CN106408113A - Production order scheduling management method and system - Google Patents
Production order scheduling management method and system Download PDFInfo
- Publication number
- CN106408113A CN106408113A CN201610787236.3A CN201610787236A CN106408113A CN 106408113 A CN106408113 A CN 106408113A CN 201610787236 A CN201610787236 A CN 201610787236A CN 106408113 A CN106408113 A CN 106408113A
- Authority
- CN
- China
- Prior art keywords
- scheduling
- production
- management
- order
- module
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 85
- 238000007726 management method Methods 0.000 title claims abstract description 47
- 238000005457 optimization Methods 0.000 claims abstract description 30
- 238000000034 method Methods 0.000 claims abstract description 26
- 238000012800 visualization Methods 0.000 claims abstract description 9
- 230000000007 visual effect Effects 0.000 claims description 9
- 238000011160 research Methods 0.000 claims description 6
- 238000005516 engineering process Methods 0.000 abstract description 5
- 238000013439 planning Methods 0.000 abstract description 4
- 238000012384 transportation and delivery Methods 0.000 abstract description 3
- 206010054949 Metaplasia Diseases 0.000 description 2
- 238000011161 development Methods 0.000 description 2
- 230000015689 metaplastic ossification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000013070 change management Methods 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 230000032696 parturition Effects 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 238000003860 storage Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q30/00—Commerce
- G06Q30/06—Buying, selling or leasing transactions
- G06Q30/0601—Electronic shopping [e-shopping]
- G06Q30/0633—Lists, e.g. purchase orders, compilation or processing
- G06Q30/0635—Processing of requisition or of purchase orders
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/04—Manufacturing
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Theoretical Computer Science (AREA)
- Marketing (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Tourism & Hospitality (AREA)
- Entrepreneurship & Innovation (AREA)
- Development Economics (AREA)
- Quality & Reliability (AREA)
- Accounting & Taxation (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Finance (AREA)
- General Factory Administration (AREA)
- Manufacturing & Machinery (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Educational Administration (AREA)
Abstract
An embodiment of the invention discloses a production order scheduling management method and system. The method comprises the following steps: a visualization Gantt chart production scheduling device is used for managing and scheduling production orders, and a GA algorithm is used for intelligently optimize production scheduling operation. Based on the production order scheduling management method and system disclosed in the embodiment of the invention, optimized configuration of the production orders and a production line can be realized via production order scheduling management and optimization, scientific management of garment production can be realized, and management efficiency and production efficiency are improved; compared with technologies of the prior art, the production order scheduling management method and system are advantageous in that an estimated 90% of production scheduling time can be saved, rapid and accurate replies of order delivery time can be made, visualized and intelligent production scheduling operation can be realized, stock can be reduced, production cost can be lowered, production delivery time can be optimized, and factory planning and scheduling operation and production management can be visualized.
Description
Technical field
The present invention relates to garment production technology, the scheduling manager of the production order in especially a kind of Apparel Manufacturing
Method and system.
Background technology
Apparel industry, as the traditional manufacture of China, occupies critical role in the light industry development of China, in recent years,
With the development of intelligent automation, the manufacturing field of apparel industry has been realized in automatization, mechanical metaplasia
Produce, greatly improve production efficiency, but in existing Apparel Manufacturing, intelligent production management also exists much to be asked
Topic.
The inventors discovered that, at least there is problems with prior art:
Order planning management relies primarily on EXCEL scheduling, is completely dependent on the experience of scheduling personnel it is impossible to meet and modernizes large-scale clothes
The order planning regulatory requirement of dress enterprise, therefore, prior art needs to improve.
Content of the invention
An embodiment of the present invention technical problem to be solved is:A kind of production order in Apparel Manufacturing is provided
Scheduling management method and system, to improve production optimization operating capability and production efficiency in Apparel Manufacturing.
One side according to embodiments of the present invention, a kind of scheduling management method producing order providing, including:
Manage scheduling order using visual Gantt chart scheduling device, described visualization Gantt chart is made up of two dimensions, one
For plant produced line dimension, another is time dimension, and what two kinds of dimensions crossed interval represents plant produced line in not same date
Under space, what here gunter bar spatially represented is each production schedule, and the different color of gunter bar represents different
Projected state;
Using GA algorithm intelligent optimization scheduling, described use GA algorithm intelligent optimization scheduling is to being discharged to using GA algorithm
Unlocked the working out a scheme of line carries out multiple target global optimization, using mathematical modeling and operational research Methods, arranges multiple constraintss, right
The production schedule carries out multiple target global optimization, generates the production scheduling scheme optimizing..
Based in another embodiment of said method, described manage scheduling order using visual Gantt chart scheduling device
Including manual scheduling, regular scheduling, Optimal Scheduling.
Based in another embodiment of said method, described multiple target global optimization that the production schedule is carried out includes reducing
Produce and postpone the raw fixture date of optimization, reduce and reduce production cost when shifting to an earlier date Optimizing manufacture stock, reducing production chief engineer.
Other side according to embodiments of the present invention, a kind of scheduling management system producing order providing, including:
Server, system management module, production scheduling module, analytical statement module, interface module;
Described server provides data to calculate and management of process for scheduling management system, and described system management module is with server even
Connect, for the management of scheduling order and production line, described production scheduling module is connected with server, for the life to order process
Occurrence condition is managed, and described analytical statement module is connected with server, for completing production task, just in production task and
The inventory of task to be produced carries out statistical report form, and described interface module is responsible for scheduling management system and is connected with external equipment.
Based in another embodiment of said system, described system management module includes visual Gantt chart scheduling
Device, described visualization Gantt chart is made up of two dimensions, and one is plant produced line dimension, and another is time dimension, two kinds
The interval expression space under not same date for the plant produced line that dimension crosses, what here gunter bar spatially represented is each
The individual production schedule, the different color of gunter bar represents different projected state, way to manage include manual scheduling, regular scheduling,
Optimal Scheduling.
Based in another embodiment of said system, described production scheduling module realizes intelligent optimization row using GA algorithm
Produce, described use GA algorithm realize intelligent optimization scheduling be using GA algorithm to be discharged to online unlocked work out a scheme carry out many
Target global optimization, using mathematical modeling and operational research Methods, arranges multiple constraintss, carries out multiple target to the production schedule whole
Body optimizes, and generates the production scheduling scheme optimizing.
A kind of scheduling management method producing order being provided based on the above embodiment of the present invention and system, are ordered by producing
Single scheduling management and optimizing it is achieved that producing the optimization collocation of order and production line it is achieved that science in garment production
Change management, improve the efficiency of management and production efficiency, the present invention is compared with prior art it is contemplated that the scheduling time saves nine than front
Become it is achieved that quick, accurately reply order form delivery time, meet visualization, intelligent scheduling, reduce stock, reduce production cost, excellent
Metaplasia produces the friendship phase, realizes the visualization of factory planning scheduling and production management.
Below by drawings and Examples, technical scheme is described in further detail.
Brief description
Constitute the Description of Drawings of a part the embodiments of the invention of description, and be used for explaining together with description
The principle of the present invention.
Referring to the drawings, according to detailed description below, the present invention can be more clearly understood from, wherein:
Fig. 1 is the flow chart of one embodiment of scheduling management method of production order of the present invention.
Fig. 2 is the structural representation of an embodiment of production optimization device of the present invention.
Specific embodiment
To describe the various exemplary embodiments of the present invention now with reference to accompanying drawing in detail.It should be noted that:Unless other have
Body illustrates, the positioned opposite, numerical expression of the part otherwise illustrating in these embodiments and step and numerical value do not limit this
The scope of invention.
Simultaneously it should be appreciated that for the ease of description, the size of the various pieces shown in accompanying drawing is not according to reality
Proportionate relationship draw.
Description only actually at least one exemplary embodiment is illustrative below, never as to the present invention
And its application or any restriction using.
May be not discussed in detail for technology, method and apparatus known to person of ordinary skill in the relevant, but suitable
When in the case of, described technology, method and apparatus should be considered a part for description.
It should be noted that:Similar label and letter represent similar terms in following accompanying drawing, therefore, once a certain Xiang Yi
It is defined in individual accompanying drawing, then do not need it is further discussed in subsequent accompanying drawing.
The flow chart that Fig. 1 produces one embodiment of scheduling management method of order for the present invention.As shown in figure 1, this enforcement
The scheduling management method of the production order of example includes:
10, manage scheduling order using visual Gantt chart scheduling device, described visualization Gantt chart is made up of two dimensions, one
Individual another is time dimension for plant produced line dimension, and what two kinds of dimensions crossed interval represents plant produced line not on the same day
Space under phase, what here gunter bar spatially represented is each production schedule, and the different color of gunter bar represents different
Projected state;
20, using GA algorithm intelligent optimization scheduling, described use GA algorithm intelligent optimization scheduling is to having arranged using GA algorithm
Carry out multiple target global optimization to online unlocked working out a scheme, using mathematical modeling and operational research Methods, multiple constraint bars are set
Part, carries out multiple target global optimization to the production schedule, generates the production scheduling scheme optimizing..
Described include manual scheduling, regular scheduling, optimize row using visual Gantt chart scheduling device management scheduling order
Produce.
Described the production schedule carried out with multiple target global optimization include reducing producing postponing to optimize raw fixture date, reducing and shift to an earlier date
Optimizing manufacture stock, minimizing produce and reduce production cost during chief engineer.
Based on another aspect of the present invention, the present invention provides a kind of scheduling management system producing order, as Fig. 2 institute
Show, the described scheduling management system producing order includes:
Server 1, system management module 2, production scheduling module 3, analytical statement module 4, interface module 5;
Described server 1 provides data to calculate and management of process, described system management module 2 and server for scheduling management system
1 connection, for the management of scheduling order and production line, described production scheduling module 3 is connected with server 1, for entering to order
The production status of journey are managed, and described analytical statement module 4 is connected with server 1, for completing production task, giving birth to
The inventory of product task and task to be produced carries out statistical report form, and described interface module 5 is responsible for scheduling management system and external equipment
Connect.
Described system management module 2 includes visual Gantt chart scheduling device, and described visualization Gantt chart is by two dimensions
Composition, one is plant produced line dimension, and another is time dimension, and what two kinds of dimensions crossed interval represents that plant produced line exists
The not space under same date, what here gunter bar spatially represented is each production schedule, the different color table of gunter bar
Show different projected state, way to manage includes manual scheduling, regular scheduling, Optimal Scheduling.
Described production scheduling module 3 realizes intelligent optimization scheduling using GA algorithm, and it is excellent that described use GA algorithm realizes intelligence
Changing scheduling is to carry out multiple target global optimization using GA algorithm to being discharged to online unlocked working out a scheme, using mathematical modeling and
Operational research Methods, arrange multiple constraintss, and the production schedule is carried out with multiple target global optimization, generate the production scheduling side optimizing
Case.
In this specification, each embodiment is all described by the way of going forward one by one, and what each embodiment stressed is and it
The difference of its embodiment, same or analogous part cross-reference between each embodiment.For system embodiment
For, because it is substantially corresponding with embodiment of the method, so description is fairly simple, referring to the portion of embodiment of the method in place of correlation
Defend oneself bright.
The method of the present invention and system may be achieved in many ways.For example, can by software, hardware, firmware or
Software, hardware, any combinations of firmware are realizing the method for the present invention and system.Said sequence for the step of methods described
Merely to illustrating, the step of the method for the present invention is not limited to order described in detail above, special unless otherwise
Do not mentionlet alone bright.Additionally, in certain embodiments, also the present invention can be embodied as recording program in the recording medium, these programs
Including the machine readable instructions for realizing the method according to the invention.Thus, the present invention also covers storage and is used for executing basis
The recording medium of the program of the method for the present invention.
Description of the invention is given for the sake of example and description, and is not exhaustively or by the present invention
It is limited to disclosed form.Many modifications and variations are obvious for the ordinary skill in the art.Select and retouch
Stating embodiment is in order to the principle of the present invention and practical application are more preferably described, and so that those of ordinary skill in the art is managed
The solution present invention is thus design is suitable to the various embodiments with various modifications of special-purpose.
Claims (6)
1. a kind of scheduling management method producing order is it is characterised in that comprise the following steps:
Manage scheduling order using visual Gantt chart scheduling device, described visualization Gantt chart is made up of two dimensions, one
For plant produced line dimension, another is time dimension, and what two kinds of dimensions crossed interval represents plant produced line in not same date
Under space, what here gunter bar spatially represented is each production schedule, and the different color of gunter bar represents different
Projected state;
Using GA algorithm intelligent optimization scheduling, described use GA algorithm intelligent optimization scheduling is to being discharged to using GA algorithm
Unlocked the working out a scheme of line carries out multiple target global optimization, using mathematical modeling and operational research Methods, arranges multiple constraintss, right
The production schedule carries out multiple target global optimization, generates the production scheduling scheme optimizing.
2. method according to claim 1 is it is characterised in that described manage scheduling using visual Gantt chart scheduling device
Order includes manual scheduling, regular scheduling, Optimal Scheduling.
3. method according to claim 1 is it is characterised in that described carry out multiple target global optimization to the production schedule and include
Reduce to produce and postpone the raw fixture date of optimization, reduce and reduce production cost when shifting to an earlier date Optimizing manufacture stock, reducing production chief engineer.
4. a kind of scheduling management system producing order is it is characterised in that include:
Server, system management module, production scheduling module, analytical statement module, interface module;
Described server provides data to calculate and management of process for scheduling management system, and described system management module is with server even
Connect, for the management of scheduling order and production line, described production scheduling module is connected with server, for the life to order process
Occurrence condition is managed, and described analytical statement module is connected with server, for completing production task, just in production task and
The inventory of task to be produced carries out statistical report form, and described interface module is responsible for scheduling management system and is connected with external equipment.
5. system according to claim 4 is it is characterised in that described system management module includes visual Gantt chart row
Produce device, described visualization Gantt chart is made up of two dimensions, one is plant produced line dimension, and another is time dimension, two
Plant the interval expression space under not same date for the plant produced line that dimension crosses, what here gunter bar spatially represented is every
One production schedule, the different color of gunter bar represents different projected state, and way to manage includes manual scheduling, rule row
Product, Optimal Scheduling.
6. system according to claim 4 is it is characterised in that described production scheduling module uses GA algorithm realization intelligence excellent
Change scheduling, described use GA algorithm realize intelligent optimization scheduling be using GA algorithm to be discharged to online unlocked work out a scheme into
Row multiple target global optimization, using mathematical modeling and operational research Methods, arranges multiple constraintss, carries out many mesh to the production schedule
Mark global optimization, generates the production scheduling scheme optimizing.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610787236.3A CN106408113A (en) | 2016-08-31 | 2016-08-31 | Production order scheduling management method and system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610787236.3A CN106408113A (en) | 2016-08-31 | 2016-08-31 | Production order scheduling management method and system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106408113A true CN106408113A (en) | 2017-02-15 |
Family
ID=58000947
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610787236.3A Pending CN106408113A (en) | 2016-08-31 | 2016-08-31 | Production order scheduling management method and system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106408113A (en) |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105741036A (en) * | 2016-01-29 | 2016-07-06 | 苏州浙远自动化工程技术有限公司 | Scheduling system and method for intelligent traditional Chinese medicine factory |
CN107168263A (en) * | 2017-06-16 | 2017-09-15 | 江南大学 | A kind of knitting MES Production-Plan and scheduling methods excavated based on big data |
CN108985711A (en) * | 2018-06-29 | 2018-12-11 | 北京仿真中心 | A kind of intelligent plant dynamic planning scheduling system |
CN109902906A (en) * | 2017-12-09 | 2019-06-18 | 英业达科技有限公司 | The manufacturing process management system and method for production |
CN110009202A (en) * | 2019-03-15 | 2019-07-12 | 安徽省司尔特肥业股份有限公司 | A kind of intelligent scheduled production program system and method for fertilizer factory |
CN110501978A (en) * | 2018-05-18 | 2019-11-26 | 中国科学院沈阳自动化研究所 | A kind of robot product workshop scheduled production dispatching method |
CN110516936A (en) * | 2019-08-13 | 2019-11-29 | 武汉攀升鼎承科技有限公司 | A kind of intelligence production line mixing system |
CN112712290A (en) * | 2021-01-18 | 2021-04-27 | 上海交通大学 | Self-organizing method, system, and medium for intelligent production system for emergency products |
CN112734222A (en) * | 2021-01-06 | 2021-04-30 | 成都星云智联科技有限公司 | Factory order production scheduling self-adaptive method, equipment and storage medium |
WO2023082549A1 (en) * | 2021-11-12 | 2023-05-19 | 珠海格力电器股份有限公司 | Manufacturing task allocation method and apparatus oriented toward intermodal freight transport under multi-factor constraints |
CN116629552A (en) * | 2023-05-26 | 2023-08-22 | 讯猫软件集团有限公司 | Intelligent industrial management regulation and control system |
CN117311296A (en) * | 2023-11-29 | 2023-12-29 | 青岛创新奇智科技集团股份有限公司 | Industrial model-based high-strength production line collaborative optimization and energy efficiency management method |
CN117952567A (en) * | 2024-03-25 | 2024-04-30 | 四川多联实业有限公司 | Production management method and system based on MES intelligent manufacturing |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040117048A1 (en) * | 2002-12-13 | 2004-06-17 | Hung-Shan Wei | Master production scheduling management system and method |
CN105160439A (en) * | 2015-10-08 | 2015-12-16 | 桥弘软件开发(上海)有限公司 | Production scheduling method and automatic scheduling system |
CN105741036A (en) * | 2016-01-29 | 2016-07-06 | 苏州浙远自动化工程技术有限公司 | Scheduling system and method for intelligent traditional Chinese medicine factory |
-
2016
- 2016-08-31 CN CN201610787236.3A patent/CN106408113A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040117048A1 (en) * | 2002-12-13 | 2004-06-17 | Hung-Shan Wei | Master production scheduling management system and method |
CN105160439A (en) * | 2015-10-08 | 2015-12-16 | 桥弘软件开发(上海)有限公司 | Production scheduling method and automatic scheduling system |
CN105741036A (en) * | 2016-01-29 | 2016-07-06 | 苏州浙远自动化工程技术有限公司 | Scheduling system and method for intelligent traditional Chinese medicine factory |
Non-Patent Citations (1)
Title |
---|
金剑 等: "卷烟生产计划排产模型建立与优化", 《计算机工程与应用》 * |
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105741036A (en) * | 2016-01-29 | 2016-07-06 | 苏州浙远自动化工程技术有限公司 | Scheduling system and method for intelligent traditional Chinese medicine factory |
CN107168263A (en) * | 2017-06-16 | 2017-09-15 | 江南大学 | A kind of knitting MES Production-Plan and scheduling methods excavated based on big data |
CN109902906A (en) * | 2017-12-09 | 2019-06-18 | 英业达科技有限公司 | The manufacturing process management system and method for production |
CN110501978A (en) * | 2018-05-18 | 2019-11-26 | 中国科学院沈阳自动化研究所 | A kind of robot product workshop scheduled production dispatching method |
CN108985711A (en) * | 2018-06-29 | 2018-12-11 | 北京仿真中心 | A kind of intelligent plant dynamic planning scheduling system |
CN110009202A (en) * | 2019-03-15 | 2019-07-12 | 安徽省司尔特肥业股份有限公司 | A kind of intelligent scheduled production program system and method for fertilizer factory |
CN110516936A (en) * | 2019-08-13 | 2019-11-29 | 武汉攀升鼎承科技有限公司 | A kind of intelligence production line mixing system |
CN110516936B (en) * | 2019-08-13 | 2022-04-08 | 武汉攀升鼎承科技有限公司 | Intelligent production line allocation system |
CN112734222A (en) * | 2021-01-06 | 2021-04-30 | 成都星云智联科技有限公司 | Factory order production scheduling self-adaptive method, equipment and storage medium |
CN112712290A (en) * | 2021-01-18 | 2021-04-27 | 上海交通大学 | Self-organizing method, system, and medium for intelligent production system for emergency products |
WO2023082549A1 (en) * | 2021-11-12 | 2023-05-19 | 珠海格力电器股份有限公司 | Manufacturing task allocation method and apparatus oriented toward intermodal freight transport under multi-factor constraints |
CN116629552A (en) * | 2023-05-26 | 2023-08-22 | 讯猫软件集团有限公司 | Intelligent industrial management regulation and control system |
CN117311296A (en) * | 2023-11-29 | 2023-12-29 | 青岛创新奇智科技集团股份有限公司 | Industrial model-based high-strength production line collaborative optimization and energy efficiency management method |
CN117311296B (en) * | 2023-11-29 | 2024-02-13 | 青岛创新奇智科技集团股份有限公司 | Industrial model-based high-strength production line collaborative optimization and energy efficiency management method |
CN117952567A (en) * | 2024-03-25 | 2024-04-30 | 四川多联实业有限公司 | Production management method and system based on MES intelligent manufacturing |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106408113A (en) | Production order scheduling management method and system | |
Grabowska | Smart factories in the age of Industry 4.0 | |
Guo et al. | Synchronization of shop-floor logistics and manufacturing under IIoT and digital twin-enabled graduation intelligent manufacturing system | |
Morris et al. | Industrialization trajectories in Madagascar’s export apparel industry: Ownership, embeddedness, markets, and upgrading | |
CN106408112A (en) | Production order production scheduling management method and production scheduling optimizer system | |
Dombrowski et al. | Industrie 4.0 in production ramp-up management | |
CN106897809A (en) | Workflow creation method, workflow designer and workflow system | |
CN106897806A (en) | Workflow creation method and system, operation system | |
CN109784656A (en) | A kind of discrete manufacture collaborative production planning scheduling method | |
CN104020676A (en) | Garment production line arrangement method based on analogue simulation technology | |
CN110232526A (en) | A kind of factory technics management system and method | |
CN104850068B (en) | A kind of intelligent modeling method of complicated production manufacture process | |
CN105809302A (en) | Production line scheduling method and system based on CEP inference engine | |
Pirola et al. | Applying simulation for sustainable production scheduling: a case study in the textile industry | |
Wu et al. | Smart factory reference architecture based on CPS fractal | |
CN109085804A (en) | It is a kind of for electronic product multiplexing factory manufacture process Optimization Scheduling | |
CN104517186A (en) | Business process design method based on data drive | |
CN101447065A (en) | Method for uniformly collecting engineering progress data | |
US10845782B2 (en) | Method for monitoring and controlling the energy cost for the production of a product lot | |
CN204331731U (en) | A kind of product automatic assembly design system based on Pro/E | |
CN102651100B (en) | A kind of generation system of clothes BOM and method | |
CN104036371A (en) | Method for mapping assembly technology tree into assembly technological processes | |
CN103455853B (en) | The procreative collaboration operational method of the multistage part of a kind of multistage supplier | |
CN103632222A (en) | Manufacturing resource service state monitoring system | |
CN112650508A (en) | Intelligent MES platform software operation method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20170215 |