CN207685864U - Combined type underground pipe gallery - Google Patents

Combined type underground pipe gallery Download PDF

Info

Publication number
CN207685864U
CN207685864U CN201721817484.4U CN201721817484U CN207685864U CN 207685864 U CN207685864 U CN 207685864U CN 201721817484 U CN201721817484 U CN 201721817484U CN 207685864 U CN207685864 U CN 207685864U
Authority
CN
China
Prior art keywords
plate
piping lane
side plate
bottom plate
top plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721817484.4U
Other languages
Chinese (zh)
Inventor
战福军
盛富强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Lianzhong Engineering Technology Co., Ltd.
Original Assignee
Nanjing Lianzhong Construction Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Lianzhong Construction Engineering Technology Co Ltd filed Critical Nanjing Lianzhong Construction Engineering Technology Co Ltd
Priority to CN201721817484.4U priority Critical patent/CN207685864U/en
Application granted granted Critical
Publication of CN207685864U publication Critical patent/CN207685864U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of Combined type underground pipe galleries, including forming tube coupling by top plate and bottom plate and both side plate are circumferentially assembled, tube coupling is assembled in an axial direction to form piping lane, the top plate and bottom plate are the arc-shaped steel corrugated plating to arch camber on the outside of piping lane, both side plate is vertical plate, wherein, the arc diameter of the top plate and bottom plate is more than the horizontal distance between both side plate.Since the both side plate of piping lane is vertical plate, the integrally-built section utilization rate of piping lane can be effectively improved, pipeline suspension and support can be laid with direct convenience on side plate simultaneously, and vertical plate is more guaranteed compared to the production and processing quality and progress of arc panel, be suitable for the not high situation of working condition requirement.

Description

Combined type underground pipe gallery
Technical field
The utility model is related to a kind of piping lane more particularly to a kind of Combined type underground pipe galleries.
Background technology
The applicant is dedicated to the research of underground pipe gallery, has applied for many patents for Pipe rack, has been directed to One kind being circumferentially spliced to form tube coupling, the piping lane that tube coupling is spliced to form in an axial direction, top plate and bottom plate by top plate and bottom plate and both side plate It is the arc panel of the arch camber on the outside of piping lane with both side plate.The piping lane can utilize the common Force principle of pipeclay, top plate and both side plate Stress is preferable, and headroom utilization rate height, passage space are big inside piping lane, while buried depth (depth can reach more than 40 meters).But it also deposits In some defects, such as when piping lane requires buried shallow (such as 3~5 meters), the safe surplus of the outer arch structure of both side plate is big, cuts Space of planes utilization rate is reduced, and there are certain wastes from the point of view of economy point.
Utility model content
Purpose of utility model:To overcome above-mentioned technical problem, the utility model, which provides, a kind of can improve Section Space profit With the combined type Underground Steel pipe gallery of rate.
Technical solution:Combined type underground pipe gallery described in the utility model, including by top plate and bottom plate and both side plate edge Circumferential assembled formation tube coupling, tube coupling is assembled in an axial direction to form piping lane, and the top plate and bottom plate are the arc to arch camber on the outside of piping lane Steel corrugated plating, both side plate are vertical plate, wherein the arc diameter of the top plate and bottom plate be more than between both side plate it is horizontal away from From.
Preferably, there are two types of radian, respectively bowed out radian and corner cambereds for top plate and bottom plate tool, wherein bowed out radian Diameter be more than both side plate between horizontal distance.
Further, both side plate is reinforced concrete wall panel or corrugated steel.
To ensure structure self-strength and rigidity, can pull rod be set between top plate and/or the arch springing of bottom plate.
At the same time, top plate and bottom plate or both side plate are one piece of whole plate or are assembled by least two pieces of scoreboards.
In addition, top plate and bottom plate and both side plate form tube coupling by the way that connecting flange is circumferentially assembled;Here connecting flange can With horizontally disposed or angularly disposed;Top plate and bottom plate and both side plate are bolted by connecting flange.
Advantageous effect:Compared with prior art, the both side plate of the utility model piping lane is vertical plate, can effectively improve piping lane Integrally-built section utilization rate, while pipeline suspension and support can be laid with direct convenience on side plate, and also vertical plate is compared It is more guaranteed in the production and processing quality and progress of arc panel, it is suitable for the not high situation of working condition requirement.
Description of the drawings
Fig. 1 is the schematic cross-section of the first piping lane (connecting flange is horizontally disposed);
Fig. 2 is the schematic cross-section of the first piping lane (connecting flange is angularly disposed);
Fig. 3 is the schematic cross-section of second of piping lane;
Fig. 4 is the schematic cross-section after piping lane arrangement pull rod.
Specific implementation mode
The technical solution of the utility model is described further below in conjunction with the accompanying drawings.
As shown in Figure 1, the first Combined type underground pipe gallery of the utility model, including by top plate 101, bottom plate 102 Circumferentially assembled formation tube coupling, tube coupling assembly in an axial direction form piping lane with both side plate 103, and top plate 101 and bottom plate 102 are to piping lane The arc-shaped steel corrugated plating of outside arch camber, both side plate 103 are vertical plate, and vertical plate is preferably reinforced concrete wall panel or corrugated steel Plate voluntarily selects required plank according to actual condition.Wherein, top plate 101, bottom plate 102 and both side plate 103 can pass through connection method Orchid 104 is circumferentially assembled to form tube coupling;Connecting flange can be horizontally disposed with (Fig. 1) or angularly disposed (Fig. 2).
In the utility model, to meet the arc diameter D of top plate 101 and bottom plate 102 more than the level between both side plate 103 Distance L.Because only that when D is more than L, the circular arc of top plate or bottom plate is only the plate that arc angle is less than 180 °, and D is differed with L and got over Greatly, space availability ratio is bigger;Actual production, which measures the horizontal distance L of both side plate and loses high H, can correspond to out D values, mistake herein High H is height difference of the main arch ring from vault to arch springing.
As shown in figure 3, the utility model also has second of piping lane structure type, on the basis of the first Pipe rack, Top plate 101 and bottom plate 102 are arranged to two kinds of radians, wherein there is bowed out radian R among plate1, plate both sides have corner cambered R2, the purpose being arranged in this way is top plate 101 and side plate 103 is arc transition form, and the stress concentration of circumferential junction can obtain Improve well, the wall thickness of connecting flange 104 can reduce;Simultaneously because corner cambered R2Relative to bowed out radian R1It is very little , so bowed out radian R should be met in this case1Diameter be more than both side plate between horizontal distance L, just can guarantee Improve the space availability ratio in piping lane section.
When geology operating mode is poor, as the deboost of weak soil area or muddy terrain, piping lane both sides backfill cannot be guaranteed When structure self-strength and rigidity, need to add Tiebar structure 105 between top plate and/or two arch springings of bottom plate, as shown in Figure 4.
When piping lane sectional dimension is larger, four unit sheet bars can be decoupled circumferentially, i.e. top plate and bottom plate or both side plate is One piece of whole plate is assembled by least two pieces of scoreboards.
Side plate and top plate thickness are the same by usually taking, if operating mode is severe, such as both sides backfill is mud or weak soil, Its side-wall outer side backfill can not provide enough propulsive thrust, then need replacing backfill material or appropriate thickening skirt walls are thick.

Claims (8)

1. a kind of Combined type underground pipe gallery, including it is circumferentially assembled by top plate (101), bottom plate (102) and both side plate (103) Tube coupling is formed, tube coupling is assembled in an axial direction to form piping lane, it is characterised in that:The top plate (101) and bottom plate (102) are to outside piping lane The arc-shaped steel corrugated plating of side arch camber, both side plate (103) are vertical plate, wherein the circular arc of the top plate (101) and bottom plate (102) Diameter is more than the horizontal distance between both side plate (103).
2. piping lane according to claim 1, it is characterised in that:The top plate (101) and bottom plate (102) have bowed out radian And corner cambered, wherein the diameter of the bowed out radian is more than the horizontal distance between both side plate.
3. piping lane according to claim 1, it is characterised in that:The both side plate (103) is reinforced concrete wall panel or wave Line steel plate.
4. piping lane according to claim 1, it is characterised in that:The arch springing of the top plate (101) and/or bottom plate (102) it Between setting pull rod (105).
5. piping lane according to claim 1, it is characterised in that:The top plate (101), bottom plate (102) or both side plate (103) Assemble for one piece of whole plate or by least two pieces of scoreboards.
6. piping lane according to claim 1, it is characterised in that:The top plate (101), bottom plate (102) and both side plate (103) Tube coupling is formed by the way that connecting flange (104) is circumferentially assembled.
7. piping lane according to claim 6, it is characterised in that:The connecting flange (104) is horizontally disposed or angularly disposed.
8. piping lane according to claim 6, it is characterised in that:The top plate (101), bottom plate (102) and both side plate (103) It is bolted by connecting flange (104).
CN201721817484.4U 2017-12-22 2017-12-22 Combined type underground pipe gallery Active CN207685864U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721817484.4U CN207685864U (en) 2017-12-22 2017-12-22 Combined type underground pipe gallery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721817484.4U CN207685864U (en) 2017-12-22 2017-12-22 Combined type underground pipe gallery

Publications (1)

Publication Number Publication Date
CN207685864U true CN207685864U (en) 2018-08-03

Family

ID=62995031

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721817484.4U Active CN207685864U (en) 2017-12-22 2017-12-22 Combined type underground pipe gallery

Country Status (1)

Country Link
CN (1) CN207685864U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108265751A (en) * 2018-01-12 2018-07-10 南京联众建设工程技术有限公司 Single cabin piping lane and the spelling more cabin underground pipe galleries of cabin formula
CN108277826A (en) * 2018-02-09 2018-07-13 南京联众建设工程技术有限公司 Single cabin piping lane and the spelling flat underground pipe gallery in the more cabins of cabin formula

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108265751A (en) * 2018-01-12 2018-07-10 南京联众建设工程技术有限公司 Single cabin piping lane and the spelling more cabin underground pipe galleries of cabin formula
WO2019136867A1 (en) * 2018-01-12 2019-07-18 南京联众工程技术有限公司 Single-compartment utility tunnel and assembled multi-compartment underground comprehensive utility tunnel
CN108277826A (en) * 2018-02-09 2018-07-13 南京联众建设工程技术有限公司 Single cabin piping lane and the spelling flat underground pipe gallery in the more cabins of cabin formula
WO2019153567A1 (en) * 2018-02-09 2019-08-15 南京联众建设工程技术有限公司 Single-compartment utility tunnel and assembled multi-compartment flat-bottom underground comprehensive utility tunnel

Similar Documents

Publication Publication Date Title
CN105887806B (en) Assembled underground continuous wall and its construction method
CN106090450A (en) There is the box pipeline that circumferential obtuse angle connects
CN103075158B (en) Steel plate and steel reinforced concrete well wall
CN207685864U (en) Combined type underground pipe gallery
CN103806449B (en) A kind of foundation pit supporting construction
CN104018534A (en) Motor-driven milling and slotting wall former
CN204876019U (en) Reverse construction method well that old and new's pipeline was linked up
CN106759265A (en) A kind of diaphram wall of fill concrete, its steel design and its construction method
CN103133004A (en) Technological process of ground prefabrication and installation of inner shaft wall of freezing shaft
CN203924071U (en) A kind of foundation pit supporting construction
CN103277115A (en) Segment and segment ring used for indoor tunneling test of shield tunneling machine model
CN105862875A (en) Support structure and construction method thereof
CN108396777A (en) Meet the big cross section tube coupling of segmentation prefabricating on-site consolidation
CN206360706U (en) A kind of screwed joint attachment structure being used between extra-large shield-driven tunnel section of jurisdiction
CN204151835U (en) The vertical piece structure of connection of the basement wall and cast-in-place buttress
CN110055953A (en) Miniature steel pipe pile and its construction method can be recycled in a kind of plural serial stage assembled
CN203096721U (en) Novel cofferdam fore shaft steel sheet pile
CN106567397B (en) The control method and control device of deep basal pit underground water
CN206929551U (en) The rubber diaphragm sealed gas holder of unistage type of regular polygon thin oil seal gas holder reconstruction
CN104908150B (en) A kind of piping shaft making template and the method based on factorial praluction piping shaft
CN102121252B (en) Method for constructing pile plate retaining wall
CN106761816A (en) A kind of screwed joint attachment structure between the section of jurisdiction for extra-large shield-driven tunnel
CN108239988A (en) A kind of assembled steel barrel base structure and its construction method
CN106480906A (en) Feed intake storehouse and the attachment structure of standard block tube coupling and the pipe gallery of changes of section
CN207919589U (en) A kind of assembled steel barrel base structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 211215 Zhetang Town Industrial Park, Lishui District, Nanjing City, Jiangsu Province

Patentee after: Nanjing Lianzhong Engineering Technology Co., Ltd.

Address before: 211215 No. 331 Zhening East Road, Zhetang Industrial Concentration Zone, Lishui Economic Development Zone, Nanjing City, Jiangsu Province

Patentee before: Nanjing Liantong Construction Engineering Technology Co., Ltd.

CP03 Change of name, title or address