CN106402488B - A kind of pipe fitting translation mechanical stage of Pipe installing - Google Patents

A kind of pipe fitting translation mechanical stage of Pipe installing Download PDF

Info

Publication number
CN106402488B
CN106402488B CN201610991131.XA CN201610991131A CN106402488B CN 106402488 B CN106402488 B CN 106402488B CN 201610991131 A CN201610991131 A CN 201610991131A CN 106402488 B CN106402488 B CN 106402488B
Authority
CN
China
Prior art keywords
pipeline
pedestal platform
pipe
anchor ear
clip slot
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610991131.XA
Other languages
Chinese (zh)
Other versions
CN106402488A (en
Inventor
路明
刘强
邵长明
阮照亮
陈纪河
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chen Jihe
Liu Qiang
Lu Ming
Ruan Zhaoliang
Shao Changming
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810120299.2A priority Critical patent/CN108458163A/en
Priority to CN201610991131.XA priority patent/CN106402488B/en
Priority to CN201810120297.3A priority patent/CN108458162A/en
Publication of CN106402488A publication Critical patent/CN106402488A/en
Application granted granted Critical
Publication of CN106402488B publication Critical patent/CN106402488B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water

Abstract

A kind of pipe fitting the present invention relates to Pipe installing translates mechanical stage.The pedestal platform both sides are respectively provided with guide rail bar, and clip slot grillage is stood on pedestal platform, and its interior both sides is connect by sliding block and guide rail bar phase groove;The clip slot plate is equipped with pin, is equipped with location hole at the top of pedestal platform, pin matches with location hole;Pedestal platform one end end is fixed with arc anchor ear by Z-shaped work block, on the arc anchor ear semi-circular in be punctured with support nail;Heating mantle is fixed with the top of the clip slot plate, pipeline one end is buckled in heating mantle in end, and pipeline other end end is erected on the support nail of arc anchor ear;The configuration of the present invention is simple, assembling are easy;Suitable for the installation of outdoor modeling tubing giving sufficient strength;Hot melting equipment is integrated with equipment, the pipeline mouth of pipe of installation can be heated in a short time, realizes that the fusion between pipeline and pipeline is docked;In addition this equipment stability is good, easy to be used under outdoor adverse circumstances.

Description

A kind of pipe fitting translation mechanical stage of Pipe installing
Technical field
A kind of pipe fitting the present invention relates to Pipe installing translates mechanical stage.
Background technology
Pipe installing is that full electromechanical equipment quotes new technology, and Pipe installing includes common data, tubing, pipe fitting, method Orchid, the connection of Pipe installing basic operation technology, pipeline, stent and compensator installation, valve, building water supply and drainage Pipe installing, confession Hot systems installation, pipeline pressure test and cleaning, common industrial Pipe installing, non-ferrous metal pipe and stainless steel pipes installation, commonly use The anti-corrosion of nonmetal pipeline and corrosion protective lining Pipe installing, instrument piping installation and pipeline and thermal insulation.Traditional Pipe installing step Suddenly:1st, tubing transports, and should clear up the barrier on road.Car transport must have heavy industry or loader to coordinate;Transported in hand truck fashion Pipe must be bound firm, whens handling rises and falls consistent;Not handy hand is transported with rolling bar and directly adjusts rolling bar, and pipe rolls front Must not someone.When tower crane is toward eminence fortune pipe, this code derrick crane pertinent regulations should be observed.Material, which is stacked to put, surely puts jail, no It must huddle and leave about.2nd, scoop tube material cut, ground, when picking flash, striking welding slag, operating personnel should wear safety goggles, and opposite forbids to have People.When the 3rd, simmering pipe, steel wire rope is firm in Guan Shangying bindings, and operating personnel must not stand in the inboard of steel wire rope or arbitrarily cross over steel wire Rope.Anchor and the stake that don't bother about must be firm.4th, during pipeline purging, outlet should set special messenger's monitoring.Purging and testing process In, it must not be installed or be overhauled.When the 5th, enduring pitch, pertinent regulations in " wasting lamp oil by not sleeping at night " in this code should be observed.When standpipe is installed the 6th, It should file an application before the bar-mat reinforcement or security protection cover board of reserved opening of pipe is opened to general contract unit, handling hole makes After knot formality.End of operation, which can be removed, to recover reserved opening security protection cover board, cover tightly jail.7th, install During cooling tower standpipe, the ring flange for last root pipe that upper end is connected with cooling tower.Again with cooling tower plastics method after must welding Blue disk connection.Before standpipe welding is installed, it is necessary to application fire syndrome, and set special messenger and see fire, get fire-fighting equipment, the hole of hoistway ready Asbestos cloth is watered using water to block up sternly, forbids Mars to drop to next layer.8th, trench or moist place pipe laying, lighting voltage must not More than 12V.Electric weld handle line forbids exposed and damaged operating personnel to wear insulated shoes, wear insulation (electric welding) gloves.9th, pipeline string During dynamic and counterpart, action will be coordinated, and hand must not be placed on the mouth of pipe and joint.10th, outdoors heating pipeline installation, pipe trench earthwork construction The pertinent regulations in this code " shoveling " should be observed.11st, the derusting and mopping of tubing, should carry out before the mounting.During disconnected tubing, Tubing should be clipped in pipe pressure twist, not handy parallel jaw;Pipe applications stent or hand rest are lived.During the sawed-off tubing of emery wheel, Pressure should be uniform, must not overexert, operating personnel should stand in the side of grinding wheel direction of rotation.
The content of the invention
A kind of pipe fitting the object of the present invention is to provide Pipe installing translates mechanical stage.
The present invention solves its above-mentioned technical problem and uses following technical solution:A kind of pipe fitting translation of Pipe installing Mechanical stage, it is mainly configured with:Pedestal platform, guide rail bar, sliding block, clip slot plate, pin, limiting plate, heating mantle, traction internal buckle, arc Shape anchor ear, support nail, Z-shaped work block, location hole, pipeline, the pedestal platform both sides are respectively provided with guide rail bar, and clip slot grillage stands on base On seat stand, and its interior both sides is connect by sliding block and guide rail bar phase groove;The clip slot plate is equipped with pin, is equipped with the top of pedestal platform Location hole, pin match with location hole;Pedestal platform one end end is fixed with arc anchor ear by Z-shaped work block, described Support nail is punctured with arc anchor ear semi-circular;
Heating mantle is fixed with the top of the clip slot plate, pipeline one end is buckled in heating mantle in end, pipeline other end end frame Stand on the support nail of arc anchor ear;
The pipe end end inner support has traction internal buckle;
One end of pedestal platform is equipped with limiting plate;
The support nail is equipped with steel ball with pipeline outer wall contact position.
Further, the traction internal buckle is held at inner-walls of duct mouth by the way of interior hydraulic buckling.
Further, the guide rail bar is equipped with graduated scale.
Further, wheel is housed under pedestal platform.
Beneficial effects of the present invention:Simple in structure, assembling is easily;Suitable for the installation of outdoor modeling tubing giving sufficient strength;Collect in equipment Into hot melting equipment, the pipeline mouth of pipe of installation can be heated in a short time, realizes that the fusion between pipeline and pipeline is docked;This Outer equipment stability is good, easy to be used under outdoor adverse circumstances.
Brief description of the drawings
Fig. 1 is that a kind of pipe fitting of Pipe installing of the present invention translates mechanical stage overall structure figure.
Fig. 2 is that a kind of pipe fitting of Pipe installing of the present invention translates mechanical stage detonation configuration figure.
1- pedestals platform in figure, 2- guide rail bars, 3- sliding blocks, 4- clip slot plates, 5- pins, 6- limiting plates, 7- heating mantles, 8- tractions Internal buckle, 9- arc anchor ears, 10- support nails, 11-Z word work blocks, 12- location holes, 13- pipelines.
Embodiment
1-2 makes a detailed explanation the embodiment of the present invention below in conjunction with the accompanying drawings.
Embodiment:A kind of pipe fitting translation mechanical stage of Pipe installing, it is mainly configured with:Pedestal platform 1, guide rail bar 2, sliding block 3rd, clip slot plate 4, pin 5, limiting plate 6, heating mantle 7, traction internal buckle 8, arc anchor ear 9, support nail 10, Z-shaped work block 11, location hole 12nd, pipeline 13,1 both sides of pedestal platform are respectively provided with guide rail bar 2, and clip slot plate 4 is erected on pedestal platform 1, and its interior both sides leads to Sliding block 3 is crossed to connect with 2 phase groove of guide rail bar;The clip slot plate 4 is equipped with pin 5, and the top of pedestal platform 1 is equipped with location hole 12, pin 5 Match with location hole 12;1 one end end of pedestal platform is fixed with arc anchor ear 9 by Z-shaped work block 11, and the arc is embraced Bind round on 9 semi-circulars and be punctured with support nail 10;
The top of clip slot plate 4 is fixed with heating mantle 7, and pipeline is buckled in heating mantle 7 in 13 one end end, and pipeline 13 is another End end is erected on the support nail 10 of arc anchor ear 9;
The 13 end end inner support of pipeline has traction internal buckle 8;
1 one end of pedestal platform is equipped with limiting plate 6;
The support nail 10 is equipped with steel ball with 13 outer wall contact position of pipeline.
The traction internal buckle 8 is held at 13 inner wall mouth of pipeline by the way of interior hydraulic buckling.
The guide rail bar 2 is equipped with graduated scale.
The pedestal platform is equipped with wheel 1 time.
Described for above-mentioned invention, whole implementation process carries out following elaboration:This mechanical equipment is for outdoor Modeling tubing giving sufficient strength is installed and used, and after its major function is field lofting, designated position, heating tempreature bulb are translated according to line bitmap The process of mouth, interception design length;Implementation steps are:Lifting pipeline to be mounted will be needed in pedestal platform by small-sized lifting machine On 1,13 one end end of pipeline is buckled into heating mantle 7 during lifting, other end is then held on the branch of arc anchor ear 9 On nail 10.Proceeded by after completing above-mentioned steps:The first step translates specific bit, and the preliminary of wheel is housed by pedestal platform 1 time The embedment position of this pipe laying is determined according to setting-out drawing.The second step heating hot melt mouth of pipe, opens the electricity in heating mantle 7 Heated filament is in hot melt state using 13 mouthfuls of walls of pipeline.3rd step buckles into traction internal buckle 8 in 13 other end of pipeline, passes through external force Draw pipeline 13 so that pipeline 13 is overall to be pulled out, and since guide rail bar 2 is equipped with graduated scale, is pulled out under external force traction 13 length of pipeline can be learnt by the graduated scale in guide rail bar 2, and according to design drawing, sawed-off pipeline 13 is to obtain design length It is required that.Need to buckle into pin 5 in location hole 12 before sawed-off pipeline 13, to reach the stability of an entirety.
Basic principle, main feature and the advantages of the present invention of the present invention has been shown and described above.The technology of the industry Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and the above embodiments and description only describe this The principle of invention, without departing from the spirit and scope of the present invention, various changes and modifications of the present invention are possible, these changes Change and improvement all fall within the protetion scope of the claimed invention.The claimed scope of the invention by appended claims and its Equivalent thereof.

Claims (4)

1. a kind of pipe fitting translation mechanical stage of Pipe installing, it is mainly configured with:Pedestal platform(1), guide rail bar(2), sliding block(3)、 Clip slot plate(4), pin(5), limiting plate(6), heating mantle(7), traction internal buckle(8), arc anchor ear(9), support nail(10), Z-shaped Work block(11), location hole(12), pipeline(13), it is characterised in that:Pedestal platform(1)Both sides are respectively provided with guide rail bar(2), clip slot plate (4)Erect in pedestal platform(1)On, and its interior both sides passes through sliding block(3)With guide rail bar(2)Phase groove connects;The clip slot plate(4)On Equipped with pin(5), pedestal platform(1)Top is equipped with location hole(12), pin(5)With location hole(12)Match;The pedestal Platform(1)One end end passes through Z-shaped work block(11)It is fixed with arc anchor ear(9), the arc anchor ear(9)It is punctured with semi-circular Support nail(10);
The clip slot plate(4)Top is fixed with heating mantle(7), pipeline(13)One end is buckled in heating mantle in end(7)It is interior, pipeline (13)Other end end is erected in arc anchor ear(9)Support nail(10)On;
The pipeline(13)The last inner support in end has traction internal buckle(8);
The pedestal platform(1)One end is equipped with limiting plate(6);
The support nail(10)With pipeline(13)Outer wall contact position is equipped with steel ball.
2. the pipe fitting translation mechanical stage of a kind of Pipe installing according to claim 1, it is characterised in that in the traction Button(8)Pipeline is held on by the way of interior hydraulic buckling(13)At inner wall mouth.
A kind of 3. pipe fitting translation mechanical stage of Pipe installing according to claim 1, it is characterised in that the guide rail bar (2)It is equipped with graduated scale.
A kind of 4. pipe fitting translation mechanical stage of Pipe installing according to claim 1, it is characterised in that the pedestal platform (1)Wheel is housed down.
CN201610991131.XA 2016-11-10 2016-11-10 A kind of pipe fitting translation mechanical stage of Pipe installing Expired - Fee Related CN106402488B (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CN201810120299.2A CN108458163A (en) 2016-11-10 2016-11-10 A kind of translation machine of water pipeline installation
CN201610991131.XA CN106402488B (en) 2016-11-10 2016-11-10 A kind of pipe fitting translation mechanical stage of Pipe installing
CN201810120297.3A CN108458162A (en) 2016-11-10 2016-11-10 A kind of translation device of municipal pipeline assembling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610991131.XA CN106402488B (en) 2016-11-10 2016-11-10 A kind of pipe fitting translation mechanical stage of Pipe installing

Related Child Applications (2)

Application Number Title Priority Date Filing Date
CN201810120297.3A Division CN108458162A (en) 2016-11-10 2016-11-10 A kind of translation device of municipal pipeline assembling
CN201810120299.2A Division CN108458163A (en) 2016-11-10 2016-11-10 A kind of translation machine of water pipeline installation

Publications (2)

Publication Number Publication Date
CN106402488A CN106402488A (en) 2017-02-15
CN106402488B true CN106402488B (en) 2018-05-15

Family

ID=59230523

Family Applications (3)

Application Number Title Priority Date Filing Date
CN201810120299.2A Pending CN108458163A (en) 2016-11-10 2016-11-10 A kind of translation machine of water pipeline installation
CN201810120297.3A Pending CN108458162A (en) 2016-11-10 2016-11-10 A kind of translation device of municipal pipeline assembling
CN201610991131.XA Expired - Fee Related CN106402488B (en) 2016-11-10 2016-11-10 A kind of pipe fitting translation mechanical stage of Pipe installing

Family Applications Before (2)

Application Number Title Priority Date Filing Date
CN201810120299.2A Pending CN108458163A (en) 2016-11-10 2016-11-10 A kind of translation machine of water pipeline installation
CN201810120297.3A Pending CN108458162A (en) 2016-11-10 2016-11-10 A kind of translation device of municipal pipeline assembling

Country Status (1)

Country Link
CN (3) CN108458163A (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018170636A1 (en) * 2017-03-18 2018-09-27 深圳市方鹏科技有限公司 Pipe installation robot

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2381612A1 (en) * 1977-02-23 1978-09-22 Drouvin Robert Jaws for heating thermoplastic pipe to be butt welded over a sleeve in - to ensure alignment of joints welded in the field
GB1537321A (en) * 1975-01-30 1978-12-29 Bergmann & Steffen Ohg Method and machine for machining tubes having a helical weld seam
EP0983819A1 (en) * 1998-08-31 2000-03-08 Walter Gensabella Device for laser cutting of profiled pipes
CN200998916Y (en) * 2007-02-06 2008-01-02 于际恒 Special tool for hot-melting pipe joint
CN104057194A (en) * 2014-06-12 2014-09-24 广东省工业技术研究院(广州有色金属研究院) Automatic-clamping and precise-positioning mechanism of pipeline in flash butt welding
CN104561997A (en) * 2015-01-16 2015-04-29 江苏永年激光成形技术有限公司 LCD machine tool applicable to integrated molding of nuclear power main pipeline table
CN104625548A (en) * 2013-11-13 2015-05-20 无锡新奇特钣金机械有限公司 Positioning fixture for machining pipeline
CN104942519A (en) * 2015-06-19 2015-09-30 江苏阳明船舶装备制造技术有限公司 Straight pipe correcting platform and straight pipe correcting method
CN105665943A (en) * 2016-04-20 2016-06-15 深圳市光大激光科技股份有限公司 Pipe clamping and transferring mechanism and integrated pipe and plate laser cutting machine with same
CN105921891A (en) * 2016-06-07 2016-09-07 济南大学 Tube supporting clamps
CN206130304U (en) * 2016-11-10 2017-04-26 杨飞 Pipe fitting translation machine tool platform of piping erection

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62197273A (en) * 1986-02-20 1987-08-31 Ishikawajima Harima Heavy Ind Co Ltd Pipe cutting machine
JP3929111B2 (en) * 1997-05-21 2007-06-13 大成建設株式会社 Insertion pressure maintenance device in pipe regeneration method

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1537321A (en) * 1975-01-30 1978-12-29 Bergmann & Steffen Ohg Method and machine for machining tubes having a helical weld seam
FR2381612A1 (en) * 1977-02-23 1978-09-22 Drouvin Robert Jaws for heating thermoplastic pipe to be butt welded over a sleeve in - to ensure alignment of joints welded in the field
EP0983819A1 (en) * 1998-08-31 2000-03-08 Walter Gensabella Device for laser cutting of profiled pipes
CN200998916Y (en) * 2007-02-06 2008-01-02 于际恒 Special tool for hot-melting pipe joint
CN104625548A (en) * 2013-11-13 2015-05-20 无锡新奇特钣金机械有限公司 Positioning fixture for machining pipeline
CN104057194A (en) * 2014-06-12 2014-09-24 广东省工业技术研究院(广州有色金属研究院) Automatic-clamping and precise-positioning mechanism of pipeline in flash butt welding
CN104561997A (en) * 2015-01-16 2015-04-29 江苏永年激光成形技术有限公司 LCD machine tool applicable to integrated molding of nuclear power main pipeline table
CN104942519A (en) * 2015-06-19 2015-09-30 江苏阳明船舶装备制造技术有限公司 Straight pipe correcting platform and straight pipe correcting method
CN105665943A (en) * 2016-04-20 2016-06-15 深圳市光大激光科技股份有限公司 Pipe clamping and transferring mechanism and integrated pipe and plate laser cutting machine with same
CN105921891A (en) * 2016-06-07 2016-09-07 济南大学 Tube supporting clamps
CN206130304U (en) * 2016-11-10 2017-04-26 杨飞 Pipe fitting translation machine tool platform of piping erection

Also Published As

Publication number Publication date
CN108458162A (en) 2018-08-28
CN108458163A (en) 2018-08-28
CN106402488A (en) 2017-02-15

Similar Documents

Publication Publication Date Title
CN206130304U (en) Pipe fitting translation machine tool platform of piping erection
US20050087662A1 (en) Collapsible hangers
CN108223912A (en) Underground space piping lane pipeline mounting construction method
CN104477755B (en) Method for rapidly hoisting suspended type vertical vessel
CN106402488B (en) A kind of pipe fitting translation mechanical stage of Pipe installing
CN104564130B (en) A kind of resistance to deformation fast-escape pipe
JP6338308B1 (en) Support
CN103775734B (en) Gas drainage pipeline system construction method under large-diameter well
CN205531271U (en) Hanging flower basket moving platform constructional device
CN211500610U (en) Quick-connection fracturing manifold sledge
CN204532415U (en) A kind of fast-escape pipe with deixis
CN206495691U (en) A kind of tunnel high-pressure air feed and the plumbing installation of lifesaving
CN204041102U (en) Life rescue device
CN212957453U (en) Trilateral fire resistive construction that covers of tuber pipe
CN209308379U (en) A kind of driven hanging basket balance weight mechanism
CN108729643A (en) A kind of overhanging type discharging platform steel wire rope drawknot tool
CN210129717U (en) Firewall cable wall-penetrating protective sleeve fixing device for comprehensive pipe rack
CN209510271U (en) Setting of casing mentions effect device
CN206857965U (en) The mobile device of casing elevator
CN111821627A (en) Fire-fighting emergency repair vehicle
CN207158618U (en) Pipeline welding lift hanger
CN214170617U (en) Ground connection structure of tunnel lining embedded channel
CN204299200U (en) Protector
CN201955199U (en) Pressure testing device for tail end of large-caliber water pipe
CN104528519A (en) Clamping tool for assisting in hoisting cement electric poles

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Lu Ming

Inventor after: Liu Qiang

Inventor after: Shao Changming

Inventor after: Ruan Zhaoliang

Inventor after: Chen Jihe

Inventor before: Yang Fei

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20180417

Address after: 255024 west two road, Zhangdian District, Zibo, Shandong Province, 35

Applicant after: Lu Ming

Applicant after: Liu Qiang

Applicant after: Shao Changming

Applicant after: Ruan Zhaoliang

Applicant after: Chen Jihe

Address before: 211800 No. 24, Yan Po village, Lin Pu village, Wujiang Town, Pukou District, Nanjing, Jiangsu

Applicant before: Yang Fei

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180515

Termination date: 20181110