CN106403652A - Shell-and-plate blast furnace evaporation air cooling system using soft water closed recirculation cooling system and plate scale treatment method thereof - Google Patents

Shell-and-plate blast furnace evaporation air cooling system using soft water closed recirculation cooling system and plate scale treatment method thereof Download PDF

Info

Publication number
CN106403652A
CN106403652A CN201610928525.0A CN201610928525A CN106403652A CN 106403652 A CN106403652 A CN 106403652A CN 201610928525 A CN201610928525 A CN 201610928525A CN 106403652 A CN106403652 A CN 106403652A
Authority
CN
China
Prior art keywords
cooling system
plate
shell
blast furnace
jet pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610928525.0A
Other languages
Chinese (zh)
Other versions
CN106403652B (en
Inventor
廖海欧
李春江
张永丰
刘宏兵
朱俊山
尹宵峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ANHUI MASTEEL CONVEYING EQUIPMENT MANUFACTURING Co Ltd
Original Assignee
ANHUI MASTEEL CONVEYING EQUIPMENT MANUFACTURING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ANHUI MASTEEL CONVEYING EQUIPMENT MANUFACTURING Co Ltd filed Critical ANHUI MASTEEL CONVEYING EQUIPMENT MANUFACTURING Co Ltd
Priority to CN201610928525.0A priority Critical patent/CN106403652B/en
Priority to CN201810139107.2A priority patent/CN108413782B/en
Priority to CN201810139117.6A priority patent/CN108398036B/en
Publication of CN106403652A publication Critical patent/CN106403652A/en
Application granted granted Critical
Publication of CN106403652B publication Critical patent/CN106403652B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28HEAT EXCHANGE IN GENERAL
    • F28DHEAT-EXCHANGE APPARATUS, NOT PROVIDED FOR IN ANOTHER SUBCLASS, IN WHICH THE HEAT-EXCHANGE MEDIA DO NOT COME INTO DIRECT CONTACT
    • F28D5/00Heat-exchange apparatus having stationary conduit assemblies for one heat-exchange medium only, the media being in contact with different sides of the conduit wall, using the cooling effect of natural or forced evaporation
    • F28D5/02Heat-exchange apparatus having stationary conduit assemblies for one heat-exchange medium only, the media being in contact with different sides of the conduit wall, using the cooling effect of natural or forced evaporation in which the evaporating medium flows in a continuous film or trickles freely over the conduits
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28HEAT EXCHANGE IN GENERAL
    • F28FDETAILS OF HEAT-EXCHANGE AND HEAT-TRANSFER APPARATUS, OF GENERAL APPLICATION
    • F28F25/00Component parts of trickle coolers
    • F28F25/10Component parts of trickle coolers for feeding gas or vapour
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28HEAT EXCHANGE IN GENERAL
    • F28GCLEANING OF INTERNAL OR EXTERNAL SURFACES OF HEAT-EXCHANGE OR HEAT-TRANSFER CONDUITS, e.g. WATER TUBES OR BOILERS
    • F28G1/00Non-rotary, e.g. reciprocated, appliances
    • F28G1/02Non-rotary, e.g. reciprocated, appliances having brushes
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28HEAT EXCHANGE IN GENERAL
    • F28GCLEANING OF INTERNAL OR EXTERNAL SURFACES OF HEAT-EXCHANGE OR HEAT-TRANSFER CONDUITS, e.g. WATER TUBES OR BOILERS
    • F28G9/00Cleaning by flushing or washing, e.g. with chemical solvents
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P80/00Climate change mitigation technologies for sector-wide applications
    • Y02P80/10Efficient use of energy, e.g. using compressed air or pressurized fluid as energy carrier

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Heat-Exchange Devices With Radiators And Conduit Assemblies (AREA)

Abstract

The invention discloses a shell-and-plate blast furnace evaporation air cooling system using a soft water closed recirculation cooling system and a plate scale treatment method thereof and belongs to the technical field of blast furnace iron making production. The shell-and-plate blast furnace vaporation air cooling system using the soft water closed recirculation cooling system comprises a base, a shell body which is over the base and is fixedly connected with the base, a cooling plate set which is a vertical layered layout is arranged in the shell body in a fixation mode, and induced air cooling towers which are connected with the shell body in a fixation mode and right above the shell body. Through replacing an induced air motor with an air suction function with the induced air cooling towers, installed gross and production running cost are lowered, there is no need to frequently change and maintain a soggy and fragile fan motor, and the induced air cooling towers are capable of being at a normal working state for a long time and saves electric energy and water consumption of refrigerant water. Physical descaling can be conducted periodically in the whole operational process of the system through the plate scale treatment method, and also thorough descaling can be conducted in a stopping process. The induced air cooling towers are flexible and mobile and through in treatment effect. The heat exchange and cooling effects of the whole system are improved, and the continuous working period and service life are prolonged.

Description

A kind of shell-and-plate blast furnace evaporative air-cooling system of employing soft water airtight circulating cooling system And its plate dirt processing method
Technical field
The present invention relates to Blast Furnace Iron-making Production Technology field, more particularly, to a kind of employing soft water airtight circulating cooling system Shell-and-plate blast furnace evaporative air-cooling system and its plate dirt processing method.
Background technology
Evaporation air cooler be mainly characterized by using outside the evaporation enhanced tube of outside tube water film conduct heat, its work process be with system Water circulating pump in system by spraying cooling water be transported to positioned at horizontal positioned light pipe tube bank top spray water dispenser, by point Cooling water is sprayed downwards tube surface by orchestration, makes tube outer surface form the thin water film of continuous uniform;Simultaneously will with blower fan Air sucks window from equipment lower air and sucks, and makes the bottom-up flowing of air, the horizontal light pipe tube bank plunderring horizontal positioned.Now The pipe unofficial biography evanescence of heat of heat-transfer pipe relies on outside the sensible heat transfer between moisture film and air stream, and the rapid evaporation of tube outer surface moisture film absorbs Substantial amounts of heat, enhances the outer heat transfer of pipe.
Because water has the higher latent heat of vaporization (the water latent heat of vaporization at one atm is 570Kcal/Kg) therefore The evaporation of outside tube water film greatly enhances the outer heat transfer of pipe, so that outfit of equipment heat transfer efficiency is significantly improved.Tube outer surface moisture film Evaporation make air pass through light pipe tube bank after humidity increase and close to saturation, blower fan is usually overhead type, by saturated moist air from Extract and pass through the water deflector above spray water dispenser in tube bank out, remove the water droplet carried secretly in saturated moist air Afterwards, from equipment top, fan outlet enters air, because blower fan is drawn up air positioned at its upper side, thus under blower fan Portion space forms negative pressure region, accelerates the evaporation of tube outer surface moisture film, is conducive to heat transfer, evaporative type cooler outside enhanced tube In, processing medium walks bottom horizontal flow sheet in pipe, and empty gas and water is walked outside pipe, and air flows from bottom to top, and shower water then flows from top to bottom Dynamic, water, air and processing medium are to intersect cross-flow, and water is adverse current with air, although so enhancing from flow arrangement Heat and mass transfer process, but also bring the technology that the easy corrosion of blower fan and motor are led to service life not grown by the long-term erosion of steam Problem.
At present as a kind of evaporative type cooler of Patent No. 02255480.7, by the water in water tank is extracted into spray dress Put, and water is sprayed on heat-exchanging tube bundle, by heat-exchanging tube bundle surface evaporation of water, and then reach the effect of heat transfer, and In the past chiller was compared, this cooler have take up an area that little, efficiency of transmission is high, cost of investment is low, that Municipal Sewage for Circulating is few is excellent Point, but due to the shell of this cooler is fixing, shell does not have openable door, therefore, continuous with cooler Use, heat-exchanging tube bundle surface easily forms incrustation scale it is impossible to timely clean, the efficiency of impact heat transfer.
China Patent Publication No.:202177322U, discloses a kind of plate-type evaporative cooler, including the water located at bottom Case, be located at water tank above housing, located at the air intake on housing, in housing and be located at air intake above heat exchange Device, the spray equipment above heat-exchanger rig, by spray upper hose be connected with spray equipment water circulating pump, located at spray Water collection device above shower device, the chiller above water collection device, described spray equipment includes complex root spray arm, often Root spray arm is provided with a plurality of water-locators, and described heat-exchanger rig is the heat exchanger plates bundle that plural block heat exchanger plates compacting is formed, and changes Formed between hot plate can the passage that passes through of heat supply process medium, described heat exchanger plates bundle two ends are provided with the thermal process with above-mentioned channel connection Medium entrance and outlet.This cooler heat-exchanger rig takes up room, and little, transmission efficiency is high, and this cooler is also preferably saved simultaneously Water resource.But this utility model equally exists blower motor service life, and length and plate dirt process halfway problem.
Content of the invention
1. invent technical problem to be solved
For the shell-and-plate blast furnace evaporative air-cooling system adopting soft water airtight circulating cooling system present in prior art Blower motor service life long and plate dirt processes halfway problem, the invention provides one kind adopts soft water closed circulating The shell-and-plate blast furnace evaporative air-cooling system of cooling system and its plate dirt processing method.It can realize without using blower fan i.e. up to To the purpose of cooling effect, and, plate dirt is processed thoroughly, due to not using blower fan, reduces using with production cost.
2. technical scheme
For reaching above-mentioned purpose, the technical scheme that the present invention provides is:
A kind of shell-and-plate blast furnace evaporative air-cooling system of employing soft water airtight circulating cooling system, including base, base just The housing that top is mutually permanently connected, and the coldplate constriction of the hard-wired vertical layered layout of enclosure interior, also include The induced draft cooling tower being fixedly connected with housing above housing, top opening fully up, air draught has been replaced by induced draft cooling tower The blower fan of effect, reduces installation total amount and production run cost, need not make moist rapid wear and frequently repair and replacement because of motor Blower motor, can be in normal operating conditions, saves energy and chilled water water consume for a long time.The plate dirt process side of the present invention Method, can enter line period, timing physics mode scale removal it is also possible to system in stopping process in whole system running Thoroughly scale removal, flexible, treatment effect thoroughly, improves heat exchange, the cooling effect of whole system, increases continuous service Time and service life.
Further technical scheme, described induced draft cooling tower is in downward from middle part and the waist tower-like hyperbola cooling of external-open Tower, meets the principle easily producing wind eddies stream in hydrodynamics, and the air velocity of generation is fast, can effectively improve cooling effect.
Further technical scheme, induced draft cooling tower has 2 to 5, and housing upper end open is completely covered, empty according to evaporation Cooler model size carries out differentiated layout, to ensure the cooling effect of different model evaporation air cooler.
Further technical scheme, the uniform stationary distribution of induced draft cooling tower outer wall has reinforcement, plays fastening and stablizes cold But the effect of tower, the uniform stationary distribution of inwall has block water plate, will drip return system, prevent excessive water after part condensate moisture Divide and discharge the waste causing water resource.
Further technical scheme, block water plate ringwise, and is in the horn-like of downward-sloping opening, does not affect wind eddies stream Formed, and effective excessive discharge stopping moisture.
Further technical scheme, also includes apparatus for eliminating sludge, described apparatus for eliminating sludge includes 2 supports, each frame upper Platform is fixed with leading truck, and bottom is fixed with drive component, and drive component top connects the cleaning mixture jet pipe bundle of horizontality;Remove The left and right two ends of dirty liquid jet pipe bundle and 2 leading trucks slide up and down connection, and cleaning mixture jet pipe caliber therebetween is slightly less than coldplate Gap between coldplate bundle in constriction, cleaning mixture jet pipe both sides uniformly have liquid outlet, and apparatus for eliminating sludge can be in whole system Carry out variable interval scale removal it is also possible to the thorough scale removal to system in stopping process, flexible, treatment effect is thorough in running Bottom, improves the lasting run time of the cooling effect of whole system, Non-intermittent and service life.
Further technical scheme, also includes being fixed on the aerator of base side, and described base is in the half of upper opening Closed, bottom is spray pond, and the side relative with aerator has the spray outlet by pipeline communication spray equipment, Described spray equipment is arranged inside housing upper, uniformly has downwards mouth spray, and mouth spray no dead angle covers in coldplate constriction Surface;Aerator underneath type, inwardly dries, does not have the erosion to electrical machine insulation for the hot dampness and the corrosion to blower fan, improve (overhead type of prior art is to discharge after the suction of hot dampness to the service life of aerator, and dampness directly rushes at motor, and motor is subject to Damp risk is larger);Inwardly the air inducing of blowing and induced draft cooling tower is worked in coordination with mutually, accelerates air inducing efficiency, improves cooling further Effect;And, blowing can also delay the falling speed on coldplate constriction of shower water, accelerates plate constriction outer surface water The evaporation of film, and improve evaporation capacity, improves the heat exchange amount with soft water in plate constriction, induced draft cooling tower, underneath type aerator, The combination of spray equipment three has very strong synergism and effect.
Further technical scheme, described aerator is axial flow blower, and aspect of blowing efficiency is high, can be in work shape for a long time State;Described drive component is Electrohydraulic push rod, and advance is long, flexible;Described frame bottom is fixedly connected directive wheel, guide support Move along its length, rapid operation is it is possible to realize automation mechanized operation;Described base periphery setting windbreak, it is to avoid impurity It is blown into system, and makes system ambient air pressure stable, play the effect of stable axial flow blower.
A kind of plate dirt processing method of shell-and-plate blast furnace evaporative air-cooling system, step is:
Step one, shutdown:By whole shell-and-plate blast furnace evaporative air-cooling system-down, and by apparatus for eliminating sludge along shell-and-plate blast furnace The length direction of evaporative air-cooling system pushes shell-and-plate blast furnace evaporative air-cooling system, and 2 supports divide the evaporation of strake shell-type blast furnace empty Cooling system both sides, cleaning mixture jet pipe bundle is flat on coldplate constriction bottom, and cleaning mixture jet pipe is just to the gap between coldplate bundle;
Step 2, hydrojet:After starting drive component, start the spray of cleaning mixture jet pipe, rotate cleaning mixture jet pipe simultaneously, remove Dirty liquid jet pipe bundle slides up and down to coldplate Shu Jinhang spray and hairbrush scale removal between coldplate constriction, in narrow space Carry out the thorough scale removal of combination of chemically and physically two ways;
Step 3, movement:After having processed a part of coldplate constriction, will be minimum for cleaning mixture jet pipe Shu Jiangzhi, along shell-and-plate The length direction of blast furnace evaporative air-cooling system pushes away before continuing, repeat step two, segmented whole coldplate constriction is sprayed Scale removal.
Another kind of processing method, is applied in shell-and-plate blast furnace evaporative air-cooling system operation, step is:
Step one, by apparatus for eliminating sludge along shell-and-plate blast furnace evaporative air-cooling system length direction push shell-and-plate blast furnace evaporation Air cooling system, 2 supports divide strake shell-type blast furnace evaporative air-cooling system both sides, and cleaning mixture jet pipe bundle is flat on coldplate constriction bottom Portion, cleaning mixture jet pipe is just to the gap between coldplate bundle;Cleaning mixture jet pipe outer wall is fixed with hairbrush;
Step 2, except plate dirt:After starting drive component, rotate cleaning mixture jet pipe, cleaning mixture jet pipe bundle is in coldplate constriction Between slide up and down to coldplate bundle by hairbrush carry out scale removal or prevention plate dirt generation;
Step 3, movement:After having processed a part of coldplate constriction, will be minimum for cleaning mixture jet pipe Shu Jiangzhi, along shell-and-plate The length direction of blast furnace evaporative air-cooling system pushes away before continuing, repeat step two, segmented carries out hairbrush to whole coldplate constriction Scale removal.
3. beneficial effect
The technical scheme being provided using the present invention, compared with prior art, is had the advantages that:
(1) a kind of shell-and-plate blast furnace evaporative air-cooling system of employing soft water airtight circulating cooling system of the present invention, passes through Induced draft cooling tower has replaced the blower fan of air draught effect, reduces installation total amount and production cost, need not because of motor rapid wear frequently Numerous more ventilating fan, can be in running order for a long time;
(2) the shell-and-plate blast furnace evaporative air-cooling system of a kind of employing soft water airtight circulating cooling system of the present invention, waist tower Shape double-curve cooling column, meets the principle easily producing wind eddies stream in hydrodynamics, and the air velocity of generation is fast, can effectively improve Cooling effect;
(3) the shell-and-plate blast furnace evaporative air-cooling system of a kind of employing soft water airtight circulating cooling system of the present invention, air inducing Cooling tower has 2 to 5, is that inventor carries out differentiated layout according to evaporation air cooler model size, to ensure different model steaming Send out the cooling effect of air cooler;
(4) the shell-and-plate blast furnace evaporative air-cooling system of a kind of employing soft water airtight circulating cooling system of the present invention, strengthens Muscle plays fastening and the effect stablizing cooling tower;Block water plate will drip return system after part condensate moisture, prevents excessive water Divide and discharge the waste causing water resource;
(5) the shell-and-plate blast furnace evaporative air-cooling system of a kind of employing soft water airtight circulating cooling system of the present invention, dash Piece ringwise, and is in the horn-like of downward-sloping opening, does not affect the formation of wind eddies stream, and effective excessive row stopping moisture Go out;
(6) the shell-and-plate blast furnace evaporative air-cooling system of a kind of employing soft water airtight circulating cooling system of the present invention, scale removal Device can carry out variable interval scale removal in whole system running it is also possible to the thorough scale removal to system in stopping process, Flexible, treatment effect thoroughly, improves the cooling effect of whole system, the run time of Non-intermittent and service life;
(7) the shell-and-plate blast furnace evaporative air-cooling system of a kind of employing soft water airtight circulating cooling system of the present invention, air blast Machine underneath type, inwardly dries, does not have the erosion to electrical machine insulation for the hot dampness and the corrosion to blower fan, improve the use of aerator Life-span;Inwardly the air inducing of blowing and induced draft cooling tower is worked in coordination with mutually, accelerates air inducing efficiency, improves cooling effect further;And And, blowing can also delay the falling speed on coldplate constriction of shower water, accelerates the steaming of plate constriction outer surface moisture film Send out, and improve evaporation capacity, improve the heat exchange amount with soft water in plate constriction, induced draft cooling tower, underneath type aerator, spray dress The combination putting three has very strong synergism and effect;
(8) a kind of shell-and-plate blast furnace evaporative air-cooling system of employing soft water airtight circulating cooling system of the present invention, keeps out the wind Wall avoids impurity to be blown into system, and makes system ambient air pressure stable, plays the effect of stable axial flow blower;
(9) the plate dirt of the shell-and-plate blast furnace evaporative air-cooling system of a kind of employing soft water airtight circulating cooling system of the present invention Processing method, can spray cleaning mixture using cleaning mixture jet pipe bundle during shutdown and hairbrush carries out thorough cleaning to plate dirt, narrow and small Space in carry out the thorough scale removal of combination of chemically and physically two ways, easy to operate, scale removal is rapid;
(10) plate of the shell-and-plate blast furnace evaporative air-cooling system of a kind of employing soft water airtight circulating cooling system of the present invention Dirty processing method, can also be processed to plate dirt in whole system running, using hairbrush can also prevention plate dirt Generate, during avoiding using cleaning mixture scale removal, corrode coldplate constriction.
Brief description
Fig. 1 is a kind of shell-and-plate blast furnace evaporative air-cooling system knot of employing soft water airtight circulating cooling system of embodiment 3 Structure schematic diagram;
Fig. 2 is a kind of shell-and-plate blast furnace evaporative air-cooling system of employing soft water airtight circulating cooling system of embodiment 3 Side view;
Fig. 3 is the apparatus for eliminating sludge structural representation in embodiment 2;
Fig. 4 is the apparatus for eliminating sludge side view in embodiment 2;
Fig. 5 is that the shell-and-plate blast furnace evaporative air-cooling system of the employing soft water airtight circulating cooling system in embodiment 3 uses View;
Fig. 6 is that the shell-and-plate blast furnace evaporative air-cooling system of the employing soft water airtight circulating cooling system in embodiment 3 uses Side view of the state.
Label declaration in schematic diagram:1st, base;2nd, housing;3rd, induced draft cooling tower;4th, spray equipment;5th, aerator;6、 Apparatus for eliminating sludge;21st, coldplate constriction;22nd, cooling water outlet mouth;23rd, coolant intake;31st, reinforcement;32nd, block water plate;41st, spray Drench outlet;61st, cleaning mixture jet pipe bundle;62nd, leading truck;63rd, support;64th, drive component.
Specific embodiment
For further appreciating that present disclosure, in conjunction with accompanying drawing, the present invention is described in detail.
Embodiment 1
2 4000m of certain steel plant3Blast furnace cooling stave and air stove adopt soft water airtight circulating cooling system, and 2 seat height stoves are altogether Meter is using the shell-and-plate blast furnace evaporative air-cooling system of the employing soft water airtight circulating cooling system of 38 playscript with stage directions embodiments, and through transport OK, the shell-and-plate blast furnace evaporative air-cooling system of the employing soft water airtight circulating cooling system of the present embodiment, including the base of 3m*9m The coldplate of the internal hard-wired vertical layered layout of the 1st, housing 2 being mutually permanently connected directly over base 1, and housing 2 Constriction 21, coldplate constriction 21 is communicated by the soft water system of coolant intake 23 and cooling water outlet mouth 22 and blast furnace, cool down into The mouth of a river 23 and cooling water outlet mouth 22 are in relative in coldplate constriction 21 both sides, and coolant intake upper, cooling water outlet mouth under Setting, and wind in opposite direction, upwind flowing, are equivalent to secondary heat exchange, improve heat exchange efficiency;Also include above housing 2 2 induced draft cooling towers being made up of Coil Coating Products 3 being fixedly connected with housing 2, are completely covered housing 2 upper end open, and air inducing cools down The top of tower 3 opening fully up, in the present embodiment, induced draft cooling tower 3 is the tower-like hyperbola of waist in and external-open downward from middle part Cooling tower, highly for 3 meters.
The shell-and-plate blast furnace evaporative air-cooling system of the employing soft water airtight circulating cooling system of the present embodiment, cold by air inducing But tower has replaced the blower fan of air draught effect, reduces installation total amount and production cost, need not because of motor rapid wear frequently more Ventilating fan, can be in running order for a long time.The tower-like double-curve cooling column of waist, meets and easily produces wind eddies stream in hydrodynamics Principle, the air velocity of generation is fast, can effectively improve cooling effect.
Embodiment 2
The shell-and-plate blast furnace evaporative air-cooling system of the employing soft water airtight circulating cooling system of the present embodiment, basic structure is same Embodiment 1 is different and the improvement is that:Double-curve cooling column has 5, and highly for 4 meters, the uniform stationary distribution of outer wall has reinforcement Muscle 31, plays fastening and the effect stablizing cooling tower, and the uniform stationary distribution of inwall has block water plate 32, will drip after part condensate moisture Fall return system, prevents excessive moisture from discharging the waste causing water resource.Block water plate 32 ringwise, and is in downward-sloping opening Horn-like, do not affect the formation of wind eddies stream, and effective excessive discharge stopping moisture.As shown in Figure 3,4, also include scale removal dress Put 6, described apparatus for eliminating sludge 6 includes 2 supports 63, each support 63 upper brace is fixed with leading truck 62, and bottom is fixed with drive Dynamic assembly 64, drive component 64 top connects the cleaning mixture jet pipe bundle 61 of horizontality;The left and right two ends of cleaning mixture jet pipe bundle 61 Slide up and down connection with 2 leading trucks 62, cleaning mixture jet pipe caliber therebetween be slightly less than in coldplate constriction 21 coldplate bundle it Between gap, cleaning mixture jet pipe both sides uniformly have liquid outlet, and cleaning mixture jet pipe outer wall is fixed with hairbrush;Apparatus for eliminating sludge can be Carry out variable interval scale removal it is also possible to the thorough scale removal to system in stopping process, flexible, place in whole system running Reason effect thoroughly, improves the cooling effect of whole system, the run time of Non-intermittent and service life.
The shell-and-plate blast furnace evaporative air-cooling system of the employing soft water airtight circulating cooling system of the present embodiment, can be applied to In shell-and-plate blast furnace evaporative air-cooling system operation, step is:
Step one, by apparatus for eliminating sludge 6 along shell-and-plate blast furnace evaporative air-cooling system length direction push shell-and-plate blast furnace steam Send out air cooling system, 63 points of strake shell-type blast furnace evaporative air-cooling system both sides of 2 supports, cleaning mixture jet pipe bundle 61 is flat on coldplate Constriction 21 bottom, cleaning mixture jet pipe is just to the gap between coldplate bundle;Cleaning mixture jet pipe outer wall is fixed with hairbrush;
Step 2, except plate dirt:After starting drive component 64, rotate cleaning mixture jet pipe, cleaning mixture jet pipe bundle 61 is in coldplate Slide up and down between constriction 21 and by hairbrush, scale removal or the generation of prevention plate dirt are carried out to coldplate bundle;It can be avoided that frequently making With the pollution to shower water after cleaning mixture, in turn result in the corrosion to coldplate constriction during spraying cooling heat exchange;
Step 3, movement:After having processed a part of coldplate constriction 21, cleaning mixture jet pipe bundle 61 is down to minimum, along plate The length direction of shell-type blast furnace evaporative air-cooling system pushes away before continuing, repeat step two, segmented whole coldplate constriction 21 is entered Row hairbrush scale removal.
The plate dirt processing method of the shell-and-plate blast furnace evaporative air-cooling system of the present embodiment is it is also possible to be applied to work long hours Shell-and-plate blast furnace evaporative air-cooling system in thorough process (not temporarily being applied to) to the plate dirt generating, step is:
Step one, shutdown:By whole shell-and-plate blast furnace evaporative air-cooling system-down and apparatus for eliminating sludge 6 is high along shell-and-plate The length direction of stove evaporative air-cooling system pushes shell-and-plate blast furnace evaporative air-cooling system, and 63 points of strake shell-type blast furnaces of 2 supports steam Send out air cooling system both sides, cleaning mixture jet pipe bundle 61 is flat on coldplate constriction 21 bottom, cleaning mixture jet pipe just to coldplate bundle it Between gap;
Step 2, hydrojet:After starting drive component 64, start the spray of cleaning mixture jet pipe, rotate cleaning mixture jet pipe simultaneously, Cleaning mixture jet pipe bundle 61 slides up and down to coldplate Shu Jinhang spray and hairbrush scale removal between coldplate constriction 21;
Step 3, movement:After having processed a part of coldplate constriction 21, cleaning mixture jet pipe bundle 61 is down to minimum, along plate The length direction of shell-type blast furnace evaporative air-cooling system pushes away before continuing, repeat step two, segmented whole coldplate constriction 21 is entered Row spray scale removal.
The shell-and-plate blast furnace evaporative air-cooling system of the employing soft water airtight circulating cooling system of the present embodiment, due to hyperbola Cooling tower is different from the blower fan of overhead, the top being fixed on housing 2 that can be stable, it is to avoid the sustained vibration of blower fan is to cooling The impact of plate constriction 21, make whole system be in a kind of very firm state, and apparatus for eliminating sludge can prevention plate dirt at any time Generate, the continuous service it is ensured that whole system need not be shut down merely for scale removal, cleaning mixture jet pipe outer wall is fixed with hairbrush Exist, moreover it is possible to delay the dirty of shower water while scale removal, and then improve coldplate constriction 21 internal-external heat exchanger effect;
Through calculating, the shell-and-plate blast furnace evaporative air-cooling system of the employing soft water airtight circulating cooling system of the present embodiment, Since in May, 2015 application, always in continuous service Maintenance free, heat exchange cooling effect also remains unchanged.
Embodiment 3
The shell-and-plate blast furnace evaporative air-cooling system of the employing soft water airtight circulating cooling system of the present embodiment, basic structure and Descaling method is with embodiment 2, different and the improvement is that:As shown in Fig. 1,2,5,6, double-curve cooling column has 3, is highly 6 meters, also include being fixed on the aerator 5 of base 1 side, described base 1 is in the semiclosed shape of upper opening, bottom is shower water Pond, the side relative with aerator 5 has the spray outlet 41 by pipeline communication spray equipment 4, and described spray equipment 4 sets It is placed in housing 1 upper inner, uniformly has downwards mouth spray, mouth spray no dead angle covers in directly over coldplate constriction 21;Air blast Machine underneath type, inwardly dries, does not have the erosion to electrical machine insulation for the hot dampness and the corrosion to blower fan, improve the use of aerator Life-span;Inwardly the air inducing of blowing and induced draft cooling tower is worked in coordination with mutually, accelerates air inducing efficiency, improves cooling effect further;And And, blowing can also delay the falling speed on coldplate constriction of shower water, accelerates the steaming of plate constriction outer surface moisture film Send out, and improve evaporation capacity, improve the heat exchange amount with soft water in plate constriction, induced draft cooling tower, underneath type aerator, spray dress The combination putting three has very strong synergism and effect.Described aerator 5 is axial flow blower, and aspect of blowing efficiency is high, when can be long Between in running order;Described drive component 64 is Electrohydraulic push rod, and advance is long, flexible;Described support 63 bottom is fixing even Connect directive wheel, guide support moves along its length, rapid operation is it is possible to realize automation mechanized operation;Described base 1 periphery can To arrange windbreak, it is to avoid impurity is blown into system, and make system ambient air pressure stable, play the effect of stable axial flow blower.
Embodiment 4
The shell-and-plate blast furnace evaporative air-cooling system of the employing soft water airtight circulating cooling system of the present embodiment, basic structure and Descaling method is with embodiment 2, different and the improvement is that:In step 2, while starting drive component 64, start aerator 5, the collaborative effect of the combination heat exchanging cooling of induced draft cooling tower, underneath type aerator, spray equipment, hairbrush can be played Really, delayed the dirty of shower water further, cooling effectiveness improves further;Described cleaning mixture jet pipe is rectangular tube, and width is slightly Less than the gap between coldplate bundle, rectangular tube can agree with the square gap between coldplate bundle, and scale removal and prevention plate dirt are raw The effect becoming is more preferable.
Embodiment 5
The shell-and-plate blast furnace evaporative air-cooling system of the employing soft water airtight circulating cooling system of the present embodiment, basic structure and Descaling method is with embodiment 2, different and the improvement is that:It is respectively provided with scale removal in the both sides of the coldplate constriction 21 of each sections Device 6, cleaning mixture jet pipe bundle 61 is interspersed between coldplate constriction 21, and is linked each apparatus for eliminating sludge 6 by chain device, Each apparatus for eliminating sludge 6 is made to run simultaneously, advantage is need not to move apparatus for eliminating sludge 6 along the length direction of coldplate constriction, and scale removal hinders Only the generation of plate dirt is convenient.
Below schematically the present invention and embodiments thereof are described, this description does not have restricted, institute in accompanying drawing Show is also one of embodiments of the present invention, and actual structure is not limited thereto.So, if the common skill of this area Art personnel enlightened by it, in the case of without departing from the invention objective, designs and this technical scheme without creative Similar frame mode and embodiment, all should belong to protection scope of the present invention.

Claims (10)

1. the shell-and-plate blast furnace evaporative air-cooling system of a kind of employing soft water airtight circulating cooling system, including base (1), base (1) housing (2) being mutually permanently connected directly over, and the coldplate of the internal hard-wired vertical layered layout of housing (2) Constriction (21) is it is characterised in that also include the induced draft cooling tower (3) being fixedly connected above housing (2) with housing (2), air inducing is cold But tower (3) top opening fully up.
2. the shell-and-plate blast furnace evaporative air-cooling system of a kind of employing soft water airtight circulating cooling system according to claim 1 System it is characterised in that:Described induced draft cooling tower (3) is downward from middle part and external-open the tower-like double-curve cooling column of waist.
3. the shell-and-plate blast furnace evaporative air-cooling system of a kind of employing soft water airtight circulating cooling system according to claim 2 System it is characterised in that:Described induced draft cooling tower (3) has 2 to 5, and housing (2) upper end open is completely covered.
4. the shell-and-plate blast furnace evaporative air-cooling system of a kind of employing soft water airtight circulating cooling system according to claim 2 System it is characterised in that:The uniform stationary distribution of described induced draft cooling tower (3) outer wall has reinforcement (31), the uniform stationary distribution of inwall There is block water plate (32).
5. the shell-and-plate blast furnace evaporative air-cooling system of a kind of employing soft water airtight circulating cooling system according to claim 4 System it is characterised in that:Described block water plate (32) ringwise, and is in the horn-like of downward-sloping opening.
6. the shell-and-plate blast furnace evaporative air-cooling system of a kind of employing soft water airtight circulating cooling system according to claim 5 System it is characterised in that:Also include apparatus for eliminating sludge (6), described apparatus for eliminating sludge (6) includes 2 supports (63), on each support (63) Portion's platform is fixed with leading truck (62), and bottom is fixed with drive component (64), and drive component (64) top connects horizontality Cleaning mixture jet pipe bundle (61);The left and right two ends of cleaning mixture jet pipe bundle (61) and 2 leading trucks (62) slide up and down connection, therebetween Cleaning mixture jet pipe caliber is slightly less than the gap in coldplate constriction (21) between coldplate bundle, and cleaning mixture jet pipe both sides uniformly have Liquid outlet.
7. the shell-and-plate blast furnace evaporative air-cooling system of a kind of employing soft water airtight circulating cooling system according to claim 5 System it is characterised in that:Also include the aerator (5) being fixed on base (1) side, described base (1) is in half envelope of upper opening Close shape, bottom is spray pond, and the side relative with aerator (5) is had and gone out by the spray of pipeline communication spray equipment (4) The mouth of a river (41), described spray equipment (4) is arranged at housing (1) upper inner, uniformly has downwards mouth spray, mouth spray no dead angle Cover in directly over coldplate constriction (21).
8. the shell-and-plate blast furnace evaporative air-cooling system of a kind of employing soft water airtight circulating cooling system according to claim 7 System it is characterised in that:Described aerator (5) is axial flow blower;Described drive component (64) is Electrohydraulic push rod;Described support (63) Bottom is fixedly connected directive wheel;Described base (1) periphery setting windbreak.
9. the shell-and-plate blast furnace evaporative air-cooling system of a kind of employing soft water airtight circulating cooling system according to claim 6 Plate dirt processing method it is characterised in that:It is applied in shell-and-plate blast furnace evaporative air-cooling system operation, step is:
Step one, apparatus for eliminating sludge (6) is pushed in system along the length direction of shell-and-plate blast furnace evaporative air-cooling system, 2 supports (63) row system both sides are divided, cleaning mixture jet pipe bundle (61) is flat on coldplate constriction (21) bottom, and cleaning mixture jet pipe is just to cooling Gap between plate bundle;Cleaning mixture jet pipe outer wall is fixed with hairbrush;
Step 2, except plate dirt:After starting drive component (64), rotate cleaning mixture jet pipe, cleaning mixture jet pipe bundle (61) is in coldplate Slide up and down between constriction (21) and by hairbrush, scale removal or the generation of prevention plate dirt are carried out to coldplate bundle;
Step 3, movement:After having processed a part of coldplate constriction (21), push away along before the length direction continuation of system, repeat to walk Rapid two, segmented hairbrush scale removal is carried out to whole coldplate constriction (21).
10. the shell-and-plate blast furnace evaporative air-cooling system of a kind of employing soft water airtight circulating cooling system according to claim 6 The plate dirt processing method of system is it is characterised in that step is:
Step one, shutdown:By whole shell-and-plate blast furnace evaporative air-cooling system-down, and by apparatus for eliminating sludge (6) along shell-and-plate blast furnace The length direction of evaporative air-cooling system pushes in system, 2 support (63) point row system both sides, cleaning mixture jet pipe bundle (61) horizontal In coldplate constriction (21) bottom, cleaning mixture jet pipe is just to the gap between coldplate bundle;
Step 2, hydrojet:After starting drive component (64), start the spray of cleaning mixture jet pipe, rotate cleaning mixture jet pipe simultaneously, remove Dirty liquid jet pipe bundle (61) slides up and down to coldplate Shu Jinhang spray and hairbrush scale removal between coldplate constriction (21);
Step 3, movement:After having processed a part of coldplate constriction (21), cleaning mixture jet pipe bundle (61) is down to minimum, along system System length direction continue before push away, repeat step two, segmented whole coldplate constriction (21) is carried out spray scale removal.
CN201610928525.0A 2016-10-31 2016-10-31 It is a kind of using the shell-and-plate blast furnace evaporative air-cooling system of soft water airtight circulating cooling system and its plate dirt processing method Active CN106403652B (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CN201610928525.0A CN106403652B (en) 2016-10-31 2016-10-31 It is a kind of using the shell-and-plate blast furnace evaporative air-cooling system of soft water airtight circulating cooling system and its plate dirt processing method
CN201810139107.2A CN108413782B (en) 2016-10-31 2016-10-31 A kind of processing method of blast furnace evaporative air-cooling system board dirt
CN201810139117.6A CN108398036B (en) 2016-10-31 2016-10-31 Plate dirt processing method in a kind of operation of shell-and-plate blast furnace evaporative air-cooling system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610928525.0A CN106403652B (en) 2016-10-31 2016-10-31 It is a kind of using the shell-and-plate blast furnace evaporative air-cooling system of soft water airtight circulating cooling system and its plate dirt processing method

Related Child Applications (2)

Application Number Title Priority Date Filing Date
CN201810139117.6A Division CN108398036B (en) 2016-10-31 2016-10-31 Plate dirt processing method in a kind of operation of shell-and-plate blast furnace evaporative air-cooling system
CN201810139107.2A Division CN108413782B (en) 2016-10-31 2016-10-31 A kind of processing method of blast furnace evaporative air-cooling system board dirt

Publications (2)

Publication Number Publication Date
CN106403652A true CN106403652A (en) 2017-02-15
CN106403652B CN106403652B (en) 2018-06-05

Family

ID=58013552

Family Applications (3)

Application Number Title Priority Date Filing Date
CN201610928525.0A Active CN106403652B (en) 2016-10-31 2016-10-31 It is a kind of using the shell-and-plate blast furnace evaporative air-cooling system of soft water airtight circulating cooling system and its plate dirt processing method
CN201810139117.6A Active CN108398036B (en) 2016-10-31 2016-10-31 Plate dirt processing method in a kind of operation of shell-and-plate blast furnace evaporative air-cooling system
CN201810139107.2A Active CN108413782B (en) 2016-10-31 2016-10-31 A kind of processing method of blast furnace evaporative air-cooling system board dirt

Family Applications After (2)

Application Number Title Priority Date Filing Date
CN201810139117.6A Active CN108398036B (en) 2016-10-31 2016-10-31 Plate dirt processing method in a kind of operation of shell-and-plate blast furnace evaporative air-cooling system
CN201810139107.2A Active CN108413782B (en) 2016-10-31 2016-10-31 A kind of processing method of blast furnace evaporative air-cooling system board dirt

Country Status (1)

Country Link
CN (3) CN106403652B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113218233A (en) * 2021-04-06 2021-08-06 关学忠 Heating furnace fire tube scale cleaning and preventing method and scale preventing device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201387248Y (en) * 2009-04-07 2010-01-20 秦皇岛莱特流体设备制造有限公司 High-efficiency evaporative cooler
CN102401581A (en) * 2011-07-27 2012-04-04 中国电力工程顾问集团西北电力设计院 Mixed ventilation indirect cooling tower system and cooling method thereof
JP2012083022A (en) * 2010-10-12 2012-04-26 Takasago Thermal Eng Co Ltd Washing apparatus for cooling tower louver
CN203949532U (en) * 2014-06-27 2014-11-19 益冷和众科技(北京)有限公司 IDC machine room closed cooling tower in winter
CN204830827U (en) * 2015-08-11 2015-12-02 安徽马钢工程技术集团有限公司 Utilize shaft furnace water bar of electromagnetism scale removal
CN206469740U (en) * 2016-10-31 2017-09-05 安徽马钢输送设备制造有限公司 A kind of shell-and-plate blast furnace evaporative air-cooling system of use soft water airtight circulating cooling system

Family Cites Families (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63150592A (en) * 1986-12-13 1988-06-23 Shinwa Sangyo Kk Heat exchanging tower with cleaning device
CN2713426Y (en) * 2004-06-15 2005-07-27 南华大学 On-line descaling and reinforced heat transfer apparatus for heat exchanger
US7137619B2 (en) * 2004-09-17 2006-11-21 Spx Cooling Technologies, Inc. Heating tower apparatus and method with wind direction adaptation
US7384026B2 (en) * 2004-09-17 2008-06-10 Spx Cooling Technologies Inc. Heating tower apparatus and method with wind direction adaptation
CN1995899A (en) * 2006-11-24 2007-07-11 华中科技大学 Water current on-line scale remover for surface evaporation type air cooling device
CN201152706Y (en) * 2007-12-18 2008-11-19 华南理工大学 Plate-shell type nonsaturated evaporative condensing apparatus
CN201242395Y (en) * 2008-07-04 2009-05-20 洪鑫鹏 Automatic cleaning device for evaporating air cooler
CN102192678A (en) * 2010-03-18 2011-09-21 陈远 Water recycling device for cooling tower
EP2505915A1 (en) * 2011-04-01 2012-10-03 Nooter/Eriksen s.r.l. Device and method for cleaning heat exchange finned tubes in a heat recovery steam generator
CN202628161U (en) * 2012-06-26 2012-12-26 湖南科技大学 Intelligent-monitoring and automatic-descaling mining air cooler
CN203132415U (en) * 2013-03-28 2013-08-14 朱校 Cooling tower
CN203414011U (en) * 2013-06-06 2014-01-29 济宁圣源环境系统工程有限公司 Descaling heat exchanger
CN203672224U (en) * 2014-01-06 2014-06-25 中国矿业大学 Automatic washing heat exchange device
CN204535536U (en) * 2015-03-28 2015-08-05 山东飞洋热工设备有限公司 A kind of plate type heat exchanger apparatus for eliminating sludge
CN205482464U (en) * 2016-01-12 2016-08-17 濮阳市海林特种设备制造防护有限公司 Automatic control is bathed to wash and is cleaned multi -functional air cooler of scale removal

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201387248Y (en) * 2009-04-07 2010-01-20 秦皇岛莱特流体设备制造有限公司 High-efficiency evaporative cooler
JP2012083022A (en) * 2010-10-12 2012-04-26 Takasago Thermal Eng Co Ltd Washing apparatus for cooling tower louver
CN102401581A (en) * 2011-07-27 2012-04-04 中国电力工程顾问集团西北电力设计院 Mixed ventilation indirect cooling tower system and cooling method thereof
CN203949532U (en) * 2014-06-27 2014-11-19 益冷和众科技(北京)有限公司 IDC machine room closed cooling tower in winter
CN204830827U (en) * 2015-08-11 2015-12-02 安徽马钢工程技术集团有限公司 Utilize shaft furnace water bar of electromagnetism scale removal
CN206469740U (en) * 2016-10-31 2017-09-05 安徽马钢输送设备制造有限公司 A kind of shell-and-plate blast furnace evaporative air-cooling system of use soft water airtight circulating cooling system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113218233A (en) * 2021-04-06 2021-08-06 关学忠 Heating furnace fire tube scale cleaning and preventing method and scale preventing device
CN113218233B (en) * 2021-04-06 2022-05-06 关学忠 Heating furnace fire tube scale cleaning and preventing method and scale preventing device

Also Published As

Publication number Publication date
CN106403652B (en) 2018-06-05
CN108398036A (en) 2018-08-14
CN108398036B (en) 2019-06-07
CN108413782B (en) 2019-06-25
CN108413782A (en) 2018-08-17

Similar Documents

Publication Publication Date Title
CN201993007U (en) Composite flow evaporation type air cooler
CN202092479U (en) Closed air cooling system for auxiliary machine circulating cooling water
CN105403068A (en) Dry-wet unified cooling tower adopting natural ventilation and composite running mode and application of dry-wet unified cooling tower
CN111457758A (en) Cooling device and method for industrial hot fluid
CN102679480B (en) Dew point indirect evaporation cooler with plate-tube combined structure
CN104315875A (en) Evaporative-type condenser for peak cooling of power plant
CN110345778A (en) A kind of closed cooling tower
CN101187535A (en) Evaporated air-cooling type heat exchange device and method
CN206469740U (en) A kind of shell-and-plate blast furnace evaporative air-cooling system of use soft water airtight circulating cooling system
CN106403652A (en) Shell-and-plate blast furnace evaporation air cooling system using soft water closed recirculation cooling system and plate scale treatment method thereof
CN202614028U (en) Anti-scaling evaporative condenser
CN105928106B (en) The cooling handpiece Water Chilling Units of capillary type enclosed evaporation
CN104930619A (en) Evaporative cooling-absorption heat pump combined air conditioning system for power plant
CN204064037U (en) The dry wet combination air cooler of a kind of tubular type
CN204255124U (en) A kind of evaporative condenser being applicable to power plant
CN206469723U (en) A kind of tubular type blast-furnace soft water evaporative air-cooling system
CN106440854B (en) A kind of tubular type blast-furnace soft water evaporative air-cooling system and its pipe scale processing method
CN106091488A (en) Fin-tube type indirect evaporation air cooler
CN207540387U (en) Bottom blast formula cooling tower cloth wind structure
CN104501624A (en) Power plant used cooling system combining evaporative type cooler and surface type condensing system
CN202133306U (en) Vacuum evaporative cooling device
CN204421686U (en) The cooling device that the evaporative cooling being applicable to power plant is combined with surperficial condensing
CN208751323U (en) Evaporating air cooler Water-saving spray device
CN202613630U (en) Plate and tube type dew-point indirect evaporative cooler
CN206131862U (en) Plate type evaporation cooler scale removal device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant