CN109630113B - 采动覆岩水力割缝与离层注浆结合的地表沉陷控制方法 - Google Patents

采动覆岩水力割缝与离层注浆结合的地表沉陷控制方法 Download PDF

Info

Publication number
CN109630113B
CN109630113B CN201811395238.3A CN201811395238A CN109630113B CN 109630113 B CN109630113 B CN 109630113B CN 201811395238 A CN201811395238 A CN 201811395238A CN 109630113 B CN109630113 B CN 109630113B
Authority
CN
China
Prior art keywords
roadway
mpa
rock stratum
hydraulic
hard rock
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201811395238.3A
Other languages
English (en)
Other versions
CN109630113A (zh
Inventor
廉旭刚
蔡音飞
胡海峰
戴华阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taiyuan University of Technology
Original Assignee
Taiyuan University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taiyuan University of Technology filed Critical Taiyuan University of Technology
Priority to CN201811395238.3A priority Critical patent/CN109630113B/zh
Publication of CN109630113A publication Critical patent/CN109630113A/zh
Application granted granted Critical
Publication of CN109630113B publication Critical patent/CN109630113B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/18Methods of underground mining; Layouts therefor for brown or hard coal

Abstract

本发明涉及采矿领域,特别涉及矿井的地表沉陷控制领域。采动覆岩水力割缝与离层注浆结合的地表沉陷控制方法,根据钻孔柱状图确定厚岩层的位置和厚岩层的单向抗压强度;在矿井工作面的巷道顶板上方进行水力割缝,水力割缝钻孔在空间上垂直于巷道,水力割缝钻孔与巷道在采空区侧的夹角为αg,水力割缝钻孔从巷道顶板到厚岩层下方在竖直方向的高度为Hg,根据厚岩层的单向抗压强度确定αg,当单向抗压强度大于等于35 MPa小于50 MPa时,αg=70°,当单向抗压强度大于等于50 MPa小于65 MPa时,αg=80°,当单向抗压强度大于等于65 MPa时,αg=90°;在地表处于矿井工作面的巷道的中心位置采用钻孔向厚硬岩层下方的离层空间注浆。

Description

采动覆岩水力割缝与离层注浆结合的地表沉陷控制方法
技术领域
本发明涉及采矿领域,特别涉及矿井的地表沉陷控制领域。
背景技术
在我国大多数煤矿采用垮落法来管理顶板,地下煤层开采引起覆岩移动与变形,并传递至地表形成下沉盆地,其影响范围较大,对沉陷区的地表建(构)筑物等造成了破坏。协调开采、条带开采、充填开采、离层注浆等方法多年来被用于控制与减缓地表沉陷,其基本思路是,通过减小或控制地下采空区或裂隙形成的空间,以达到减缓或改变岩层与地表移动变形与分布的目的。存在着充填成本高,工艺复杂的问题。按研究(关注)对象不同,沉陷控制可以分为岩层移动控制(覆岩破坏高度控制、底板破坏范围控制、采矿地压控制)和地表移动控制(地表下沉量或变形量控制、移动变形分布控制、移动变形速度控制),岩层移动控制一定程度上也是地表移动控制,两者目标不同,控制方法上既有差别又有密切联系。
发明内容
本发明所要解决的技术问题是:如何对矿井的地表沉陷进行控制。
本发明所采用的技术方案是:采动覆岩水力割缝与离层注浆结合的地表沉陷控制方法,按照如下的步骤进行
步骤一、根据矿井所在地的地质报告确定矿井的巷道上方岩层的钻孔柱状图,并根据钻孔柱状图确定厚岩层的位置和厚岩层的单向抗压强度;
步骤二、在矿井工作面的巷道顶板上方进行水力割缝,水力割缝钻孔在空间上垂直于巷道,水力割缝钻孔与巷道在采空区侧的夹角为αg,水力割缝钻孔从巷道顶板到厚岩层下方在竖直方向的高度为Hg,根据厚岩层的单向抗压强度确定αg,当单向抗压强度大于等于35 MPa小于50 MPa时,αg=70°,当单向抗压强度大于等于50 MPa小于65 MPa时,αg=80°,当单向抗压强度大于等于65 MPa时,αg=90°,水力割缝钻孔到厚硬岩层下方边界(即水力割缝钻孔上部紧靠厚硬岩层),不能穿过厚硬岩层;
步骤三、在地表处于矿井工作面的巷道的中心位置采用钻孔向厚硬岩层下方的离层空间注浆。
如图2所示,在没有注浆的条件下,改变水力割缝角度,研究离层空间的发育状态。现有技术:无水力割缝形成的下沉曲线,影响的范围较大。而采用水力割缝后,地表下沉形态发生明显变化,当αg=90°时,下沉集中控制效果最好,覆岩内部离层空间较大程度被压实,说明剩余的离层空间较小,当αg=70、80°,下沉锐减,下沉集中控制的效果不明显,覆岩离层空间未能较大程度被压实,形成较大的离层空间。
如图3所示,与现有的无割缝技术相比,当αg=90°时,在厚硬岩层存在的情况下,其割断与否,地表下沉曲线分布截然不同,割断对地表集中控制下沉显著。说明了厚硬岩层割断后,离层空间被碎胀岩体一定程度的充填,造成了地表下沉集中。因此根据岩性来确定水力割缝的角度,
Figure DEST_PATH_IMAGE001
厚硬岩层抗压强度较大时,其极限破断的距离最大,此时αg=90°,
Figure 161511DEST_PATH_IMAGE002
随着厚硬岩层抗压强度的减小,其极限破断的距离减小,此时采用保持厚硬岩层不断裂,采用αg=70°、80°,使得离层空间保持稳定,以便于注浆充填。
本发明的有益效果是:本发明通过水力割缝和钻孔注浆,有效避免了沉陷区的形成,对已经沉陷区避免了进一步的沉陷。
附图说明
图1是本发明的结构示意图;
图2是在没有注浆的条件下,改变水力割缝地表下沉曲线分布图;
图3是在厚硬岩层存在的情况下,水力割缝割到不同位置地表下沉曲线分布图。
具体实施方式
如图1所示,当采矿区上方具有重要的保护对象,为了充分开采资源,已经确定厚硬岩层的位置Hg,并确定其抗压强度为66Mpa,经过判断为C类坚硬岩层,从而确定水力割缝钻孔角度为αg=90°。参数确定后,在工作面巷道进行水力割缝施工,使得离层空间形成。离层空间在形成的过程中,可以在采空区中心地表进行钻孔施工,并注浆(采用现有技术注浆即可)。通过充填离层空间的方法来控制地表的下沉。

Claims (1)

1.采动覆岩水力割缝与离层注浆结合的地表沉陷控制方法,其特征在于:按照如下的步骤进行
步骤一、根据矿井所在地的地质报告确定矿井的巷道上方岩层的钻孔柱状图,并根据钻孔柱状图确定厚硬 岩层的位置和厚硬 岩层的单向抗压强度;
步骤二、在矿井工作面的巷道顶板上方进行水力割缝,水力割缝钻孔在空间上垂直于巷道,水力割缝钻孔与巷道在采空区侧的夹角为αg,水力割缝钻孔从巷道顶板到厚硬 岩层下方在竖直方向的高度为Hg,根据厚硬 岩层的单向抗压强度确定αg,当单向抗压强度大于等于35 MPa小于50 MPa时,αg=70°,当单向抗压强度大于等于50 MPa小于65 MPa时,αg=80°,当单向抗压强度大于等于65 MPa时,αg=90°,水力割缝钻孔到厚硬岩层下方边界,不能穿过厚硬岩层;
步骤三、在地表处于矿井工作面的巷道的中心位置采用钻孔向厚硬岩层下方的离层空间注浆。
CN201811395238.3A 2018-11-22 2018-11-22 采动覆岩水力割缝与离层注浆结合的地表沉陷控制方法 Active CN109630113B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811395238.3A CN109630113B (zh) 2018-11-22 2018-11-22 采动覆岩水力割缝与离层注浆结合的地表沉陷控制方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811395238.3A CN109630113B (zh) 2018-11-22 2018-11-22 采动覆岩水力割缝与离层注浆结合的地表沉陷控制方法

Publications (2)

Publication Number Publication Date
CN109630113A CN109630113A (zh) 2019-04-16
CN109630113B true CN109630113B (zh) 2020-09-08

Family

ID=66068946

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811395238.3A Active CN109630113B (zh) 2018-11-22 2018-11-22 采动覆岩水力割缝与离层注浆结合的地表沉陷控制方法

Country Status (1)

Country Link
CN (1) CN109630113B (zh)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110472273B (zh) * 2019-07-01 2021-04-16 中国矿业大学 一种覆岩垂向离层预测方法
CN111255453B (zh) * 2020-03-10 2021-10-01 安徽理工大学 一种缩小地下采矿区地表沉陷范围的方法
CN112392507B (zh) * 2020-11-26 2022-10-04 太原理工大学 一种复合离层顶板巷道阶梯锚杆组支护设备及方法

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105569659A (zh) * 2015-12-25 2016-05-11 中国矿业大学 一种巷道水力割缝定向爆破切顶卸压方法
CN107989613A (zh) * 2017-11-14 2018-05-04 太原理工大学 一种覆岩离层分区隔离注浆充填开采煤层全部回采方法

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102654054B (zh) * 2011-12-09 2015-07-15 王志强 错层位内错式巷道布置采场垮落带高度的确定方法
CN107165676B (zh) * 2017-06-26 2019-02-22 中国矿业大学 岩层控制的三位一体监测方法
CN107816352A (zh) * 2017-10-16 2018-03-20 安徽理工大学 一种水力切割硬厚顶板卸压防冲的方法
CN108708723A (zh) * 2018-05-02 2018-10-26 中国矿业大学 一种煤岩柱交替支撑无煤柱充填开采减沉方法
CN108756944B (zh) * 2018-05-29 2019-10-08 中国煤炭地质总局勘查研究总院 采煤过程中控制地表塌陷的方法

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105569659A (zh) * 2015-12-25 2016-05-11 中国矿业大学 一种巷道水力割缝定向爆破切顶卸压方法
CN107989613A (zh) * 2017-11-14 2018-05-04 太原理工大学 一种覆岩离层分区隔离注浆充填开采煤层全部回采方法

Also Published As

Publication number Publication date
CN109630113A (zh) 2019-04-16

Similar Documents

Publication Publication Date Title
CN105422170B (zh) 一种建筑基础下中深采空区注浆加固处理方法
CN107989614B (zh) 一种回采上盘围岩破碎的急倾斜厚矿体的采矿方法
CN103953343B (zh) 一种对煤层坚硬顶板控制放顶的方法
CN110242301A (zh) 一种顶板含水层两步骤注浆改性保水采煤方法
CN112096380B (zh) 一种高强度开采岩层运移注浆控制及注浆量计算方法
CN113404535B (zh) 一种煤矿井上下水力压裂防治冲击地压的方法
CN109630113B (zh) 采动覆岩水力割缝与离层注浆结合的地表沉陷控制方法
CN108343418B (zh) 从地表定向水压致裂预裂基岩控制采动影响范围的方法
CN100560937C (zh) 一种薄基岩浅埋煤层长壁工作面保水开采方法
CN108361011B (zh) 从井下巷道定向水力压裂控制采动影响范围的方法
CN106869966B (zh) 一种离层水补给源的封堵方法
CN112879011B (zh) 一种含水层下坚硬覆岩预裂弱化控制导水裂缝带高度方法
CN107740707A (zh) 一种深部高承压水下厚煤层开采水害防治方法
AU2021106168A4 (en) High-gas Coal Seam Group Pressure Relief Mining Method Based on Gob-side Entry Retaining in the First Mining Whole Rock Pressure Relief Working Face
WO2014187171A1 (zh) 一种高突煤层穿层钻孔网络化加固方法
CN107387082A (zh) 一种弱化煤层坚硬顶板的方法
CN103953386A (zh) 一种上堵下渗抽采采动区瓦斯的方法
CN104775816A (zh) 切眼侧局部压煤覆岩隔离注浆充填不迁村开采方法
US11732548B2 (en) Ground double-hole combined water inrush prevention method for overlying strata movement monitoring and bed separation water drainage
CN106089291A (zh) 一种协同抽采垮落式老空区及下煤层煤层气的方法
CN105239964A (zh) 保护层卸压井上下立体化煤与煤层气协调开发方法
CN111255453A (zh) 一种缩小地下采矿区地表沉陷范围的方法
CN113914862A (zh) 切顶卸压无煤柱自成巷开采设计与评价方法
CN109869150A (zh) 一种矿山资源分段全采局充开采方法
CN113700483A (zh) 一种地面钻井卸压的多煤层冲击矿压防治方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant