CN106403652A - Shell-and-plate blast furnace evaporation air cooling system using soft water closed recirculation cooling system and plate scale treatment method thereof - Google Patents
Shell-and-plate blast furnace evaporation air cooling system using soft water closed recirculation cooling system and plate scale treatment method thereof Download PDFInfo
- Publication number
- CN106403652A CN106403652A CN201610928525.0A CN201610928525A CN106403652A CN 106403652 A CN106403652 A CN 106403652A CN 201610928525 A CN201610928525 A CN 201610928525A CN 106403652 A CN106403652 A CN 106403652A
- Authority
- CN
- China
- Prior art keywords
- cooling system
- plate
- shell
- blast furnace
- jet pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F28—HEAT EXCHANGE IN GENERAL
- F28D—HEAT-EXCHANGE APPARATUS, NOT PROVIDED FOR IN ANOTHER SUBCLASS, IN WHICH THE HEAT-EXCHANGE MEDIA DO NOT COME INTO DIRECT CONTACT
- F28D5/00—Heat-exchange apparatus having stationary conduit assemblies for one heat-exchange medium only, the media being in contact with different sides of the conduit wall, using the cooling effect of natural or forced evaporation
- F28D5/02—Heat-exchange apparatus having stationary conduit assemblies for one heat-exchange medium only, the media being in contact with different sides of the conduit wall, using the cooling effect of natural or forced evaporation in which the evaporating medium flows in a continuous film or trickles freely over the conduits
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F28—HEAT EXCHANGE IN GENERAL
- F28F—DETAILS OF HEAT-EXCHANGE AND HEAT-TRANSFER APPARATUS, OF GENERAL APPLICATION
- F28F25/00—Component parts of trickle coolers
- F28F25/10—Component parts of trickle coolers for feeding gas or vapour
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F28—HEAT EXCHANGE IN GENERAL
- F28G—CLEANING OF INTERNAL OR EXTERNAL SURFACES OF HEAT-EXCHANGE OR HEAT-TRANSFER CONDUITS, e.g. WATER TUBES OR BOILERS
- F28G1/00—Non-rotary, e.g. reciprocated, appliances
- F28G1/02—Non-rotary, e.g. reciprocated, appliances having brushes
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F28—HEAT EXCHANGE IN GENERAL
- F28G—CLEANING OF INTERNAL OR EXTERNAL SURFACES OF HEAT-EXCHANGE OR HEAT-TRANSFER CONDUITS, e.g. WATER TUBES OR BOILERS
- F28G9/00—Cleaning by flushing or washing, e.g. with chemical solvents
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P80/00—Climate change mitigation technologies for sector-wide applications
- Y02P80/10—Efficient use of energy, e.g. using compressed air or pressurized fluid as energy carrier
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Thermal Sciences (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Heat-Exchange Devices With Radiators And Conduit Assemblies (AREA)
Abstract
The invention discloses a shell-and-plate blast furnace evaporation air cooling system using a soft water closed recirculation cooling system and a plate scale treatment method thereof and belongs to the technical field of blast furnace iron making production. The shell-and-plate blast furnace vaporation air cooling system using the soft water closed recirculation cooling system comprises a base, a shell body which is over the base and is fixedly connected with the base, a cooling plate set which is a vertical layered layout is arranged in the shell body in a fixation mode, and induced air cooling towers which are connected with the shell body in a fixation mode and right above the shell body. Through replacing an induced air motor with an air suction function with the induced air cooling towers, installed gross and production running cost are lowered, there is no need to frequently change and maintain a soggy and fragile fan motor, and the induced air cooling towers are capable of being at a normal working state for a long time and saves electric energy and water consumption of refrigerant water. Physical descaling can be conducted periodically in the whole operational process of the system through the plate scale treatment method, and also thorough descaling can be conducted in a stopping process. The induced air cooling towers are flexible and mobile and through in treatment effect. The heat exchange and cooling effects of the whole system are improved, and the continuous working period and service life are prolonged.
Description
Technical field
The present invention relates to Blast Furnace Iron-making Production Technology field, more particularly, to a kind of employing soft water airtight circulating cooling system
Shell-and-plate blast furnace evaporative air-cooling system and its plate dirt processing method.
Background technology
Evaporation air cooler be mainly characterized by using outside the evaporation enhanced tube of outside tube water film conduct heat, its work process be with system
Water circulating pump in system by spraying cooling water be transported to positioned at horizontal positioned light pipe tube bank top spray water dispenser, by point
Cooling water is sprayed downwards tube surface by orchestration, makes tube outer surface form the thin water film of continuous uniform;Simultaneously will with blower fan
Air sucks window from equipment lower air and sucks, and makes the bottom-up flowing of air, the horizontal light pipe tube bank plunderring horizontal positioned.Now
The pipe unofficial biography evanescence of heat of heat-transfer pipe relies on outside the sensible heat transfer between moisture film and air stream, and the rapid evaporation of tube outer surface moisture film absorbs
Substantial amounts of heat, enhances the outer heat transfer of pipe.
Because water has the higher latent heat of vaporization (the water latent heat of vaporization at one atm is 570Kcal/Kg) therefore
The evaporation of outside tube water film greatly enhances the outer heat transfer of pipe, so that outfit of equipment heat transfer efficiency is significantly improved.Tube outer surface moisture film
Evaporation make air pass through light pipe tube bank after humidity increase and close to saturation, blower fan is usually overhead type, by saturated moist air from
Extract and pass through the water deflector above spray water dispenser in tube bank out, remove the water droplet carried secretly in saturated moist air
Afterwards, from equipment top, fan outlet enters air, because blower fan is drawn up air positioned at its upper side, thus under blower fan
Portion space forms negative pressure region, accelerates the evaporation of tube outer surface moisture film, is conducive to heat transfer, evaporative type cooler outside enhanced tube
In, processing medium walks bottom horizontal flow sheet in pipe, and empty gas and water is walked outside pipe, and air flows from bottom to top, and shower water then flows from top to bottom
Dynamic, water, air and processing medium are to intersect cross-flow, and water is adverse current with air, although so enhancing from flow arrangement
Heat and mass transfer process, but also bring the technology that the easy corrosion of blower fan and motor are led to service life not grown by the long-term erosion of steam
Problem.
At present as a kind of evaporative type cooler of Patent No. 02255480.7, by the water in water tank is extracted into spray dress
Put, and water is sprayed on heat-exchanging tube bundle, by heat-exchanging tube bundle surface evaporation of water, and then reach the effect of heat transfer, and
In the past chiller was compared, this cooler have take up an area that little, efficiency of transmission is high, cost of investment is low, that Municipal Sewage for Circulating is few is excellent
Point, but due to the shell of this cooler is fixing, shell does not have openable door, therefore, continuous with cooler
Use, heat-exchanging tube bundle surface easily forms incrustation scale it is impossible to timely clean, the efficiency of impact heat transfer.
China Patent Publication No.:202177322U, discloses a kind of plate-type evaporative cooler, including the water located at bottom
Case, be located at water tank above housing, located at the air intake on housing, in housing and be located at air intake above heat exchange
Device, the spray equipment above heat-exchanger rig, by spray upper hose be connected with spray equipment water circulating pump, located at spray
Water collection device above shower device, the chiller above water collection device, described spray equipment includes complex root spray arm, often
Root spray arm is provided with a plurality of water-locators, and described heat-exchanger rig is the heat exchanger plates bundle that plural block heat exchanger plates compacting is formed, and changes
Formed between hot plate can the passage that passes through of heat supply process medium, described heat exchanger plates bundle two ends are provided with the thermal process with above-mentioned channel connection
Medium entrance and outlet.This cooler heat-exchanger rig takes up room, and little, transmission efficiency is high, and this cooler is also preferably saved simultaneously
Water resource.But this utility model equally exists blower motor service life, and length and plate dirt process halfway problem.
Content of the invention
1. invent technical problem to be solved
For the shell-and-plate blast furnace evaporative air-cooling system adopting soft water airtight circulating cooling system present in prior art
Blower motor service life long and plate dirt processes halfway problem, the invention provides one kind adopts soft water closed circulating
The shell-and-plate blast furnace evaporative air-cooling system of cooling system and its plate dirt processing method.It can realize without using blower fan i.e. up to
To the purpose of cooling effect, and, plate dirt is processed thoroughly, due to not using blower fan, reduces using with production cost.
2. technical scheme
For reaching above-mentioned purpose, the technical scheme that the present invention provides is:
A kind of shell-and-plate blast furnace evaporative air-cooling system of employing soft water airtight circulating cooling system, including base, base just
The housing that top is mutually permanently connected, and the coldplate constriction of the hard-wired vertical layered layout of enclosure interior, also include
The induced draft cooling tower being fixedly connected with housing above housing, top opening fully up, air draught has been replaced by induced draft cooling tower
The blower fan of effect, reduces installation total amount and production run cost, need not make moist rapid wear and frequently repair and replacement because of motor
Blower motor, can be in normal operating conditions, saves energy and chilled water water consume for a long time.The plate dirt process side of the present invention
Method, can enter line period, timing physics mode scale removal it is also possible to system in stopping process in whole system running
Thoroughly scale removal, flexible, treatment effect thoroughly, improves heat exchange, the cooling effect of whole system, increases continuous service
Time and service life.
Further technical scheme, described induced draft cooling tower is in downward from middle part and the waist tower-like hyperbola cooling of external-open
Tower, meets the principle easily producing wind eddies stream in hydrodynamics, and the air velocity of generation is fast, can effectively improve cooling effect.
Further technical scheme, induced draft cooling tower has 2 to 5, and housing upper end open is completely covered, empty according to evaporation
Cooler model size carries out differentiated layout, to ensure the cooling effect of different model evaporation air cooler.
Further technical scheme, the uniform stationary distribution of induced draft cooling tower outer wall has reinforcement, plays fastening and stablizes cold
But the effect of tower, the uniform stationary distribution of inwall has block water plate, will drip return system, prevent excessive water after part condensate moisture
Divide and discharge the waste causing water resource.
Further technical scheme, block water plate ringwise, and is in the horn-like of downward-sloping opening, does not affect wind eddies stream
Formed, and effective excessive discharge stopping moisture.
Further technical scheme, also includes apparatus for eliminating sludge, described apparatus for eliminating sludge includes 2 supports, each frame upper
Platform is fixed with leading truck, and bottom is fixed with drive component, and drive component top connects the cleaning mixture jet pipe bundle of horizontality;Remove
The left and right two ends of dirty liquid jet pipe bundle and 2 leading trucks slide up and down connection, and cleaning mixture jet pipe caliber therebetween is slightly less than coldplate
Gap between coldplate bundle in constriction, cleaning mixture jet pipe both sides uniformly have liquid outlet, and apparatus for eliminating sludge can be in whole system
Carry out variable interval scale removal it is also possible to the thorough scale removal to system in stopping process, flexible, treatment effect is thorough in running
Bottom, improves the lasting run time of the cooling effect of whole system, Non-intermittent and service life.
Further technical scheme, also includes being fixed on the aerator of base side, and described base is in the half of upper opening
Closed, bottom is spray pond, and the side relative with aerator has the spray outlet by pipeline communication spray equipment,
Described spray equipment is arranged inside housing upper, uniformly has downwards mouth spray, and mouth spray no dead angle covers in coldplate constriction
Surface;Aerator underneath type, inwardly dries, does not have the erosion to electrical machine insulation for the hot dampness and the corrosion to blower fan, improve
(overhead type of prior art is to discharge after the suction of hot dampness to the service life of aerator, and dampness directly rushes at motor, and motor is subject to
Damp risk is larger);Inwardly the air inducing of blowing and induced draft cooling tower is worked in coordination with mutually, accelerates air inducing efficiency, improves cooling further
Effect;And, blowing can also delay the falling speed on coldplate constriction of shower water, accelerates plate constriction outer surface water
The evaporation of film, and improve evaporation capacity, improves the heat exchange amount with soft water in plate constriction, induced draft cooling tower, underneath type aerator,
The combination of spray equipment three has very strong synergism and effect.
Further technical scheme, described aerator is axial flow blower, and aspect of blowing efficiency is high, can be in work shape for a long time
State;Described drive component is Electrohydraulic push rod, and advance is long, flexible;Described frame bottom is fixedly connected directive wheel, guide support
Move along its length, rapid operation is it is possible to realize automation mechanized operation;Described base periphery setting windbreak, it is to avoid impurity
It is blown into system, and makes system ambient air pressure stable, play the effect of stable axial flow blower.
A kind of plate dirt processing method of shell-and-plate blast furnace evaporative air-cooling system, step is:
Step one, shutdown:By whole shell-and-plate blast furnace evaporative air-cooling system-down, and by apparatus for eliminating sludge along shell-and-plate blast furnace
The length direction of evaporative air-cooling system pushes shell-and-plate blast furnace evaporative air-cooling system, and 2 supports divide the evaporation of strake shell-type blast furnace empty
Cooling system both sides, cleaning mixture jet pipe bundle is flat on coldplate constriction bottom, and cleaning mixture jet pipe is just to the gap between coldplate bundle;
Step 2, hydrojet:After starting drive component, start the spray of cleaning mixture jet pipe, rotate cleaning mixture jet pipe simultaneously, remove
Dirty liquid jet pipe bundle slides up and down to coldplate Shu Jinhang spray and hairbrush scale removal between coldplate constriction, in narrow space
Carry out the thorough scale removal of combination of chemically and physically two ways;
Step 3, movement:After having processed a part of coldplate constriction, will be minimum for cleaning mixture jet pipe Shu Jiangzhi, along shell-and-plate
The length direction of blast furnace evaporative air-cooling system pushes away before continuing, repeat step two, segmented whole coldplate constriction is sprayed
Scale removal.
Another kind of processing method, is applied in shell-and-plate blast furnace evaporative air-cooling system operation, step is:
Step one, by apparatus for eliminating sludge along shell-and-plate blast furnace evaporative air-cooling system length direction push shell-and-plate blast furnace evaporation
Air cooling system, 2 supports divide strake shell-type blast furnace evaporative air-cooling system both sides, and cleaning mixture jet pipe bundle is flat on coldplate constriction bottom
Portion, cleaning mixture jet pipe is just to the gap between coldplate bundle;Cleaning mixture jet pipe outer wall is fixed with hairbrush;
Step 2, except plate dirt:After starting drive component, rotate cleaning mixture jet pipe, cleaning mixture jet pipe bundle is in coldplate constriction
Between slide up and down to coldplate bundle by hairbrush carry out scale removal or prevention plate dirt generation;
Step 3, movement:After having processed a part of coldplate constriction, will be minimum for cleaning mixture jet pipe Shu Jiangzhi, along shell-and-plate
The length direction of blast furnace evaporative air-cooling system pushes away before continuing, repeat step two, segmented carries out hairbrush to whole coldplate constriction
Scale removal.
3. beneficial effect
The technical scheme being provided using the present invention, compared with prior art, is had the advantages that:
(1) a kind of shell-and-plate blast furnace evaporative air-cooling system of employing soft water airtight circulating cooling system of the present invention, passes through
Induced draft cooling tower has replaced the blower fan of air draught effect, reduces installation total amount and production cost, need not because of motor rapid wear frequently
Numerous more ventilating fan, can be in running order for a long time;
(2) the shell-and-plate blast furnace evaporative air-cooling system of a kind of employing soft water airtight circulating cooling system of the present invention, waist tower
Shape double-curve cooling column, meets the principle easily producing wind eddies stream in hydrodynamics, and the air velocity of generation is fast, can effectively improve
Cooling effect;
(3) the shell-and-plate blast furnace evaporative air-cooling system of a kind of employing soft water airtight circulating cooling system of the present invention, air inducing
Cooling tower has 2 to 5, is that inventor carries out differentiated layout according to evaporation air cooler model size, to ensure different model steaming
Send out the cooling effect of air cooler;
(4) the shell-and-plate blast furnace evaporative air-cooling system of a kind of employing soft water airtight circulating cooling system of the present invention, strengthens
Muscle plays fastening and the effect stablizing cooling tower;Block water plate will drip return system after part condensate moisture, prevents excessive water
Divide and discharge the waste causing water resource;
(5) the shell-and-plate blast furnace evaporative air-cooling system of a kind of employing soft water airtight circulating cooling system of the present invention, dash
Piece ringwise, and is in the horn-like of downward-sloping opening, does not affect the formation of wind eddies stream, and effective excessive row stopping moisture
Go out;
(6) the shell-and-plate blast furnace evaporative air-cooling system of a kind of employing soft water airtight circulating cooling system of the present invention, scale removal
Device can carry out variable interval scale removal in whole system running it is also possible to the thorough scale removal to system in stopping process,
Flexible, treatment effect thoroughly, improves the cooling effect of whole system, the run time of Non-intermittent and service life;
(7) the shell-and-plate blast furnace evaporative air-cooling system of a kind of employing soft water airtight circulating cooling system of the present invention, air blast
Machine underneath type, inwardly dries, does not have the erosion to electrical machine insulation for the hot dampness and the corrosion to blower fan, improve the use of aerator
Life-span;Inwardly the air inducing of blowing and induced draft cooling tower is worked in coordination with mutually, accelerates air inducing efficiency, improves cooling effect further;And
And, blowing can also delay the falling speed on coldplate constriction of shower water, accelerates the steaming of plate constriction outer surface moisture film
Send out, and improve evaporation capacity, improve the heat exchange amount with soft water in plate constriction, induced draft cooling tower, underneath type aerator, spray dress
The combination putting three has very strong synergism and effect;
(8) a kind of shell-and-plate blast furnace evaporative air-cooling system of employing soft water airtight circulating cooling system of the present invention, keeps out the wind
Wall avoids impurity to be blown into system, and makes system ambient air pressure stable, plays the effect of stable axial flow blower;
(9) the plate dirt of the shell-and-plate blast furnace evaporative air-cooling system of a kind of employing soft water airtight circulating cooling system of the present invention
Processing method, can spray cleaning mixture using cleaning mixture jet pipe bundle during shutdown and hairbrush carries out thorough cleaning to plate dirt, narrow and small
Space in carry out the thorough scale removal of combination of chemically and physically two ways, easy to operate, scale removal is rapid;
(10) plate of the shell-and-plate blast furnace evaporative air-cooling system of a kind of employing soft water airtight circulating cooling system of the present invention
Dirty processing method, can also be processed to plate dirt in whole system running, using hairbrush can also prevention plate dirt
Generate, during avoiding using cleaning mixture scale removal, corrode coldplate constriction.
Brief description
Fig. 1 is a kind of shell-and-plate blast furnace evaporative air-cooling system knot of employing soft water airtight circulating cooling system of embodiment 3
Structure schematic diagram;
Fig. 2 is a kind of shell-and-plate blast furnace evaporative air-cooling system of employing soft water airtight circulating cooling system of embodiment 3
Side view;
Fig. 3 is the apparatus for eliminating sludge structural representation in embodiment 2;
Fig. 4 is the apparatus for eliminating sludge side view in embodiment 2;
Fig. 5 is that the shell-and-plate blast furnace evaporative air-cooling system of the employing soft water airtight circulating cooling system in embodiment 3 uses
View;
Fig. 6 is that the shell-and-plate blast furnace evaporative air-cooling system of the employing soft water airtight circulating cooling system in embodiment 3 uses
Side view of the state.
Label declaration in schematic diagram:1st, base;2nd, housing;3rd, induced draft cooling tower;4th, spray equipment;5th, aerator;6、
Apparatus for eliminating sludge;21st, coldplate constriction;22nd, cooling water outlet mouth;23rd, coolant intake;31st, reinforcement;32nd, block water plate;41st, spray
Drench outlet;61st, cleaning mixture jet pipe bundle;62nd, leading truck;63rd, support;64th, drive component.
Specific embodiment
For further appreciating that present disclosure, in conjunction with accompanying drawing, the present invention is described in detail.
Embodiment 1
2 4000m of certain steel plant3Blast furnace cooling stave and air stove adopt soft water airtight circulating cooling system, and 2 seat height stoves are altogether
Meter is using the shell-and-plate blast furnace evaporative air-cooling system of the employing soft water airtight circulating cooling system of 38 playscript with stage directions embodiments, and through transport
OK, the shell-and-plate blast furnace evaporative air-cooling system of the employing soft water airtight circulating cooling system of the present embodiment, including the base of 3m*9m
The coldplate of the internal hard-wired vertical layered layout of the 1st, housing 2 being mutually permanently connected directly over base 1, and housing 2
Constriction 21, coldplate constriction 21 is communicated by the soft water system of coolant intake 23 and cooling water outlet mouth 22 and blast furnace, cool down into
The mouth of a river 23 and cooling water outlet mouth 22 are in relative in coldplate constriction 21 both sides, and coolant intake upper, cooling water outlet mouth under
Setting, and wind in opposite direction, upwind flowing, are equivalent to secondary heat exchange, improve heat exchange efficiency;Also include above housing 2
2 induced draft cooling towers being made up of Coil Coating Products 3 being fixedly connected with housing 2, are completely covered housing 2 upper end open, and air inducing cools down
The top of tower 3 opening fully up, in the present embodiment, induced draft cooling tower 3 is the tower-like hyperbola of waist in and external-open downward from middle part
Cooling tower, highly for 3 meters.
The shell-and-plate blast furnace evaporative air-cooling system of the employing soft water airtight circulating cooling system of the present embodiment, cold by air inducing
But tower has replaced the blower fan of air draught effect, reduces installation total amount and production cost, need not because of motor rapid wear frequently more
Ventilating fan, can be in running order for a long time.The tower-like double-curve cooling column of waist, meets and easily produces wind eddies stream in hydrodynamics
Principle, the air velocity of generation is fast, can effectively improve cooling effect.
Embodiment 2
The shell-and-plate blast furnace evaporative air-cooling system of the employing soft water airtight circulating cooling system of the present embodiment, basic structure is same
Embodiment 1 is different and the improvement is that:Double-curve cooling column has 5, and highly for 4 meters, the uniform stationary distribution of outer wall has reinforcement
Muscle 31, plays fastening and the effect stablizing cooling tower, and the uniform stationary distribution of inwall has block water plate 32, will drip after part condensate moisture
Fall return system, prevents excessive moisture from discharging the waste causing water resource.Block water plate 32 ringwise, and is in downward-sloping opening
Horn-like, do not affect the formation of wind eddies stream, and effective excessive discharge stopping moisture.As shown in Figure 3,4, also include scale removal dress
Put 6, described apparatus for eliminating sludge 6 includes 2 supports 63, each support 63 upper brace is fixed with leading truck 62, and bottom is fixed with drive
Dynamic assembly 64, drive component 64 top connects the cleaning mixture jet pipe bundle 61 of horizontality;The left and right two ends of cleaning mixture jet pipe bundle 61
Slide up and down connection with 2 leading trucks 62, cleaning mixture jet pipe caliber therebetween be slightly less than in coldplate constriction 21 coldplate bundle it
Between gap, cleaning mixture jet pipe both sides uniformly have liquid outlet, and cleaning mixture jet pipe outer wall is fixed with hairbrush;Apparatus for eliminating sludge can be
Carry out variable interval scale removal it is also possible to the thorough scale removal to system in stopping process, flexible, place in whole system running
Reason effect thoroughly, improves the cooling effect of whole system, the run time of Non-intermittent and service life.
The shell-and-plate blast furnace evaporative air-cooling system of the employing soft water airtight circulating cooling system of the present embodiment, can be applied to
In shell-and-plate blast furnace evaporative air-cooling system operation, step is:
Step one, by apparatus for eliminating sludge 6 along shell-and-plate blast furnace evaporative air-cooling system length direction push shell-and-plate blast furnace steam
Send out air cooling system, 63 points of strake shell-type blast furnace evaporative air-cooling system both sides of 2 supports, cleaning mixture jet pipe bundle 61 is flat on coldplate
Constriction 21 bottom, cleaning mixture jet pipe is just to the gap between coldplate bundle;Cleaning mixture jet pipe outer wall is fixed with hairbrush;
Step 2, except plate dirt:After starting drive component 64, rotate cleaning mixture jet pipe, cleaning mixture jet pipe bundle 61 is in coldplate
Slide up and down between constriction 21 and by hairbrush, scale removal or the generation of prevention plate dirt are carried out to coldplate bundle;It can be avoided that frequently making
With the pollution to shower water after cleaning mixture, in turn result in the corrosion to coldplate constriction during spraying cooling heat exchange;
Step 3, movement:After having processed a part of coldplate constriction 21, cleaning mixture jet pipe bundle 61 is down to minimum, along plate
The length direction of shell-type blast furnace evaporative air-cooling system pushes away before continuing, repeat step two, segmented whole coldplate constriction 21 is entered
Row hairbrush scale removal.
The plate dirt processing method of the shell-and-plate blast furnace evaporative air-cooling system of the present embodiment is it is also possible to be applied to work long hours
Shell-and-plate blast furnace evaporative air-cooling system in thorough process (not temporarily being applied to) to the plate dirt generating, step is:
Step one, shutdown:By whole shell-and-plate blast furnace evaporative air-cooling system-down and apparatus for eliminating sludge 6 is high along shell-and-plate
The length direction of stove evaporative air-cooling system pushes shell-and-plate blast furnace evaporative air-cooling system, and 63 points of strake shell-type blast furnaces of 2 supports steam
Send out air cooling system both sides, cleaning mixture jet pipe bundle 61 is flat on coldplate constriction 21 bottom, cleaning mixture jet pipe just to coldplate bundle it
Between gap;
Step 2, hydrojet:After starting drive component 64, start the spray of cleaning mixture jet pipe, rotate cleaning mixture jet pipe simultaneously,
Cleaning mixture jet pipe bundle 61 slides up and down to coldplate Shu Jinhang spray and hairbrush scale removal between coldplate constriction 21;
Step 3, movement:After having processed a part of coldplate constriction 21, cleaning mixture jet pipe bundle 61 is down to minimum, along plate
The length direction of shell-type blast furnace evaporative air-cooling system pushes away before continuing, repeat step two, segmented whole coldplate constriction 21 is entered
Row spray scale removal.
The shell-and-plate blast furnace evaporative air-cooling system of the employing soft water airtight circulating cooling system of the present embodiment, due to hyperbola
Cooling tower is different from the blower fan of overhead, the top being fixed on housing 2 that can be stable, it is to avoid the sustained vibration of blower fan is to cooling
The impact of plate constriction 21, make whole system be in a kind of very firm state, and apparatus for eliminating sludge can prevention plate dirt at any time
Generate, the continuous service it is ensured that whole system need not be shut down merely for scale removal, cleaning mixture jet pipe outer wall is fixed with hairbrush
Exist, moreover it is possible to delay the dirty of shower water while scale removal, and then improve coldplate constriction 21 internal-external heat exchanger effect;
Through calculating, the shell-and-plate blast furnace evaporative air-cooling system of the employing soft water airtight circulating cooling system of the present embodiment,
Since in May, 2015 application, always in continuous service Maintenance free, heat exchange cooling effect also remains unchanged.
Embodiment 3
The shell-and-plate blast furnace evaporative air-cooling system of the employing soft water airtight circulating cooling system of the present embodiment, basic structure and
Descaling method is with embodiment 2, different and the improvement is that:As shown in Fig. 1,2,5,6, double-curve cooling column has 3, is highly
6 meters, also include being fixed on the aerator 5 of base 1 side, described base 1 is in the semiclosed shape of upper opening, bottom is shower water
Pond, the side relative with aerator 5 has the spray outlet 41 by pipeline communication spray equipment 4, and described spray equipment 4 sets
It is placed in housing 1 upper inner, uniformly has downwards mouth spray, mouth spray no dead angle covers in directly over coldplate constriction 21;Air blast
Machine underneath type, inwardly dries, does not have the erosion to electrical machine insulation for the hot dampness and the corrosion to blower fan, improve the use of aerator
Life-span;Inwardly the air inducing of blowing and induced draft cooling tower is worked in coordination with mutually, accelerates air inducing efficiency, improves cooling effect further;And
And, blowing can also delay the falling speed on coldplate constriction of shower water, accelerates the steaming of plate constriction outer surface moisture film
Send out, and improve evaporation capacity, improve the heat exchange amount with soft water in plate constriction, induced draft cooling tower, underneath type aerator, spray dress
The combination putting three has very strong synergism and effect.Described aerator 5 is axial flow blower, and aspect of blowing efficiency is high, when can be long
Between in running order;Described drive component 64 is Electrohydraulic push rod, and advance is long, flexible;Described support 63 bottom is fixing even
Connect directive wheel, guide support moves along its length, rapid operation is it is possible to realize automation mechanized operation;Described base 1 periphery can
To arrange windbreak, it is to avoid impurity is blown into system, and make system ambient air pressure stable, play the effect of stable axial flow blower.
Embodiment 4
The shell-and-plate blast furnace evaporative air-cooling system of the employing soft water airtight circulating cooling system of the present embodiment, basic structure and
Descaling method is with embodiment 2, different and the improvement is that:In step 2, while starting drive component 64, start aerator
5, the collaborative effect of the combination heat exchanging cooling of induced draft cooling tower, underneath type aerator, spray equipment, hairbrush can be played
Really, delayed the dirty of shower water further, cooling effectiveness improves further;Described cleaning mixture jet pipe is rectangular tube, and width is slightly
Less than the gap between coldplate bundle, rectangular tube can agree with the square gap between coldplate bundle, and scale removal and prevention plate dirt are raw
The effect becoming is more preferable.
Embodiment 5
The shell-and-plate blast furnace evaporative air-cooling system of the employing soft water airtight circulating cooling system of the present embodiment, basic structure and
Descaling method is with embodiment 2, different and the improvement is that:It is respectively provided with scale removal in the both sides of the coldplate constriction 21 of each sections
Device 6, cleaning mixture jet pipe bundle 61 is interspersed between coldplate constriction 21, and is linked each apparatus for eliminating sludge 6 by chain device,
Each apparatus for eliminating sludge 6 is made to run simultaneously, advantage is need not to move apparatus for eliminating sludge 6 along the length direction of coldplate constriction, and scale removal hinders
Only the generation of plate dirt is convenient.
Below schematically the present invention and embodiments thereof are described, this description does not have restricted, institute in accompanying drawing
Show is also one of embodiments of the present invention, and actual structure is not limited thereto.So, if the common skill of this area
Art personnel enlightened by it, in the case of without departing from the invention objective, designs and this technical scheme without creative
Similar frame mode and embodiment, all should belong to protection scope of the present invention.
Claims (10)
1. the shell-and-plate blast furnace evaporative air-cooling system of a kind of employing soft water airtight circulating cooling system, including base (1), base
(1) housing (2) being mutually permanently connected directly over, and the coldplate of the internal hard-wired vertical layered layout of housing (2)
Constriction (21) is it is characterised in that also include the induced draft cooling tower (3) being fixedly connected above housing (2) with housing (2), air inducing is cold
But tower (3) top opening fully up.
2. the shell-and-plate blast furnace evaporative air-cooling system of a kind of employing soft water airtight circulating cooling system according to claim 1
System it is characterised in that:Described induced draft cooling tower (3) is downward from middle part and external-open the tower-like double-curve cooling column of waist.
3. the shell-and-plate blast furnace evaporative air-cooling system of a kind of employing soft water airtight circulating cooling system according to claim 2
System it is characterised in that:Described induced draft cooling tower (3) has 2 to 5, and housing (2) upper end open is completely covered.
4. the shell-and-plate blast furnace evaporative air-cooling system of a kind of employing soft water airtight circulating cooling system according to claim 2
System it is characterised in that:The uniform stationary distribution of described induced draft cooling tower (3) outer wall has reinforcement (31), the uniform stationary distribution of inwall
There is block water plate (32).
5. the shell-and-plate blast furnace evaporative air-cooling system of a kind of employing soft water airtight circulating cooling system according to claim 4
System it is characterised in that:Described block water plate (32) ringwise, and is in the horn-like of downward-sloping opening.
6. the shell-and-plate blast furnace evaporative air-cooling system of a kind of employing soft water airtight circulating cooling system according to claim 5
System it is characterised in that:Also include apparatus for eliminating sludge (6), described apparatus for eliminating sludge (6) includes 2 supports (63), on each support (63)
Portion's platform is fixed with leading truck (62), and bottom is fixed with drive component (64), and drive component (64) top connects horizontality
Cleaning mixture jet pipe bundle (61);The left and right two ends of cleaning mixture jet pipe bundle (61) and 2 leading trucks (62) slide up and down connection, therebetween
Cleaning mixture jet pipe caliber is slightly less than the gap in coldplate constriction (21) between coldplate bundle, and cleaning mixture jet pipe both sides uniformly have
Liquid outlet.
7. the shell-and-plate blast furnace evaporative air-cooling system of a kind of employing soft water airtight circulating cooling system according to claim 5
System it is characterised in that:Also include the aerator (5) being fixed on base (1) side, described base (1) is in half envelope of upper opening
Close shape, bottom is spray pond, and the side relative with aerator (5) is had and gone out by the spray of pipeline communication spray equipment (4)
The mouth of a river (41), described spray equipment (4) is arranged at housing (1) upper inner, uniformly has downwards mouth spray, mouth spray no dead angle
Cover in directly over coldplate constriction (21).
8. the shell-and-plate blast furnace evaporative air-cooling system of a kind of employing soft water airtight circulating cooling system according to claim 7
System it is characterised in that:Described aerator (5) is axial flow blower;Described drive component (64) is Electrohydraulic push rod;Described support (63)
Bottom is fixedly connected directive wheel;Described base (1) periphery setting windbreak.
9. the shell-and-plate blast furnace evaporative air-cooling system of a kind of employing soft water airtight circulating cooling system according to claim 6
Plate dirt processing method it is characterised in that:It is applied in shell-and-plate blast furnace evaporative air-cooling system operation, step is:
Step one, apparatus for eliminating sludge (6) is pushed in system along the length direction of shell-and-plate blast furnace evaporative air-cooling system, 2 supports
(63) row system both sides are divided, cleaning mixture jet pipe bundle (61) is flat on coldplate constriction (21) bottom, and cleaning mixture jet pipe is just to cooling
Gap between plate bundle;Cleaning mixture jet pipe outer wall is fixed with hairbrush;
Step 2, except plate dirt:After starting drive component (64), rotate cleaning mixture jet pipe, cleaning mixture jet pipe bundle (61) is in coldplate
Slide up and down between constriction (21) and by hairbrush, scale removal or the generation of prevention plate dirt are carried out to coldplate bundle;
Step 3, movement:After having processed a part of coldplate constriction (21), push away along before the length direction continuation of system, repeat to walk
Rapid two, segmented hairbrush scale removal is carried out to whole coldplate constriction (21).
10. the shell-and-plate blast furnace evaporative air-cooling system of a kind of employing soft water airtight circulating cooling system according to claim 6
The plate dirt processing method of system is it is characterised in that step is:
Step one, shutdown:By whole shell-and-plate blast furnace evaporative air-cooling system-down, and by apparatus for eliminating sludge (6) along shell-and-plate blast furnace
The length direction of evaporative air-cooling system pushes in system, 2 support (63) point row system both sides, cleaning mixture jet pipe bundle (61) horizontal
In coldplate constriction (21) bottom, cleaning mixture jet pipe is just to the gap between coldplate bundle;
Step 2, hydrojet:After starting drive component (64), start the spray of cleaning mixture jet pipe, rotate cleaning mixture jet pipe simultaneously, remove
Dirty liquid jet pipe bundle (61) slides up and down to coldplate Shu Jinhang spray and hairbrush scale removal between coldplate constriction (21);
Step 3, movement:After having processed a part of coldplate constriction (21), cleaning mixture jet pipe bundle (61) is down to minimum, along system
System length direction continue before push away, repeat step two, segmented whole coldplate constriction (21) is carried out spray scale removal.
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610928525.0A CN106403652B (en) | 2016-10-31 | 2016-10-31 | It is a kind of using the shell-and-plate blast furnace evaporative air-cooling system of soft water airtight circulating cooling system and its plate dirt processing method |
CN201810139107.2A CN108413782B (en) | 2016-10-31 | 2016-10-31 | A kind of processing method of blast furnace evaporative air-cooling system board dirt |
CN201810139117.6A CN108398036B (en) | 2016-10-31 | 2016-10-31 | Plate dirt processing method in a kind of operation of shell-and-plate blast furnace evaporative air-cooling system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610928525.0A CN106403652B (en) | 2016-10-31 | 2016-10-31 | It is a kind of using the shell-and-plate blast furnace evaporative air-cooling system of soft water airtight circulating cooling system and its plate dirt processing method |
Related Child Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810139117.6A Division CN108398036B (en) | 2016-10-31 | 2016-10-31 | Plate dirt processing method in a kind of operation of shell-and-plate blast furnace evaporative air-cooling system |
CN201810139107.2A Division CN108413782B (en) | 2016-10-31 | 2016-10-31 | A kind of processing method of blast furnace evaporative air-cooling system board dirt |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106403652A true CN106403652A (en) | 2017-02-15 |
CN106403652B CN106403652B (en) | 2018-06-05 |
Family
ID=58013552
Family Applications (3)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610928525.0A Active CN106403652B (en) | 2016-10-31 | 2016-10-31 | It is a kind of using the shell-and-plate blast furnace evaporative air-cooling system of soft water airtight circulating cooling system and its plate dirt processing method |
CN201810139117.6A Active CN108398036B (en) | 2016-10-31 | 2016-10-31 | Plate dirt processing method in a kind of operation of shell-and-plate blast furnace evaporative air-cooling system |
CN201810139107.2A Active CN108413782B (en) | 2016-10-31 | 2016-10-31 | A kind of processing method of blast furnace evaporative air-cooling system board dirt |
Family Applications After (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810139117.6A Active CN108398036B (en) | 2016-10-31 | 2016-10-31 | Plate dirt processing method in a kind of operation of shell-and-plate blast furnace evaporative air-cooling system |
CN201810139107.2A Active CN108413782B (en) | 2016-10-31 | 2016-10-31 | A kind of processing method of blast furnace evaporative air-cooling system board dirt |
Country Status (1)
Country | Link |
---|---|
CN (3) | CN106403652B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113218233A (en) * | 2021-04-06 | 2021-08-06 | 关学忠 | Heating furnace fire tube scale cleaning and preventing method and scale preventing device |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201387248Y (en) * | 2009-04-07 | 2010-01-20 | 秦皇岛莱特流体设备制造有限公司 | High-efficiency evaporative cooler |
CN102401581A (en) * | 2011-07-27 | 2012-04-04 | 中国电力工程顾问集团西北电力设计院 | Mixed ventilation indirect cooling tower system and cooling method thereof |
JP2012083022A (en) * | 2010-10-12 | 2012-04-26 | Takasago Thermal Eng Co Ltd | Washing apparatus for cooling tower louver |
CN203949532U (en) * | 2014-06-27 | 2014-11-19 | 益冷和众科技(北京)有限公司 | IDC machine room closed cooling tower in winter |
CN204830827U (en) * | 2015-08-11 | 2015-12-02 | 安徽马钢工程技术集团有限公司 | Utilize shaft furnace water bar of electromagnetism scale removal |
CN206469740U (en) * | 2016-10-31 | 2017-09-05 | 安徽马钢输送设备制造有限公司 | A kind of shell-and-plate blast furnace evaporative air-cooling system of use soft water airtight circulating cooling system |
Family Cites Families (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS63150592A (en) * | 1986-12-13 | 1988-06-23 | Shinwa Sangyo Kk | Heat exchanging tower with cleaning device |
CN2713426Y (en) * | 2004-06-15 | 2005-07-27 | 南华大学 | On-line descaling and reinforced heat transfer apparatus for heat exchanger |
US7137619B2 (en) * | 2004-09-17 | 2006-11-21 | Spx Cooling Technologies, Inc. | Heating tower apparatus and method with wind direction adaptation |
US7384026B2 (en) * | 2004-09-17 | 2008-06-10 | Spx Cooling Technologies Inc. | Heating tower apparatus and method with wind direction adaptation |
CN1995899A (en) * | 2006-11-24 | 2007-07-11 | 华中科技大学 | Water current on-line scale remover for surface evaporation type air cooling device |
CN201152706Y (en) * | 2007-12-18 | 2008-11-19 | 华南理工大学 | Plate-shell type nonsaturated evaporative condensing apparatus |
CN201242395Y (en) * | 2008-07-04 | 2009-05-20 | 洪鑫鹏 | Automatic cleaning device for evaporating air cooler |
CN102192678A (en) * | 2010-03-18 | 2011-09-21 | 陈远 | Water recycling device for cooling tower |
EP2505915A1 (en) * | 2011-04-01 | 2012-10-03 | Nooter/Eriksen s.r.l. | Device and method for cleaning heat exchange finned tubes in a heat recovery steam generator |
CN202628161U (en) * | 2012-06-26 | 2012-12-26 | 湖南科技大学 | Intelligent-monitoring and automatic-descaling mining air cooler |
CN203132415U (en) * | 2013-03-28 | 2013-08-14 | 朱校 | Cooling tower |
CN203414011U (en) * | 2013-06-06 | 2014-01-29 | 济宁圣源环境系统工程有限公司 | Descaling heat exchanger |
CN203672224U (en) * | 2014-01-06 | 2014-06-25 | 中国矿业大学 | Automatic washing heat exchange device |
CN204535536U (en) * | 2015-03-28 | 2015-08-05 | 山东飞洋热工设备有限公司 | A kind of plate type heat exchanger apparatus for eliminating sludge |
CN205482464U (en) * | 2016-01-12 | 2016-08-17 | 濮阳市海林特种设备制造防护有限公司 | Automatic control is bathed to wash and is cleaned multi -functional air cooler of scale removal |
-
2016
- 2016-10-31 CN CN201610928525.0A patent/CN106403652B/en active Active
- 2016-10-31 CN CN201810139117.6A patent/CN108398036B/en active Active
- 2016-10-31 CN CN201810139107.2A patent/CN108413782B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201387248Y (en) * | 2009-04-07 | 2010-01-20 | 秦皇岛莱特流体设备制造有限公司 | High-efficiency evaporative cooler |
JP2012083022A (en) * | 2010-10-12 | 2012-04-26 | Takasago Thermal Eng Co Ltd | Washing apparatus for cooling tower louver |
CN102401581A (en) * | 2011-07-27 | 2012-04-04 | 中国电力工程顾问集团西北电力设计院 | Mixed ventilation indirect cooling tower system and cooling method thereof |
CN203949532U (en) * | 2014-06-27 | 2014-11-19 | 益冷和众科技(北京)有限公司 | IDC machine room closed cooling tower in winter |
CN204830827U (en) * | 2015-08-11 | 2015-12-02 | 安徽马钢工程技术集团有限公司 | Utilize shaft furnace water bar of electromagnetism scale removal |
CN206469740U (en) * | 2016-10-31 | 2017-09-05 | 安徽马钢输送设备制造有限公司 | A kind of shell-and-plate blast furnace evaporative air-cooling system of use soft water airtight circulating cooling system |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113218233A (en) * | 2021-04-06 | 2021-08-06 | 关学忠 | Heating furnace fire tube scale cleaning and preventing method and scale preventing device |
CN113218233B (en) * | 2021-04-06 | 2022-05-06 | 关学忠 | Heating furnace fire tube scale cleaning and preventing method and scale preventing device |
Also Published As
Publication number | Publication date |
---|---|
CN106403652B (en) | 2018-06-05 |
CN108398036A (en) | 2018-08-14 |
CN108398036B (en) | 2019-06-07 |
CN108413782B (en) | 2019-06-25 |
CN108413782A (en) | 2018-08-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201993007U (en) | Composite flow evaporation type air cooler | |
CN202092479U (en) | Closed air cooling system for auxiliary machine circulating cooling water | |
CN105403068A (en) | Dry-wet unified cooling tower adopting natural ventilation and composite running mode and application of dry-wet unified cooling tower | |
CN111457758A (en) | Cooling device and method for industrial hot fluid | |
CN102679480B (en) | Dew point indirect evaporation cooler with plate-tube combined structure | |
CN104315875A (en) | Evaporative-type condenser for peak cooling of power plant | |
CN110345778A (en) | A kind of closed cooling tower | |
CN101187535A (en) | Evaporated air-cooling type heat exchange device and method | |
CN206469740U (en) | A kind of shell-and-plate blast furnace evaporative air-cooling system of use soft water airtight circulating cooling system | |
CN106403652A (en) | Shell-and-plate blast furnace evaporation air cooling system using soft water closed recirculation cooling system and plate scale treatment method thereof | |
CN202614028U (en) | Anti-scaling evaporative condenser | |
CN105928106B (en) | The cooling handpiece Water Chilling Units of capillary type enclosed evaporation | |
CN104930619A (en) | Evaporative cooling-absorption heat pump combined air conditioning system for power plant | |
CN204064037U (en) | The dry wet combination air cooler of a kind of tubular type | |
CN204255124U (en) | A kind of evaporative condenser being applicable to power plant | |
CN206469723U (en) | A kind of tubular type blast-furnace soft water evaporative air-cooling system | |
CN106440854B (en) | A kind of tubular type blast-furnace soft water evaporative air-cooling system and its pipe scale processing method | |
CN106091488A (en) | Fin-tube type indirect evaporation air cooler | |
CN207540387U (en) | Bottom blast formula cooling tower cloth wind structure | |
CN104501624A (en) | Power plant used cooling system combining evaporative type cooler and surface type condensing system | |
CN202133306U (en) | Vacuum evaporative cooling device | |
CN204421686U (en) | The cooling device that the evaporative cooling being applicable to power plant is combined with surperficial condensing | |
CN208751323U (en) | Evaporating air cooler Water-saving spray device | |
CN202613630U (en) | Plate and tube type dew-point indirect evaporative cooler | |
CN206131862U (en) | Plate type evaporation cooler scale removal device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |