in structure, and power transmission is clear and definite, and volume is little, be suitable for the less Cable-stayed Bridge Pylon in king-post cross section and use, easy construction, cost is low, structural safety is reliable, and profile is succinctly attractive in appearance, has solved problems of the prior art.
The present invention solves the problems of the technologies described above the technical scheme that is adopted to be: it comprises the steel anchor slab that is embedded in concrete king-post inside, and lateral symmetry is provided with diaphragm in the two sides of steel anchor slab, vertically is arranged with a vertical clapboard in the centre position, two sides; Be provided with a base plate in the bottom of steel anchor slab, on the upper surface of the two sides of steel anchor slab, base plate, vertically be arranged with stiffening rib, on the steel anchor slab of vertical clapboard both sides, be arranged with some with the vertically disposed PBL shear connector of steel anchor slab; Be fixed with one respectively at the two ends of steel anchor slab and stretch out the anchoring otic placode in the king-post outside, the anchoring otic placode is provided with pin-and-hole, be respectively equipped with a side plate parallel at steel anchor slab two ends with anchoring otic placode junction, on the anchoring otic placode, be fixed with an end horizontal stiffener relative with the diaphragm position with vertical clapboard.
Anchoring otic placode both sides at the pin-and-hole place are respectively equipped with stiffening plate.
Be provided with two-layer diaphragm up and down in the two sides of steel anchor slab lateral symmetry.
Vertical symmetrically arranged stiffening rib is two groups on the upper surface of the two sides of steel anchor slab, base plate, and two groups of stiffening ribs are symmetricly set on the vertical clapboard both sides.
The present invention is simple in structure, power transmission is clear and definite, volume is little, anchoring otic placode and steel anchor slab connect as one, pass through PBL shear connector and diaphragm with king-post, vertical clapboard, base plate, stiffening rib connects, the anchoring otic placode passes to the anchorage zone with stay cable force, the steel anchor slab mainly bears the horizontal component of suspension cable, the PBL shear connector, diaphragm, vertical clapboard, base plate and stiffening rib link together steel anchor slab and concrete king-post, bear the vertical force component and the part of horizontal component of suspension cable jointly, whole anchor structure is except the anchoring otic placode is exposed at the concrete king-post, and remainder all is embedded in concrete king-post inside, and structural safety is reliable, profile is succinctly attractive in appearance, easy construction, cost is low, is suitable for the less Cable-stayed Bridge Pylon in king-post cross section and uses.
Description of drawings:
Fig. 1 is a structural representation of the present invention.
Fig. 2 is a plan structure schematic diagram of the present invention.
Fig. 3 is the plan structure schematic diagram of bottom parts of the present invention.
Fig. 4 is a side structure schematic diagram of the present invention.
Among the figure, 1, king-post; 2, steel anchor slab; 3, diaphragm; 4, vertical clapboard; 5, base plate; 6, stiffening rib; 7, PBL shear connector; 8, anchoring otic placode; 9, pin-and-hole; 10, side plate; 11, stiffener; 12, stiffening plate; 13, connector; 14, suspension cable.
The specific embodiment:
For clearly demonstrating the technical characterstic of this programme, below by the specific embodiment, and in conjunction with its accompanying drawing, the present invention will be described in detail.
Shown in Fig. 1~4, the present invention includes the steel anchor slab 2 that is embedded in concrete king-post 1 inside, be provided with two-layer diaphragm 3 up and down in the two sides of steel anchor slab 2 lateral symmetry, vertically be arranged with a vertical clapboard 4 in the centre position, two sides; Be provided with a base plate 5 in the bottom of steel anchor slab 2, on the upper surface of the two sides of steel anchor slab 2, base plate 5, vertically be arranged with two groups of stiffening ribs 6, two groups of stiffening ribs 6 are symmetricly set on vertical clapboard 4 both sides, are arranged with some and steel anchor slab 2 vertically disposed PBL shear connectors 7 on the steel anchor slab 2 of vertical clapboard 4 both sides; Be fixed with one respectively at the two ends of steel anchor slab 2 and stretch out the anchoring otic placode 8 in king-post 1 outside, anchoring otic placode 8 is provided with pin-and-hole 9, be respectively equipped with a side plate 10 parallel in steel anchor slab 2 two ends and anchoring otic placode 8 junctions, on anchoring otic placode 8, be fixed with an end horizontal stiffener 11 relative with diaphragm 3 positions with vertical clapboard 4.
Anchoring otic placode 8 both sides at pin-and-hole 9 places are respectively equipped with stiffening plate 12.
When the present invention uses, to sell hinge fitting 13 is connected by nut with suspension cable 14 anchor heads, pin-and-hole on connector 13 and the anchoring otic placode 89 is connected by bearing pin, anchoring otic placode 8 connects as one with steel anchor slab 2, pass through PBL shear connector 7 and diaphragm 3 with king-post 1, vertical clapboard 4, base plate 5, stiffening rib 6 connects, anchoring otic placode 8 passes to the anchorage zone with suspension cable 14 Suo Li, steel anchor slab 2 mainly bears the horizontal component of suspension cable 14, PBL shear connector 7, diaphragm 3, vertical clapboard 4, base plate 5 and stiffening rib 6 link together steel anchor slab 2 and concrete king-post 1, bear the vertical force component and the part of horizontal component of suspension cable 14 jointly, whole anchor structure is exposed at concrete king-post 1 outside except anchoring otic placode 8, remainder all is embedded in concrete king-post 1 inside, structural safety is reliable, profile is succinctly attractive in appearance, easy construction, cost is low, is suitable for the less Cable-stayed Bridge Pylon in king-post 1 cross section and uses.
The present invention does not describe part in detail, is those skilled in the art of the present technique's known technology.
Claims (4)
1. stayed-cable anchor plate type anchoring structure of stayed-cable bridge cable tower, it is characterized in that: comprise the steel anchor slab that is embedded in concrete king-post inside, lateral symmetry is provided with diaphragm in the two sides of steel anchor slab, vertically is arranged with a vertical clapboard in the centre position, two sides; Be provided with a base plate in the bottom of steel anchor slab, on the upper surface of the two sides of steel anchor slab, base plate, vertically be arranged with stiffening rib, on the steel anchor slab of vertical clapboard both sides, be arranged with some with the vertically disposed PBL shear connector of steel anchor slab; Be fixed with one respectively at the two ends of steel anchor slab and stretch out the anchoring otic placode in the king-post outside, the anchoring otic placode is provided with pin-and-hole, be respectively equipped with a side plate parallel at steel anchor slab two ends with anchoring otic placode junction, on the anchoring otic placode, be fixed with an end horizontal stiffener relative with the diaphragm position with vertical clapboard.
2. stayed-cable anchor plate type anchoring structure of stayed-cable bridge cable tower according to claim 1 is characterized in that: the anchoring otic placode both sides at the pin-and-hole place are respectively equipped with stiffening plate.
3. stayed-cable anchor plate type anchoring structure of stayed-cable bridge cable tower according to claim 1 is characterized in that: be provided with two-layer diaphragm up and down in the two sides of steel anchor slab lateral symmetry.
4. stayed-cable anchor plate type anchoring structure of stayed-cable bridge cable tower according to claim 1 is characterized in that: vertical symmetrically arranged stiffening rib is two groups on the upper surface of the two sides of steel anchor slab, base plate, and two groups of stiffening ribs are symmetricly set on the vertical clapboard both sides.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010205534 CN101858053A (en) | 2010-06-22 | 2010-06-22 | Stayed-cable anchor plate type anchoring structure of stayed-cable bridge cable tower |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010205534 CN101858053A (en) | 2010-06-22 | 2010-06-22 | Stayed-cable anchor plate type anchoring structure of stayed-cable bridge cable tower |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101858053A true CN101858053A (en) | 2010-10-13 |
Family
ID=42944192
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201010205534 Pending CN101858053A (en) | 2010-06-22 | 2010-06-22 | Stayed-cable anchor plate type anchoring structure of stayed-cable bridge cable tower |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101858053A (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102286945A (en) * | 2011-08-24 | 2011-12-21 | 石家庄铁道大学 | External pre-stressed anchoring device for concrete bridge body and rapid strengthening method |
CN102704397A (en) * | 2012-06-28 | 2012-10-03 | 中铁十三局集团第一工程有限公司 | Light anchorage structure |
CN104562932A (en) * | 2015-01-06 | 2015-04-29 | 大连理工大学 | Embedded type steel anchor box |
CN105586826A (en) * | 2015-11-30 | 2016-05-18 | 湖州交通规划设计院 | Connecting structure of anchorage ends of booms of concrete tied arch bridge and construction method of connecting structure |
CN107988907A (en) * | 2017-12-27 | 2018-05-04 | 中铁第四勘察设计院集团有限公司 | A kind of anchor of suspension cable and concrete girder |
CN108643043A (en) * | 2018-06-27 | 2018-10-12 | 中国中元国际工程有限公司 | A kind of anchor structure being applied to the Sarasota with narrow top section |
CN108660911A (en) * | 2018-07-13 | 2018-10-16 | 重庆大学 | A kind of steel anchor plate type cable beam anchoring structure for cable-stayed bridge concrete girder |
CN109596329A (en) * | 2018-12-11 | 2019-04-09 | 佛山科学技术学院 | A kind of Anchorage Zone of Cable-stayed Bridge Pylon stress distribution test self-balanced loading device |
CN113585069A (en) * | 2021-08-23 | 2021-11-02 | 浙江数智交院科技股份有限公司 | Cable-stayed bridge cable tower end anchoring device and construction method |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201738238U (en) * | 2010-06-22 | 2011-02-09 | 山东高速青岛公路有限公司 | Cable stayed anchor plate type anchor of cable stayed bridge cable tower |
-
2010
- 2010-06-22 CN CN 201010205534 patent/CN101858053A/en active Pending
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201738238U (en) * | 2010-06-22 | 2011-02-09 | 山东高速青岛公路有限公司 | Cable stayed anchor plate type anchor of cable stayed bridge cable tower |
Non-Patent Citations (2)
Title |
---|
《公路》 20090930 于坤等 青岛海湾大桥红岛航道桥设计和关键技术研究 第10页左栏及附图2 , 第9期 2 * |
《公路》 20090930 陈茂久第 索塔钢锚板锚固结构施工及监理要点 222-228 , 第9期 2 * |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102286945A (en) * | 2011-08-24 | 2011-12-21 | 石家庄铁道大学 | External pre-stressed anchoring device for concrete bridge body and rapid strengthening method |
CN102704397A (en) * | 2012-06-28 | 2012-10-03 | 中铁十三局集团第一工程有限公司 | Light anchorage structure |
CN104562932A (en) * | 2015-01-06 | 2015-04-29 | 大连理工大学 | Embedded type steel anchor box |
CN104562932B (en) * | 2015-01-06 | 2016-04-13 | 大连理工大学 | A kind of flush type steel anchor box |
CN105586826A (en) * | 2015-11-30 | 2016-05-18 | 湖州交通规划设计院 | Connecting structure of anchorage ends of booms of concrete tied arch bridge and construction method of connecting structure |
CN107988907A (en) * | 2017-12-27 | 2018-05-04 | 中铁第四勘察设计院集团有限公司 | A kind of anchor of suspension cable and concrete girder |
CN108643043A (en) * | 2018-06-27 | 2018-10-12 | 中国中元国际工程有限公司 | A kind of anchor structure being applied to the Sarasota with narrow top section |
CN108643043B (en) * | 2018-06-27 | 2024-01-09 | 中国中元国际工程有限公司 | Be applied to anchor structure of cable tower that has narrow and small upper portion cross-section |
CN108660911A (en) * | 2018-07-13 | 2018-10-16 | 重庆大学 | A kind of steel anchor plate type cable beam anchoring structure for cable-stayed bridge concrete girder |
CN109596329A (en) * | 2018-12-11 | 2019-04-09 | 佛山科学技术学院 | A kind of Anchorage Zone of Cable-stayed Bridge Pylon stress distribution test self-balanced loading device |
CN113585069A (en) * | 2021-08-23 | 2021-11-02 | 浙江数智交院科技股份有限公司 | Cable-stayed bridge cable tower end anchoring device and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101858053A (en) | Stayed-cable anchor plate type anchoring structure of stayed-cable bridge cable tower | |
CN102713071B (en) | Method for constructing a suspension bridge using temporary cables under tensionless stay cable conditions, and temporary cable for same | |
CN103938533B (en) | The construction method of Simply supported non-uniform structure | |
CN202899015U (en) | Modular highway steel truss bridge | |
CN104499413A (en) | Modularized steel die and concrete combined arch bridge and suspending construction method of suspension cable thereof | |
CN203729193U (en) | Low tower stay cable reinforced T-type rigid framework system with suspension beams | |
CN105369736B (en) | Outer anchoring structure of cable-stayed bridge tower body | |
CN103882801A (en) | Segment assembled type combined highway and railway cable-stayed bridge with inconsistent bridge deck widths of highway and railway | |
CN104695341A (en) | Non-self-balanced beam string structure for reinforcing large-span continuous beam bridge | |
CN104727222A (en) | Separated steel and concrete combined cable tower anchorage zone structure | |
KR101366903B1 (en) | Girder having truss section and construction method of bridge and pedestrian overpass using it | |
CN201738238U (en) | Cable stayed anchor plate type anchor of cable stayed bridge cable tower | |
CN105544373A (en) | Steel box-concrete composite girder for long-span cable-stayed bridge and construction method | |
KR101335382B1 (en) | Constrution method of Prestressed Composite Truss girder with internal hinge structure | |
CN103898834A (en) | Concrete-filled steel tube composite beam and trussed cable tower cable-stayed bridge and construction method thereof | |
CN204570482U (en) | Separate type steel reinforced concrete synthetic rope tower anchorage zone structure | |
KR20140145746A (en) | Prestressed concrete segment girder with reinforced rigidity | |
CN203080411U (en) | Anchoring plate assembly used for cable-stayed bridge concrete main beam | |
CN204644869U (en) | Drag-line bridge tower anchoring structure | |
CN203639804U (en) | Continuous rigid frame bridge based on steel truss and concrete slab composite beam | |
CN202688848U (en) | Anchoring connecting structure for nodes of composite truss girder cable-stayed bridge | |
CN202064275U (en) | Double-stayed-steel arch tower in-situ cantilever split joint structure | |
CN204475179U (en) | Bridge construction Cast-in-situ Beam, bent cap, binder concrete attaching prestressed girder support | |
CN202390978U (en) | Self-centering prestressed concrete frame floor slab structure | |
CN210507095U (en) | H-shaped single-tower double-cable-surface prestressed concrete cable-stayed bridge main beam structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Open date: 20101013 |