CN106401504A - 一种新型手动防顶卡瓦 - Google Patents
一种新型手动防顶卡瓦 Download PDFInfo
- Publication number
- CN106401504A CN106401504A CN201610927006.2A CN201610927006A CN106401504A CN 106401504 A CN106401504 A CN 106401504A CN 201610927006 A CN201610927006 A CN 201610927006A CN 106401504 A CN106401504 A CN 106401504A
- Authority
- CN
- China
- Prior art keywords
- tile
- slide block
- swing arm
- handle
- flange
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B19/00—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
- E21B19/10—Slips; Spiders ; Catching devices
Abstract
本发明涉及一种手动防顶卡瓦,其中壳体的两侧对称设置有夹板;夹板为倾斜布置且中部开设有滑槽;第一瓦片和第二瓦片分别通过第一滑块和第二滑块活动连接在夹板上;第一滑块通过第一摇臂与摆臂活动连接;摆臂通过驱动轴连接有手柄;壳体的底部还设置有法兰;法兰靠近边缘位置上开设有螺栓孔;壳体上还设置有第二摇臂、锁紧盘、调节槽、固定螺栓和调节手柄,锁紧盘通过第二摇臂与第二滑块连接;锁紧盘上设置有弧形的调节槽;调节手柄通过固定螺栓连接在调节槽上。本发明的技术方案通过倾斜布置的滑槽及活动瓦片,可以解决卡紧上顶的石油管道;还设置了调节和锁紧机构,可以实现对石油管道的夹紧及位置锁定,起到避免管道飞出事故。
Description
技术领域
本发明涉及机械设备领域,尤其涉及一种手动防顶卡瓦。
背景技术
油田在作业过程中,有时井下管柱上的封隔器未解封直接用大钩上提管柱,对井下部的浅层气由于抽吸作用,集聚到井下对井下管柱形成上顶力,当井下管柱较少时,有可能使管柱飞出,为防止油井内钻孔飞出造成伤人等事故,所以需要一种防止钻杆上顶的装置,保证油田井口工作的人员及设备安全。
发明内容
本发明目的是为了克服现有技术的不足而提供一种结构合理、调节灵活的手动防顶卡瓦。
为达到上述目的,本发明采用了如下技术方案。
一种手动防顶卡瓦,包括壳体、夹板、滑槽、第一瓦片、第二瓦片、第一滑块、第二滑块、第一摇臂、摆臂、驱动轴、手柄、法兰和螺栓孔,所述壳体的两侧对称设置有夹板;所述夹板为倾斜布置且中部开设有滑槽;所述第一瓦片和第二瓦片分别通过第一滑块和第二滑块活动连接在所述夹板上;所述第一滑块通过第一摇臂与摆臂活动连接;所述摆臂通过驱动轴连接有手柄;所述壳体的底部还设置有法兰;所述法兰靠近边缘位置上开设有螺栓孔。
作为本发明的进一步改进,所述壳体上还设置有锁紧组件,所述锁紧组件包括第二摇臂、锁紧盘、调节槽、固定螺栓和调节手柄,所述锁紧盘通过第二摇臂与第二滑块连接;所述锁紧盘上设置有弧形的调节槽;所述调节手柄通过固定螺栓连接在所述调节槽上。
作为本发明的进一步改进,所述第一瓦片和第二瓦片均为耐磨材料制成。
本发明具有的有益技术效果:本发明的技术方案通过采用倾斜布置夹板和可上下滑动的瓦片,由于是有锥度的斜面,可以实现在夹在瓦片之间的石油管道在上顶时,瓦片越向上移动则夹紧力度越大直至紧紧卡住管道,防止由于管道上顶甚至飞出时,给现象人员造成伤害,保证了现象工作人员的安全;本技术方案还设置了手动调节的手柄及锁紧组件,可以实现人工对石油管道紧张夹紧,而且可以实现瓦片位置锁定的功能,具有功能多样、调节灵活、操作简单的有益技术效果。
附图说明
下面结合附图对本发明技术方案作进一步说明。
附图1为本发明的结构示意图。
图中:1.壳体;2.夹板;3.滑槽;4.第一瓦片;5.第二瓦片;6.第一滑块;7.第二滑块;8.第一摇臂;9.摆臂;10.驱动轴;11.手柄;12.法兰;13.螺栓孔;14.第二摇臂;15.锁紧盘;16.调节槽;17.固定螺栓;18.调节手柄。
具体实施方式
下面结合附图及具体实施例对本发明作进一步的详细说明。
如附图1所示的本发明所述的一种手动防顶卡瓦,包括壳体1、夹板2、滑槽3、第一瓦片4、第二瓦片5、第一滑块6、第二滑块7、第一摇臂8、摆臂9、驱动轴10、手柄11、法兰12、螺栓孔13、第二摇臂14、锁紧盘15、调节槽16、固定螺栓17和调节手柄18,所述壳体1的两侧对称设置有夹板2;所述夹板2为倾斜布置且中部开设有滑槽3;所述第一瓦片4和第二瓦片5分别通过第一滑块6和第二滑块7活动连接在所述夹板2上;所述第一滑块6通过第一摇臂8与摆臂9活动连接;所述摆臂9通过驱动轴10连接有手柄11;所述壳体1的底部还设置有法兰12;所述法兰12靠近边缘位置上开设有螺栓孔13;所述壳体1上还设置有第二摇臂14、锁紧盘15、调节槽16、固定螺栓17和调节手柄18,所述锁紧盘15通过第二摇臂14与第二滑块7连接;所述锁紧盘15上设置有弧形的调节槽16;所述调节手柄18通过固定螺栓17连接在所述调节槽16上;所述第一瓦片4和第二瓦片5均为耐磨材料制成。
实际使用时,当石油提升管路发现越来越轻最后已无重量时,即不可再往上提,此时应将手动防顶卡瓦安装在井口上,通过法兰12固定后,下压左侧的手柄11,摆臂9的动作会通过第一摇臂8传递到第一瓦片4上,第一瓦片4及第二瓦片5就会沿着滑槽3向上移动,由于第一瓦片4和第二瓦片5的间距缩小,进而就会紧紧夹持住管道;当管道夹紧后,为防止管道的松动,可以通过摆动调节手柄18锁定此时第一瓦片4和第二瓦片5的位置。
以上仅是本发明的具体应用范例,对本发明的保护范围不构成任何限制。凡采用等同变换或者等效替换而形成的技术方案,均落在本发明权利保护范围之内。
Claims (3)
1.一种手动防顶卡瓦,其特征在于:包括壳体、夹板、滑槽、第一瓦片、第二瓦片、第一滑块、第二滑块、第一摇臂、摆臂、驱动轴、手柄、法兰和螺栓孔,所述壳体的两侧对称设置有夹板;所述夹板为倾斜布置且中部开设有滑槽;所述第一瓦片和第二瓦片分别通过第一滑块和第二滑块活动连接在所述夹板上;所述第一滑块通过第一摇臂与摆臂活动连接;所述摆臂通过驱动轴连接有手柄;所述壳体的底部还设置有法兰;所述法兰靠近边缘位置上开设有螺栓孔。
2.根据权利要求1所述的一种手动防顶卡瓦,其特征在于:所述壳体上还设置有锁紧组件,所述锁紧组件包括第二摇臂、锁紧盘、调节槽、固定螺栓和调节手柄,所述锁紧盘通过第二摇臂与第二滑块连接;所述锁紧盘上设置有弧形的调节槽;所述调节手柄通过固定螺栓连接在所述调节槽上。
3.根据权利要求1所述的一种手动防顶卡瓦,其特征在于:所述第一瓦片和第二瓦片均为耐磨材料制成。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610927006.2A CN106401504A (zh) | 2016-10-31 | 2016-10-31 | 一种新型手动防顶卡瓦 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610927006.2A CN106401504A (zh) | 2016-10-31 | 2016-10-31 | 一种新型手动防顶卡瓦 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106401504A true CN106401504A (zh) | 2017-02-15 |
Family
ID=58011737
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610927006.2A Pending CN106401504A (zh) | 2016-10-31 | 2016-10-31 | 一种新型手动防顶卡瓦 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106401504A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111395985A (zh) * | 2020-04-10 | 2020-07-10 | 长江岩土工程总公司(武汉) | 钻杆三爪夹持器及其使用方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2777180Y (zh) * | 2005-01-10 | 2006-05-03 | 河北华北石油荣盛机械制造有限公司 | 自紧式防顶卡瓦 |
CN203257347U (zh) * | 2013-05-23 | 2013-10-30 | 长沙探矿机械厂 | 一种钻机钻杆的卡盘 |
CN204225800U (zh) * | 2014-11-14 | 2015-03-25 | 中国石油大学(北京) | 一种可拆装石油管柱的液压动力卡瓦 |
CN204386511U (zh) * | 2014-11-12 | 2015-06-10 | 霸州市石大宏盛石化机械有限责任公司 | 一种立式油管防顶卡瓦 |
CN105422021A (zh) * | 2015-12-23 | 2016-03-23 | 西安秦森科技有限公司 | 一种平动式折线形导轨液动卡瓦 |
CN206256886U (zh) * | 2016-10-31 | 2017-06-16 | 江苏恒达机械制造有限公司 | 一种新型手动防顶卡瓦 |
-
2016
- 2016-10-31 CN CN201610927006.2A patent/CN106401504A/zh active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2777180Y (zh) * | 2005-01-10 | 2006-05-03 | 河北华北石油荣盛机械制造有限公司 | 自紧式防顶卡瓦 |
CN203257347U (zh) * | 2013-05-23 | 2013-10-30 | 长沙探矿机械厂 | 一种钻机钻杆的卡盘 |
CN204386511U (zh) * | 2014-11-12 | 2015-06-10 | 霸州市石大宏盛石化机械有限责任公司 | 一种立式油管防顶卡瓦 |
CN204225800U (zh) * | 2014-11-14 | 2015-03-25 | 中国石油大学(北京) | 一种可拆装石油管柱的液压动力卡瓦 |
CN105422021A (zh) * | 2015-12-23 | 2016-03-23 | 西安秦森科技有限公司 | 一种平动式折线形导轨液动卡瓦 |
CN206256886U (zh) * | 2016-10-31 | 2017-06-16 | 江苏恒达机械制造有限公司 | 一种新型手动防顶卡瓦 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111395985A (zh) * | 2020-04-10 | 2020-07-10 | 长江岩土工程总公司(武汉) | 钻杆三爪夹持器及其使用方法 |
CN111395985B (zh) * | 2020-04-10 | 2023-08-18 | 长江岩土工程有限公司 | 钻杆三爪夹持器及其使用方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104563912B (zh) | 一种钻井管柱自动化操作系统 | |
US20110259602A1 (en) | Christmas tree installation using coiled tubing injector | |
CN109322628B (zh) | 小修井口无人化作业装备 | |
US2589159A (en) | Hold-down slip assembly | |
NO20076198L (no) | Fremgangsmate og apparat for kontinuerlig injisering av fluid i en bronnboring samtidig med at sikker ventil operasjon opprettholdes | |
US4035012A (en) | Dual elevators | |
CN206256886U (zh) | 一种新型手动防顶卡瓦 | |
CN106401504A (zh) | 一种新型手动防顶卡瓦 | |
CN113153190A (zh) | 一种多相流节流压力控制装置及方法 | |
US20200141193A1 (en) | Elevator with a Tiltable Housing for Lifting Tubulars of Various Sizes | |
CN105715220B (zh) | 一种钻井控压系统 | |
CN105822237A (zh) | 用于修井的小吨位液压吊卡 | |
US20130025105A1 (en) | Blowout preventer head removal tools and methods | |
CN204283373U (zh) | 一种水力喷砂射孔节流管汇 | |
CN206801514U (zh) | 一种高效压裂井口装置 | |
CN209244530U (zh) | 一种卡盘用新型操作手把机构 | |
US1343426A (en) | Casing-head top | |
CN208502714U (zh) | 油水井的测试用井口装置 | |
CN206942691U (zh) | 一种多功能组合修井自动操作井口装置 | |
CN209780812U (zh) | 锁紧装置及石油设备 | |
CN203948052U (zh) | 一种气动翻转吊卡 | |
CN207161011U (zh) | 一种自动修井机游动滑车组合机械臂 | |
CN112049583A (zh) | 一种液压修井装置 | |
US20060108124A1 (en) | Casing alignment tool | |
CN202017467U (zh) | 抽油杆吊卡 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170215 |