CN106439209A - 一种新型高压联合气阀安装方案 - Google Patents

一种新型高压联合气阀安装方案 Download PDF

Info

Publication number
CN106439209A
CN106439209A CN201610780963.7A CN201610780963A CN106439209A CN 106439209 A CN106439209 A CN 106439209A CN 201610780963 A CN201610780963 A CN 201610780963A CN 106439209 A CN106439209 A CN 106439209A
Authority
CN
China
Prior art keywords
air valve
girder steel
steel beam
high pressure
pressure union
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610780963.7A
Other languages
English (en)
Other versions
CN106439209B (zh
Inventor
张俊
张青年
王虎
边兆光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Energy Engineering Group Tianjin Electric Power Construction Co Ltd
Original Assignee
China Energy Engineering Group Tianjin Electric Power Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Energy Engineering Group Tianjin Electric Power Construction Co Ltd filed Critical China Energy Engineering Group Tianjin Electric Power Construction Co Ltd
Priority to CN201610780963.7A priority Critical patent/CN106439209B/zh
Publication of CN106439209A publication Critical patent/CN106439209A/zh
Application granted granted Critical
Publication of CN106439209B publication Critical patent/CN106439209B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16KVALVES; TAPS; COCKS; ACTUATING-FLOATS; DEVICES FOR VENTING OR AERATING
    • F16K51/00Other details not peculiar to particular types of valves or cut-off apparatus
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16KVALVES; TAPS; COCKS; ACTUATING-FLOATS; DEVICES FOR VENTING OR AERATING
    • F16K99/00Subject matter not provided for in other groups of this subclass

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Arc Welding In General (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

本发明是一种新型高压联合气阀安装方案,其特征在于,包括如下步骤:在阀体上方的基础平台上预留的部位安装钢梁;依据设计数据的要求,预留安装相应的偏装值,确定好钢梁下吊板的中心焊接位置,同时做钢梁与基础的相对应的安装位置;将上述钢梁吊出至组合平台;在组合平台上进行吊板焊接、钢梁打磨除锈及油漆工作;在吊板处安装各自部位相应的拉杆组件;吊装钢梁,恢复钢梁至原定位位置;安装并紧固所有钢梁的连接螺栓;吊装高压联合气阀,并将拉杆与高压联合气阀阀门的销钉穿装上,高压联合气阀安装完成。

Description

一种新型高压联合气阀安装方案
技术领域
本发明涉及重型设备安装技术领域,尤其涉及一种新型高压联合气阀安装方案。
背景技术
在大型火力发电厂中,汽轮发电机组的控制组件—高压联合汽门,此装置的安装对设备的稳定运行有着至关重要的作用,安装方式的选择是关键。高压联合气阀倒挂在汽机房平台下,300MW级汽轮机高压联合气阀总重约为41t,600MW级高压联合气阀总重约为49.5t,1000MW级高压联合气阀总重约98t。传统的高压联合气阀吊架一般均焊接在土建已安装好的钢梁上,安装时在钢梁上画出吊板位置,搭设吊架,安装工在吊架上打磨钢梁油漆、焊工在吊架上焊接吊板,然后再挂手拉葫芦安装拉杆。此种方式需要工人进行高空作业,具有危险性,且存在高空作业防火难题,工人站在吊架上仰头打磨、焊接,工作难度大,效率低下。因此,需要设计一种新型高压联合气阀安装方案。
发明内容
本发明旨在解决现有技术的不足,而提供一种新型高压联合气阀安装方案。
本发明为实现上述目的,采用以下技术方案:一种新型高压联合气阀安装方案,其特征在于,包括如下步骤:
(1)在阀体上方的基础平台上预留的部位安装钢梁;
(2)依据设计数据的要求,预留安装相应的偏装值,确定好钢梁下吊板的中心焊接位置,同时做钢梁与基础的相对应的安装位置;
(3)将上述钢梁吊出至组合平台;
(4)在组合平台上进行吊板焊接、钢梁打磨除锈及油漆工作;
(5)在吊板处安装各自部位相应的拉杆组件;
(6)吊装钢梁,恢复钢梁至原定位位置;
(7)安装并紧固所有钢梁的连接螺栓;
(8)吊装高压联合气阀,并将拉杆与高压联合气阀阀门的销钉穿装上,高压联合气阀安装完成。
在步骤(1)中,安装钢梁时,连接螺栓无需全部安装,只要满足定位需求即可。
步骤(8)吊装高压联合气阀采用的设备是桥式起重机。
本发明的有益效果是:本发明将定位过吊板安装位置的钢梁吊出至平台上,进行后续工作,避免工人进行高空作业,安全系数大大提高,避免了工人站在吊架上仰头打磨、焊接,工作降低,效率大大提高。
具体实施方式
下面对本发明作进一步说明:
一种新型高压联合气阀安装方案,其特征在于,包括如下步骤:
(1)在阀体上方的基础平台上预留的部位安装钢梁;
(2)依据设计数据的要求,预留安装相应的偏装值,确定好钢梁下吊板的中心焊接位置,同时做钢梁与基础的相对应的安装位置;
(3)将上述钢梁吊出至组合平台;
(4)在组合平台上进行吊板焊接、钢梁打磨除锈及油漆工作;
(5)在吊板处安装各自部位相应的拉杆组件;
(6)吊装钢梁,恢复钢梁至原定位位置;
(7)安装并紧固所有钢梁的连接螺栓
(8)吊装高压联合气阀,并将拉杆与高压联合气阀阀门的销钉穿装上,高压联合气阀安装完成。
在步骤(1)中,安装钢梁时,连接螺栓无需全部安装,只要满足定位需求即可。
步骤(8)吊装高压联合气阀采用的设备是桥式起重机。
上面对本发明进行了描述,显然本发明具体实现并不受上述方式的限制,只要采用了本发明的方法构思和技术方案进行的各种改进,或未经改进直接应用于其它场合的,均在本发明的保护范围之内。

Claims (3)

1.一种新型高压联合气阀安装方案,其特征在于,包括如下步骤:
(1)在阀体上方的基础平台上预留的部位安装钢梁;
(2)依据设计数据的要求,预留安装相应的偏装值,确定好钢梁下吊板的中心焊接位置,同时做钢梁与基础的相对应的安装位置;
(3)将上述钢梁吊出至组合平台;
(4)在组合平台上进行吊板焊接、钢梁打磨除锈及油漆工作;
(5)在吊板处安装各自部位相应的拉杆组件;
(6)吊装钢梁,恢复钢梁至原定位位置;
(7)安装并紧固所有钢梁的连接螺栓;
(8)吊装高压联合气阀,并将拉杆与高压联合气阀阀门的销钉穿装上,高压联合气阀安装完成。
2.根据权利要求1所述的一种新型高压联合气阀安装方案,其特征在于,在步骤(1)中,安装钢梁时,连接螺栓无需全部安装,只要满足定位需求即可。
3.根据权利要求1或2所述的一种新型高压联合气阀安装方案,其特征在于,步骤(8)吊装高压联合气阀采用的设备是桥式起重机。
CN201610780963.7A 2016-08-31 2016-08-31 一种高压联合气阀安装方案 Active CN106439209B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610780963.7A CN106439209B (zh) 2016-08-31 2016-08-31 一种高压联合气阀安装方案

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610780963.7A CN106439209B (zh) 2016-08-31 2016-08-31 一种高压联合气阀安装方案

Publications (2)

Publication Number Publication Date
CN106439209A true CN106439209A (zh) 2017-02-22
CN106439209B CN106439209B (zh) 2019-01-15

Family

ID=58091853

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610780963.7A Active CN106439209B (zh) 2016-08-31 2016-08-31 一种高压联合气阀安装方案

Country Status (1)

Country Link
CN (1) CN106439209B (zh)

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6186382U (zh) * 1984-11-09 1986-06-06
JPS62237007A (ja) * 1986-04-09 1987-10-17 Hitachi Ltd 可搬式タ−ビンダイヤフラム吊運搬装置
CN87210761U (zh) * 1987-11-20 1988-09-07 牛前卫 起重机轨道支架
US6866579B2 (en) * 2002-07-11 2005-03-15 Applied Applications International, Inc. Boot hanger mounting bracket
CN101059014A (zh) * 2007-05-15 2007-10-24 广东省建筑设计研究院 一种钢管空心混凝土楼板及其施工方法
KR100821826B1 (ko) * 2006-11-30 2008-04-14 한국전력공사 터빈 유압작동기의 이송 및 고정장치
CN101759098A (zh) * 2008-11-28 2010-06-30 中冶成工上海五冶建设有限公司 吊车梁架施工方法
CN201817208U (zh) * 2010-06-13 2011-05-04 中国铝业股份有限公司 一种简易吊装机
CN102259794A (zh) * 2011-07-21 2011-11-30 长江航运规划设计院 整体组合式吊车梁的安装方法
CN103072004A (zh) * 2013-01-21 2013-05-01 湖南省第五工程有限公司 一种电动葫芦吊架的安装方法
DE202013000660U1 (de) * 2013-01-23 2014-04-24 Noell Mobile Systems Gmbh Portalhubstapler

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6186382U (zh) * 1984-11-09 1986-06-06
JPS62237007A (ja) * 1986-04-09 1987-10-17 Hitachi Ltd 可搬式タ−ビンダイヤフラム吊運搬装置
CN87210761U (zh) * 1987-11-20 1988-09-07 牛前卫 起重机轨道支架
US6866579B2 (en) * 2002-07-11 2005-03-15 Applied Applications International, Inc. Boot hanger mounting bracket
KR100821826B1 (ko) * 2006-11-30 2008-04-14 한국전력공사 터빈 유압작동기의 이송 및 고정장치
CN101059014A (zh) * 2007-05-15 2007-10-24 广东省建筑设计研究院 一种钢管空心混凝土楼板及其施工方法
CN101759098A (zh) * 2008-11-28 2010-06-30 中冶成工上海五冶建设有限公司 吊车梁架施工方法
CN201817208U (zh) * 2010-06-13 2011-05-04 中国铝业股份有限公司 一种简易吊装机
CN102259794A (zh) * 2011-07-21 2011-11-30 长江航运规划设计院 整体组合式吊车梁的安装方法
CN103072004A (zh) * 2013-01-21 2013-05-01 湖南省第五工程有限公司 一种电动葫芦吊架的安装方法
DE202013000660U1 (de) * 2013-01-23 2014-04-24 Noell Mobile Systems Gmbh Portalhubstapler

Also Published As

Publication number Publication date
CN106439209B (zh) 2019-01-15

Similar Documents

Publication Publication Date Title
CN113084380B (zh) 一种合成气/蒸汽联产气化炉现场装配方法
CN101829470B (zh) 电袋复合式除尘器施工技术
CN106144907A (zh) 一种轨道吊总装工艺
CN105442866B (zh) 用于大型高耸钢结构的保护性拆除和安装方法
CN105114976A (zh) 冷灰斗段前后水冷壁反向搬起吊装方法
CN106544959B (zh) 含有鞍座的主塔吊装节段及桥梁主塔鞍座的施工方法
CN106439209A (zh) 一种新型高压联合气阀安装方案
CN105932601A (zh) 架空地线断股修补方法
CN101818563B (zh) 自升式整体提升移动平台及使用方法
CN204850516U (zh) 一种用于钢结构厂房的水平生命线系统
CN203486787U (zh) 一种维金斯式煤气柜柜顶的整体提升装置
CN201702544U (zh) 风力发电机变桨轴承安装走台
CN105834272A (zh) 一种受限空间下的大型铝板拉伸机设备安装方法
CN108862005A (zh) 一种大直径钢制保温烟囱拆装方法
CN101776033B (zh) 立轴水斗式水轮机转轮液压拆装装置
CN204826704U (zh) 用于钢结构厂房的水平生命线系统
CN204703542U (zh) 一种钢结构施工用定型化拼装通道
CN202577927U (zh) 组装蜂窝网格柱结构钢框架用的悬挂式吊篮
CN203855324U (zh) 用于煤矿井下采煤工作面安装撤除时的起吊装置
CN205663226U (zh) 一种超高层建筑物顶部钢结构对称吊拉装置
CN205834583U (zh) 机架整体竖立工装
CN206437780U (zh) 风力发电机塔筒筒节起吊工具
CN202866303U (zh) 一种钢结构框架主次梁、次梁安装定位固定架
CN202744167U (zh) 一种用于大型多跨钢结构厂房钢柱柱头吊装的吊具
CN205527287U (zh) 核电站给水泵汽轮机上缸翻转装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant