CN106437774B - Single hole list cover tunnelling construction method - Google Patents

Single hole list cover tunnelling construction method Download PDF

Info

Publication number
CN106437774B
CN106437774B CN201611054354.XA CN201611054354A CN106437774B CN 106437774 B CN106437774 B CN 106437774B CN 201611054354 A CN201611054354 A CN 201611054354A CN 106437774 B CN106437774 B CN 106437774B
Authority
CN
China
Prior art keywords
construction method
cover
protective cover
single hole
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611054354.XA
Other languages
Chinese (zh)
Other versions
CN106437774A (en
Inventor
张延年
周佳新
汪青杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Far Zhuo Construction Engineering Co.,Ltd.
Original Assignee
Shenyang Jianzhu University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Jianzhu University filed Critical Shenyang Jianzhu University
Priority to CN201611054354.XA priority Critical patent/CN106437774B/en
Publication of CN106437774A publication Critical patent/CN106437774A/en
Application granted granted Critical
Publication of CN106437774B publication Critical patent/CN106437774B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/003Linings or provisions thereon, specially adapted for traffic tunnels, e.g. with built-in cleaning devices
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/15Plate linings; Laggings, i.e. linings designed for holding back formation material or for transmitting the load to main supporting members
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/003Machines for drilling anchor holes and setting anchor bolts

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Civil Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The present invention provides a kind of single hole list cover tunnelling construction method, the 1st steps:Advance anchor bolt, ductule installation, slip casting;2nd step:Tunnel border line excavates;3rd step:Protective cover enters tunnel border line;4th step:Tunnel cutting;5th step:First pneumatically placed concrete;6th step:Reinforced mesh is installed;7th step:Steelframe(Steel grating)Installation;8th step:Rockbolt installation;9th step:To carrying out secondary injection concrete on the upside of protective cover;10th step:Part other than secondary lining protective cover.The beneficial effects of the invention are as follows constructing convenient for tunnelling, simplify supporting, utmostly ensure personnel and property safety, and simple in structure, easy to process with operation, the feasibility for excavating different tunnels is high.

Description

Single hole list cover tunnelling construction method
Technical field
The present invention relates to tunnel construction technologies, more particularly to a kind of single hole list cover tunnelling construction method.
Background technology
When by a variety of accumulation bodies, due to loosely organized, without cementing or cementing difference between particle, cause to cave in after excavation. The accident that Geological Hazard is caused is also very more, this is still continued to use constant in the case where not knowing front adverse geological condition Construction means, caused by not taking targetedly treatment measures in time.Front of tunnel heading rock crusher, joints development, rock Stone trend is vertical, has interburden layer, front not to plan a successor band etc. between rock stratum, these unfavorable geologies easily cause cave in accident.Therefore, The single hole list cover tunnelling construction method of exploitation is of great significance.
Invention content
It is an object of the invention to solve the cave in accident during tunnelling, effective protection construction safety simplifies just Phase supporting.
To achieve the goals above, the technical solution adopted by the present invention is:
Single hole list cover tunnelling construction method, includes the following steps:
1st step:Advance anchor bolt, ductule installation, slip casting;
2nd step:Tunnel border line excavates;
3rd step:Protective cover enters tunnel border line;
4th step:Tunnel cutting;
5th step:First pneumatically placed concrete;
6th step:Reinforced mesh is installed;
7th step:Steelframe(Steel grating)Installation;
8th step:Rockbolt installation;
9th step:To carrying out secondary injection concrete on the upside of protective cover;
10th step:Part other than secondary lining protective cover.
1st step further comprises:
1)Advanced hollow grouting anchor, ductule and grid steel frame are used cooperatively, rock-bolt length 4.5m, ductule be for 3.5m, and should be greater than 2 times of cyclic advance;
2)Advance anchor bolt extrapolation angle is 10-15 °, and the outer limb of ductule is 10-25 °;
3)The slip casting of ductule periphery is suitable for from the stratum of 6 ~ 12 hours steady time.
2nd step further comprises:
1) it is excavated from side to the 1/3 of entire arc length;
2)Remaining segmental arc is excavated from the other side;
3)Clear up tunnel border line.
3rd step further comprises:
1)The depth that protective cover once enters tunnel border line is 1/3 ~ 2/3;
2)The secondary lining time conserves gunite concrete on the upside of protective cover on the outside of using protective cover;
3)After first pneumatically placed concrete, meet the secondary lining time and maintenance stabilization time, can carry out next section the 1st step ~ 4th step.
5th step further comprises:
1)First injection top arch, from left to right or from right to left;
2)Fill-before-fire both sides wall, from bottom to top;
6th step further comprises:
1), can be without first pneumatically placed concrete when country rock surface is more smooth, and bar-mat reinforcement is first hung, bar-mat reinforcement need to be close to rock Wall, then pneumatically placed concrete covering;
2)When using double layer bar, second layer bar-mat reinforcement is laid with after first layer bar-mat reinforcement is covered by concrete, is covered Lid thickness is not less than 3cm;
3)Bar-mat reinforcement is connected firmly with anchor pole.
7th step further comprises:
1) cross dimensions inspection is carried out before installing, timely processing owes to dig intrusion headroom part;
2) in-site measurement positions, and determines tunnel center line first, determines elevation, then measure steelframe again(Steel grating)It is vertical To position;Steelframe(Steel grating)Thickness of shotcrete between country rock is not less than 40mm;
3) two rows of steelframes(Steel grating)Between peripherally every 1m 22 longitudinal reinforcement weld connections of φ, formed longitudinally connected System.
8th step further comprises:
1)Bolthole position deviation is not more than 150mm, and hole keeps straight line;The length of body of rod exposed surface is thick no more than spray-up Degree;
2)Anchor pole mortar is full, and makees pull-out bond test, and every 300 anchor poles inspect one group, every group 3 by random samples.
9th step further comprises:
1)Both sides wall is first sprayed, from bottom to top;
2)Arch at the top of fill-before-fire, from left to right or from right to left.
10th step further comprises:
1)Section inspection;
2)It is symmetrically carried out from both sides arch springing to vault;
3)Inverted arch and bottom plate.
Protective cover mainly adds including driving port, exterior side port, outer protective plate support plate, easy sliding floor, base angle support Strong protection board, circumferential ribs, it is characterised in that:The vertical cross section of outer protective plate support plate is arch, rectangle, ellipse (Cut away part in bottom), it is round(Cut away part in bottom), the unshielded plate in bottom, thickness is 5 ~ 50mm;Tunnel port, exterior side port It is vertical, driving port cross-sectional is more than 200 ~ 400mm of exterior side port section, the outer protection between driving port, exterior side port Plate support plate uniformly continuous is excessive;Several circumferential ribs of inside setting of outer protective plate support plate, circumferential ribs place are flat Face is vertical, and vertical outer protective plate support plate, and the spacing of circumferential ribs is 200 ~ 500mm;In the outer protection of two side bottoms The bottom of plate support plate is respectively easy sliding floor, and easy sliding floor is level, and width is 200 ~ 400mm;In outer protective plate branch The inside or outside of fagging or inner side and outer side setting base angle support reinforcing protection board (4-5), base angle support reinforcing protection board One end is connect with easy sliding floor, and the other end is connect with outer protective plate support plate, the horizontal both ends of base angle support reinforcing protection board It arrives separately at driving port and exterior side port, main support monolithic stability simultaneously protects easy sliding floor.
Easy sliding floor is mainly by driving wheel, support sprocket wheel, directive wheel, thrust wheel, equalizer bar, steel plate track frame and creeper tread Deng composition, there are multiple support sprocket wheels, support sprocket wheel to be uniformly distributed on the top of steel plate track frame;Have in the lower part of steel plate track frame multigroup Thrust wheel, every group of thrust wheel is 2 ~ 8, and the connection axle center of thrust wheel is connected with equalizer bar, and equalizer bar (4-4-5) is carried out with steel plate Tape holder connect, be at one end driving wheel, the other end be directive wheel, driving wheel, support sprocket wheel, directive wheel, thrust wheel outside be Creeper tread.
The beneficial effects of the invention are as follows constructing convenient for tunnelling, simplify supporting, utmostly ensures personnel and property peace Entirely, and simple in structure, easy to process with operation, the feasibility for excavating different tunnels is high.
Description of the drawings
Fig. 1 is advance anchor bolt, ductule installation, slip casting schematic diagram.
Fig. 2 is that tunnel border line excavates schematic diagram.
Fig. 3 is that protective cover enters tunnel border line schematic diagram.
Fig. 4 is tunnel cutting schematic diagram.
Fig. 5 is first pneumatically placed concrete schematic diagram.
Fig. 6 is reinforced mesh, steelframe(Steel grating)Scheme of installation.
Fig. 7 is rockbolt installation schematic diagram.
Fig. 8 is protective cover side elevation schematic diagram.
Fig. 9 is protective cover exterior side port elevational schematic view.
Figure 10 is easy sliding floor schematic diagram.
In figure:1 is advanced hollow grouting anchor;2 be non-tunneling;3 be tunnel border line;4 be protective cover;5 be hole Body tunneling;6 be pneumatically placed concrete;7 be reinforced mesh and steelframe(Steel grating);8 be anchor pole.
4-1 is driving port;4-2 is exterior side port;4-3 is outer protective plate support plate;4-4 is easy sliding floor;4-5 is Base angle support reinforcing protection board;4-6 is circumferential ribs;4-4-1 is driving wheel;4-4-2 is support sprocket wheel;4-4-3 is directive wheel; 4-4-4 is thrust wheel;4-4-5 is equalizer bar;4-4-6 is steel plate track frame;4-4-7 is creeper tread.
Specific implementation mode
In order to further illustrate the present invention, the present invention is described in detail with reference to the accompanying drawings and embodiments, but not They can be interpreted as limiting the scope of the present invention.
Embodiment:A kind of list hole list cover tunnelling construction method, as shown in Figure 1, including mainly driving port 4-1, outer Side ports 4-2, outer protective plate support plate 4-3, easy sliding floor 4-4, base angle support reinforcing protection board 4-5, circumferential ribs 4- 6。
Single hole list cover tunnelling construction method, which is characterized in that include the following steps:
1st step:Advance anchor bolt, ductule installation, slip casting;
2nd step:Tunnel border line excavates;
3rd step:Protective cover enters tunnel border line;
4th step:Tunnel cutting;
5th step:First pneumatically placed concrete;
6th step:Reinforced mesh is installed;
7th step:Steelframe(Steel grating)Installation;
8th step:Rockbolt installation;
9th step:To carrying out secondary injection concrete on the upside of protective cover;
10th step:Part other than secondary lining protective cover;
11st step:Return to the 1st step.
1st step specifically includes:
1)Advanced hollow grouting anchor, ductule and grid steel frame are used cooperatively, rock-bolt length 4.5m, ductule be for 3.5m, and should be greater than 2 times of cyclic advance;
2)Advance anchor bolt extrapolation angle is 10-15 °, and the outer limb of ductule is 10-25 °;
3)The slip casting of ductule periphery was suitable for from 6 ~ 12 hours steady time.
2nd step specifically includes:
1) it is excavated from side to the 1/3 of entire arc length;
2)Remaining segmental arc is excavated from the other side;
3)Clear up tunnel border line.
3rd step specifically includes:
1)The depth that protective cover once enters tunnel border line is 1/3 ~ 2/3;
2)The secondary lining time conserves gunite concrete on the upside of protective cover on the outside of using protective cover;
3)After first pneumatically placed concrete, meet the secondary lining time and maintenance stabilization time, can carry out next section the 1st step ~ 4th step.
5th step specifically includes:
1)First injection top arch, from left to right or from right to left;
2)Fill-before-fire both sides wall, from bottom to top.
6th step specifically includes:
1), can be without first pneumatically placed concrete when country rock surface is more smooth, and bar-mat reinforcement is first hung, bar-mat reinforcement need to be close to rock Wall, then pneumatically placed concrete covering;
2)When using double layer bar, second layer bar-mat reinforcement is laid with after first layer bar-mat reinforcement is covered by concrete, is covered Lid thickness is not less than 3cm;
3)Bar-mat reinforcement is connected firmly with anchor pole.
7th step specifically includes:
1) cross dimensions inspection is carried out before installing, timely processing owes to dig intrusion headroom part;
2) in-site measurement positions, and determines tunnel center line first, determines elevation, then measure steelframe again(Steel grating)It is vertical To position;Steelframe(Steel grating)Thickness of shotcrete between country rock is not less than 40mm;
3) two rows of steelframes(Steel grating)Between peripherally every 1m 22 longitudinal reinforcement weld connections of φ, formed longitudinally connected System;
8th step specifically includes:
1)Bolthole position deviation is not more than 150mm, and hole keeps straight line;The length of body of rod exposed surface is thick no more than spray-up Degree;
2)Anchor pole mortar is full, and makees pull-out bond test, and every 300 anchor poles inspect one group, every group 3 by random samples.
9th step specifically includes:
1)Both sides wall is first sprayed, from bottom to top;
2)Arch at the top of fill-before-fire, from left to right or from right to left;
10th step specifically includes:
1)Section inspection;
2)It is symmetrically carried out from both sides arch springing to vault;
3)Inverted arch and bottom plate.
Protective cover includes mainly driving port 4-1, exterior side port 4-2, outer protective plate support plate 4-3, easy sliding floor 4- 4, base angle support reinforcing protection board 4-5, circumferential ribs 4-6, it is characterised in that:Outer protective plate support plate 4-3's is vertical cross-section Face is arch, rectangle, ellipse(Cut away part in bottom), it is round(Cut away part in bottom), the unshielded plate in bottom, thickness be 5 ~ 50mm;Driving port 4-1, exterior side port 4-2 be it is vertical, the driving port sections 4-1 be more than the sections exterior side port 4-2 200 ~ 400mm, the outer protective plate support plate 4-3 uniformly continuous between driving port 4-1, exterior side port 4-2 are excessive;Outer protective plate support Several circumferential ribs 4-6 of inside setting of plate 4-3, plane where circumferential ribs 4-6 is vertical, and vertical outer protective plate branch The spacing of fagging 4-3, circumferential ribs (4-6) are 200 ~ 500mm;In the bottom of the outer protective plate support plate 4-3 of two side bottoms Respectively easy sliding floor 4-4, easy sliding floor 4-4 are level, and width is 200 ~ 400mm;Outer protective plate support plate 4-3's Inside or outside or inner side and outer side are arranged base angle support reinforcing protection board 4-5, base angle support reinforcing one end protection board 4-5 with Easy sliding floor 4-4 connections, the other end are connect with outer protective plate support plate 4-3, the level two of base angle support reinforcing protection board 4-5 End arrives separately at driving port 4-1 and exterior side port 4-2, and main support monolithic stability simultaneously protects easy sliding floor 4-4.
Easy sliding floor 4-4 includes driving wheel 4-4-1, support sprocket wheel 4-4-2, directive wheel 4-4-3, thrust wheel 4-4-4, balance Beam 4-4-5, steel plate track frame 4-4-6 and creeper tread 4-4-7 have multiple support sprocket wheel 4-4- on the top of steel plate track frame 4-4-6 2, support sprocket wheel 4-4-2 is uniformly distributed;There are multigroup thrust wheel 4-4-4, every group of thrust wheel 4-4- in the lower part of steel plate track frame 4-4-6 4 be 2 ~ 8, and the connection axle center of thrust wheel 4-4-4 is connected with equalizer bar 4-4-5, equalizer bar 4-4-5 and steel plate track frame 4-4- 6 connections, are at one end driving wheel 4-4-1, are directive wheel 4-4-3 in the other end, driving wheel 4-4-1, support sprocket wheel 4-4-2, are oriented to Take turns 4-4-3, the outside of thrust wheel 4-4-4 is creeper tread 4-4-7.
The above is only embodiments of the present invention, it is noted that those skilled in the art are come It says, various improvements and modifications may be made without departing from the principle of the present invention, these improvements and modifications also should be regarded as Protection scope of the present invention.

Claims (10)

1. a kind of list hole list cover tunnelling construction method, which is characterized in that include the following steps:
1st step:Advance anchor bolt and ductule installation, slip casting;
2nd step:Tunnel border line excavates;
3rd step:Protective cover enters tunnel border line;
4th step:Tunnel cutting;
5th step:First pneumatically placed concrete;
6th step:Reinforced mesh is installed;
7th step:Steelframe is installed;
8th step:Rockbolt installation;
9th step:To carrying out secondary injection concrete on the upside of protective cover;
10th step:Part other than secondary lining protective cover;
Protective cover includes driving port (4-1), exterior side port (4-2), outer protective plate support plate (4-3), easy sliding floor (4- 4), base angle support reinforcing protection board (4-5), circumferential ribs (4-6);The vertical cross section of outer protective plate support plate (4-3) is The circle that ellipse that arch, rectangle, bottom are cut away, bottom are cut away, the unshielded plate in bottom, thickness are 5 ~ 50mm;Tunnel port (4-1), exterior side port (4-2) are vertical, and driving port (4-1) depth of section is more than exterior side port (4-2) depth of section 200 ~ 400mm, outer protective plate support plate (4-3) uniformly continuous between driving port (4-1), exterior side port (4-2) are excessive;It is outer anti- Several circumferential ribs (4-6) of inside setting of baseboard support plate (4-3), plane where circumferential ribs (4-6) is vertical, and The spacing of vertical outer protective plate support plate (4-3), circumferential ribs (4-6) is 200 ~ 500mm;In the outer protective plate of two side bottoms The bottom of support plate (4-3) is respectively easy sliding floor (4-4), and easy sliding floor (4-4) is level, and width is 200 ~ 400mm; At the inside of outer protective plate support plate (4-3) or outside or inner side and outer side setting base angle support reinforcing protection board (4-5), bottom Angle support reinforcing protection board one end (4-5) is connect with easy sliding floor (4-4), and the other end connects with outer protective plate support plate (4-3) It connects, the horizontal both ends of base angle support reinforcing protection board (4-5) arrive separately at driving port (4-1) and exterior side port (4-2), support Monolithic stability simultaneously protects easy sliding floor (4-4);
Easy sliding floor (4-4) by driving wheel (4-4-1), support sprocket wheel (4-4-2), directive wheel (4-4-3), thrust wheel (4-4-4), Equalizer bar (4-4-5), steel plate track frame (4-4-6) and creeper tread (4-4-7) are constituted, on the top of steel plate track frame (4-4-6) There are multiple support sprocket wheels (4-4-2), support sprocket wheel (4-4-2) to be uniformly distributed;There is multigroup Zhi Chong in the lower part of steel plate track frame (4-4-6) It takes turns (4-4-4), every group of thrust wheel (4-4-4) is 2 ~ 8, and the connection axle center of thrust wheel (4-4-4) is connected with equalizer bar (4-4-5) It connects, equalizer bar (4-4-5) is connect with steel plate track frame (4-4-6), is at one end driving wheel (4-4-1), is to be oriented in the other end Take turns (4-4-3), driving wheel (4-4-1), support sprocket wheel (4-4-2), directive wheel (4-4-3), thrust wheel (4-4-4) outside be crawler belt Plate (4-4-7).
2. a kind of single hole list cover tunnelling construction method according to claim 1, which is characterized in that the 1st step tool Body includes:
1)Advanced hollow grouting anchor, ductule and grid steel frame are used cooperatively, rock-bolt length 4.5m, and ductule length is 3.5m, and should be greater than 2 times of cyclic advance;
2)Advance anchor bolt extrapolation angle is 10-15 °, and the outer limb of ductule is 10-25 °;
3)The slip casting of ductule periphery is suitable for from the stratum of 6 ~ 12 hours steady time.
3. a kind of single hole list cover tunnelling construction method according to claim 1, which is characterized in that the 2nd step tool Body includes:
1)It is excavated from side to the 1/3 of entire arc length;
2)Remaining segmental arc is excavated from the other side;
3)Clear up tunnel border line.
4. a kind of single hole list cover tunnelling construction method according to claim 1, which is characterized in that the 3rd step tool Body includes:
1)The depth that protective cover once enters tunnel border line is the 1/3 ~ 2/3 of protective cover length;
2)The secondary lining time conserves gunite concrete on the upside of protective cover on the outside of using protective cover.
5. a kind of single hole list cover tunnelling construction method according to claim 1, which is characterized in that the 5th step tool Body includes:
1)First injection top arch, from left to right or from right to left;
2)Fill-before-fire both sides wall, from bottom to top.
6. a kind of single hole list cover tunnelling construction method according to claim 1, which is characterized in that the 6th step tool Body includes:
1)When country rock surface is more smooth, without first pneumatically placed concrete, and bar-mat reinforcement is first hung, bar-mat reinforcement need to be close to palisades, then spray Concrete covers;
2)When using double layer bar, second layer bar-mat reinforcement is laid with after first layer bar-mat reinforcement is covered by concrete, and covering is thick Degree is not less than 3cm;
3)Bar-mat reinforcement is connected firmly with anchor pole.
7. a kind of single hole list cover tunnelling construction method according to claim 1, which is characterized in that the 7th step tool Body includes:
1) cross dimensions inspection is carried out before installing, timely processing owes to dig intrusion headroom part;
2) in-site measurement positions, and determines tunnel center line first, determines elevation, then measures the lengthwise position of steelframe again;Steelframe Thickness of shotcrete between country rock is not less than 40mm;
3) between two rows of steelframes longitudinally connected system is formed peripherally every 1m diameter 22mm longitudinal reinforcement weld connections.
8. a kind of single hole list cover tunnelling construction method according to claim 1, which is characterized in that the 8th step tool Body includes:
1)Bolthole position deviation is not more than 150mm, and hole keeps straight line;The length of body of rod exposed surface is not more than jetting thickness;
2)Anchor pole mortar is full, and makees pull-out bond test, and every 300 anchor poles inspect one group, every group 3 by random samples.
9. a kind of single hole list cover tunnelling construction method according to claim 1, which is characterized in that the 9th step tool Body includes:
1)Both sides wall is first sprayed, from bottom to top;
2)Arch at the top of fill-before-fire, from left to right or from right to left.
10. a kind of single hole list cover tunnelling construction method according to claim 1, which is characterized in that the 10th step It specifically includes:
1)Section inspection;
2)It is symmetrically carried out from both sides arch springing to vault;
3)Inverted arch and bottom plate.
CN201611054354.XA 2016-11-25 2016-11-25 Single hole list cover tunnelling construction method Active CN106437774B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611054354.XA CN106437774B (en) 2016-11-25 2016-11-25 Single hole list cover tunnelling construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611054354.XA CN106437774B (en) 2016-11-25 2016-11-25 Single hole list cover tunnelling construction method

Publications (2)

Publication Number Publication Date
CN106437774A CN106437774A (en) 2017-02-22
CN106437774B true CN106437774B (en) 2018-10-02

Family

ID=58219843

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611054354.XA Active CN106437774B (en) 2016-11-25 2016-11-25 Single hole list cover tunnelling construction method

Country Status (1)

Country Link
CN (1) CN106437774B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107504872B (en) * 2017-09-13 2019-03-05 大连理工大学 A kind of blasting method for preventing tunnel arch foot to owe to dig

Also Published As

Publication number Publication date
CN106437774A (en) 2017-02-22

Similar Documents

Publication Publication Date Title
JP7125550B2 (en) SUPPORT STRUCTURE AND CONSTRUCTION METHOD FOR TWO-STAGE HIGH-SPEED CLOSING TUNNEL WITH INVERTED ARCH
CN102926757B (en) The construction method of the mountain ridge weak Large span tunnel two step four step excavation supporting
CN106761778B (en) A kind of underground digging in subway station construction technology suitable for upper-soft lower-hard ground
CN106567718B (en) A kind of construction method of compound stratum list arch super-span subway station kerve support replacement
CN205742213U (en) Foundation pit supporting construction
CN103821167A (en) Construction method for subway station body
CN104612698A (en) Method for constructing upper step middle partition wall of shallow-buried excavation tunnel
CN110185457B (en) TBM (Tunnel boring machine) horizontal pilot tunnel construction method
CN105201516B (en) A kind of main structure of subway station and its tetrad arch PBA excavating construction methods
CN111997639B (en) Method for getting rid of trouble and reinforcing and improving geology of TBM construction tunnel bad geology section card machine
CN107725064A (en) Tunnel partition wall structure and the method that tunnel step excavation is realized using middle-wall method
CN102061923A (en) Tunnel construction method capable of protecting existing building
CN103603679A (en) Vault steel frame for support tunnel arch and tunnel construction method
CN204851266U (en) Secretly dig shaft structure directly over station
CN205036380U (en) Block of four encircles PBA and secretly digs subway station major structure
CN107339109A (en) The construction method of existing road is worn under super Shallow tunnel with large cross-section
CN106437774B (en) Single hole list cover tunnelling construction method
CN207609428U (en) The ground handling well Shed-pipe Advanced Support pre-add solid system of existing object is worn under shield section
CN109578035A (en) Steel pipe draining lock foot stake and construction method
CN112879016A (en) Construction method of tunnel with upper soft and lower hard strata
CN109209484A (en) A kind of return channel combination lotion prefabricated section back work face withdraws method
CN113107501A (en) Initial tunneling construction method for portal extension steel ring
CN110735641B (en) Construction method of transfer passage of underpass pipeline
CN104453915A (en) Large-section vertical shaft pre-grouting reinforcement quick excavation method
CN205036388U (en) Block of four encircles knot hunch construction structures that PBA secretly dug subway station

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200728

Address after: 430074 No.1, 6 / F, building 15, 20 / F, headquarters base, contemporary international garden, south of Zhengqiao Village Middle Ring Road, East Lake New Technology Development Zone, Wuhan, Hubei Province

Patentee after: Far Zhuo Construction Engineering Co.,Ltd.

Address before: 110168 Liaoning province Shenyang Hunnan Hunnan Road No. 9

Patentee before: SHENYANG JIANZHU University

TR01 Transfer of patent right