CN106401587B - 一种防治底滑型冲击地压的方法 - Google Patents

一种防治底滑型冲击地压的方法 Download PDF

Info

Publication number
CN106401587B
CN106401587B CN201610914668.6A CN201610914668A CN106401587B CN 106401587 B CN106401587 B CN 106401587B CN 201610914668 A CN201610914668 A CN 201610914668A CN 106401587 B CN106401587 B CN 106401587B
Authority
CN
China
Prior art keywords
bottom plate
pressure relief
relief groove
plate pressure
bump
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610914668.6A
Other languages
English (en)
Other versions
CN106401587A (zh
Inventor
潘立友
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University of Science and Technology
Original Assignee
Shandong University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University of Science and Technology filed Critical Shandong University of Science and Technology
Priority to CN201610914668.6A priority Critical patent/CN106401587B/zh
Publication of CN106401587A publication Critical patent/CN106401587A/zh
Application granted granted Critical
Publication of CN106401587B publication Critical patent/CN106401587B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/18Methods of underground mining; Layouts therefor for brown or hard coal
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C37/00Other methods or devices for dislodging with or without loading
    • E21C37/06Other methods or devices for dislodging with or without loading by making use of hydraulic or pneumatic pressure in a borehole

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Remote Sensing (AREA)
  • Road Paving Structures (AREA)

Abstract

本发明公开了一种防治底滑型冲击地压的方法,首先在采煤工作面巷道中,对存在发生底滑型冲击地压区段,在巷道底角开挖底板卸压槽;要求底板卸压槽的开挖方向垂直巷道方向,且一半高度处于底板岩层中;再在该区段中垂直于巷道方向间隔布置辅助卸压钻孔;最后在两个底板卸压槽中间位置打注水孔,向注水孔内动压注水,注水后使煤层软化、降低冲击倾向性。本发明方法将起到冲击地压能量分割、引导、煤层软化的综合作用,实现主次有序释放能量,从根本上降低冲击地压冲击倾向性、破坏性;同时,底板卸压槽区域持续释放能量,有效防控底滑型冲击地压。

Description

一种防治底滑型冲击地压的方法
技术领域
本发明属于煤矿开采技术领域。
背景技术
我国煤矿有许多高冲击地压倾向的煤层。煤矿冲击地压发生的地质条件复杂,不但三硬煤层(顶板硬、煤层硬、底板硬)发生冲击地压,而且在软底板结构的硬煤层同样发生强冲击地压,随着煤矿开采深度的增加,这种冲击地压数量不断增加,已严重制约着煤矿的安全生产。理论与实践证明,当开采深度超过一定临界深度,特别是深度超过1000m的矿井,这种底板岩层相对较软、煤体强度较硬的煤层具有冲击危险性强,在剧烈的采掘扰动条件下会发生严重的破坏性冲击地压,这种类型的冲击能量释放有别于一般意义下的冲击地压。这种冲击地压的防治有别于常规类型,采用常规措施难以防范。由于底板岩层具有“软滑”特征,会产生“强烈”的底滑型破坏,由于巷道底板属于支护相对较弱部位,如果受到工作面动态应力场的强烈扰动作用,极易发生规模大、破坏严重的冲击地压。这种冲击地压现象称为底滑型冲击地压。
底滑型冲击地压主要发生在高应力分布广、能量场范围大的区域。包括留有底煤、遇水软化底板等区域,会频繁发生底滑型冲击地压。我国的开滦矿区、东北矿区、山能矿区等老矿井,开采深度最大已达到1500m,开采深度超过800m的矿井普遍存在。因此,针对这种深部开采、软底板与硬冲击煤层,需要发明一种消除底板冲击、且能量有序释放的防控冲击地压的方法,对防控这种特殊条件下的冲击地压灾害具有重要意义。
发明内容
本发明的目的是针对软底板、硬冲击煤层、采深大的煤矿容易发生底滑型冲击地压灾害的问题,提出一种能有序释放冲击能量的防治冲击地压的方法。
本发明的技术方案是:
一种防治底滑型冲击地压的方法,步骤如下:
第一步、开挖底板卸压槽
在采煤工作面巷道中,对存在发生底滑型冲击地压区段,每间隔40-50m,在巷道底角开挖深度5m、宽度0.5-0.8m、高度0.6-1.0m的底板卸压槽;要求底板卸压槽的开挖方向垂直巷道方向,且一半高度处于底板岩层中;
第二步、施工辅助卸压钻孔
开挖底板卸压槽后,再在该区段中垂直于巷道方向间隔布置辅助卸压钻孔,辅助卸压钻孔间隔距离1.0m、距离底板高度0.6-0.8m、钻孔直径115mm,深度15-18m,辅助卸压钻孔可将底槽两侧煤层能量导向至底板卸压槽内;
第三步、注水软化
在两个底板卸压槽中间位置打注水孔,注水孔距离底板高度1.0-1.2m、孔深30m、孔直径65-70mm,然后向注水孔内动压注水,注水后使煤层软化、降低冲击倾向性。
本发明的积极效果是:上述三种措施实施后,将起到冲击地压能量分割、引导、煤层软化的综合作用,实现主次有序释放能量,从根本上降低冲击地压冲击倾向性、破坏性;同时,底板卸压槽区域持续释放能量,有效防控底滑型冲击地压。
附图说明
下面结合附图说明本发明的实施。
图1是本发明实施例的平面布置图示意图;
图2是图1A部剖面放大图,图中显示底板卸压槽的位置情况;
图3是本发明实施例的立面布置图示意图。
具体实施方式
如图1、图2、图3所示的本发明防治底滑型冲击地压的方法,步骤如下:
一、开挖底板卸压槽
在采煤工作面巷道中,对存在发生底滑型冲击地压区段,每间隔40-50m,(图1显示50m)在巷道底角开挖深度5m、宽度0.5-0.8m、高度0.6-1.0m的底板卸压槽;要求底板卸压槽的开挖方向垂直巷道方向,且一半高度处于底板岩层中;如图2所示,高度0.8m时有0.4m处于底板岩层中;
二、施工辅助卸压钻孔
开挖底板卸压槽后,再在该区段中垂直于巷道方向间隔布置辅助卸压钻孔,辅助卸压钻孔间隔距离1.0m、距离底板高度0.6-0.8m(图3显示0.8m)、钻孔直径115mm,深度15-18m,辅助卸压钻孔可将底槽两侧煤层能量导向至底板卸压槽内;
三、注水软化
在两个底板卸压槽中间位置打注水孔,注水孔距离底板高度1.0-1.2m(图3显示1.2m)、孔深30m、孔直径65-70mm,然后向注水孔内动压注水,注水后使煤层软化、降低冲击倾向性。

Claims (1)

1. 一种防治底滑型冲击地压的方法,其特征在于,步骤如下:
第一步、开挖底板卸压槽
在采煤工作面巷道中,对存在发生底滑型冲击地压区段,每间隔40-50m,在巷道底角开挖深度5m、宽度0.5-0.8m、高度0.6-1.0m的底板卸压槽;要求底板卸压槽的开挖方向垂直巷道方向,且一半高度处于底板岩层中;
第二步、施工辅助卸压钻孔
开挖底板卸压槽后,再在该区段中垂直于巷道方向间隔布置辅助卸压钻孔,辅助卸压钻孔间隔距离1.0m、距离底板高度0.6-0.8m、钻孔直径115mm、深度15-18m,辅助卸压钻孔可将底板卸压槽两侧煤层能量导向至底板卸压槽内;
第三步、注水软化
在两个底板卸压槽中间位置打注水孔,注水孔距离底板高度1.0-1.2m、孔深30m、孔直径65-70mm,然后向注水孔内动压注水,注水后使煤层软化、降低冲击倾向性。
CN201610914668.6A 2016-10-20 2016-10-20 一种防治底滑型冲击地压的方法 Expired - Fee Related CN106401587B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610914668.6A CN106401587B (zh) 2016-10-20 2016-10-20 一种防治底滑型冲击地压的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610914668.6A CN106401587B (zh) 2016-10-20 2016-10-20 一种防治底滑型冲击地压的方法

Publications (2)

Publication Number Publication Date
CN106401587A CN106401587A (zh) 2017-02-15
CN106401587B true CN106401587B (zh) 2019-05-17

Family

ID=58012723

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610914668.6A Expired - Fee Related CN106401587B (zh) 2016-10-20 2016-10-20 一种防治底滑型冲击地压的方法

Country Status (1)

Country Link
CN (1) CN106401587B (zh)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108952809B (zh) * 2018-07-11 2020-01-14 黑龙江科技大学 一种利用能量引导防治冲击地压的方法

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102678120A (zh) * 2012-05-18 2012-09-19 河南大有能源股份有限公司 冲击地压卸压解危方法

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1664310A (zh) * 2005-02-28 2005-09-07 清华大学 煤矿孤岛煤柱冲击地压控制方法
CN1804374B (zh) * 2006-01-06 2010-12-01 山东科技大学 煤矿长壁工作面顺槽冲击地压防治方法
CN101713290B (zh) * 2009-12-10 2012-04-18 天地科技股份有限公司 煤矿深部全煤巷道冲击地压解危方法
CN101915098A (zh) * 2010-07-14 2010-12-15 中国矿业大学 水力割缝防治冲击地压的方法
CN102296958A (zh) * 2011-07-22 2011-12-28 山东科技大学 人造空间缺陷体防治冲击地压方法
CN102322262A (zh) * 2011-09-12 2012-01-18 山东科技大学 煤矿孤岛煤柱顺槽冲击地压控制方法

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102678120A (zh) * 2012-05-18 2012-09-19 河南大有能源股份有限公司 冲击地压卸压解危方法

Also Published As

Publication number Publication date
CN106401587A (zh) 2017-02-15

Similar Documents

Publication Publication Date Title
AU2018330958B2 (en) Method for rock burst prevention by active support reinforcement and active pressure relief
CN104533467B (zh) 一种高承压水、断层破碎巷道的支护方法
CN110173264B (zh) 断顶与常规卸压防治坚硬顶板留巷冲击地压方法
CN102678120B (zh) 冲击地压卸压解危方法
CN113404535B (zh) 一种煤矿井上下水力压裂防治冲击地压的方法
CN111305876A (zh) 深部巷道锚固-劈裂注浆-水力压裂卸压协同控制方法
CN106761902B (zh) 一种适用于软岩保护层开采的立体综合卸压瓦斯抽采方法
CN106894816A (zh) 基于三角板结构模型的远场关键层切顶卸压护巷方法
CN107740707A (zh) 一种深部高承压水下厚煤层开采水害防治方法
CN110344831B (zh) 切顶卸压无煤柱沿空自成巷留巷方法
AU2021106168A4 (en) High-gas Coal Seam Group Pressure Relief Mining Method Based on Gob-side Entry Retaining in the First Mining Whole Rock Pressure Relief Working Face
CN112780340A (zh) 一种煤矿井上下区域超前防治冲击地压的方法
CN110924945A (zh) 侧向悬顶冲击地压条件下的安全工作方法
CN111255453A (zh) 一种缩小地下采矿区地表沉陷范围的方法
CN102226412B (zh) 井下暗采动钻井瓦斯抽采方法
CN109630113B (zh) 采动覆岩水力割缝与离层注浆结合的地表沉陷控制方法
CN106401587B (zh) 一种防治底滑型冲击地压的方法
CN110454164A (zh) 冲击矿压巷道缓冲吸能带水力预置方法
CN112031772B (zh) 一种利用高压水射流诱导上覆残留煤柱整体破坏的方法
CN109736876A (zh) 采动体涌出瓦斯顶板大直径定向长钻孔抽采方法
CN111677514B (zh) 顶板弱化方法
CN101886546B (zh) 一种用于煤矿井下锚杆锚索巷道抑制顶板变形的方法
CN106285777B (zh) 大水矿山矿房超前放水的方法
CN110847909B (zh) 一种减少采煤工作面回采末期回撤通道顶板压力的方法
Cheng et al. De-stressed mining of multi-seams: Surrounding rock control during the mining of a roadway in the overlying protected seam

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190517

Termination date: 20211020