CN204830827U - Utilize shaft furnace water bar of electromagnetism scale removal - Google Patents

Utilize shaft furnace water bar of electromagnetism scale removal Download PDF

Info

Publication number
CN204830827U
CN204830827U CN201520599599.5U CN201520599599U CN204830827U CN 204830827 U CN204830827 U CN 204830827U CN 201520599599 U CN201520599599 U CN 201520599599U CN 204830827 U CN204830827 U CN 204830827U
Authority
CN
China
Prior art keywords
water
water quality
control system
pipeline
water beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520599599.5U
Other languages
Chinese (zh)
Inventor
程学祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Masteel Engineering and Technology Group Co Ltd
Original Assignee
Anhui Masteel Engineering and Technology Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Masteel Engineering and Technology Group Co Ltd filed Critical Anhui Masteel Engineering and Technology Group Co Ltd
Priority to CN201520599599.5U priority Critical patent/CN204830827U/en
Application granted granted Critical
Publication of CN204830827U publication Critical patent/CN204830827U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)

Abstract

The utility model discloses an utilize shaft furnace water bar of electromagnetism scale removal belongs to the metallurgical equipment field. It includes and still includes electromagnetism descaler, control system, water quality monitoring system by the water bar pipeline, wherein, water quality monitoring system set up in the water bar pipeline, the one end exit of water bar pipeline be provided with one the electromagnetism descaler, the other end export of water bar pipeline also be provided with another the electromagnetism descaler, water quality monitoring system with control system circuit connection, control system and electromagnetism descaler circuit connection, every water bar pipeline parallel arrangement of each other, the both ends exit of water bar pipeline is provided with lift bar group, it is of each other parallel that the export of lift bar group place plane and water bar pipeline belongs to the plane. Water bar pipeline both ends make the position of water bar both sides electromagnetism descaler corresponding by control system synchro control, guarantee electromagnetism descaler scale removal stability. It can clear away the dirt in the shaft furnace wind -guiding wall water bar, ensures that the water bar pipeline is unblocked.

Description

A kind of shaft furnace water beam utilizing electromagnetism scale removal
Technical field
The utility model relates to field of metallurgical equipment, particularly relates to a kind of shaft furnace water beam utilizing electromagnetism scale removal.
Background technology
At present, work under bad environment in stove residing for vertical furnace wind guide wall water beam in smelter, should bear the weight of air-guiding wall, bears the extruding of high temperature pelletizing again.Water beam often occurs that harmful bending, wearing and tearing such as to burn at the problem, causes producing impaired, and main cause causes due to water beam pipeline Inner eycle cooling water scaling blocking pipe.
In production, in order to anti-sealing beam inwall produces incrustation scale, the circulation of impact heat radiation and water, water beam uses water to be demineralized water.Technical process is that the premium on currency of head-tank flows automatically to ion-exchanger, and flow to shaft furnace drum through water pump after water softening, drum demineralized water enters water beam of wind leading wall by gravity flow, and the backwater of water beam returns drum again by steam pressure difference.Water beam of wind leading wall must ensure the supply of demineralized water, otherwise can cause drum and the fouling of water beam.In actual production, because ion-exchanger accident, supply channel and shaft furnace drum leak, cause demineralized water under-supply; Certainly will unboiled water that in addition part is not softening for guaranteeing to produce, thus make water beam and drum cause serious scale, fouling thickness is up to 4-9mm.The generation of these problems, cause drum and water beam heat radiation difficulty, water temperature sharply rises, and drum cannot carry out carbonated drink separation, water level decreasing, serious water shortage sometimes.Thus, cause water beam deformed, the serious production accident that air-guiding wall collapses.
New type water boom device effectively can remove the cooling water scaling in pipeline, guarantees that water beam pipeline is unimpeded, is improved the service life of water beam by the cooling of guarantee pipeline.Current common method has following several:
1), recirculated cooling water fouling processing scheme based on chemical method, carry out chemical treatment as added antisludging agent to recirculated cooling water in outside circulating water pool; Chemical Treatment handling safety small investment, but to equipment and carrying capacity of environment higher, corrosion and the environmental pollution of equipment can be caused;
2), recirculated cooling water fouling processing scheme another be ion-exchange more reliably, recirculated cooling water features high scale-removing effect and reliable, but cost of investment and production cost higher;
3), integrated m odel is changed, as water beam of wind leading wall bilayer sleeve water beam pipeline configuration.Although the water beam life-span increases, water beam supported weight and manufacturing cost increase, and do not solve to some extent the basic harm incrustation scale problem occurred in the cooling of water beam, have just delayed the blocking of water beam, harm that lay bricks erosion and line clogging produce air-guiding wall.
Chinese utility model patent, publication number: CN202836153U, publication date: 2013.03.27, disclosing a kind of novel shaft furnace water beam, is by seamless steel pipe suits different for two diameters, two ligament 5.5mm, in gap, squeeze into refractory wass, in intermediate conduit, logical soft water connects with outside.In the seamless steel pipe suit intermediate conduit that this utility model adopts two diameters different due to main body, therefore logical soft water both ensured with outside connecting the cooling effect that water beam is enough; the double action adding solid water beam can be played again; decrease water beam to leak and extend air-guiding wall service life to the erosion of masonry in wind-guiding wall brick and stove; shaft furnace shortens downtime greatly; greatly improve pellet output; improve the key link of restriction shaft furnace technology economic indicator, yield increase effect is remarkable.Its weak point is: although the water beam life-span increase, but water beam supported weight and manufacturing cost increase, and the basic harm incrustation scale problem that occurs in the cooling of water beam is not solved to some extent, just delay the blocking of water beam, harm that lay bricks erosion and line clogging produce air-guiding wall.
Utility model content
1. the utility model technical problem that will solve
The problem of the easy fouling of the vertical furnace wind guide wall water beam for prior art, the utility model provides a kind of shaft furnace water beam utilizing electromagnetism scale removal.It can remove the dirt in vertical furnace wind guide wall water beam, guarantees that water beam pipeline is unimpeded.
2. technical scheme
For solving the problem, the technical scheme that the utility model provides is:
A kind of shaft furnace water beam utilizing electromagnetism scale removal, it comprises water beam pipeline, also comprise electric magnetic incrustant remover, control system, water quality monitor, wherein, one end of described water quality monitoring is arranged in water beam pipeline, and the exit, two ends of described water beam pipeline is provided with a lifting arm group, and the other end of water quality monitor and electric magnetic incrustant remover are all arranged in lifting arm group, described water quality monitor is connected with described control system circuit, and described control system is connected with electric magnetic incrustant remover circuit.Water beam pipe ends, by control system Synchronization Control, makes the position of Shui Liang both sides electric magnetic incrustant remover corresponding, ensures electric magnetic incrustant remover scale removal stability.
Preferably, the setting parallel to each other of every root water beam pipeline, the exit, two ends of water beam pipeline is provided with lifting arm group, and the outlet place plane of lifting arm group place plane and water beam pipeline is parallel to each other.
Preferably, described lifting arm group is provided with electric magnetic incrustant remover, electric magnetic incrustant remover comprises coil, coil signal amplification module and drive motors, the output of coil signal amplification module is connected with coil, the input of coil signal amplification module is connected with the output of control system, and coil is parallel with the port cross-sectional face of water beam pipeline.Produce electromagnetic field of high frequency in the pipeline of electric magnetic incrustant remover between water beam pipeline two ports, not be used in pipeline outer wall parcel coil, all have greater advantage in installation with in using.
Preferably, described lifting arm group is provided with electro-hydraulic device and walking track.
Preferably, described walking track is provided with electric magnetic incrustant remover, and electro-hydraulic device is connected with the drive motors of electric magnetic incrustant remover, drives electric magnetic incrustant remover along walking rail moving by electro-hydraulic device.On walking track, adjust position by electric magnetic incrustant remover and respectively scale removal is carried out to every root water beam pipeline.
Preferably, described set-up of control system is in the bottom of water beam pipeline one end.
Preferably, drive motors in described water quality monitor is all connected with electro-hydraulic device with stepper motor, drive water quality monitor along walking rail moving by electro-hydraulic device, described electro-hydraulic device is connected with the output of control system, and water quality monitor is connected with the input of control system.Control system controls to collect the water monitoring data in the every root pipeline of process, control electro-hydraulic device and drive electric magnetic incrustant remover, change position and its operating frequency of electric magnetic incrustant remover, separately high frequency magnetic field magnetic scale is carried out to each root water beam pipeline, and aggregation process is carried out to data such as water beam tube-cooled data and water quality.
Preferably, also comprise water quality monitoring unit in described water quality monitor, water quality monitoring unit is connected with the stepper motor in water quality monitor, water quality monitoring unit comprises conductivity measurement, temperature sensor, pH value detector and two film sensors, they are all connected with the input of control system.Conductivity measurement in water quality monitoring unit in water quality monitor, temperature sensor, pH value detector and two film sensors measure water electric conductivity, water temperature, pH value and magnetic field in water beam pipeline respectively.
Preferably, described control system comprises single-chip microcomputer, signal output module, signal input module, wireless sending module; Water quality monitoring unit in water quality monitor is connected with signal input module, signal input module is connected with the input of single-chip microcomputer, the output of single-chip microcomputer is connected with signal output module, signal output module is connected with the input of electro-hydraulic device and coil signal amplification module respectively, the output of single-chip microcomputer is connected with wireless sending module, wireless receiving module outside shaft furnace receives the signal that wireless sending module sends, and wireless receiving module is connected with host computer by RS485; Signal output module is connected with the drive system of lifting arm group.
3. beneficial effect
The technical scheme adopting the utility model to provide, compared with prior art, has following beneficial effect:
(1) the utility model the utility model is by the magnetic field in water beam pipeline except descale, thus improves the cooling of water beam, reaches the object improving the water beam life-span; Electric magnetic incrustant remover generation electromagnetism particular by water beam pipe ends loosens and peels off already present incrustation scale, stops cooling water to produce incrustation scale blocking pipe, ensures that water pipe is unimpeded, guarantee tube-cooled efficiency, the life-span of prolongation water beam of wind leading wall;
(2) the utility model overcomes the deficiency of prior art level, corresponding electric magnetic incrustant remover and corresponding lifting arm group is provided with in water beam pipe ends, and water quality monitor the control system be connected in shaft furnace, it is simple, the easy to operate novel shaft furnace water beam of a kind of structure, the incrustation scale blockage problem existed in the cooling of existing water beam is fundamentally solved by physical field method, and do not endanger environment, easy to use;
(3) the utility model water beam agent structure is constant, has corresponding electric magnetic incrustant remover and corresponding lifting arm group in water beam pipe ends, and water quality monitor the control system be connected in shaft furnace; Water quality monitor and control system combine, determine whether as required to start electric magnetic incrustant remover, or determined irregularly by production actual conditions or regularly to pipeline carry out the scale removal work of existing incrustation scale, owing to being separation design, water beam global reliability increases, strong to controllings simple to operate such as scale removal module replacing maintenances, substantially increase shaft furnace production efficiency;
(4) produce electromagnetic field of high frequency in the pipeline of the utility model electric magnetic incrustant remover between water beam pipeline two ports, not be used in pipeline outer wall parcel coil, all have greater advantage in installation with in using, and be convenient to later maintenance;
(5) the utility model water beam pipe ends is by control system Synchronization Control, makes the position of Shui Liang both sides electric magnetic incrustant remover corresponding, ensures electric magnetic incrustant remover scale removal stability.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Label declaration in schematic diagram:
1, water beam pipeline; 2, lifting arm group; 3, electric magnetic incrustant remover; 4, control system; 5, water quality monitor.
Detailed description of the invention
For understanding content of the present utility model further, by reference to the accompanying drawings and embodiment the utility model is described in detail.
Embodiment 1
Composition graphs 1, a kind of shaft furnace water beam utilizing electromagnetism scale removal, it comprises water beam pipeline 1, it also comprises electric magnetic incrustant remover 3, control system 4, water quality monitor 5, wherein, one end of described water quality monitor 5 is arranged in water beam pipeline 1, the exit, two ends of described water beam pipeline 1 is provided with a lifting arm group 2, the other end of water quality monitor 5 and electric magnetic incrustant remover 3 are all arranged in lifting arm group 2, described water quality monitor 5 is connected with described control system 4 circuit, and described control system 4 is connected with electric magnetic incrustant remover 3 circuit.Water beam pipeline 1 two ends, by control system 4 Synchronization Control, make the position of water beam pipeline 1 both sides electric magnetic incrustant remover 3 corresponding, keep strokes, and ensure electric magnetic incrustant remover 3 scale removal stability.
The setting parallel to each other of every root water beam pipeline 1, the exit, two ends of water beam pipeline 1 is provided with lifting arm group 2, and the outlet place plane of lifting arm group 2 place plane and water beam pipeline 1 is parallel to each other.Control system 4 is arranged on the bottom of water beam pipeline 1 one end, the relevant device at control system 4 and water beam pipeline 1 two ends, and namely electric magnetic incrustant remover 3 and the equal circuit of water quality monitor 5 are connected.
Described lifting arm group 2 is provided with electric magnetic incrustant remover 3, electric magnetic incrustant remover 3 comprises coil, coil signal amplification module and drive motors, the output of coil signal amplification module is connected with coil, the input of coil signal amplification module is connected with the output of control system 4, and coil is parallel with the port cross-sectional face of water beam pipeline 1.Produce electromagnetic field of high frequency in the pipeline of electric magnetic incrustant remover 3 between water beam pipeline 1 two ports, not be used in pipeline outer wall parcel coil, all have greater advantage, convenient later maintenance in installation with in using.
Lifting arm group 2 is provided with electro-hydraulic device and walking track.Walking track is provided with electric magnetic incrustant remover 3, and electro-hydraulic device is connected with the drive motors of electric magnetic incrustant remover 3, drives electric magnetic incrustant remover 3 along walking rail moving by electro-hydraulic device.On walking track, adjust position by electric magnetic incrustant remover 3 and respectively scale removal is carried out to every root water beam pipeline 1.
Drive motors in water quality monitor 5 is all connected with electro-hydraulic device with stepper motor, drive water quality monitor 5 along walking rail moving by electro-hydraulic device, described electro-hydraulic device is connected with the output of control system 4, and water quality monitor 5 is connected with the input of control system 4.Control system 4 controls to collect the water monitoring data in the every root pipeline of process, namely the water electric conductivity in water beam pipeline 1, water temperature, pH value, hardness, viscosity and magnetic field, control electro-hydraulic device and drive electric magnetic incrustant remover 3, changes position and its operating frequency of electric magnetic incrustant remover 3, separately high frequency magnetic field magnetic scale is carried out to each root water beam pipeline 1, and aggregation process is carried out to data such as water beam tube-cooled data and water quality.
Water quality monitoring unit is also comprised in water quality monitor 5, water quality monitoring unit is connected with the stepper motor in water quality monitor 5, driving stepper motor water quality monitoring unit is mobile in water beam pipeline 1, monitoring water quality data index, water quality monitoring unit comprises conductivity measurement, temperature sensor, pH value detector and two film sensors, they are all connected with the input of control system 4.Conductivity measurement in water quality monitoring unit in water quality monitor 5, temperature sensor, pH value detector, water hardness monitor and two film sensors measure the water electric conductivity in water beam pipeline 1 respectively, water temperature, pH value, hardness and magnetic field, water quality monitoring unit also has the function of monitoring water quality viscosity in addition.
Control system 4 comprises single-chip microcomputer, signal output module, signal input module, wireless sending module; Water quality monitoring unit in water quality monitor 5 is connected with signal input module, signal input module is connected with the input of single-chip microcomputer, the output of single-chip microcomputer is connected with signal output module, signal output module is connected with the input of electro-hydraulic device and coil signal amplification module respectively, the output of single-chip microcomputer is also connected with wireless sending module, wireless receiving module outside shaft furnace receives the signal that wireless sending module sends, and wireless receiving module is connected with host computer by RS485; Signal output module is connected with the drive system of lifting arm group 2.
Water electric conductivity in the shaft furnace water beam pipeline that water quality monitoring unit records, water temperature, pH value and field signal, single-chip microcomputer is transferred to by the signal input module of control system 4, single-chip microcomputer carries out software process to data measured on the one hand, the drive motors that electro-hydraulic device drives electric magnetic incrustant remover 3 is controlled by signal output module, the drive motors of electric magnetic incrustant remover 3 drives electric magnetic incrustant remover 3 to move on walking track, scale removal is carried out to corresponding water beam pipeline 1, signal is also flowed to coil signal amplification module by signal output module by single-chip microcomputer, the coil controlling electric magnetic incrustant remover 3 produces changeable frequency, magnetic field intensity variable Magnetic Field on Water beam pipeline 1 carry out scale removal, on the other hand, single-chip microcomputer is by the water electric conductivity in shaft furnace water beam pipeline, water temperature, pH value and field signal are sent by wireless sending module, wireless receiving module outside shaft furnace receives the signal that wireless sending module sends, wireless receiving module is connected with host computer by RS485, host computer can store and show the water quality situation in water beam pipeline 1 in real time, in addition, electro-hydraulic device can drive the drive motors in water quality monitor 5, drive motors in water quality monitor 5 drives water quality monitor 5 on walking track, move up and down, simultaneously, electro-hydraulic device can drive the stepper motor in water quality monitor 5, and driving stepper motor water quality monitoring unit moves, and monitors the water quality in each water beam pipeline 1.To cooling water strong adaptability, the magnetic field intensity of electric magnetic incrustant remover 5 can be set according to condition of water quality (temperature, hardness, viscosity, pH value etc.); The drive systems lifting arm group 2 that single-chip microcomputer controls lifting arm group 2 by signal output module moves, in the horizontal direction to carry out scale removal to each water beam pipeline 1 within the scope of other.
Cooling water is after absorbing high-frequency electromagnetism field energy, hydrone is produced distortion as dipole by constantly repeatedly polarizing, distortion, reversion, vibration, form the water of active very strong unimolecule or the gregarious body state of little meaning, thus the dipole moment between enhancing hydrone, promote that water is to the effect becoming dirty material and component thereof, change the bonding state of the existing forms of deposited material and the physical property of relevant ions and hydrone and other ions in cooling water, make the time lengthening that fouling crystal deposition thing is separated out, and separate out with tiny unbodied particle, finally reach scale inhibition and loosen and peel off the incrustation scale generated.
Water is made up of an oxygen atom and two hydrogen atoms, in usual water, the hydrone of 80% is the form being become water clusters by hydrogen bond association, the dissolution degree of this water clusters to calcium carbonate (incrustation scale) is lower, so incrustation scale is easy to separate out, but during the magnetic field of the frequency identical with its natural frequency when applying one in water, hydrone can be caused to produce resonance, the result of resonance, hydrogen bond is disconnected, make the polar water molecules that water clusters becomes single, thus improve the reactivity of water and the solubility to incrustation scale, atomic little hydrone can permeate, dissolve, remove the incrustation scale that water beam inside has produced, meanwhile be free in calcium ion in water and carbanion collides mutually, form special calcium carbonate body, its surface is without electric charge, therefore, can not be adsorbed on pipeline again, thus reach scale removal, the object of antiscale.
Overcome the deficiency of prior art level, corresponding electric magnetic incrustant remover 3 and corresponding lifting arm group 2 is provided with at water beam pipeline 1 two ends, and water quality monitor 5 control system 4 be connected in shaft furnace, it is simple, the easy to operate novel shaft furnace water beam of a kind of structure, the incrustation scale blockage problem existed in the cooling of existing water beam is fundamentally solved by physical field method, and do not endanger environment, easy to use.
The utility model is by the magnetic field in water beam pipeline 1 except descale, thus improves the cooling of water beam, reaches the object improving the water beam life-span.Electric magnetic incrustant remover 3 particular by water beam pipeline 1 two ends produces electromagnetism and loosens and peel off already present incrustation scale, stops cooling water to produce incrustation scale blocking pipe.Guarantee water pipe is unimpeded, guarantees tube-cooled efficiency, extends the life-span of water beam of wind leading wall.
Water beam agent structure is constant, is provided with corresponding electric magnetic incrustant remover 3 and corresponding lifting arm group 2 at water beam pipeline 1 two ends, and water quality monitor 5 control system 4 be connected in shaft furnace.Water quality monitor 5 and control system 4 combine, determine whether as required to start electric magnetic incrustant remover 3, or determined irregularly by production actual conditions or regularly to pipeline carry out the scale removal work of existing incrustation scale, owing to being separation design, water beam global reliability increases, strong to controllings simple to operate such as scale removal module replacing maintenances, substantially increase shaft furnace production efficiency.
Schematically above be described the utility model and embodiment thereof, this description does not have restricted, and also just one of the embodiment of the present utility model shown in accompanying drawing, actual structure is not limited thereto.So, if those of ordinary skill in the art enlightens by it, when not departing from the utility model and creating aim, design the frame mode similar to this technical scheme and embodiment without creationary, protection domain of the present utility model all should be belonged to.

Claims (9)

1. one kind utilizes the shaft furnace water beam of electromagnetism scale removal, it comprises water beam pipeline (1), it is characterized in that, it also comprises electric magnetic incrustant remover (3), control system (4), water quality monitor (5), wherein, described water quality monitor (5) one end is arranged in water beam pipeline (1), the exit, two ends of described water beam pipeline (1) is provided with a lifting arm group (2), the other end of water quality monitor (5) and electric magnetic incrustant remover (3) are all arranged in lifting arm group (2), described water quality monitor (5) is connected with described control system (4) circuit, described control system (4) is connected with electric magnetic incrustant remover (3) circuit.
2. a kind of shaft furnace water beam utilizing electromagnetism scale removal according to claim 1, it is characterized in that, every root water beam pipeline (1) setting parallel to each other, the outlet place plane of lifting arm group (2) place plane and water beam pipeline (1) is parallel to each other.
3. a kind of shaft furnace water beam utilizing electromagnetism scale removal according to claim 2, it is characterized in that, electric magnetic incrustant remover (3) comprises coil, coil signal amplification module and drive motors, the output of coil signal amplification module is connected with coil, the input of coil signal amplification module is connected with the output of control system (4), and coil is parallel with the port cross-sectional face of water beam pipeline (1).
4. a kind of shaft furnace water beam utilizing electromagnetism scale removal according to claim 2, is characterized in that, described lifting arm group (2) is provided with electro-hydraulic device and walking track.
5. a kind of shaft furnace water beam utilizing electromagnetism scale removal according to claim 4, it is characterized in that, described walking track is provided with electric magnetic incrustant remover (3), electro-hydraulic device is connected with the drive motors of electric magnetic incrustant remover (3), drives electric magnetic incrustant remover (3) along walking rail moving by electro-hydraulic device.
6. a kind of shaft furnace water beam utilizing electromagnetism scale removal according to claim 1, is characterized in that, described control system (4) is arranged on the bottom of water beam pipeline (1) one end.
7. a kind of shaft furnace water beam utilizing electromagnetism scale removal according to claim 4, it is characterized in that, drive motors in described water quality monitor (5) is all connected with electro-hydraulic device with stepper motor, drive water quality monitor (5) along walking rail moving by electro-hydraulic device, described electro-hydraulic device is connected with the output of control system (4), and water quality monitor (5) is connected with the input of control system (4).
8. a kind of shaft furnace water beam utilizing electromagnetism scale removal according to claim 7, it is characterized in that, water quality monitoring unit is also comprised in described water quality monitor (5), water quality monitoring unit is connected with the stepper motor in water quality monitor (5), water quality monitoring unit comprises conductivity measurement, temperature sensor, pH value detector and two film sensors, they are all connected with the input of control system (4), conductivity measurement in water quality monitoring unit in water quality monitor (5), temperature sensor, pH value detector and two film sensors measure the water electric conductivity in water beam pipeline (1) respectively, water temperature, pH value and magnetic field.
9. a kind of shaft furnace water beam utilizing electromagnetism scale removal according to claim 1, it is characterized in that, described control system (4) comprises single-chip microcomputer, signal output module, signal input module and wireless sending module; Water quality monitoring unit in water quality monitor (5) is connected with signal input module, signal input module is connected with the input of single-chip microcomputer, the output of single-chip microcomputer is connected with signal output module, signal output module is connected with the input of electro-hydraulic device and coil signal amplification module respectively, the output of single-chip microcomputer is connected with wireless sending module, wireless receiving module outside shaft furnace receives the signal that wireless sending module sends, and wireless receiving module is connected with host computer by RS485; Signal output module is connected with the drive system of lifting arm group (2).
CN201520599599.5U 2015-08-11 2015-08-11 Utilize shaft furnace water bar of electromagnetism scale removal Expired - Fee Related CN204830827U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520599599.5U CN204830827U (en) 2015-08-11 2015-08-11 Utilize shaft furnace water bar of electromagnetism scale removal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520599599.5U CN204830827U (en) 2015-08-11 2015-08-11 Utilize shaft furnace water bar of electromagnetism scale removal

Publications (1)

Publication Number Publication Date
CN204830827U true CN204830827U (en) 2015-12-02

Family

ID=54688422

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520599599.5U Expired - Fee Related CN204830827U (en) 2015-08-11 2015-08-11 Utilize shaft furnace water bar of electromagnetism scale removal

Country Status (1)

Country Link
CN (1) CN204830827U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106403652A (en) * 2016-10-31 2017-02-15 安徽马钢输送设备制造有限公司 Shell-and-plate blast furnace evaporation air cooling system using soft water closed recirculation cooling system and plate scale treatment method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106403652A (en) * 2016-10-31 2017-02-15 安徽马钢输送设备制造有限公司 Shell-and-plate blast furnace evaporation air cooling system using soft water closed recirculation cooling system and plate scale treatment method thereof

Similar Documents

Publication Publication Date Title
CN203414012U (en) Underground water plate heat exchanger online backwashing device
CN104785466B (en) A kind of intelligent circulating cooling water- to-water heat exchanger automatic on-line purging system and method
CN202938691U (en) Condenser ball type automatic cleaning system
CN203197017U (en) Water supply and water return system of bar water-cooling device
CN103115521B (en) Device and method for tube type heat exchanger on-line washing
CN204830827U (en) Utilize shaft furnace water bar of electromagnetism scale removal
CN203364316U (en) Surface water natural cooling system
CN203501147U (en) Feed water treatment and regulation device for cement kiln low-temperature cogeneration system
CN203908396U (en) Device for cleaning heat exchanger rapidly
CN202990007U (en) Improved water supply system for high-temperature alloy production line
CN105157046A (en) Slag water overtemperature disposal system and control method
CN102032835A (en) Surface anti-scaling method for evaporator for brine
CN205762786U (en) A kind of magnetic suspension tube cleaning arrangement
CN102183008B (en) Coal economizer with high efficiency, corrosion resistance and hot dust erosion prevention
CN204514058U (en) Industrial circulating water heat-exchange system
CN203976489U (en) Recirculated water is softening treatment unit continuously
CN210506434U (en) Annealing line annealing stove steel roller cooling device anneals
CN102491539A (en) Descaling, antiscale and anticorrosion technology for condenser of heat power enterprise
CN208952480U (en) A kind of air-conditioning hydraulic module with descaling function
CN202915339U (en) Water-saving energy-saving device of converter heat recovery boiler
CN107726867B (en) A kind of vacuum drying oven discharge port material quickly cooling dust pelletizing system
CN207335528U (en) A kind of plate heat exchanger removes fouling device online
CN207348827U (en) A kind of quick anti-heating device for paraffin removal of oil well
CN205066161U (en) There is not water -soluble mining water supply system of dirt
CN202643792U (en) Vertical annealing furnace cooling water system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151202