CN106480827A - A kind of construction technology of segmented casting concrete box beam - Google Patents

A kind of construction technology of segmented casting concrete box beam Download PDF

Info

Publication number
CN106480827A
CN106480827A CN201610994227.1A CN201610994227A CN106480827A CN 106480827 A CN106480827 A CN 106480827A CN 201610994227 A CN201610994227 A CN 201610994227A CN 106480827 A CN106480827 A CN 106480827A
Authority
CN
China
Prior art keywords
section
box beam
box
concrete
reinforcement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610994227.1A
Other languages
Chinese (zh)
Inventor
易汉斌
江祥林
俞博
曾国良
张冬兵
李德慧
李小宝
糜江
赖毅
谭子翼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU TRAFFIC RESEARCH INSTITUTE
Original Assignee
JIANGSU TRAFFIC RESEARCH INSTITUTE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU TRAFFIC RESEARCH INSTITUTE filed Critical JIANGSU TRAFFIC RESEARCH INSTITUTE
Priority to CN201610994227.1A priority Critical patent/CN106480827A/en
Publication of CN106480827A publication Critical patent/CN106480827A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention discloses a kind of construction technology of segmented casting concrete box beam, constructed box beam is made up of multiple box girder segments of first after-pouring, and described box girder segment is armored concrete beam section, and when constructed box beam is constructed, process is as follows:(1) support is installed, and carries out precompressed to described support;(2) installation form;(3) colligation regular reinforcement;(3) scene is segmented pours:Pour first sections concrete, complete the work progress of first section box girder;Then pour later section section box beam concrete, carry out the subsequent construction process of later section section box beam afterwards.Wherein, between the two neighboring box girder segment of first after-pouring, the ratio of reinforcement of the horizontal regular reinforcement of top board is different.The present invention passes through the scheme using adjacent segment top board horizontal ordinary reinforced concrete ratio of reinforcement differentiation, restrained effectively the generation of after-pouring section box beam contraction fissure in segmented casting concrete box beam.

Description

A kind of construction technology of segmented casting concrete box beam
Technical field
The present invention relates to a kind of construction technology of segmented casting concrete box beam.
Background technology
With the fast development of Bridges in Our Country building cause, emerge a collection of across footpath big, various informative, construction complexity Continuous bridge, has promoted prestressed concrete continuous box girder construction technology constantly to advance, have accumulated rich experience.Continuously Box beam particularly ultra-wide concrete box girder generally adopts segmented pouring construction process, during segmented pouring construction, The old and new pour section box girder and shrink inconsistent, often lead to newly to pour box beam section and easily produce cross-direction shrinkage at interface and split Seam is although these cracks not necessarily affect the safety of works, but it can cause the psychological uneasiness of user.And from From the point of view of the life-time service of works requires, crack increases the permeability of concrete, and the harmful substance of in the air is easily by splitting Seam penetrates in concrete, causes regular reinforcement to produce corrosion, the durability of impact works and service life, reduces works Safety.
Content of the invention
In order to solve problem above, the present invention provides technical scheme below:
A kind of construction technology of segmented casting concrete box beam, constructed box beam is by multiple box girder segments of first after-pouring Composition, described box girder segment is armored concrete beam section, and when constructed box beam is constructed, process is as follows:(1) support peace Dress, and precompressed is carried out to described support;(2) installation form;(3) colligation regular reinforcement;(3) scene is segmented pours:Pour head Sections concrete, completes the work progress of first section box girder;Then pour later section section box beam concrete, carry out later section afterwards The subsequent construction process of section box beam.
Wherein, between the two neighboring box girder segment of first after-pouring, the ratio of reinforcement of the horizontal regular reinforcement of top board is different.
Further, between described two neighboring box girder segment, the ratio of reinforcement difference 10%- of the horizontal regular reinforcement of top board 15%.
Further, in step (1), before described support is set up, carry out basement process first.
Further, in step (3), after casting concrete, carry out pre- when concrete strength reaches 100% design strength Stress rib tensioning.
Beneficial effect:The present invention passes through the side using adjacent segment top board horizontal ordinary reinforced concrete ratio of reinforcement difference Case, restrained effectively the generation of after-pouring section box beam contraction fissure, and construction method has simple structure, with low cost, construction Convenient feature.
Brief description
The pre-pressing bracket schematic diagram that Fig. 1 provides for the present invention;
The model sheetinstallat schematic diagram that Fig. 2 provides for the present invention;
The Cast-in-Situ Segment regular reinforcement colligation schematic diagram that Fig. 3 provides for the present invention;
Box section schematic diagram after the concreting that Fig. 4 provides for the present invention;
Fig. 5 is the top view of Fig. 4.
Specific embodiment
The present invention will be further described with reference to the accompanying drawings and examples, but the present invention is not limited to following examples.
The construction technology of a kind of segmented casting concrete box beam that the present invention provides, constructed box beam is mixed by first after-pouring Multiple box girder segment compositions of solidifying soil, described box girder segment is armored concrete beam section, when constructed box beam is constructed, mistake Journey is as follows:
First, basement process
Purpose is to ensure that ground has enough bearing capacities and necessary water-proof drainage facility.Calculate full hall supporter first The requirement to foundation bearing capacity for the system, is then processed to original ground according to ground actual carrying capacity, for example the reality according to ground Border situation, can fill out, do the processing methods such as rendzinas, casting concrete basis using changing, and in the ground scope four processing Dig gutter and cure process week, it is to avoid support produces differential settlement.
2nd, support is installed
Mounting system can be selected according to on-site actual situations, for example, can be common steel tube scaffold, bowl button foot Hand cradle and assembled door-type scaffold etc..With reference to Fig. 1, in illustrative examples in the present invention, select full hall bowl button Formula strutting system, is combined installing using bowl fastening type functional steel pipe holder, and wherein, the external diameter of steel pipe is not less than 48mm, wall Thickness is not less than 3.5mm.
3rd, pre-pressing bracket
The purpose one side of precompressed is by once carrying simulation, the stability in the large that checking bracket is set up and checking support And the actual bearer ability of bracket basis, overcome the differential settlement of concrete placings process medium-height trestle, it is to avoid box beam concrete is because propping up Frame differential settlement and crack occurs it is ensured that construction safety, be on the other hand eliminate construction fore-stock and ground non-resilient heavy Fall deformation, collects support and the elastic deformation of ground and the data of inelastic deformation simultaneously, is that bottom die of box-beam construction elevation controls With span centre Application in Pre-camber provide accurately according to it is ensured that beam body geometricshape accurate.
Load mode those skilled in the art of support can be selected according to practical situation, for example, can use sand Bag, earth bag, water tank, or using modes such as water for prepressing, the scope of loading is box beam bottom, and the gross weight of loading is not less than box beam 1.2 times of gross weight.Load assignment position is consistent with the distribution of box beam gravity load, and during loading, each point ballast will symmetrically be prevented Abnormal conditions only occur.According to the difference of box beam concrete casting process method during practice of construction, the scheme of loading is permissible It is divided into disposable loading and two kinds of hierarchical loading.Disposable loading is that the disposable cloth of total weight of load is pressed on support, And carry out settlement observation.Hierarchical loading is the total weight of load to be divided into (what) cloth several times be pressed on support, and from Jia the One-level load starts persistently to carry out settlement observation.With reference to Fig. 1, in illustrative examples in the present invention, select sand pocket 02 carries out precompressed.The pile of precompressed sand pocket 02 presses the dead load of design beam body and distribution form is stacked, and it is right to adopt during loading Claim equal-load preloading arrangement, prevent support bias unstability.Loading sequence is carried out by the order of concreting, can adopt hierarchical loading Scheme, for example can carry out in three times, the total weight of load is divided into three cloth and is pressed on support, and from plus first order lotus Load starts persistently to carry out settlement observation.
4th, installation form
Template can be selected according to properties such as material, thickness, intensity, as shown in Fig. 2 the installation of template can be according to existing Technology is carried out, after support 01 precompressed, by girder model sheetinstallat above support 01.
5th, assembling reinforcement
With reference to Fig. 3, after installation form, assembling reinforcement, and simultaneously bury prestress pipe, wherein, adjacent two casees In girder segment, the ratio of reinforcement of the horizontal regular reinforcement of top board is different, with reference to Fig. 5, the horizontal regular reinforcement of later section section 06 top board 07 with front The ratio of reinforcement of the horizontal regular reinforcement of one sections 05 top board 04 is different, by encrypting the arrangement of reinforcement of later section section 06 top board regular reinforcement 07 Rate, to suppress the generation of concrete shrinkage crack it is preferable that between two neighboring described box girder segment, the horizontal ordinary steel of top board The ratio of reinforcement difference 10%-15% of muscle.
5th, casting concrete
The present invention pours using scene is segmented, pours first sections concrete, the box section after concreting first Schematic diagram is as shown in figure 4, when first sections concrete strength reaches 100% design strength, carry out tension of prestressed tendon, afterwards root According to operations such as prior art form removal and supports, complete the construction of first section box girder;Then pour later section section box beam coagulation Soil, according to the construction of a section box girder after the completion of the work progress of first section box girder.
Specific case used herein is set forth to the principle of the present invention and embodiment, the saying of above example Bright it is only intended to help and understands assembly of the invention and its core concept;Simultaneously for one of ordinary skill in the art, foundation The thought of the present invention, all will change in specific embodiments and applications, and in sum, this specification content is not It is interpreted as limitation of the present invention.

Claims (3)

1. a kind of construction technology of segmented casting concrete box beam, constructed box beam is by multiple box girder segment groups of first after-pouring Become, described box girder segment is armored concrete beam section, and when constructed box beam is constructed, process is as follows:(1) support is installed, And precompressed is carried out to described support;(2) installation form;(3) colligation regular reinforcement, and bury prestress pipe simultaneously;(3) scene Segmented pour:Pour first sections concrete, complete the work progress of first section box girder;Then pour later section section box beam coagulation Soil, carries out the subsequent construction of later section section box beam.
Wherein, between the two neighboring box girder segment of first after-pouring, the ratio of reinforcement of the horizontal regular reinforcement of top board is different.
2. the construction technology of segmented casting concrete box beam as claimed in claim 1, wherein, described two neighboring box beam section Between section, the ratio of reinforcement difference 10%-15% of the horizontal regular reinforcement of top board.
3. the construction technology of segmented casting concrete box beam as claimed in claim 1, wherein, in step (1), described support Before setting up, carry out basement process first.
CN201610994227.1A 2016-11-11 2016-11-11 A kind of construction technology of segmented casting concrete box beam Pending CN106480827A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610994227.1A CN106480827A (en) 2016-11-11 2016-11-11 A kind of construction technology of segmented casting concrete box beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610994227.1A CN106480827A (en) 2016-11-11 2016-11-11 A kind of construction technology of segmented casting concrete box beam

Publications (1)

Publication Number Publication Date
CN106480827A true CN106480827A (en) 2017-03-08

Family

ID=58272053

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610994227.1A Pending CN106480827A (en) 2016-11-11 2016-11-11 A kind of construction technology of segmented casting concrete box beam

Country Status (1)

Country Link
CN (1) CN106480827A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108252210A (en) * 2018-04-09 2018-07-06 长沙理工大学 Segment cast-in-situ UHPC bridge beam section joint and construction method thereof
CN108589531A (en) * 2017-12-28 2018-09-28 广东省建筑工程机械施工有限公司 A kind of overpass wing plate cantilever pouring method
CN109306663A (en) * 2018-11-01 2019-02-05 江苏中路工程技术研究院有限公司 A kind of extremely frigid zones Full space support construction method
CN109797660A (en) * 2019-03-21 2019-05-24 东南大学 A kind of segment bracket construction method of beam bridge

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007016595A (en) * 2006-10-27 2007-01-25 Jfe Engineering Kk Joining structure and joining method for joining main beam to reinforced concrete pier
KR100842062B1 (en) * 2007-11-08 2008-06-30 우경건설 주식회사 The steel composite rahmen bridge construction technique for which preflexion steel girder was used
CN103485287A (en) * 2012-06-15 2014-01-01 北京交通大学 Prestressed application method in concrete frame box culvert construction
CN205369597U (en) * 2016-02-05 2016-07-06 中国建筑西南设计研究院有限公司 Divide local strenghthened type of few arrangement of reinforcement of disconnected formula not link up concrete power consumption partition wall that cracks
CN205475881U (en) * 2016-02-05 2016-08-17 中国建筑西南设计研究院有限公司 Local strenghthened type of few arrangement of reinforcement of connection type does not link up concrete power consumption partition wall that cracks

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007016595A (en) * 2006-10-27 2007-01-25 Jfe Engineering Kk Joining structure and joining method for joining main beam to reinforced concrete pier
KR100842062B1 (en) * 2007-11-08 2008-06-30 우경건설 주식회사 The steel composite rahmen bridge construction technique for which preflexion steel girder was used
CN103485287A (en) * 2012-06-15 2014-01-01 北京交通大学 Prestressed application method in concrete frame box culvert construction
CN205369597U (en) * 2016-02-05 2016-07-06 中国建筑西南设计研究院有限公司 Divide local strenghthened type of few arrangement of reinforcement of disconnected formula not link up concrete power consumption partition wall that cracks
CN205475881U (en) * 2016-02-05 2016-08-17 中国建筑西南设计研究院有限公司 Local strenghthened type of few arrangement of reinforcement of connection type does not link up concrete power consumption partition wall that cracks

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
刘海鹰: "支架现浇连续梁混凝土施工技术", 《铁道建筑技术》 *
杨成辰: "超长混凝土框架温度收缩应力分析与无缝设计对策", 《工程科技II辑》 *
王誉: "斜交连续箱梁桥空间受力分析及裂缝成因研究", 《工程科技II辑》 *
陈荣毅、沈祖炎: "钢筋混凝土结构抗火设计评述", 《工业建筑》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108589531A (en) * 2017-12-28 2018-09-28 广东省建筑工程机械施工有限公司 A kind of overpass wing plate cantilever pouring method
CN108252210A (en) * 2018-04-09 2018-07-06 长沙理工大学 Segment cast-in-situ UHPC bridge beam section joint and construction method thereof
CN109306663A (en) * 2018-11-01 2019-02-05 江苏中路工程技术研究院有限公司 A kind of extremely frigid zones Full space support construction method
CN109797660A (en) * 2019-03-21 2019-05-24 东南大学 A kind of segment bracket construction method of beam bridge

Similar Documents

Publication Publication Date Title
CN103938864B (en) Infilled wall Constructional Col-umn Construction engineering method
CN109778721A (en) Synchronization of jacking up bridge top and the bottom structure carries out the method that bridge increases transformation
CN203229874U (en) Repeatedly used cast-in-place support system for simply-supported beam
CN106480827A (en) A kind of construction technology of segmented casting concrete box beam
CN102839601A (en) Fixed connection structure for steel pier column and cushion cap of portal rigid frame overbridge and construction method of fixed connection structure
CN106703437A (en) Shock-insulation underpinning structure and construction method thereof
CN103469732B (en) Construction method of preformed holes for foundation bolts of bridge support
CN204738556U (en) A device for landmark is whole to shift
CN202787055U (en) Pier fixed connection structure of steel structure overhead bridge
CN107816056A (en) Filled type concrete gravity retaining wall and its construction technology
CN106836262A (en) A kind of construction method of packaged type bridges substructure
CN110080454A (en) LPM light filling body Construction of Cast-in-situ Concrete Hollow
CN206408515U (en) Precast pier section assembling structure
CN107355008A (en) A kind of prefabricated attachment structure and method of newly-increased steel core concrete column and existing structure
CN103233426A (en) Bailey beam support free of buttress in soft foundation and supporting method thereof
CN107299764A (en) A kind of concrete apparatus and construction method for being conveniently constructed the positioning of post cage bar
CN206503079U (en) A kind of packaged type bridges substructure
CN112431225A (en) Top-down construction method for pipe-jacking brick-built working well
CN107299640A (en) A kind of variable cross-section well shaft type ground continuous wall base and its construction method
CN106638329A (en) Assembling type bridge girder lower structure
CN203113515U (en) Slip form jacking integrated device
Chen On the Influence of Pile Foundation Settlement of Existing High‐Rise Buildings on the Surrounding Buildings
CN104878756A (en) Sand-filling hollow structure based cast-in-place special-shaped pile construction method
CN103437549B (en) Preloading structural part for high and large formwork support system
CN208219667U (en) Foundation pit supporting construction based on campshed and inner support

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170308

RJ01 Rejection of invention patent application after publication