CN106444659A - Production management method and system for stamping workshop - Google Patents
Production management method and system for stamping workshop Download PDFInfo
- Publication number
- CN106444659A CN106444659A CN201610838712.XA CN201610838712A CN106444659A CN 106444659 A CN106444659 A CN 106444659A CN 201610838712 A CN201610838712 A CN 201610838712A CN 106444659 A CN106444659 A CN 106444659A
- Authority
- CN
- China
- Prior art keywords
- production
- server
- data
- field controller
- time
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 101
- 238000007726 management method Methods 0.000 title claims abstract description 31
- 238000000034 method Methods 0.000 claims abstract description 9
- 238000012545 processing Methods 0.000 claims abstract description 9
- 238000004080 punching Methods 0.000 claims description 28
- 230000002159 abnormal effect Effects 0.000 claims description 11
- 230000008569 process Effects 0.000 claims description 7
- 230000004913 activation Effects 0.000 claims description 5
- 238000001994 activation Methods 0.000 claims description 5
- 238000012790 confirmation Methods 0.000 claims description 5
- 230000000694 effects Effects 0.000 description 4
- 230000008859 change Effects 0.000 description 3
- 238000004891 communication Methods 0.000 description 3
- 241001269238 Data Species 0.000 description 2
- 230000009471 action Effects 0.000 description 2
- 238000004458 analytical method Methods 0.000 description 2
- 238000013461 design Methods 0.000 description 2
- 230000003993 interaction Effects 0.000 description 2
- 230000002452 interceptive effect Effects 0.000 description 2
- 238000004886 process control Methods 0.000 description 2
- 238000012546 transfer Methods 0.000 description 2
- 230000002860 competitive effect Effects 0.000 description 1
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 230000001186 cumulative effect Effects 0.000 description 1
- 238000013480 data collection Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000008676 import Effects 0.000 description 1
- 238000012797 qualification Methods 0.000 description 1
- 230000004044 response Effects 0.000 description 1
- 230000011664 signaling Effects 0.000 description 1
- 238000003860 storage Methods 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
- 230000007474 system interaction Effects 0.000 description 1
- 230000026676 system process Effects 0.000 description 1
- 238000013518 transcription Methods 0.000 description 1
- 230000035897 transcription Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM]
- G05B19/41865—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/32—Operator till task planning
- G05B2219/32252—Scheduling production, machining, job shop
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
Abstract
Description
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610838712.XA CN106444659B (en) | 2016-09-21 | 2016-09-21 | A kind of production management method and system of press workshop |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610838712.XA CN106444659B (en) | 2016-09-21 | 2016-09-21 | A kind of production management method and system of press workshop |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106444659A true CN106444659A (en) | 2017-02-22 |
CN106444659B CN106444659B (en) | 2019-02-15 |
Family
ID=58166913
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610838712.XA Active CN106444659B (en) | 2016-09-21 | 2016-09-21 | A kind of production management method and system of press workshop |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106444659B (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2018205203A1 (en) * | 2017-05-11 | 2018-11-15 | 深圳市柘叶红实业有限公司 | Mould intelligent management system and management method |
CN111221310A (en) * | 2020-02-03 | 2020-06-02 | 浙江杰克智能缝制科技有限公司 | System and method for acquiring utilization rate of sewing workshop |
CN111240286A (en) * | 2020-01-19 | 2020-06-05 | 珠海格力电器股份有限公司 | System and method for reducing misjudgment of line stop reason |
WO2020199639A1 (en) * | 2019-04-03 | 2020-10-08 | 长电科技(宿迁)有限公司 | Automated control system for functional module and control method thereof |
CN112215468A (en) * | 2020-09-14 | 2021-01-12 | 贵州东冠科技有限公司 | Workload statistical system and method |
CN112468579A (en) * | 2020-11-25 | 2021-03-09 | 苏州德森斯特通信技术有限公司 | Punching equipment networking monitored control system |
CN112547970A (en) * | 2020-10-31 | 2021-03-26 | 江阴市新万沅机件有限公司 | Molding simulation system and method for production of washing machine inner barrel stamping part |
CN114449023A (en) * | 2022-04-11 | 2022-05-06 | 成都秦川物联网科技股份有限公司 | Double-front-split-platform type industrial Internet of things and control method thereof |
WO2023193619A1 (en) * | 2022-04-09 | 2023-10-12 | 广州达宝文汽车设备集团有限公司 | Unmanned intelligent manufacturing system |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101266493A (en) * | 2007-03-14 | 2008-09-17 | 欧姆龙株式会社 | Production management system and production management method |
US7584165B2 (en) * | 2003-01-30 | 2009-09-01 | Landmark Graphics Corporation | Support apparatus, method and system for real time operations and maintenance |
CN101639912A (en) * | 2008-08-11 | 2010-02-03 | 香港纺织及成衣研发中心 | Production monitoring system based on rfid |
CN101846985A (en) * | 2009-03-25 | 2010-09-29 | 鸿富锦精密工业(深圳)有限公司 | Remote data acquisition system and method |
CN103971223A (en) * | 2014-05-27 | 2014-08-06 | 浪潮电子信息产业股份有限公司 | Automatic calibrating method of make-to-order production materials by server |
CN104539658A (en) * | 2014-12-09 | 2015-04-22 | 武汉大政科技有限责任公司 | Big data processing system and method based on enterprise private cloud |
JP2015087877A (en) * | 2013-10-29 | 2015-05-07 | 株式会社安川電機 | Industrial equipment production system, industrial equipment production server, industrial equipment production method, program, and information storage medium |
CN105023111A (en) * | 2015-07-31 | 2015-11-04 | 广东省自动化研究所 | Production management method and apparatus for die-casting workshop |
-
2016
- 2016-09-21 CN CN201610838712.XA patent/CN106444659B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7584165B2 (en) * | 2003-01-30 | 2009-09-01 | Landmark Graphics Corporation | Support apparatus, method and system for real time operations and maintenance |
CN101266493A (en) * | 2007-03-14 | 2008-09-17 | 欧姆龙株式会社 | Production management system and production management method |
CN101639912A (en) * | 2008-08-11 | 2010-02-03 | 香港纺织及成衣研发中心 | Production monitoring system based on rfid |
CN101846985A (en) * | 2009-03-25 | 2010-09-29 | 鸿富锦精密工业(深圳)有限公司 | Remote data acquisition system and method |
JP2015087877A (en) * | 2013-10-29 | 2015-05-07 | 株式会社安川電機 | Industrial equipment production system, industrial equipment production server, industrial equipment production method, program, and information storage medium |
CN103971223A (en) * | 2014-05-27 | 2014-08-06 | 浪潮电子信息产业股份有限公司 | Automatic calibrating method of make-to-order production materials by server |
CN104539658A (en) * | 2014-12-09 | 2015-04-22 | 武汉大政科技有限责任公司 | Big data processing system and method based on enterprise private cloud |
CN105023111A (en) * | 2015-07-31 | 2015-11-04 | 广东省自动化研究所 | Production management method and apparatus for die-casting workshop |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2018205203A1 (en) * | 2017-05-11 | 2018-11-15 | 深圳市柘叶红实业有限公司 | Mould intelligent management system and management method |
WO2020199639A1 (en) * | 2019-04-03 | 2020-10-08 | 长电科技(宿迁)有限公司 | Automated control system for functional module and control method thereof |
CN111240286A (en) * | 2020-01-19 | 2020-06-05 | 珠海格力电器股份有限公司 | System and method for reducing misjudgment of line stop reason |
CN111221310A (en) * | 2020-02-03 | 2020-06-02 | 浙江杰克智能缝制科技有限公司 | System and method for acquiring utilization rate of sewing workshop |
CN112215468A (en) * | 2020-09-14 | 2021-01-12 | 贵州东冠科技有限公司 | Workload statistical system and method |
CN112215468B (en) * | 2020-09-14 | 2024-03-22 | 贵州东冠科技有限公司 | Workload statistics system and method |
CN112547970A (en) * | 2020-10-31 | 2021-03-26 | 江阴市新万沅机件有限公司 | Molding simulation system and method for production of washing machine inner barrel stamping part |
CN112468579A (en) * | 2020-11-25 | 2021-03-09 | 苏州德森斯特通信技术有限公司 | Punching equipment networking monitored control system |
WO2023193619A1 (en) * | 2022-04-09 | 2023-10-12 | 广州达宝文汽车设备集团有限公司 | Unmanned intelligent manufacturing system |
CN114449023A (en) * | 2022-04-11 | 2022-05-06 | 成都秦川物联网科技股份有限公司 | Double-front-split-platform type industrial Internet of things and control method thereof |
CN114449023B (en) * | 2022-04-11 | 2022-06-17 | 成都秦川物联网科技股份有限公司 | Double-front-split-platform type industrial Internet of things and control method thereof |
US11586183B1 (en) | 2022-04-11 | 2023-02-21 | Chengdu Qinchuan Iot Technology Co., Ltd. | Industrial internet of things with dual front sub platform and control methods thereof |
US11860610B2 (en) | 2022-04-11 | 2024-01-02 | Chengdu Qinchuan Iot Technology Co., Ltd. | Systems of industrial internet of things for industrial production control and control methods thereof |
Also Published As
Publication number | Publication date |
---|---|
CN106444659B (en) | 2019-02-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106444659A (en) | Production management method and system for stamping workshop | |
CN205015691U (en) | Injection molding machine intelligent management system | |
CN102819758B (en) | System and method for improving read-write success rate of radio frequency identification tags on movement production line | |
CN104091224B (en) | A kind of system and method for production line real time data acquisition analysis | |
CN103926900A (en) | Production line management control system | |
CN103612860B (en) | Based on Wide and Thick Slab warehouse for finished product warehouse-in location and the position-recognizing system of machine vision | |
CN104008465B (en) | Grid switching operation bill safety implemented systems | |
CN105334798A (en) | Automatic piece counting method and system for machining workshop of numerically-controlled machine tool | |
CN101183251A (en) | Electrical power system safety operation intelligent monitoring device and monitoring method thereof | |
CN109359895A (en) | RFID habilimentation instructs system and its guidance method, production management system and method | |
CN107168256B (en) | Data collection station towards medium-sized and small enterprises Discrete Production Workshop | |
CN110126886B (en) | Hump safety protection information system | |
CN102222270B (en) | Manufacture and perform management system and production curves device | |
CN110232504A (en) | A kind of quality manufacturing execution system platform and terminal | |
CN106502219A (en) | A kind of bearing Internet of Things intelligence fabrication line process control system | |
CN110503401A (en) | A kind of management method based on product lifecycle, device, equipment and medium | |
CN105550939A (en) | Knitting production management system terminal | |
CN103984326B (en) | Production management system and method | |
CN201170900Y (en) | Intelligent monitoring apparatus for electric power system safety operation | |
CN110264132A (en) | Material management system and implementation method based on MES | |
CN102880889A (en) | RFID-based machine room monitoring device, system and method | |
CN202093569U (en) | Safety tool monitoring and managing system | |
CN102087518A (en) | Industrial control system and management method for wireless structure | |
CN109377143A (en) | Operation trace acquisition system, acquisition method, management system and management method | |
CN111741089B (en) | Intelligent safety operation management and control system and method based on industrial Internet of things |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information | ||
CB02 | Change of applicant information |
Address after: 510000 15 building, 100 martyrs Road, Yuexiu District, Guangzhou, Guangdong. Applicant after: GUANGDONG INSTITUTE OF INTELLIGENT MANUFACTURING Address before: 510070 15 building, 100 martyrs Road, Yuexiu District, Guangzhou, Guangdong. Applicant before: Guangdong Institute of Automation |
|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 510000 15 building, 100 martyrs Road, Yuexiu District, Guangzhou, Guangdong. Patentee after: Institute of intelligent manufacturing, Guangdong Academy of Sciences Address before: 510000 15 building, 100 martyrs Road, Yuexiu District, Guangzhou, Guangdong. Patentee before: GUANGDONG INSTITUTE OF INTELLIGENT MANUFACTURING |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20240207 Address after: 519060, Zone B, 1st Floor, Building 1, No. 15 Nanping North Second Road, Xiangzhou District, Zhuhai City, Guangdong Province Patentee after: Zhuhai Jinyi Intelligent Technology Co.,Ltd. Country or region after: China Address before: 510000 15 building, 100 martyrs Road, Yuexiu District, Guangzhou, Guangdong. Patentee before: Institute of intelligent manufacturing, Guangdong Academy of Sciences Country or region before: China |