CN106444659A CN201610838712.XA CN201610838712A CN106444659A CN 106444659 A CN106444659 A CN 106444659A CN 201610838712 A CN201610838712 A CN 201610838712A CN 106444659 A CN106444659 A CN 106444659A
Authority
CN
China
Prior art keywords
production
server
data
field controller
time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610838712.XA
Other languages
Chinese (zh)
Other versions
CN106444659B (en
Inventor
张立平
汪暾
王志平
吴宝健
邹兵
鲁遥遥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhuhai Jinyi Intelligent Technology Co ltd
Original Assignee
Guangdong Institute of Automation
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Institute of Automation filed Critical Guangdong Institute of Automation
Priority to CN201610838712.XA priority Critical patent/CN106444659B/en
Publication of CN106444659A publication Critical patent/CN106444659A/en
Application granted granted Critical
Publication of CN106444659B publication Critical patent/CN106444659B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM]
    • G05B19/41865Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/32Operator till task planning
    • G05B2219/32252Scheduling production, machining, job shop
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Abstract

The invention provides a production management method for a stamping workshop. The method comprises the following steps: a server receives and stores a production order in a relational database thereof; a field controller acquires the serial number of a mold and the job number of a worker, and acquires the production data of a stamping press to obtain a stamping production count; the field controller uploads the acquired serial number of the mold, the job number of the worker and the stamping production count to the server to form a real-time updated production record; the server judges whether the stamping production count meets the requirement of the order or not according to the production order, and if the requirement of the order is met, transmits a production stopping instruction to the field controller, wherein the field controller regularly sends acquired data to the server, and after receiving the data, the server verifies the data, performs invalid data processing if the data is failed to be verified, and if the data is successfully verified, performs data parsing and data processing and generates and stores a production record in the relational database for real-time updating.

Description

A kind of production management method and system of press workshop
Technical field
The present invention relates to a kind of production management method of press workshop and its system.
Background technology
With the development of economic globalization, the market competitive pressure that manufacturing is faced is increasingly severe, for tackling market Keen competition, the spare and accessory parts that press workshop produces also will meet higher requirement;Need the mode of production of enterprise and tissue Mode is by production model traditional, that production in enormous quantities pattern is changed into the multi items met customer need, small lot.
At present, the press workshop production operation management of China depends on manual management pattern, that is, with manual transcription's paper The mode of matter inventory is monitored to production process and follows the tracks of, and this mode relies primarily on artificial operation it is impossible to real-time obtain The critical data of production scene, it is difficult to ensure that the accuracy of production activity information needed and promptness, does not accomplish that quick response is given birth to Produce change.
Content of the invention
The present invention provides a kind of production management method and system of press workshop so that the production process of press workshop reaches Informationization, thus improve production efficiency.
A kind of production management method of press workshop of the present invention, comprises the following steps:Server receives and produces order simultaneously It is stored in its relational database;Field controller collection die number and employee's job number, and obtain the creation data of stamping machine Counted with obtaining punching production;The die number collecting, employee's job number and punching production are counted and upload by field controller To server, to form the record of production of real-time update;And according to producing order, server judges that punching production counting is The no instruction reaching order requirements, if having reached order requirements, assigning stopping production to field controller;Wherein, scene Controller timing is by the employee collecting job number, die number, punching production counts, employee produces counting, the punching press time, standby The data is activations such as time, to server, after server receives these data, verify to these data;If verifying unsuccessfully, Then carry out invalid data process;If verifying successfully, carrying out data parsing, data processing, then generating a record of production and protecting Exist in relational database to realize real-time update.
A kind of production management system of press workshop that the present invention provides, including:Field controller, compiles for gathering mould Number, the creation data of employee's job number and stamping machine;And server, produce order for receiving, from field controller reception person Work job number, die number and the production note forming real-time update by the creation data acquisition punching production counting of stamping machine Record, and judge punching production counts whether reach order requirements according to described production order, if reaching order requirements, Assign the instruction stopping producing to field controller;Wherein, the employee collecting job number, mould are compiled by field controller timing Number, punching production counts, employee produces counting, the punching press time, the data is activation such as stand-by time to server, server receives After these data, these data are verified;If verifying unsuccessfully, carry out invalid data process;If verifying successfully, carry out Data parsing, data processing, then generate a record of production and are saved in relational database to realize real-time update.
The invention enables the relevant information of press workshop achieves transparence, improve enterprise management level, reduce people Work cost;Improve the productivity effect of enterprise.
Brief description
Fig. 1 is the production management system structural principle block diagram of the press workshop of the present invention;
Fig. 2 is the Human-computer Interactive Design flow chart of the production management method of press workshop of the present invention;
Fig. 3 is the flow chart of the production management system process abnormal conditions of the press workshop of the present invention.
Specific embodiment
As shown in figure 1, the production management method of the press workshop of the present invention comprises the following steps:Server receives production and orders List is simultaneously stored in itself relational database;Field controller utilizes RFID technique collection die number and employee's job number, And combine to obtain the creation data of stamping machine by capturing the PLC signaling point on stamping machine control panel;In LED display not Light the different real time status information of correspondence with the LED of color.Field controller respectively with timing and not timing two ways, These information gathering are sent to server by workshop network carry out processing, store, and form a real-time synchronization and update The record of production.Acquired production number of packages is contrasted by server with producing order, to judge whether to complete production task, If completed, send the instruction stopping producing.
The production order of press workshop is an Excel file having customized, and is the existing resources of production according to enterprise Integrate with the market demand.For the ease of producing assigning of order, company manager passes through equipped with workshop management software Pc client import corresponding Excel file, then the content being read is stored among relational database.
The production management system of the press workshop of the present invention adopts two kinds of RFID reader respectively as reading die number Equipment with employee's job number.Generally, the workpiece producing the corresponding different structure of order of different batches, different processing The different mould of part correspondence.When here, using C236023 ultrahigh frequency RFID reader collection die number, be with RFID electronics Label collocation completes;In advance die number information need to be write in this electronic tag, be then embedded within corresponding mould, Ultrahigh frequency readers by being placed in above mould read out the die number information inside electronic tag again.Employee's job number Collection using specialize in employee check card use EM series non-contact radio-frequency ID card reader.Both RFID reader all carry RS232 serial communication interface, it is connected with the serial ports on field controller, can achieve two by corresponding software programming The communication of person.
The control system of stamping machine mainly with PLC as core, for the equipment feature of stamping machine, rushed by capture by the system PLC pulse signal point on press control panel combines and to obtain stamping machine creation data, and this creation data is translated in real time Status information, punching production counting, punching press time, power consumption etc..Master controller controls according to live real time status information LED display action, green light, that is, it is in production model;Amber light is bright to be in standby mode;When red is in shutdown mould Formula;Lamp goes out entirely, i.e. machine shutdown.Stamping machine often produces a workpiece, and punching production counts and employee counts and automatically Jia one.
From the beginning of operator's operation stamping machine produces, field controller can sporadically receive employee and check card certification, mould Tool numbering certification, PLC pulse signal change information, as long as a kind of situation generation of this three, field controller will collect Employee's job number, die number, punching production count, employee produces the critical datas such as counting, punching press time, stand-by time and passes through car Between network upload onto the server.Meanwhile, in order to ensure gathered data is safe and reliable, prevent workshop network from occurring sporadic Collapse leads to data transfer up or not imperfect, field controller again in the way of " heartbeat packet " timing, that is, every 30 seconds By the employee collecting job number, die number, punching production counts, employee produces the keys such as counting, punching press time, stand-by time Data is activation is to server.After server receives these data, these data are verified.If verifying unsuccessfully, carry out Invalid data is processed;If verifying successfully, carrying out data parsing, data processing, then generating a record of production and being saved in pass It is in database, the collection information real-time update that this record of production uploads according to field controller.
While generating and update the record of production, acquired punching production is counted and is carried out with production order by server Contrast, to judge whether to complete production task, if completed, sends, to field controller, the instruction stopping producing, at this moment Field controller controls LED display to be shown as red light, points out operation employee to stop producing.
Operation employee clocks out, and field controller sends next for the employee of collection authentication information to server, services While device receives employee's next authentication information, the cumulative time on duty of this employee is counted by algorithm computing and produces effect Rate, as the foundation of performance appraisal, itself and other gathered datas is stored in the record of production in the lump, and stops updating described production Record.
8 road dc switch amount collection input channels are provided with altogether on field controller hardware circuit and 4 road dc switch amounts are defeated Go out passage, be adapted to the stamping machine of different model and the following demand increasing collection signal, have preferable extensibility and Flexibility.For preventing electromagnetic interference and electrical safety all using Phototube Coupling input and output.
As shown in Fig. 2 being Human-computer Interactive Design flow chart.The human-computer interaction function good for realizing system, in stamping machine Side be provided with touch-screen display module.This touch-screen display module carries RS232 serial communication interface, with field controller On serial ports be connected, the two is communicated by Modbus rtu protocol, and the frame format of Modbus is simple, compact, easy-to-understand, It is easy to develop.It is big that the main contents of system interaction include workman's rights management, quality management, mold management and scheduling scheduling four Part.By this touch-screen, workman and system can realize real-time, easy man-machine interaction, largely enrich and are The data acquisition function of system, preferably feed back on-site situation.
Meanwhile, be provided with electronic board in workshop, this electronic board can show Workshop Production information in real time, such as group, Time, produce odd numbers, equipment fault, line running state and actual production, target output, qualification rate, stop line time, peace Full accident etc..Electronic board is a kind of performance of visualizing management, open-and-shut performance currently whole production equipment situation, when When having new production information to change, electronic board synchronized update, facilitate the administrative staff of enterprise to grasp the life in workshop in time Occurrence condition simultaneously adjusts production schedules it is achieved that enterprise managing integrated, the informationalized requirement of data transfer, substantially increases The workshop management level of punching press enterprise.
Furthermore, when an exception occurs, when such as there is equipment fault or security incident, field controller is timely Abnormal information is sent to server, after server parsing, confirmation, this abnormal information is simultaneously sent to two or two Above director, within the predetermined time limit of server, will have scenario described below:The first situation, only receives one and bears The instruction of duty people;Second situation, receives the instruction of two or more director;The third situation, does not receive The instruction of any director.
In the first scenario, the instruction (i.e. single instruction) that system execution uniquely receives;In the latter case, exist Within the predetermined time, server mutually notifies the instruction of all directors so that each director can learn that other are born The instruction of duty people, can be mutually coordinated between each director, determines optimum, final instruction to server (i.e. multiple fingers Make);If not sending final instruction between each director, server carries out the work of next step according to predetermined rule Make.
In a third case, server assigns, to stamping machine, the instruction that stops production immediately, and LED display is shown as red simultaneously Lamp, points out operator to stop producing.
In the latter case, receive the instruction of two or more director, server is by all directors Instruction mutually notify so that each director can learn the instruction of other directors, can be mutual between each director Coordinate, determine optimum, final instruction to server;After exceeding the predetermined time, if each is responsible for not sending per capita Final instruction, system carries out the work of next step according to predetermined rule, and predetermined rule is excellent according to each director First level is arranged, and such as director is divided into prime principal, the second director and the 3rd director etc..Prime principal Priority is higher than the second director, and the priority of the second director is higher than the priority of the 3rd director, by that analogy;Work as presence The instruction of prime principal, then carry out further work according to the instruction of prime principal;Finger without prime principal Order, but there is the instruction of the second director, then carry out the work of next step according to the instruction of the second director, by that analogy.This Sample, when an exception occurs, the program of the timely management and control of people and automatic acquiescence can be tied by the production management system of the present invention automatically Close to carry out next step action, realize double shield, embody security.
In process of production, data acquisition is capable of ERP (Enterprise to the production management system of the present invention Resource Planning, enterprise resource planning) instruction issuing and PCS (Process Control System, mistake Process control system) data upload, the production history of record product, monitor in real time production process, confirm manufacturing process flow, punching Whether pressure parameter mates, and solves the relatively single weak point of existing stamping machine systemic-function, this production management system liquidates Press related data automatic data collection, by the wireless network in workshop, collection critical data is sent to host computer server and carries out Analysis, process, storage.And, the production management system of the present invention can also pass through Terminal Server Client or mobile platform client Monitor in real time manufacture process, and realize the inquiry of creation data, statistics, analysis;It is plan operation and the life of enterprise in time The command scheduling of product activity provides reliable data supporting.

Claims (6)

1. a kind of production management method of press workshop is it is characterised in that comprise the following steps:
Server receives and produces order and be stored in its relational database;
Field controller collection die number and employee's job number, and obtain the creation data of stamping machine in terms of obtaining punching production Number;
The die number collecting, employee's job number and punching production are counted and upload onto the server by field controller, to be formed The record of production of real-time update;And
According to production order, server judges punching production counts whether reach order requirements, if reaching order requirements, Then assign, to field controller, the instruction stopping producing;
Wherein, field controller timing by the employee collecting job number, die number, punching production count, employee produce count, The data is activations such as punching press time, stand-by time, to server, after server receives these data, carry out school to these data Test;If verifying unsuccessfully, carry out invalid data process;If verifying successfully, carrying out data parsing, data processing, then generating One record of production is saved in relational database to realize real-time update.
2. the production management method of press workshop according to claim 1 is it is characterised in that further include following step Suddenly:If among production process, when an exception occurs, field controller in time by abnormal information to transmitting server, server After parsing, confirmation, abnormal information is simultaneously sent to two or more director.
3. the production management method of press workshop according to claim 2 is it is characterised in that further include following step Suddenly:If among production process, when an exception occurs, abnormal information is sent to server, server by field controller in time After parsing, confirmation, abnormal information is simultaneously sent to two or more director, if only single instruction is returned Back to server, server executes this single instruction.
4. the production management method of press workshop according to claim 2 is it is characterised in that further include following step Suddenly:If among production process, when an exception occurs, abnormal information is sent to server, server by field controller in time After parsing, confirmation, abnormal information is simultaneously sent to two or more director, within the predetermined time, When server receives the instruction of two or more director, the instruction of all directors is mutually notified so that each Individual director can learn the instruction of other directors;After exceeding the predetermined time, if each is responsible for not sending per capita Whole instruction, server carries out the work of next step according to predetermined rule.
5. the production management method of press workshop according to claim 2 is it is characterised in that further include following step Suddenly:If among production process, when an exception occurs, abnormal information is sent to server, server by field controller in time After parsing, confirmation, abnormal information is simultaneously sent to two or more director, within the predetermined time, Server is not received by any instruction, then execute the instruction of stopping production.
6. a kind of production management system of press workshop is it is characterised in that include:
Field controller, for gathering the creation data of die number, employee's job number and stamping machine;And
Server, produces order for receiving, and receives employee's job number, die number and by the life of stamping machine from field controller Produce data and obtain punching production counting to form the record of production of real-time update, and judge that punching press is given birth to according to described production order Producing and count whether reach order requirements, if having reached order requirements, assigning, to field controller, the instruction stopping producing;
Wherein, field controller timing by the employee collecting job number, die number, punching production count, employee produce count, The data is activations such as punching press time, stand-by time, to server, after server receives these data, carry out school to these data Test;If verifying unsuccessfully, carry out invalid data process;If verifying successfully, carrying out data parsing, data processing, then generating One record of production is saved in relational database to realize real-time update.
CN201610838712.XA 2016-09-21 2016-09-21 A kind of production management method and system of press workshop Active CN106444659B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610838712.XA CN106444659B (en) 2016-09-21 2016-09-21 A kind of production management method and system of press workshop

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610838712.XA CN106444659B (en) 2016-09-21 2016-09-21 A kind of production management method and system of press workshop

Publications (2)

Publication Number Publication Date
CN106444659A true CN106444659A (en) 2017-02-22
CN106444659B CN106444659B (en) 2019-02-15

Family

ID=58166913

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610838712.XA Active CN106444659B (en) 2016-09-21 2016-09-21 A kind of production management method and system of press workshop

Country Status (1)

Country Link
CN (1) CN106444659B (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018205203A1 (en) * 2017-05-11 2018-11-15 深圳市柘叶红实业有限公司 Mould intelligent management system and management method
CN111221310A (en) * 2020-02-03 2020-06-02 浙江杰克智能缝制科技有限公司 System and method for acquiring utilization rate of sewing workshop
CN111240286A (en) * 2020-01-19 2020-06-05 珠海格力电器股份有限公司 System and method for reducing misjudgment of line stop reason
WO2020199639A1 (en) * 2019-04-03 2020-10-08 长电科技(宿迁)有限公司 Automated control system for functional module and control method thereof
CN112215468A (en) * 2020-09-14 2021-01-12 贵州东冠科技有限公司 Workload statistical system and method
CN112468579A (en) * 2020-11-25 2021-03-09 苏州德森斯特通信技术有限公司 Punching equipment networking monitored control system
CN112547970A (en) * 2020-10-31 2021-03-26 江阴市新万沅机件有限公司 Molding simulation system and method for production of washing machine inner barrel stamping part
CN114449023A (en) * 2022-04-11 2022-05-06 成都秦川物联网科技股份有限公司 Double-front-split-platform type industrial Internet of things and control method thereof
WO2023193619A1 (en) * 2022-04-09 2023-10-12 广州达宝文汽车设备集团有限公司 Unmanned intelligent manufacturing system

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101266493A (en) * 2007-03-14 2008-09-17 欧姆龙株式会社 Production management system and production management method
US7584165B2 (en) * 2003-01-30 2009-09-01 Landmark Graphics Corporation Support apparatus, method and system for real time operations and maintenance
CN101639912A (en) * 2008-08-11 2010-02-03 香港纺织及成衣研发中心 Production monitoring system based on rfid
CN101846985A (en) * 2009-03-25 2010-09-29 鸿富锦精密工业(深圳)有限公司 Remote data acquisition system and method
CN103971223A (en) * 2014-05-27 2014-08-06 浪潮电子信息产业股份有限公司 Automatic calibrating method of make-to-order production materials by server
CN104539658A (en) * 2014-12-09 2015-04-22 武汉大政科技有限责任公司 Big data processing system and method based on enterprise private cloud
JP2015087877A (en) * 2013-10-29 2015-05-07 株式会社安川電機 Industrial equipment production system, industrial equipment production server, industrial equipment production method, program, and information storage medium
CN105023111A (en) * 2015-07-31 2015-11-04 广东省自动化研究所 Production management method and apparatus for die-casting workshop

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7584165B2 (en) * 2003-01-30 2009-09-01 Landmark Graphics Corporation Support apparatus, method and system for real time operations and maintenance
CN101266493A (en) * 2007-03-14 2008-09-17 欧姆龙株式会社 Production management system and production management method
CN101639912A (en) * 2008-08-11 2010-02-03 香港纺织及成衣研发中心 Production monitoring system based on rfid
CN101846985A (en) * 2009-03-25 2010-09-29 鸿富锦精密工业(深圳)有限公司 Remote data acquisition system and method
JP2015087877A (en) * 2013-10-29 2015-05-07 株式会社安川電機 Industrial equipment production system, industrial equipment production server, industrial equipment production method, program, and information storage medium
CN103971223A (en) * 2014-05-27 2014-08-06 浪潮电子信息产业股份有限公司 Automatic calibrating method of make-to-order production materials by server
CN104539658A (en) * 2014-12-09 2015-04-22 武汉大政科技有限责任公司 Big data processing system and method based on enterprise private cloud
CN105023111A (en) * 2015-07-31 2015-11-04 广东省自动化研究所 Production management method and apparatus for die-casting workshop

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018205203A1 (en) * 2017-05-11 2018-11-15 深圳市柘叶红实业有限公司 Mould intelligent management system and management method
WO2020199639A1 (en) * 2019-04-03 2020-10-08 长电科技(宿迁)有限公司 Automated control system for functional module and control method thereof
CN111240286A (en) * 2020-01-19 2020-06-05 珠海格力电器股份有限公司 System and method for reducing misjudgment of line stop reason
CN111221310A (en) * 2020-02-03 2020-06-02 浙江杰克智能缝制科技有限公司 System and method for acquiring utilization rate of sewing workshop
CN112215468A (en) * 2020-09-14 2021-01-12 贵州东冠科技有限公司 Workload statistical system and method
CN112215468B (en) * 2020-09-14 2024-03-22 贵州东冠科技有限公司 Workload statistics system and method
CN112547970A (en) * 2020-10-31 2021-03-26 江阴市新万沅机件有限公司 Molding simulation system and method for production of washing machine inner barrel stamping part
CN112468579A (en) * 2020-11-25 2021-03-09 苏州德森斯特通信技术有限公司 Punching equipment networking monitored control system
WO2023193619A1 (en) * 2022-04-09 2023-10-12 广州达宝文汽车设备集团有限公司 Unmanned intelligent manufacturing system
CN114449023A (en) * 2022-04-11 2022-05-06 成都秦川物联网科技股份有限公司 Double-front-split-platform type industrial Internet of things and control method thereof
CN114449023B (en) * 2022-04-11 2022-06-17 成都秦川物联网科技股份有限公司 Double-front-split-platform type industrial Internet of things and control method thereof
US11586183B1 (en) 2022-04-11 2023-02-21 Chengdu Qinchuan Iot Technology Co., Ltd. Industrial internet of things with dual front sub platform and control methods thereof
US11860610B2 (en) 2022-04-11 2024-01-02 Chengdu Qinchuan Iot Technology Co., Ltd. Systems of industrial internet of things for industrial production control and control methods thereof

Also Published As

Publication number Publication date
CN106444659B (en) 2019-02-15

Similar Documents

Publication Publication Date Title
CN106444659A (en) Production management method and system for stamping workshop
CN205015691U (en) Injection molding machine intelligent management system
CN102819758B (en) System and method for improving read-write success rate of radio frequency identification tags on movement production line
CN104091224B (en) A kind of system and method for production line real time data acquisition analysis
CN103926900A (en) Production line management control system
CN103612860B (en) Based on Wide and Thick Slab warehouse for finished product warehouse-in location and the position-recognizing system of machine vision
CN104008465B (en) Grid switching operation bill safety implemented systems
CN105334798A (en) Automatic piece counting method and system for machining workshop of numerically-controlled machine tool
CN101183251A (en) Electrical power system safety operation intelligent monitoring device and monitoring method thereof
CN109359895A (en) RFID habilimentation instructs system and its guidance method, production management system and method
CN107168256B (en) Data collection station towards medium-sized and small enterprises Discrete Production Workshop
CN110126886B (en) Hump safety protection information system
CN102222270B (en) Manufacture and perform management system and production curves device
CN110232504A (en) A kind of quality manufacturing execution system platform and terminal
CN106502219A (en) A kind of bearing Internet of Things intelligence fabrication line process control system
CN110503401A (en) A kind of management method based on product lifecycle, device, equipment and medium
CN105550939A (en) Knitting production management system terminal
CN103984326B (en) Production management system and method
CN201170900Y (en) Intelligent monitoring apparatus for electric power system safety operation
CN110264132A (en) Material management system and implementation method based on MES
CN102880889A (en) RFID-based machine room monitoring device, system and method
CN202093569U (en) Safety tool monitoring and managing system
CN102087518A (en) Industrial control system and management method for wireless structure
CN109377143A (en) Operation trace acquisition system, acquisition method, management system and management method
CN111741089B (en) Intelligent safety operation management and control system and method based on industrial Internet of things

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 510000 15 building, 100 martyrs Road, Yuexiu District, Guangzhou, Guangdong.

Applicant after: GUANGDONG INSTITUTE OF INTELLIGENT MANUFACTURING

Address before: 510070 15 building, 100 martyrs Road, Yuexiu District, Guangzhou, Guangdong.

Applicant before: Guangdong Institute of Automation

GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 510000 15 building, 100 martyrs Road, Yuexiu District, Guangzhou, Guangdong.

Patentee after: Institute of intelligent manufacturing, Guangdong Academy of Sciences

Address before: 510000 15 building, 100 martyrs Road, Yuexiu District, Guangzhou, Guangdong.

Patentee before: GUANGDONG INSTITUTE OF INTELLIGENT MANUFACTURING

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240207

Address after: 519060, Zone B, 1st Floor, Building 1, No. 15 Nanping North Second Road, Xiangzhou District, Zhuhai City, Guangdong Province

Patentee after: Zhuhai Jinyi Intelligent Technology Co.,Ltd.

Country or region after: China

Address before: 510000 15 building, 100 martyrs Road, Yuexiu District, Guangzhou, Guangdong.

Patentee before: Institute of intelligent manufacturing, Guangdong Academy of Sciences

Country or region before: China