CN106410954B - The control method of region prepared auto restart, device and prepared auto restart control method, system - Google Patents

The control method of region prepared auto restart, device and prepared auto restart control method, system Download PDF

Info

Publication number
CN106410954B
CN106410954B CN201610954301.7A CN201610954301A CN106410954B CN 106410954 B CN106410954 B CN 106410954B CN 201610954301 A CN201610954301 A CN 201610954301A CN 106410954 B CN106410954 B CN 106410954B
Authority
CN
China
Prior art keywords
auto restart
prepared auto
region
station domain
station
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610954301.7A
Other languages
Chinese (zh)
Other versions
CN106410954A (en
Inventor
李晶
刘金生
蔡莹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Power Supply Bureau of Guangdong Power Grid Co Ltd
Original Assignee
Guangzhou Power Supply Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Power Supply Bureau Co Ltd filed Critical Guangzhou Power Supply Bureau Co Ltd
Priority to CN201610954301.7A priority Critical patent/CN106410954B/en
Publication of CN106410954A publication Critical patent/CN106410954A/en
Application granted granted Critical
Publication of CN106410954B publication Critical patent/CN106410954B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J9/00Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting
    • H02J9/04Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source
    • H02J9/06Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems
    • H02J9/061Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems for DC powered loads

Landscapes

  • Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Small-Scale Networks (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Safety Devices In Control Systems (AREA)

Abstract

The present invention relates to a kind of control method of region prepared auto restart, device and prepared auto restart control method systems, the control method of the region prepared auto restart includes: after the starting of region prepared auto restart, continue to send pause instruction to the station domain prepared auto restart for communicating with connection, it is acted by station domain prepared auto restart according to pause instruction pause, to domain prepared auto restart pause isolated fault of standing, after prepared auto restart acts successfully when region, blocking order is sent to station domain prepared auto restart, is failure to actuate by station domain prepared auto restart according to blocking order locking.After region prepared auto restart acts successfully, restore the power supply of corresponding chain type power grid decompression plant stand, and domain prepared auto restart of standing is failure to actuate according to blocking order, station domain prepared auto restart isolated fault is avoided to disconnect the supply path on chain type power grid between open loop point and fault point, to pay the utmost attention to the movement of region prepared auto restart in the case where the movement of region prepared auto restart, restore the power supply of bigger decompression range.

Description

The control method of region prepared auto restart, device and prepared auto restart control method, system
Technical field
The present invention relates to electric system transmission & distribution electro-technical field, more particularly to a kind of region prepared auto restart control method, Device and prepared auto restart control method, system.
Background technique
Prepared auto restart, i.e. automatic throw-in equipment of emergency power supply, when working power because failure disconnect after, can automatically and promptly incite somebody to action In-put of spare power supply is gone to working or user being switched on backup power source, so that the one kind for making user be unlikely to be had a power failure is automatic Device.In recent years, automatic closing technology is used widely in 220kV and the power grid of following level, is maintaining power grid It stabilizes and increases power supply reliability etc. and has played important function.
There are many chain structure power grids in 220kV or 110kV power grid, tactic pattern is both ends power supply, chain type knot Open loop operation among structure, when the tripping of source side main transformer, bus or line fault, it is possible to lead to multiple power transformation no-voltage of entire station, Cause large-area power-cuts.The load of open loop point plant stand can only be saved, by traditional station domain prepared auto restart in order to avoid such event Generation, many places consider the installation area prepared auto restarts in the power grid of chain structure at present, reduce failure to a certain extent The region of power failure and time improve customer power supply reliability.
But if only considering installation area prepared auto restart not configuration station domain prepared auto restart, in the case where breaking in the communications, region is standby It will be latched from throwing, system jam, the load at open loop point station also will be unable to save at this time, therefore in area control system It should be provided with region prepared auto restart and station domain backup power automatic switching function in construction, but how to realize between region prepared auto restart and station domain prepared auto restart Coordinated control be a technological difficulties.
Summary of the invention
Based on this, it is necessary to control method, device and the prepared auto restart control method, system of a kind of region prepared auto restart are provided, It can be realized region prepared auto restart and station domain prepared auto restart coordinated control.
A kind of control method of region prepared auto restart, comprising:
After the starting of region prepared auto restart, continue to send pause instruction to the station domain prepared auto restart for communicating with connection, by described Domain prepared auto restart of standing is acted according to the pause instruction pause;
After the region prepared auto restart acts successfully, blocking order is sent to the station domain prepared auto restart, it is standby by the station domain It is failure to actuate from throwing according to blocking order locking.
A kind of prepared auto restart control method, comprising:
After the starting of region prepared auto restart, continue to send pause instruction to the station domain prepared auto restart for communicating with connection;The station domain Prepared auto restart is acted according to the pause instruction pause;
After the region prepared auto restart acts successfully, blocking order is sent to the station domain prepared auto restart;
The station domain prepared auto restart is failure to actuate according to blocking order locking.
A kind of control device of region prepared auto restart, comprising:
Whether detection module starts for detection zone prepared auto restart;
Control module, for after the detection module detects region prepared auto restart starting, continue to the area The station domain prepared auto restart of domain prepared auto restart communication connection sends pause instruction, is suspended by the station domain prepared auto restart according to the pause instruction Movement;And after the region prepared auto restart acts successfully, blocking order is sent to the station domain prepared auto restart, it is standby certainly by the station domain It throws and is failure to actuate according to blocking order locking.
A kind of prepared auto restart control system, at least one including region prepared auto restart and with region prepared auto restart communication connection Station domain prepared auto restart;The region prepared auto restart has the control device of above-mentioned region prepared auto restart.
The control method of above-mentioned region prepared auto restart continues to send to station domain prepared auto restart temporary after the starting of region prepared auto restart Stop instruction is acted by station domain prepared auto restart according to pause instruction pause, thus domain prepared auto restart pause isolated fault of standing, when region is standby certainly After throwing acts successfully, blocking order is sent to station domain prepared auto restart, is failure to actuate by station domain prepared auto restart according to blocking order locking.Region After prepared auto restart acts successfully, restore the power supply of corresponding chain type power grid decompression plant stand, and domain prepared auto restart of standing is motionless according to blocking order Make, station domain prepared auto restart isolated fault is avoided to disconnect the supply path on chain type power grid between open loop point and fault point, thus Region prepared auto restart pays the utmost attention to the movement of region prepared auto restart in the case where acting, restore the power supply of bigger decompression range.
Detailed description of the invention
Fig. 1 is that the structural schematic diagram from the control system thrown is thrown in the region of one embodiment;
Fig. 2 is the flow chart of the control method of the region prepared auto restart of one embodiment;
Fig. 3 is the timing explanatory diagram that the region prepared auto restart of one embodiment is interacted with station domain prepared auto restart;
Fig. 4 is the timing explanatory diagram that the region prepared auto restart of another embodiment is interacted with station domain prepared auto restart;
Fig. 5 is the schematic diagram of the chain structure power grid of one embodiment;
Fig. 6 is the flow chart of the control method of the region prepared auto restart of another embodiment;
Fig. 7 is the structural schematic diagram of the control device of the region prepared auto restart of one embodiment.
Specific embodiment
As shown in Figure 1, a kind of prepared auto restart control system, including a region prepared auto restart 102, and it is logical with region prepared auto restart Believe an at least station domain prepared auto restart 104 for connection.
Domain prepared auto restart 104 of standing is arranged in each substation of regional power grid, and the weight of regional power grid is arranged in region prepared auto restart It wants in plant stand, is communicated to connect with the station domain prepared auto restart in regional power grid.Specifically, region prepared auto restart 102 and station domain prepared auto restart 104 It is connected by way of wire communication or wireless communication.It is understood that region prepared auto restart 102 and station domain prepared auto restart 104 have There is communication interface.It is communicatively coupled by communication interface, stand domain prepared auto restart 104 and the realization regional power grid of region prepared auto restart 102 Information sharing.
Region prepared auto restart 102 is provided with control device, for realizing the control to the station domain prepared auto restart in region.The control The implementation method of device is as shown in Figure 2, comprising the following steps:
S202: after the starting of region prepared auto restart, continuing to send pause instruction to the station domain prepared auto restart for communicating with connection, by Domain prepared auto restart of standing is acted according to pause instruction pause.
After domain prepared auto restart of standing starting, it is necessary to first pass through the auxiliaries-supply circuit-breaker put into again after delay isolated fault.It stands domain After prepared auto restart starting, during the delay of isolated fault, region prepared auto restart continues to send pause instruction to station domain prepared auto restart.It stands domain Prepared auto restart is after receiving pause instruction, pause movement, thus domain prepared auto restart pause isolated fault of standing, it is ensured that open on chain type power grid The integrality of supply path between circling point and fault point.
S204: after when region, prepared auto restart is acted successfully, to station domain prepared auto restart send blocking order, by station domain prepared auto restart according to Blocking order locking is failure to actuate.
After the starting of region prepared auto restart, continue to send pause instruction to station domain prepared auto restart, if region prepared auto restart acts successfully, Blocking order is sent to station domain prepared auto restart.Domain prepared auto restart stand after receiving blocking order, is failure to actuate according to blocking order.Region After prepared auto restart acts successfully, restore the power supply of corresponding chain type power grid decompression plant stand, and domain prepared auto restart of standing is motionless according to blocking order Make.
The control method of above-mentioned region prepared auto restart continues to send to station domain prepared auto restart temporary after the starting of region prepared auto restart Stop instruction is acted by station domain prepared auto restart according to pause instruction pause, thus domain prepared auto restart pause isolated fault of standing, when region is standby certainly After throwing acts successfully, blocking order is sent to station domain prepared auto restart, is failure to actuate by station domain prepared auto restart according to blocking order locking.Region After prepared auto restart acts successfully, restore the power supply of corresponding chain type power grid decompression plant stand, and domain prepared auto restart of standing is motionless according to blocking order Make, station domain prepared auto restart isolated fault is avoided to disconnect the supply path on chain type power grid between open loop point and fault point, thus Region prepared auto restart pays the utmost attention to the movement of region prepared auto restart in the case where acting, avoid the power supply of bigger decompression range.
In another embodiment, further include step S206 please continue to refer to Fig. 2: when region prepared auto restart movement not at When function, stop sending pause instruction to station domain prepared auto restart, by standing, domain prepared auto restart acts after not receiving pause instruction.
Region prepared auto restart is failure to actuate including two kinds of situations, and one kind is that region prepared auto restart does not have operation condition, i.e. region is standby From the preset condition for throwing not up to starting.Another kind is the baulk of region prepared auto restart.
It is to be understood that region prepared auto restart presets corresponding entry condition with station domain prepared auto restart respectively, when When reaching respective default entry condition, region prepared auto restart is respectively started with station domain prepared auto restart.In the present embodiment, region prepared auto restart The starting time be not later than station domain prepared auto restart the starting time.
When region prepared auto restart does not have operation condition or baulk, then stop sending pause instruction to station domain prepared auto restart. Domain prepared auto restart of standing does not receive pause instruction and acts after not receiving blocking order, so that domain prepared auto restart isolated fault of standing, extensive The power supply of open loop website is corresponded to again.
The control method of the region prepared auto restart of the present embodiment, when region prepared auto restart does not have operation condition or baulk When, domain prepared auto restart of standing starting continues the power supply that fast quick-recovery corresponds to open loop website by domain prepared auto restart of standing, and avoids all decompression electricity The equal decompression of factory can not be restored, and provide double shield for the safe operation of power grid.
In another embodiment, it further comprises the steps of: when prepared auto restart movement in region is failed, is sent to station domain prepared auto restart Action command, by standing, domain prepared auto restart continues to act after receiving action command.In the present embodiment, when region prepared auto restart acts not When success, by region prepared auto restart to station domain prepared auto restart sending action instruction, domain prepared auto restart of standing is acted according to action command, is avoided All equal decompressions of decompression power plant can not be restored, and provide double shield for the safe operation of power grid.
A kind of prepared auto restart control method, as shown in Figure 3, comprising the following steps:
Step 1: after the starting of region prepared auto restart, continuing to send pause instruction to the station domain prepared auto restart for communicating with connection.
Step 2: domain prepared auto restart of standing is acted according to pause instruction pause.
Step 3: after region prepared auto restart acts successfully, sending blocking order to station domain prepared auto restart.
Step 4: domain prepared auto restart of standing is failure to actuate according to blocking order locking.
Above-mentioned prepared auto restart control method continues to send pause instruction to station domain prepared auto restart after the starting of region prepared auto restart, Stand domain prepared auto restart according to pause instruction pause act, thus stand domain prepared auto restart pause isolated fault, when region prepared auto restart movement at After function, blocking order is sent to station domain prepared auto restart, domain prepared auto restart of standing is failure to actuate according to blocking order locking.The movement of region prepared auto restart After after success, restore the power supply of corresponding chain type power grid decompression plant stand, and domain prepared auto restart of standing is failure to actuate according to blocking order, avoids standing Domain prepared auto restart isolated fault disconnects the supply path on chain type power grid between open loop point and fault point, thus in region prepared auto restart Prepared auto restart movement in region is paid the utmost attention in the case where movement, restores the power supply of bigger decompression range.
In another embodiment, as shown in figure 4, further comprise the steps of: when region prepared auto restart movement it is failed when, stop to Domain prepared auto restart of standing sends pause instruction, and domain prepared auto restart of standing continues to act after not receiving pause instruction.The present embodiment it is standby from Control method is thrown, when region prepared auto restart does not have operation condition or baulk, domain prepared auto restart of standing starting is standby certainly by station domain It throws and continues the power supply that fast quick-recovery corresponds to open loop website, avoid all equal decompressions of decompression power plant that from can not restoring, be the safety of power grid Operation provides double shield.
In another embodiment, it further comprises the steps of: when prepared auto restart movement in region is failed, is sent to station domain prepared auto restart Action command, domain prepared auto restart of standing continue to act after receiving action command.In the present embodiment, when region prepared auto restart movement not at When function, by region prepared auto restart to station domain prepared auto restart sending action instruction, domain prepared auto restart of standing is acted according to action command, avoids institute Losing the equal decompression of piezo plant can not restore, and provide double shield for the safe operation of power grid.
In the following, being illustrated by taking chain type power grid shown in fig. 5 as an example to a kind of control method of region prepared auto restart.Such as Fig. 5 Shown in chain type power grid, open loop point 220kV station 2 bus connection switch at, 220kV stand 2 bus fanout operations.
When the equal failure of 1 first and second line of Fig. 5 line section, the station domain of the region prepared auto restart and the station 220kV 2 that control main website is standby certainly The entry condition for meeting prepared auto restart movement simultaneously is thrown, if region prepared auto restart preferentially acts successfully and is latched station domain prepared auto restart, The bus connection switch that then station 220kV 2 is closed in the 1 first and second line isolated fault of region prepared auto restart tripping line section can restore the station 220kV 2 1M bus and 220kV station 1 power supply;It acts or is not incited somebody to action by region prepared auto restart if the station domain prepared auto restart at the station 220kV 2 is tried to be the first It is latched, then 2 first and second line of tripping our station line section is closed bus connection switch by the station domain prepared auto restart at the station 220kV 2, is only capable of at this time extensive The 1M bussed supply at the multiple station 220kV 2.
Using a kind of control method of region prepared auto restart of the invention, as shown in fig. 6, being held first after the starting of region prepared auto restart Continue to station domain prepared auto restart hair " pause " instruction, suspend the station domain prepared auto restart isolated fault of open loop point station, forbids 2 station of the station tripping 220kV 2 first and second line of line section.Region controls main website during subsequent action, if region prepared auto restart acts successfully, restores The 1M bus at the station 220kV 2 and the power supply at the station 220kV 1, then enable to station domain control sub-station hair " locking ", locking station domain control sub-station Station domain prepared auto restart, 220kV station 2 station station domain prepared auto restart do not continue to then act;Otherwise region control main website stopping issues " temporarily Stop " instruction, " pause " instruction is not received when the station domain prepared auto restart at 2 station of the station 220kV receives, the station domain prepared auto restart at 2 station of the station 220kV 2 first and second line of line section for then continuing 2 station of the station isolated fault tripping 220kV, closes bus connection switch, and the 1M for restoring the station 220kV 2 is female Line power supply.
It is standby that the above coordination ensures that area control system pays the utmost attention to region in the case where region prepared auto restart has movement It is acted from throwing, restores the power supply of bigger decompression range, when region prepared auto restart does not have operation condition or baulk, then by standing Domain prepared auto restart restores the power supply of open loop point decompression bus, provides double shield for the safe and stable operation of power grid.
As shown in fig. 7, a kind of control device of region prepared auto restart, comprising:
Whether detection module 702 starts for detection zone prepared auto restart.Control module 704 is examined for detection module 702 After measuring the starting of region prepared auto restart, continues the station domain prepared auto restart that connect to region prepared auto restart and send pause instruction, it is standby certainly by station domain It throws and is acted according to pause instruction pause, and after station domain prepared auto restart acts successfully, blocking order is sent to station domain prepared auto restart, by standing Domain prepared auto restart is failure to actuate according to blocking order locking.
After prepared auto restart of standing starting, it is necessary to first pass through the auxiliaries-supply circuit-breaker put into again after delay isolated fault.Domain of standing is standby From after throwing starting, during delay, region prepared auto restart continues to send pause instruction to station domain prepared auto restart.Domain prepared auto restart of standing is receiving To after pause instruction, pause movement, thus domain prepared auto restart pause isolated fault of standing, it is ensured that open loop point and fault point on chain type power grid Between supply path integrality.
After the starting of region prepared auto restart, continue to send pause instruction to station domain prepared auto restart, if region prepared auto restart acts successfully, Blocking order is sent to station domain prepared auto restart.Domain prepared auto restart stand after receiving blocking order, is failure to actuate according to blocking order.Region After prepared auto restart starting, restore the power supply of corresponding chain type power grid decompression plant stand, and domain prepared auto restart of standing is failure to actuate according to blocking order.
The control device of above-mentioned region prepared auto restart continues to send to station domain prepared auto restart temporary after the starting of region prepared auto restart Stop instruction is acted by station domain prepared auto restart according to pause instruction pause, thus domain prepared auto restart pause isolated fault of standing, when region is standby certainly After throwing acts successfully, blocking order is sent to station domain prepared auto restart, is failure to actuate by station domain prepared auto restart according to blocking order locking.Region After prepared auto restart acts successfully, restore the power supply of corresponding chain type power grid decompression plant stand, and domain prepared auto restart of standing is motionless according to blocking order Make, station domain prepared auto restart isolated fault is avoided to disconnect the supply path on chain type power grid between open loop point and fault point, thus Region prepared auto restart pays the utmost attention to the movement of region prepared auto restart in the case where acting, restore the power supply of bigger decompression range.
In another embodiment, control module 704 are also used to stop when region prepared auto restart acts failed to station Domain prepared auto restart broadcasts pause instruction, and by standing, domain prepared auto restart acts after not receiving pause instruction.
Region prepared auto restart is failure to actuate including two kinds of situations, and one kind is that region prepared auto restart does not have operation condition, i.e. region is standby From the preset condition for throwing not up to starting.Another kind is the baulk of region prepared auto restart.
It is to be understood that region prepared auto restart presets corresponding entry condition with station domain prepared auto restart respectively, when When reaching respective default entry condition, region prepared auto restart is respectively started with station domain prepared auto restart.In the present embodiment, region prepared auto restart The starting time be not later than station domain prepared auto restart the starting time.
When the not operating success of region prepared auto restart, stop sending pause instruction to station domain prepared auto restart.Domain prepared auto restart of standing does not connect It is acted after receiving pause instruction, so that domain prepared auto restart isolated fault of standing, restores the power supply of corresponding open loop website.
The control device of the region prepared auto restart of the present embodiment, when region prepared auto restart does not have operation condition or baulk When, domain prepared auto restart of standing starting continues the power supply that fast quick-recovery corresponds to open loop website by domain prepared auto restart of standing, and avoids all decompression electricity The equal decompression of factory can not be restored, and provide double shield for the safe operation of power grid.
Each technical characteristic of embodiment described above can be combined arbitrarily, for simplicity of description, not to above-mentioned reality It applies all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited In contradiction, all should be considered as described in this specification.
The embodiments described above only express several embodiments of the present invention, and the description thereof is more specific and detailed, but simultaneously It cannot therefore be construed as limiting the scope of the patent.It should be pointed out that coming for those of ordinary skill in the art It says, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to protection of the invention Range.Therefore, the scope of protection of the patent of the invention shall be subject to the appended claims.

Claims (9)

1. a kind of control method of region prepared auto restart characterized by comprising
After the starting of region prepared auto restart, during communicating with the delay of station domain prepared auto restart isolated fault of connection, continue to institute It states station domain prepared auto restart and sends pause instruction, acted by the station domain prepared auto restart according to the pause instruction pause;
After the region prepared auto restart acts successfully, blocking order is sent to the station domain prepared auto restart, by station domain prepared auto restart It is failure to actuate according to blocking order locking;
When region prepared auto restart movement is failed, stop sending pause instruction to the station domain prepared auto restart, by the station domain Prepared auto restart continues to act after not receiving the pause instruction;And instructed to station domain prepared auto restart sending action, by described Domain prepared auto restart of standing continues to act after receiving the action command;
The starting time of the region prepared auto restart is not later than the starting time of the station domain prepared auto restart.
2. the control method of region prepared auto restart according to claim 1, which is characterized in that
The region prepared auto restart and station domain prepared auto restart respectively correspond preset entry condition, when reaching respective default starting When condition, the region prepared auto restart is respectively started with station domain prepared auto restart.
3. the control method of region prepared auto restart according to claim 1, which is characterized in that
The region prepared auto restart movement includes that the region prepared auto restart does not have operation condition or the region prepared auto restart not successfully Baulk.
4. the control method of region prepared auto restart according to claim 1, which is characterized in that
The region prepared auto restart is provided with control device, and the control device is used to carry out the station domain prepared auto restart in region Control.
5. a kind of prepared auto restart control method characterized by comprising
After the starting of region prepared auto restart, during communicating with the delay of station domain prepared auto restart isolated fault of connection, continue to described Domain prepared auto restart of standing sends pause instruction;
The station domain prepared auto restart is acted according to the pause instruction pause;
After the region prepared auto restart acts successfully, blocking order is sent to the station domain prepared auto restart;
The station domain prepared auto restart is failure to actuate according to blocking order locking;
When region prepared auto restart movement is failed, stop sending pause instruction to the station domain prepared auto restart;
The station domain prepared auto restart continues to act after not receiving the pause instruction;
And it is instructed to station domain prepared auto restart sending action;
The station domain prepared auto restart acts after receiving the action command;
The starting time of the region prepared auto restart is not later than the starting time of the station domain prepared auto restart.
6. a kind of control device of region prepared auto restart characterized by comprising
Whether detection module starts for detection zone prepared auto restart;
Control module, for after the detection module detects region prepared auto restart starting, at the station for communicating with connection During the delay of domain prepared auto restart isolated fault, continue to send pause instruction to the station domain prepared auto restart, by station domain prepared auto restart It is acted according to the pause instruction pause;And after the region prepared auto restart acts successfully, closed to station domain prepared auto restart transmission Lock instruction is failure to actuate by the station domain prepared auto restart according to blocking order locking;
The control module is also used to stop broadcasting to station domain prepared auto restart when the region prepared auto restart acts failed Pause instruction is acted after not receiving the pause instruction by the station domain prepared auto restart;And it is sent to the station domain prepared auto restart Action command is acted after receiving the action command by the station domain prepared auto restart;The starting time of the region prepared auto restart It is not later than the starting time of the station domain prepared auto restart.
7. a kind of prepared auto restart control system, at least one including region prepared auto restart and with region prepared auto restart communication connection It stands domain prepared auto restart;The region prepared auto restart has the control device of region prepared auto restart as claimed in claim 6.
8. a kind of computer equipment, including memory and processor, the memory are stored with computer program, feature exists In the step of processor realizes any one of claims 1 to 5 the method when executing the computer program.
9. a kind of computer readable storage medium, is stored thereon with computer program, which is characterized in that the computer program quilt The step of processor realizes method described in any one of claims 1 to 5 when executing.
CN201610954301.7A 2016-11-03 2016-11-03 The control method of region prepared auto restart, device and prepared auto restart control method, system Active CN106410954B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610954301.7A CN106410954B (en) 2016-11-03 2016-11-03 The control method of region prepared auto restart, device and prepared auto restart control method, system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610954301.7A CN106410954B (en) 2016-11-03 2016-11-03 The control method of region prepared auto restart, device and prepared auto restart control method, system

Publications (2)

Publication Number Publication Date
CN106410954A CN106410954A (en) 2017-02-15
CN106410954B true CN106410954B (en) 2019-10-18

Family

ID=58014775

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610954301.7A Active CN106410954B (en) 2016-11-03 2016-11-03 The control method of region prepared auto restart, device and prepared auto restart control method, system

Country Status (1)

Country Link
CN (1) CN106410954B (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103683480A (en) * 2013-12-27 2014-03-26 南京南瑞继保电气有限公司 Spare power automatic switching cooperation control method of substation area
CN104901414A (en) * 2015-05-29 2015-09-09 广州供电局有限公司 Switching-in and switching-off control method and system for busbar automatic transfer switch
CN105515169A (en) * 2014-09-26 2016-04-20 南京南瑞继保电气有限公司 Multilevel spare power automatic switching system, priority cooperation method, and construction method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103683480A (en) * 2013-12-27 2014-03-26 南京南瑞继保电气有限公司 Spare power automatic switching cooperation control method of substation area
CN105515169A (en) * 2014-09-26 2016-04-20 南京南瑞继保电气有限公司 Multilevel spare power automatic switching system, priority cooperation method, and construction method
CN104901414A (en) * 2015-05-29 2015-09-09 广州供电局有限公司 Switching-in and switching-off control method and system for busbar automatic transfer switch

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
智能电网区域备自投的研究与实现;金震等;《2013第十四届全国保护和控制学术研讨会》;20140609;第1-6页 *

Also Published As

Publication number Publication date
CN106410954A (en) 2017-02-15

Similar Documents

Publication Publication Date Title
CN102403735B (en) Method and system for switching microgrid between island mode and grid connected mode
CN104518564A (en) Backup automatic switching apparatus with area automatic switching function, and backup automatic switching method
CN203747436U (en) Distributed photovoltaic power generation access system
KR101336042B1 (en) Emergency power system with the solar system
CN103825363B (en) A kind of wind-light storage low pressure micro-capacitance sensor group protection coordination controller
CN109818410A (en) A kind of rapidly self-healing method of urban track traffic ac power supply system
CN104242455A (en) 110 kV substation protection and control action cooperation strategy suitable for DG (distributed generation) accessing
CN104993448A (en) Distribution substation low-voltage intelligent reclosing method
CN104467163B (en) The segmentation prepared auto restart implementation method of more electric power incoming lines
CN113241844A (en) 10kV bus sectional spare power automatic switching method and device
CN110912253B (en) Low-voltage intelligent spare power automatic switching system
CN201789332U (en) Power supply system of communication base station
CN106787131B (en) A kind of two rank region spare power automatic switching system and prepared auto restart control method
CN201274417Y (en) Locking remote self-start apparatus for electric grid
CN106410954B (en) The control method of region prepared auto restart, device and prepared auto restart control method, system
CN201160223Y (en) Multi-ring website system
CN101707397A (en) Auto-switch-on system on basis of power grid dispatching and implementation method thereof
CN105356585B (en) Closing locking circuit of breaker
CN103326457A (en) Control method and control device based on gas-steam integral unit security segment interlock automatic switch
CN115133502B (en) Alternating current bus fault removal method for energy storage power station
CN104124749B (en) The dual-ring network distribution line failure processing method that prepared auto restart coordinates with power distribution automation
CN105449835B (en) A kind of region spare power automatic switching method
CN207304024U (en) A kind of public line distributed power supply smart management system
CN104065064A (en) Control method for a 110 kilovolt transformer substation micro-grid
CN105449682A (en) Overload control method and coordination method of overload control and spare power automatic switch

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200925

Address after: 510620 Tianhe District, Guangzhou, Tianhe South Road, No. two, No. 2, No.

Patentee after: Guangzhou Power Supply Bureau of Guangdong Power Grid Co.,Ltd.

Address before: 510620 Tianhe District, Guangzhou, Tianhe South Road, No. two, No. 2, No.

Patentee before: GUANGZHOU POWER SUPPLY Co.,Ltd.

TR01 Transfer of patent right