A kind of construction method of environment-friendly type assembled grouting behind shaft or drift lining steel cylinder pile foundation Download PDF

Info

Publication number
CN106400832B
CN106400832B CN201611073523.4A CN201611073523A CN106400832B CN 106400832 B CN106400832 B CN 106400832B CN 201611073523 A CN201611073523 A CN 201611073523A CN 106400832 B CN106400832 B CN 106400832B
Authority
CN
China
Prior art keywords
stake
cylinder
environment
friendly type
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611073523.4A
Other languages
Chinese (zh)
Other versions
CN106400832A (en
Inventor
周鲲
陈霖华
梅志凌
程育林
徐满华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Jingyan Electric Power Design Co ltd
State Grid Corp of China SGCC
State Grid Hunan Electric Power Co Ltd
Economic and Technological Research Institute of State Grid Hunan Electric Power Co Ltd
Original Assignee
Hunan Transmission & Distribution Investigation Design And Consultation Co Ltd
Economic and Technological Research Institute of State Grid Hunan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Transmission & Distribution Investigation Design And Consultation Co Ltd, Economic and Technological Research Institute of State Grid Hunan Electric Power Co Ltd filed Critical Hunan Transmission & Distribution Investigation Design And Consultation Co Ltd
Priority to CN201611073523.4A priority Critical patent/CN106400832B/en
Publication of CN106400832A publication Critical patent/CN106400832A/en
Application granted granted Critical
Publication of CN106400832B publication Critical patent/CN106400832B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/44Foundations for machines, engines or ordnance
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a kind of environment-friendly type assembled grouting behind shaft or drift lining steel cylinder pile foundation, including stake cylinder, the stake cylinder is sequentially assembled in an axial direction by multiple tube couplings;The stake cylinder is embedded in foundation pit, and periphery has poured concrete or cement mortar, inside filling spoir, and upper end is equipped with the connector being connect with shaft tower tower leg, and bottom end is equipped with the anchor pole for being anchored at bottom of foundation ditch.A kind of construction method of environment-friendly type assembled grouting behind shaft or drift lining steel cylinder pile foundation is also disclosed, is included the following steps:Artificial or machinery digs foundation pit;Construction stake bottom anchor pole, tube coupling assembly form stake cylinder, and the connector being connect with tower leg is installed in stake cylinder upper end;Casting concrete or cement mortar between foundation pit side-wall and stake cylinder;With earthen backfill steel cylinder stake hollow parts.Process of the present invention is simple, is convenient for constructing operation, can realize that factory modularization produces, simple for production, high precision machining is easy to assembly, and economic benefit, social benefit are notable, there is preferable promotional value.

Description

A kind of construction method of environment-friendly type assembled grouting behind shaft or drift lining steel cylinder pile foundation
Technical field
The present invention relates to Electric Design technical field more particularly to a kind of environment-friendly type assembled grouting behind shaft or drift lining steel cylinder pile foundation and Its construction method.
Background technology
Currently, the construction of China's ultra-high-tension power transmission line remains in based on manpower, and the state supplemented by machinery, construction machinery Change degree is low.Construction equipment is simple, and personnel's operation intensity is big, efficiency is low, dangerous higher.As economic society is fast-developing, One line construction personnel is in short supply, and labor cost persistently increases, and the form of construction work of manpower-intensive type is unsustainable, with transmission line of electricity The research of the development of design, overall process mechanized construction is also more and more important.For response State Grid Corporation of China " amphitypy three is new " Construction requirements, provide one kind can batch production processing, assembled construction, reduce live " wet construction ", realize that environmental protection construction, raising are applied Work efficiency rate promotes site machineryization construction, reduces labour's input, reduces site safety risk, improve the electric power of construction quality Pole and tower foundation is a current problem urgently to be resolved hurrily.
Invention content
That one of the objects of the present invention is to provide a kind of processes is simple, convenient for construction, spoir is few and the environment-friendly type of short time limit Assembled grouting behind shaft or drift lining steel cylinder pile foundation.
For this purpose, it includes stake cylinder that the present invention, which proposes a kind of environment-friendly type assembled grouting behind shaft or drift lining steel cylinder pile foundation, the stake cylinder by Multiple tube couplings are sequentially assembled in an axial direction;The stake cylinder is embedded in foundation pit, and periphery has poured concrete or cement mortar, interior Portion fills spoir, and upper end is equipped with the connector being connect with shaft tower tower leg, and bottom end is equipped with the anchor pole for being anchored at bottom of foundation ditch.
Wherein, two adjacent tube couplings are realized by flange and are connected.
Several stiffeners are welded on the inner wall of each tube coupling.
The connector is pyramid holder;Pyramid holder one end is spirally connected with the stiffener on the tube coupling of stake cylinder top, separately One end is stretched out outside foundation pit, and is connected with pyramid rack plate, and the pyramid rack plate is equipped with the spiral shell being connect with shaft tower tower leg Pit.
Wherein, stake cylinder bottom welding steel, and anchor bolt hole is reserved on the steel plate, the anchor pole and the stake cylinder Bottom steel plate is spirally connected fixation.
Wherein, stake cylinder and connection bolt density are not more than 7850kg/m3, Q235 grades or more.
Wherein, stake cylinder, flange, pyramid holder and connection bolt surface are using spray zinc processing.
Wherein, concrete or cement mortar density are not more than 2450kg/m3, compression strength is not less than C20, in 1% hydrochloric acid Outside is without dusting and crackle after solution impregnates 120 hours.
Another object of the present invention is to provide a kind of construction method of environment-friendly type assembled grouting behind shaft or drift lining steel cylinder pile foundation, packets Include following steps:
1) artificial or machinery digs foundation pit, and clear bottom is levelling;
2) construction stake bottom anchor pole is fixed the tube coupling of bottommost with anchor pole, successively by one by anchor rod anchored in bottom of foundation ditch Tube coupling forms stake cylinder together by apical grafting above and below flange, and to which stake cylinder to be embedded in foundation pit, stake cylinder and shaft tower tower leg are connected The connector connect is installed on the tube coupling of top;
3) casting concrete or cement mortar between foundation pit side-wall and stake cylinder;
4) earthen backfill steel cylinder stake hollow parts are used.
The advantageous effect of technical solution of the present invention is:The present invention is assembled in construction by by stake cylinder subsection setup, no Only process is simple, is convenient for constructing operation, and has saved a large amount of artificial, shortens the construction period;Stake hollow parts backfill a large amount of spoirs, energy Enough reduce soil erosion;Single stake cylinder unit weight is lighter, can be controlled in 40kg~100kg, is readily transported;Stake cylinder can be in factory It is prefabricated into various sizes of section and length on demand, realizes that factory modularization production, simple for production, high precision machining, bolt are spelled Dress, it is easy to assembly;Steel tower is connect with basis by pyramid holder, can flexible modulation basis appear height.Therefore, economic benefit, Social benefit is notable, there is preferable promotional value.
Description of the drawings
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is the sectional view of the line A-A along Fig. 1;
Fig. 3 is the structural schematic diagram of anchor pole in the present invention;
Fig. 4 is the structural schematic diagram of stake cylinder unit connecting flange in the present invention;
Fig. 5 is pyramid rack plate structural schematic diagram in the present invention;
Wherein:1- cylinders;2- concrete or cement mortar;Banket body in 3-;4- anchor poles;5- flanges;6- pyramid top of support Plate;7- pyramid holders, 8- stiffeners.
Specific implementation mode
Below in conjunction with the drawings and specific embodiments, the present invention is further illustrated.
As Figure 1-Figure 5, environment-friendly type assembled grouting behind shaft or drift lining steel cylinder pile foundation provided by the present invention, including stake cylinder 1, institute It is sequentially assembled by 6 sections of tube couplings to state stake cylinder 1;Several stiffeners 8 are also welded on the inner wall of each tube coupling, to increase stake cylinder Intensity improves bearing capacity;Each adjacent tube coupling is spirally connected fixation by being welded on the flange 5 at both ends;The stake cylinder 1 is embedded in base In hole, 1 top surface of stake cylinder is substantially concordant with foundation pit opening face;Periphery has poured concrete or cement mortar 2, and inside fills the soil body 3, Upper end is equipped with the pyramid holder 7 being connect with shaft tower tower leg, and bottom end is equipped with the vertical anchor pole 4 for being anchored at prefabricated bottom of foundation ditch.This reality It applies in example, stake cylinder 1 and connection bolt density are not more than 7850kg/m3, Q235 grades or more;Stake cylinder 1, flange 5, pyramid holder 7 and Bolt surface is connected using spray zinc processing;Concrete or 2 density of cement mortar are not more than 2450kg/m3, compression strength is not less than C20, outside is not less than 60 years without dusting and crackle, service life after 1% hydrochloric acid solution impregnates 120 hours;The body 3 that inside bankets is in Hard plastic state.
As shown in Figure 1 and Figure 5, in the angle steel and stake cylinder top tube coupling that the bottom of pyramid holder 7 passes through four holder supporting legs Stiffener be threadedly coupled, top is stretched out outside foundation pit, and by the angle steel of four holder supporting legs and being welded under pyramid rack plate 6 Cross junction steel plate be bolted fixation.
As shown in figures 1 and 3,1 bottom of stake cylinder is welded with steel plate, and the steel plate makes the closing of stake cylinder bottom opening in flat Bottom Shape reserves anchor bolt through-hole on the steel plate, and 4 one end outer wall of the anchor pole is equipped with connection screw thread, and the anchor pole 4 is upper It is equipped with limit convex shoulder in connection screw thread bottom end, the anchor pole 4 is installed in anchor bolt hole, and is fastenedly connected by nut.
The concrete construction method of environment-friendly type assembled grouting behind shaft or drift lining steel cylinder pile foundation of the present invention is as follows:
1) artificial or machinery digs foundation pit, and clear bottom is levelling;
2) tube coupling of bottommost and anchor pole are spirally connected fixation, by anchor rod anchored in bottom of foundation ditch by one by construction stake bottom anchor pole Section section tube coupling forms stake cylinder together by apical grafting above and below flange, to which stake cylinder is embedded in foundation pit, the tube coupling at the top of stake cylinder It is upper to weld the connector being connect with shaft tower tower leg;
3) casting concrete or cement mortar between foundation pit side-wall and stake cylinder;
4) earthen backfill steel cylinder stake hollow parts are used.
Herein according to specifically exemplary embodiments describe the present invention.Those skilled in the art is come It says and is carrying out replacement appropriate without departing from the scope of the invention or changing will be apparent.Exemplary embodiment is only It is illustrative, rather than limiting the scope of the present invention, the scope of the present invention is defined by the appended.

Claims (8)

1. a kind of construction method of environment-friendly type assembled grouting behind shaft or drift lining steel cylinder pile foundation, which is characterized in that after the environment-friendly type assembled The construction method of slip casting steel cylinder pile foundation, including stake cylinder (1), the stake cylinder (1) are sequentially assembled in an axial direction by multiple tube couplings; The stake cylinder (1) is embedded in foundation pit, and periphery has poured concrete or cement mortar (2), inside filling spoir, upper end be equipped with The connector of shaft tower tower leg connection, bottom end are equipped with the anchor pole (4) for being anchored at bottom of foundation ditch;
Include the following steps:
1) artificial or machinery digs foundation pit, and clear bottom is levelling;
2) construction stake bottom anchor pole is fixed the tube coupling of bottommost with anchor pole, then successively by one by anchor rod anchored in bottom of foundation ditch Tube coupling forms stake cylinder together by apical grafting above and below flange, and to which stake cylinder to be embedded in foundation pit, stake cylinder and shaft tower tower leg are connected The connector connect is installed on the tube coupling of top;
3) casting concrete or cement mortar between foundation pit side-wall and stake cylinder;
4) earthen backfill steel cylinder stake hollow parts are used.
2. the construction method of environment-friendly type assembled grouting behind shaft or drift lining steel cylinder pile foundation according to claim 1, it is characterised in that:Phase Two adjacent tube couplings are realized by flange (5) and are connected.
3. the construction method of environment-friendly type assembled grouting behind shaft or drift lining steel cylinder pile foundation according to claim 1 or 2, feature exist In:Several stiffeners are welded on the inner wall of each tube coupling.
4. the construction method of environment-friendly type assembled grouting behind shaft or drift lining steel cylinder pile foundation according to claim 3, it is characterised in that:Institute It is pyramid holder (7) to state connector;Described pyramid holder (7) one end is spirally connected with the stiffener in the tube coupling of stake cylinder top, the other end It stretches out outside foundation pit, and connects with pyramid rack plate (6), the pyramid rack plate (6) is equipped with to be connect with shaft tower tower leg Threaded hole.
5. the construction method of environment-friendly type assembled grouting behind shaft or drift lining steel cylinder pile foundation according to claim 4, it is characterised in that:Institute Stake cylinder (1) bottom welding steel is stated, and reserves anchor bolt hole on the steel plate, the anchor pole (4) and stake cylinder (1) bottom steel Plate is spirally connected fixation.
6. the construction method of environment-friendly type assembled grouting behind shaft or drift lining steel cylinder pile foundation according to claim 5, it is characterised in that:Stake Cylinder (1) and connection bolt density are not more than 7850kg/m3, Q235 grades or more.
7. the construction method of environment-friendly type assembled grouting behind shaft or drift lining steel cylinder pile foundation according to claim 6, it is characterised in that:Stake Cylinder (1), flange (5), pyramid holder (7) and connection bolt surface are using spray zinc processing.
8. the construction method of environment-friendly type assembled grouting behind shaft or drift lining steel cylinder pile foundation according to claim 1 or 2, feature exist In:Concrete or cement mortar (3) density are not more than 2450kg/m3, compression strength is not less than C20, in the immersion of 1% hydrochloric acid solution Outside is without dusting and crackle after 120 hours.
CN201611073523.4A 2016-11-29 2016-11-29 A kind of construction method of environment-friendly type assembled grouting behind shaft or drift lining steel cylinder pile foundation Active CN106400832B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611073523.4A CN106400832B (en) 2016-11-29 2016-11-29 A kind of construction method of environment-friendly type assembled grouting behind shaft or drift lining steel cylinder pile foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611073523.4A CN106400832B (en) 2016-11-29 2016-11-29 A kind of construction method of environment-friendly type assembled grouting behind shaft or drift lining steel cylinder pile foundation

Publications (2)

Publication Number Publication Date
CN106400832A CN106400832A (en) 2017-02-15
CN106400832B true CN106400832B (en) 2018-08-10

Family

ID=58084210

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611073523.4A Active CN106400832B (en) 2016-11-29 2016-11-29 A kind of construction method of environment-friendly type assembled grouting behind shaft or drift lining steel cylinder pile foundation

Country Status (1)

Country Link
CN (1) CN106400832B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109083151A (en) * 2018-08-15 2018-12-25 庐江荣睿建设工程有限公司 A kind of stratum pre-reinforcement processing method of basement construction
CN110106910A (en) * 2019-06-12 2019-08-09 中国电力工程顾问集团西南电力设计院有限公司 A kind of major diameter manually digging hole steel-pipe pile for mountain area overhead transmission line

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04285211A (en) * 1991-03-14 1992-10-09 Asahi Chem Ind Co Ltd Foundation structure of building
JP2006328716A (en) * 2005-05-24 2006-12-07 Shimizu Corp Structure and method for underpinning of existing structure and method of constructing new structure near existing structure
CN101250880A (en) * 2007-12-19 2008-08-27 中铁大桥局集团第一工程有限公司 Method for embedding and fixing steel tube concrete pile and steel tube pile anchor
CN204125963U (en) * 2014-10-11 2015-01-28 浙江鸿顺实业有限公司 A kind of communication tower steel pipe pile foundation
CN204780979U (en) * 2015-07-16 2015-11-18 江苏省邮电规划设计院有限责任公司 Install steel -pipe pile basis of anti horizontal force of iron tower fast
CN204898706U (en) * 2015-08-14 2015-12-23 华信咨询设计研究院有限公司 Steel pipe pile foundation communication tower structure
CN206204985U (en) * 2016-11-29 2017-05-31 湖南送变电勘察设计咨询有限公司 A kind of environment-friendly type assembled grouting behind shaft or drift lining steel cylinder pile foundation

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04285211A (en) * 1991-03-14 1992-10-09 Asahi Chem Ind Co Ltd Foundation structure of building
JP2006328716A (en) * 2005-05-24 2006-12-07 Shimizu Corp Structure and method for underpinning of existing structure and method of constructing new structure near existing structure
CN101250880A (en) * 2007-12-19 2008-08-27 中铁大桥局集团第一工程有限公司 Method for embedding and fixing steel tube concrete pile and steel tube pile anchor
CN204125963U (en) * 2014-10-11 2015-01-28 浙江鸿顺实业有限公司 A kind of communication tower steel pipe pile foundation
CN204780979U (en) * 2015-07-16 2015-11-18 江苏省邮电规划设计院有限责任公司 Install steel -pipe pile basis of anti horizontal force of iron tower fast
CN204898706U (en) * 2015-08-14 2015-12-23 华信咨询设计研究院有限公司 Steel pipe pile foundation communication tower structure
CN206204985U (en) * 2016-11-29 2017-05-31 湖南送变电勘察设计咨询有限公司 A kind of environment-friendly type assembled grouting behind shaft or drift lining steel cylinder pile foundation

Also Published As

Publication number Publication date
CN106400832A (en) 2017-02-15

Similar Documents

Publication Publication Date Title
CN103867019B (en) Assembling external prestressing RPC wind power tower
CN103075158B (en) Steel plate and steel reinforced concrete well wall
CN203755778U (en) Assembly external pre-stress reactive powder concrete wind power tower
CN108035376B (en) Anti-deformation rectification foundation applicable to goaf site wind turbine generator and construction method thereof
CN108914961B (en) Communication iron tower foundation adopting spiral anchors and construction method
CN105155572A (en) Cast-in-place pre-stressed anchor cable draught fan foundation system and construction method thereof
CN106400832B (en) A kind of construction method of environment-friendly type assembled grouting behind shaft or drift lining steel cylinder pile foundation
CN107964979A (en) A kind of transmission line of electricity combining structure assembled cushion cap anchor rod foundation
CN106958259B (en) A kind of concrete towers column foundation and its construction method
CN203613533U (en) Reinforced prestressed pipe pile
CN204849806U (en) Steel pipe pole for transmission line
CN206035725U (en) Mix steel tower frame and wind generating set
CN206204985U (en) A kind of environment-friendly type assembled grouting behind shaft or drift lining steel cylinder pile foundation
CN205577187U (en) Prefabricated steel pipe concrete constructional column rammed earth wall
CN104674839A (en) Foundation structure for wind-driven generator
CN204690563U (en) A kind of novel device for promoting concrete plate
CN207714358U (en) A kind of transmission line of electricity composite structure assembled cushion cap anchor rod foundation
CN205046569U (en) Annular wind -powered electricity generation foundation structure based on shaping of two ripple steel cylinder
CN105155573A (en) Offshore wind turbine barrel-in-barrel foundation
CN204825924U (en) Square steel tube concrete waist rail
CN207794761U (en) A kind of large bending moment electrical pole
CN209603166U (en) A kind of shaft tower screw pile
CN208618381U (en) The construction operation platform repaired for electric power pylon in water
CN209243711U (en) A kind of compacted thread major diameter cylinder stake and its pile-forming apparatus
CN105714844A (en) Compound foundation for power transmission tower

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 410015 Room 1411, 226 Electricity Building, Labor West Road, Changsha City, Hunan Province

Co-patentee after: ECONOMIC TECHNOLOGY RESEARCH INSTITUTE, STATE GRID HUNAN ELECTRIC POWER Co.,Ltd.

Patentee after: Hunan Jingyan Electric Power Design Co.,Ltd.

Address before: 410015 Room 1411, 226 Electricity Building, Labor West Road, Changsha City, Hunan Province

Co-patentee before: ECONOMIC TECHNOLOGY RESEARCH INSTITUTE, STATE GRID HUNAN ELECTRIC POWER Co.,Ltd.

Patentee before: HUNAN TRANSMISSION & DISTRIBUTION INVESTIGATION DESIGN AND CONSULTATION Co.,Ltd.

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 410015 room 1411, building 226, labour West Road, Changsha, Hunan

Co-patentee after: STATE GRID HUNAN ELECTRIC POWER COMPANY LIMITED ECONOMIC TECHNOLOGY Research Institute

Patentee after: Hunan Jingyan Electric Power Design Co.,Ltd.

Address before: 410015 room 1411, building 226, labour West Road, Changsha, Hunan

Co-patentee before: ECONOMIC TECHNOLOGY RESEARCH INSTITUTE, STATE GRID HUNAN ELECTRIC POWER Co.,Ltd.

Patentee before: Hunan Jingyan Electric Power Design Co.,Ltd.

CP01 Change in the name or title of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20191031

Address after: 410004 No. 398 Xinshao East Road, Tianxin District, Changsha City, Hunan Province

Co-patentee after: Hunan Jingyan Electric Power Design Co.,Ltd.

Patentee after: STATE GRID HUNAN ELECTRIC POWER Co.,Ltd.

Co-patentee after: STATE GRID HUNAN ELECTRIC POWER COMPANY LIMITED ECONOMIC TECHNOLOGY Research Institute

Co-patentee after: STATE GRID CORPORATION OF CHINA

Address before: 410015 room 1411, building 226, labour West Road, Changsha, Hunan

Co-patentee before: STATE GRID HUNAN ELECTRIC POWER COMPANY LIMITED ECONOMIC TECHNOLOGY Research Institute

Patentee before: Hunan Jingyan Electric Power Design Co.,Ltd.

TR01 Transfer of patent right